|
Data Tanggal 05 Oktober 2026 , 11:27:38 |
| No |
Unit / Fakultas |
Bulan Belanja |
MAK |
Item RBA |
Tgl. SPP |
No. SPP |
Tgl. SP2D |
No. SP2D |
Jumlah Belanja |
Lama Proses |
Keterangan |
| 1 |
UPA Perpustakaan |
Februari 2026 |
537112 |
Pengadaan kipas angin tempel |
2026-03-12 |
02/UN47.E1/SPP-GUP1/KU/2026 |
2026-04-09 |
0709M |
Rp. 8.000.000 |
28 Hari |
|
| 2 |
UPA Perpustakaan |
Agustus 2026 |
537112 |
Pengadaan Komputer |
2026-08-27 |
022/UN47.E1/SPP-LS5/KU/2026 |
2026-09-10 |
2239M |
Rp. 212.200.000 |
14 Hari |
|
| 3 |
UPA Perpustakaan |
Mei 2026 |
537112 |
Pengadaan AC standing floor |
2026-04-20 |
011/UN47.E1/SPP-LS1/KU/2026 |
2026-05-04 |
0973M |
Rp. 44.436.061 |
14 Hari |
|
| 4 |
UPA Perpustakaan |
September 2026 |
537112 |
Pengadaan AC standing floor |
2026-09-08 |
024/UN47.E1/SPP-LS6/KU/2026 |
2026-09-11 |
2261M |
Rp. 88.799.000 |
3 Hari |
|
| 5 |
UPA Perpustakaan |
Februari 2026 |
525114 |
Pemeliharaan Listrik |
2026-03-12 |
05/UN47.E1/SPP-GUP1/KU/2026 |
2026-04-09 |
0712M |
Rp. 289.000 |
28 Hari |
|
| 6 |
UPA Perpustakaan |
Mei 2026 |
525114 |
Pemeliharaan Listrik |
2026-05-21 |
012/UN47.E1/SPP-GUP3/KU/2026 |
2026-06-30 |
1392M |
Rp. 16.000.000 |
40 Hari |
|
| 7 |
UPA Perpustakaan |
September 2026 |
525114 |
Pemeliharaan Listrik |
2026-09-28 |
031/UN47.E1/SPP-GUP7/KU/2026 |
|
|
Rp. 1.450.000 |
7 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 05 Oktober 2026 (7 Hari) |
| 8 |
UPA Perpustakaan |
April 2026 |
525114 |
Pemeliharaan AC |
2026-04-20 |
09/UN47.E1/SPP-GUP2/KU/2026 |
2026-04-30 |
0941M |
Rp. 29.945.000 |
10 Hari |
|
| 9 |
UPA Perpustakaan |
Juli 2026 |
525114 |
Pemeliharaan Gedung/ Ruangan Perkantoran |
2026-05-22 |
014/UN47.E1/SPP-LS2/KU/2026 |
2026-07-03 |
1471M |
Rp. 125.048.000 |
42 Hari |
|
| 10 |
UPA Perpustakaan |
Agustus 2026 |
525114 |
Pemeliharaan Gedung/ Ruangan Perkantoran |
2026-08-24 |
021/UN47.E1/SPP-LS4/KU/2026 |
|
|
Rp. 48.950.000 |
42 Hari |
Belum ada SP2D terhitung dari 24 Agustus 2026 hingga 05 Oktober 2026 (42 Hari) |
| 11 |
UPA Perpustakaan |
Januari 2026 |
525112 |
Spanduk kegiatan |
2026-03-12 |
03/UN47.E1/SPP-GUP1/KU/2026 |
2026-04-09 |
0710M |
Rp. 52.500 |
28 Hari |
|
| 12 |
UPA Perpustakaan |
Februari 2026 |
525112 |
Spanduk kegiatan |
2026-03-12 |
03/UN47.E1/SPP-GUP1/KU/2026 |
2026-04-09 |
0710M |
Rp. 1.520.000 |
28 Hari |
|
| 13 |
UPA Perpustakaan |
Februari 2026 |
525112 |
Barang Habis Pakai ATM / ATK
|
2026-03-12 |
03/UN47.E1/SPP-GUP1/KU/2026 |
2026-04-09 |
0710M |
Rp. 6.552.295 |
28 Hari |
|
| 14 |
UPA Perpustakaan |
Maret 2026 |
525112 |
Barang Habis Pakai ATM / ATK
|
2026-03-12 |
03/UN47.E1/SPP-GUP1/KU/2026 |
2026-04-09 |
0710M |
Rp. 713.500 |
28 Hari |
|
| 15 |
UPA Perpustakaan |
Juni 2026 |
525112 |
Barang Habis Pakai ATM / ATK
|
2026-08-13 |
015/UN47.E1/SPP-GUP4/KU/2026 |
2026-08-24 |
2069T |
Rp. 1.450.000 |
11 Hari |
|
| 16 |
UPA Perpustakaan |
Juli 2026 |
525112 |
Barang Habis Pakai ATM / ATK
|
2026-08-13 |
015/UN47.E1/SPP-GUP4/KU/2026 |
2026-08-24 |
2069T |
Rp. 7.156.000 |
11 Hari |
|
| 17 |
UPA Perpustakaan |
Oktober 2026 |
525112 |
Barang Habis Pakai ATM / ATK
|
|
|
|
|
Rp. 15.950.000 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 18 |
UPA Perpustakaan |
Februari 2026 |
525112 |
Insentif Validasi Skripsi/Tesis/Disertasi |
2026-03-12 |
03/UN47.E1/SPP-GUP1/KU/2026 |
2026-04-09 |
0710M |
Rp. 5.000.000 |
28 Hari |
|
| 19 |
UPA Perpustakaan |
Juni 2026 |
525112 |
Insentif Validasi Skripsi/Tesis/Disertasi |
2026-08-13 |
015/UN47.E1/SPP-GUP4/KU/2026 |
2026-08-24 |
2069T |
Rp. 5.000.000 |
11 Hari |
|
| 20 |
UPA Perpustakaan |
Oktober 2026 |
525112 |
Insentif Validasi Skripsi/Tesis/Disertasi |
|
|
|
|
Rp. 5.000.000 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 21 |
UPA Perpustakaan |
September 2026 |
525119 |
Bantuan Biaya Pencetakan Buku |
2026-09-28 |
030/UN47.E1/SPP-GUP7/KU/2026 |
|
|
Rp. 10.000.000 |
7 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 05 Oktober 2026 (7 Hari) |
| 22 |
UPA Perpustakaan |
Maret 2026 |
525112 |
Konsumsi tamu pimpinan |
2026-03-12 |
03/UN47.E1/SPP-GUP1/KU/2026 |
2026-04-09 |
0710M |
Rp. 1.989.695 |
28 Hari |
|
| 23 |
UPA Perpustakaan |
April 2026 |
525112 |
Konsumsi tamu pimpinan |
2026-04-20 |
07/UN47.E1/SPP-GUP2/KU/2026 |
2026-04-30 |
0939M |
Rp. 2.505.000 |
10 Hari |
|
| 24 |
UPA Perpustakaan |
Juli 2026 |
525112 |
Konsumsi tamu pimpinan |
2026-08-13 |
015/UN47.E1/SPP-GUP4/KU/2026 |
2026-08-24 |
2069T |
Rp. 1.006.920 |
11 Hari |
|
| 25 |
UPA Perpustakaan |
September 2026 |
525112 |
Konsumsi tamu pimpinan |
2026-09-28 |
029/UN47.E1/SPP-GUP7/KU/2026 |
|
|
Rp. 2.700.000 |
7 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 05 Oktober 2026 (7 Hari) |
| 26 |
UPA Perpustakaan |
Februari 2026 |
525112 |
Komsumsi ringan berat
rapat kerja (RAKER) pimpinan dan staf UPA
Perpustakaan |
2026-03-12 |
03/UN47.E1/SPP-GUP1/KU/2026 |
2026-04-09 |
0710M |
Rp. 6.800.000 |
28 Hari |
|
| 27 |
UPA Perpustakaan |
Oktober 2026 |
525112 |
Komsumsi ringan berat
rapat kerja (RAKER) pimpinan dan staf UPA
Perpustakaan |
|
|
|
|
Rp. 8.200.000 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 28 |
UPA Perpustakaan |
April 2026 |
525119 |
Biaya Media Cetak |
2026-04-20 |
08/UN47.E1/SPP-GUP2/KU/2026 |
2026-04-30 |
0940M |
Rp. 850.000 |
10 Hari |
|
| 29 |
UPA Perpustakaan |
Juni 2026 |
525119 |
Biaya Media Cetak |
2026-08-13 |
017/UN47.E1/SPP-GUP4/KU/2026 |
2026-08-24 |
2071T |
Rp. 1.700.000 |
11 Hari |
|
| 30 |
UPA Perpustakaan |
September 2026 |
525119 |
Biaya Media Cetak |
2026-09-28 |
030/UN47.E1/SPP-GUP7/KU/2026 |
|
|
Rp. 850.000 |
7 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 05 Oktober 2026 (7 Hari) |
| 31 |
UPA Perpustakaan |
Oktober 2026 |
525119 |
Biaya Media Cetak |
|
|
|
|
Rp. 850.000 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 32 |
UPA Perpustakaan |
Juli 2026 |
525119 |
Pembuatan Leaflet/brosur perpustakaan |
2026-08-13 |
017/UN47.E1/SPP-GUP4/KU/2026 |
2026-08-24 |
2071T |
Rp. 3.600.000 |
11 Hari |
|
| 33 |
UPA Perpustakaan |
Februari 2026 |
525119 |
Pembuatan Kalender |
2026-03-12 |
04/UN47.E1/SPP-GUP1/KU/2026 |
2026-04-09 |
0711M |
Rp. 3.313.010 |
28 Hari |
|
| 34 |
UPA Perpustakaan |
Juli 2026 |
525119 |
Pembuatan tumbler perpustakaan |
2026-08-13 |
017/UN47.E1/SPP-GUP4/KU/2026 |
2026-08-24 |
2071T |
Rp. 3.000.000 |
11 Hari |
|
| 35 |
UPA Perpustakaan |
Agustus 2026 |
525119 |
Pembuatan buku panduan perpustakaan tahun 2026 |
2026-08-31 |
023/UN47.E1/SPP-GUP5/KU/2026 |
2026-09-09 |
2223M |
Rp. 35.000.000 |
9 Hari |
|
| 36 |
UPA Perpustakaan |
Juni 2026 |
525115 |
Transport Dalam dan Luar Daerah Terkait Kegiatan |
2026-08-13 |
016/UN47.E1/SPP-GUP4/KU/2026 |
2026-08-24 |
2070T |
Rp. 150.600 |
11 Hari |
|
| 37 |
UPA Perpustakaan |
Agustus 2026 |
525115 |
Transport Dalam dan Luar Daerah Terkait Kegiatan |
2026-08-20 |
019/UN47.E1/SPP-LS3/KU/2026 |
2026-08-28 |
2095M |
Rp. 7.038.700 |
8 Hari |
|
| 38 |
UPA Perpustakaan |
September 2026 |
525115 |
Transport Dalam dan Luar Daerah Terkait Kegiatan |
2026-09-09 |
025/UN47.E1/SPP-LS7/KU/2026 |
|
|
Rp. 850.000 |
26 Hari |
Belum ada SP2D terhitung dari 09 September 2026 hingga 05 Oktober 2026 (26 Hari) |
| 39 |
UPA Perpustakaan |
September 2026 |
525115 |
Transport Dalam dan Luar Daerah Terkait Kegiatan |
2026-09-29 |
032/UN47.E1/SPP-LS8/KU/2026 |
|
|
Rp. 113.000 |
6 Hari |
Belum ada SP2D terhitung dari 29 September 2026 hingga 05 Oktober 2026 (6 Hari) |
| 40 |
UPA Perpustakaan |
Juni 2026 |
525115 |
Tiket Perjalanan Dinas PP Terkait Kegiatan |
2026-08-13 |
016/UN47.E1/SPP-GUP4/KU/2026 |
2026-08-24 |
2070T |
Rp. 3.210.480 |
11 Hari |
|
| 41 |
UPA Perpustakaan |
Agustus 2026 |
525115 |
Tiket Perjalanan Dinas PP Terkait Kegiatan |
2026-08-20 |
019/UN47.E1/SPP-LS3/KU/2026 |
2026-08-28 |
2095M |
Rp. 89.479.458 |
8 Hari |
|
| 42 |
UPA Perpustakaan |
September 2026 |
525115 |
Tiket Perjalanan Dinas PP Terkait Kegiatan |
2026-09-09 |
025/UN47.E1/SPP-LS7/KU/2026 |
|
|
Rp. 6.525.416 |
26 Hari |
Belum ada SP2D terhitung dari 09 September 2026 hingga 05 Oktober 2026 (26 Hari) |
| 43 |
UPA Perpustakaan |
September 2026 |
525115 |
Tiket Perjalanan Dinas PP Terkait Kegiatan |
2026-09-29 |
032/UN47.E1/SPP-LS8/KU/2026 |
|
|
Rp. 6.277.321 |
6 Hari |
Belum ada SP2D terhitung dari 29 September 2026 hingga 05 Oktober 2026 (6 Hari) |
| 44 |
UPA Perpustakaan |
Juni 2026 |
525115 |
Hotel/Penginapan |
2026-08-13 |
016/UN47.E1/SPP-GUP4/KU/2026 |
2026-08-24 |
2070T |
Rp. 826.000 |
11 Hari |
|
| 45 |
UPA Perpustakaan |
Agustus 2026 |
525115 |
Hotel/Penginapan |
2026-08-20 |
019/UN47.E1/SPP-LS3/KU/2026 |
2026-08-28 |
2095M |
Rp. 16.820.000 |
8 Hari |
|
| 46 |
UPA Perpustakaan |
September 2026 |
525115 |
Hotel/Penginapan |
2026-09-09 |
025/UN47.E1/SPP-LS7/KU/2026 |
|
|
Rp. 2.225.000 |
26 Hari |
Belum ada SP2D terhitung dari 09 September 2026 hingga 05 Oktober 2026 (26 Hari) |
| 47 |
UPA Perpustakaan |
September 2026 |
525115 |
Hotel/Penginapan |
2026-09-29 |
032/UN47.E1/SPP-LS8/KU/2026 |
|
|
Rp. 1.965.600 |
6 Hari |
Belum ada SP2D terhitung dari 29 September 2026 hingga 05 Oktober 2026 (6 Hari) |
| 48 |
UPA Perpustakaan |
Juni 2026 |
525115 |
Uang Harian |
2026-08-13 |
016/UN47.E1/SPP-GUP4/KU/2026 |
2026-08-24 |
2070T |
Rp. 1.200.000 |
11 Hari |
|
| 49 |
UPA Perpustakaan |
Agustus 2026 |
525115 |
Uang Harian |
2026-08-20 |
019/UN47.E1/SPP-LS3/KU/2026 |
2026-08-28 |
2095M |
Rp. 37.600.000 |
8 Hari |
|
| 50 |
UPA Perpustakaan |
September 2026 |
525115 |
Uang Harian |
2026-09-09 |
025/UN47.E1/SPP-LS7/KU/2026 |
|
|
Rp. 2.810.000 |
26 Hari |
Belum ada SP2D terhitung dari 09 September 2026 hingga 05 Oktober 2026 (26 Hari) |
| 51 |
UPA Perpustakaan |
September 2026 |
525115 |
Uang Harian |
2026-09-29 |
032/UN47.E1/SPP-LS8/KU/2026 |
|
|
Rp. 2.650.000 |
6 Hari |
Belum ada SP2D terhitung dari 29 September 2026 hingga 05 Oktober 2026 (6 Hari) |
| 52 |
UPA Perpustakaan |
Juli 2026 |
525119 |
Pemeliharaan E-Skripsi, Opac, Internet,dan Website |
2026-08-13 |
018/UN47.E1/SPP-GUP4/KU/2026 |
2026-08-24 |
2072T |
Rp. 5.000.000 |
11 Hari |
|
| 53 |
UPA Perpustakaan |
Januari 2026 |
525119 |
Pembayaran aplikasi Canva |
2026-03-12 |
06/UN47.E1/SPP-GUP1/KU/2026 |
2026-04-09 |
0713M |
Rp. 770.000 |
28 Hari |
|
| 54 |
UPA Perpustakaan |
April 2026 |
525119 |
Insentif Penguji Tagihan/Verifikator UK
|
2026-04-20 |
010/UN47.E1/SPP-GUP2/KU/2026 |
2026-04-30 |
0942M |
Rp. 480.000 |
10 Hari |
|
| 55 |
UPA Perpustakaan |
Juni 2026 |
525119 |
Insentif Penguji Tagihan/Verifikator UK
|
2026-08-13 |
018/UN47.E1/SPP-GUP4/KU/2026 |
2026-08-24 |
2072T |
Rp. 480.000 |
11 Hari |
|
| 56 |
UPA Perpustakaan |
April 2026 |
525119 |
Insentif PPK/UK |
2026-04-20 |
010/UN47.E1/SPP-GUP2/KU/2026 |
2026-04-30 |
0942M |
Rp. 1.220.000 |
10 Hari |
|
| 57 |
UPA Perpustakaan |
Juni 2026 |
525119 |
Insentif PPK/UK |
2026-08-13 |
018/UN47.E1/SPP-GUP4/KU/2026 |
2026-08-24 |
2072T |
Rp. 1.220.000 |
11 Hari |
|
| 58 |
UPA Perpustakaan |
Agustus 2026 |
525176 |
Insentif Penguji Tagihan/Verifikator UK |
2026-08-20 |
020/UN47.E1/SPP-LS3/KU/2026 |
2026-08-28 |
2094M |
Rp. 480.000 |
8 Hari |
|
| 59 |
UPA Perpustakaan |
September 2026 |
525176 |
Insentif Penguji Tagihan/Verifikator UK |
2026-09-09 |
026/UN47.E1/SPP-LS7/KU/2026 |
|
|
Rp. 480.000 |
26 Hari |
Belum ada SP2D terhitung dari 09 September 2026 hingga 05 Oktober 2026 (26 Hari) |
| 60 |
UPA Perpustakaan |
Agustus 2026 |
525176 |
Insentif PPK/UK |
2026-08-20 |
020/UN47.E1/SPP-LS3/KU/2026 |
2026-08-28 |
2094M |
Rp. 1.220.000 |
8 Hari |
|
| 61 |
UPA Perpustakaan |
September 2026 |
525176 |
Insentif PPK/UK |
2026-09-09 |
026/UN47.E1/SPP-LS7/KU/2026 |
|
|
Rp. 1.220.000 |
26 Hari |
Belum ada SP2D terhitung dari 09 September 2026 hingga 05 Oktober 2026 (26 Hari) |
| 62 |
UPA Perpustakaan |
Oktober 2026 |
525119 |
Bantuan Biaya Terkait Kegiatan Literasi |
|
|
|
|
Rp. 5.000.000 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 63 |
UPA Perpustakaan |
Mei 2026 |
525119 |
Transformasi Literasi di Era Artificial Intelligent |
2026-05-21 |
013/UN47.E1/SPP-GUP3/KU/2026 |
2026-06-30 |
1393M |
Rp. 7.000.000 |
40 Hari |
|
| 64 |
UPA Perpustakaan |
September 2026 |
525119 |
Bantuan biaya pendaftaran sertifikasi pustakawan |
2026-09-15 |
028/UN47.E1/SPP-GUP6/KU/2026 |
|
|
Rp. 15.000.000 |
20 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 05 Oktober 2026 (20 Hari) |
| 65 |
UPA Perpustakaan |
Mei 2026 |
525119 |
Sosialisasi Pencegahan dan Penanggulangan Anti Kekerasan, Anti Narkoba, dan Anti Korupsi |
2026-05-21 |
013/UN47.E1/SPP-GUP3/KU/2026 |
2026-06-30 |
1393M |
Rp. 7.000.000 |
40 Hari |
|
| 66 |
UPA Perpustakaan |
April 2026 |
525119 |
Sosialisasi Penerapan Zona Integritas UPA Perpustakaan |
2026-05-21 |
013/UN47.E1/SPP-GUP3/KU/2026 |
2026-06-30 |
1393M |
Rp. 5.000.000 |
40 Hari |
|
| 67 |
UPA Perpustakaan |
September 2026 |
525119 |
Jurnal Internasional Bereputasi |
2026-09-15 |
027/UN47.E1/SPP-GUP6/KU/2026 |
|
|
Rp. 20.000.000 |
20 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 05 Oktober 2026 (20 Hari) |
| 68 |
UPA Perpustakaan |
September 2026 |
525119 |
Jurnal Internasional Bereputasi |
2026-09-28 |
030/UN47.E1/SPP-GUP7/KU/2026 |
|
|
Rp. 20.000.000 |
7 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 05 Oktober 2026 (7 Hari) |
| 69 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
537112 |
Pengadaan Meubelair Pendukung Pembelajaran |
2026-02-25 |
04/SPP-LS-PPBJ/2026 |
2026-03-02 |
0284AE |
Rp. 182.040.000 |
5 Hari |
|
| 70 |
Pengelola Pengadaan Barang dan Jasa |
Mei 2026 |
537112 |
Pengadaan Peralatan Pembelajaran Di Lingkungan UNG |
2026-05-12 |
45/LS-SPP-PPBJ/2026 |
2026-05-21 |
1117AE |
Rp. 218.059.000 |
9 Hari |
|
| 71 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
537112 |
Pengadaan Peralatan Pembelajaran Di Lingkungan UNG |
2026-07-28 |
61/LS-SPP-PPBJ/2026 |
2026-08-03 |
1800AE |
Rp. 83.145.000 |
6 Hari |
|
| 72 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
537112 |
Pengadaan Peralatan Pembelajaran Di Lingkungan UNG |
2026-08-11 |
63/LS-SPP/PPBJ/2026 |
|
|
Rp. 599.841.000 |
55 Hari |
Belum ada SP2D terhitung dari 11 Agustus 2026 hingga 05 Oktober 2026 (55 Hari) |
| 73 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
537112 |
Pengadaan Peralatan Pembelajaran Di Lingkungan UNG |
2026-08-11 |
64/LS-SPP/PPBJ/2026 |
|
|
Rp. 677.044.000 |
55 Hari |
Belum ada SP2D terhitung dari 11 Agustus 2026 hingga 05 Oktober 2026 (55 Hari) |
| 74 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
537112 |
Pengadaan Peralatan Pembelajaran Di Lingkungan UNG |
2026-08-12 |
65/LS-SPP/PPBJ/2026 |
|
|
Rp. 792.559.000 |
54 Hari |
Belum ada SP2D terhitung dari 12 Agustus 2026 hingga 05 Oktober 2026 (54 Hari) |
| 75 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
537112 |
Pengadaan Peralatan Pendukung Perkantoran |
2026-02-25 |
05/SPP-LS-PPBJ/2026 |
2026-03-02 |
0280AE |
Rp. 222.714.000 |
5 Hari |
|
| 76 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
537112 |
Pengadaan Peralatan Pendukung Perkantoran |
2026-02-26 |
19/SPP-LS-PPBJ/2026 |
2026-03-07 |
0293AE |
Rp. 19.097.000 |
9 Hari |
|
| 77 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
537112 |
Pengadaan Peralatan Pendukung Perkantoran |
2026-03-02 |
20/SPP-GU-PPBJ/2026 |
2026-03-05 |
0334AE |
Rp. 16.872.000 |
3 Hari |
|
| 78 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
537112 |
Pengadaan Peralatan Pendukung Perkantoran |
2026-03-12 |
31/LS-SPTB-PPBJ/2026 |
2026-03-17 |
0603AE |
Rp. 149.838.000 |
5 Hari |
|
| 79 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
537112 |
Pengadaan Peralatan Pendukung Perkantoran |
2026-07-06 |
53/LS-SPTB-PPBJ/2026 |
2026-07-22 |
1660AE |
Rp. 69.100.000 |
16 Hari |
|
| 80 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
537112 |
Pengadaan Peralatan Pendukung Perkantoran |
2026-09-21 |
84/LS-SPP-PPBJ/2026 |
|
|
Rp. 49.644.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 81 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
537112 |
Pengadaan Meubelair Pendukung Perkantoran |
2026-02-23 |
14/SPP-LS-PPBJ/2026 |
2026-03-02 |
0275AE |
Rp. 29.788.000 |
7 Hari |
|
| 82 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
537112 |
Pengadaan Meubelair Pendukung Perkantoran |
2026-03-04 |
27/SPP-LS/PPBJ/2026 |
2026-03-13 |
0494AE |
Rp. 53.812.000 |
9 Hari |
|
| 83 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
537112 |
Pengadaan Meubelair Pendukung Perkantoran |
2026-03-04 |
28/SPTB-LS/PPBJ/2026 |
2026-03-13 |
0491AE |
Rp. 248.196.000 |
9 Hari |
|
| 84 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525113 |
Jasa Konsultan Perencanaan dan Bangunan |
2026-02-25 |
16/SPP-LS-PPBJ/2026 |
2026-03-02 |
0283AE |
Rp. 49.783.000 |
5 Hari |
|
| 85 |
Pengelola Pengadaan Barang dan Jasa |
Mei 2026 |
525113 |
Jasa Konsultan Perencanaan dan Bangunan |
2026-05-05 |
41-LS-SPP-PPBJ/2026 |
2026-05-21 |
1111AE |
Rp. 79.365.000 |
16 Hari |
|
| 86 |
Pengelola Pengadaan Barang dan Jasa |
Mei 2026 |
525113 |
Jasa Konsultan Perencanaan dan Bangunan |
2026-05-13 |
46/LS -SPP-PPBJ/2026 |
2026-05-26 |
1161AE |
Rp. 49.839.000 |
13 Hari |
|
| 87 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525113 |
Jasa Konsultan Perencanaan dan Bangunan |
2026-07-08 |
57/LS-SPTB-PPBJ/2026 |
2026-07-29 |
1744AE |
Rp. 640.957.400 |
21 Hari |
|
| 88 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
525113 |
Jasa Konsultan Perencanaan dan Bangunan |
2026-07-08 |
58/LS -SPP-PPBJ/2026 |
2026-08-10 |
1745AE |
Rp. 343.289.200 |
33 Hari |
|
| 89 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
525113 |
Jasa Konsultan Perencanaan dan Bangunan |
2026-08-18 |
66/LS-SPP/PPBJ/2026 |
|
|
Rp. 49.894.000 |
48 Hari |
Belum ada SP2D terhitung dari 18 Agustus 2026 hingga 05 Oktober 2026 (48 Hari) |
| 90 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
525113 |
Jasa Konsultan Perencanaan dan Bangunan |
2026-08-27 |
78-LS-SPPPPBJ/.2026 |
|
|
Rp. 146.936.000 |
39 Hari |
Belum ada SP2D terhitung dari 27 Agustus 2026 hingga 05 Oktober 2026 (39 Hari) |
| 91 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
525113 |
Jasa Konsultan Perencanaan dan Bangunan |
2026-08-27 |
79-LS-SPTBR-PPBJ./2026 |
|
|
Rp. 149.803.000 |
39 Hari |
Belum ada SP2D terhitung dari 27 Agustus 2026 hingga 05 Oktober 2026 (39 Hari) |
| 92 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-02-25 |
06/LS-SPP-PPBJ/2026 |
2026-03-02 |
0270AE |
Rp. 49.461.000 |
5 Hari |
|
| 93 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-03-04 |
23/SPP-LS/PPBJ/2026 |
2026-03-13 |
0493AE |
Rp. 49.875.000 |
9 Hari |
|
| 94 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-03-04 |
24/SPP-LS/PPBJ/2026 |
2026-03-13 |
0492AE |
Rp. 49.407.000 |
9 Hari |
|
| 95 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-03-04 |
26/SPP-LS/PPBJ/2026 |
2026-03-13 |
0489AE |
Rp. 49.736.000 |
9 Hari |
|
| 96 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-03-04 |
25/SPTB-LS/PPBJ/2026 |
2026-03-13 |
0490AE |
Rp. 49.420.000 |
9 Hari |
|
| 97 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-03-09 |
29/SPP-LS/PPBJ/2026 |
2026-03-13 |
0528AE |
Rp. 104.723.000 |
4 Hari |
|
| 98 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-03-12 |
30/SPP-LS/PPBJ/2026 |
2026-03-13 |
0543AE |
Rp. 49.684.000 |
1 Hari |
|
| 99 |
Pengelola Pengadaan Barang dan Jasa |
April 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-03-31 |
33/SPP-LS/PPBJ/2026 |
2026-04-09 |
0703AE |
Rp. 9.967.000 |
9 Hari |
|
| 100 |
Pengelola Pengadaan Barang dan Jasa |
April 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-04-13 |
37/SPP-LS-PPBJ/2026 |
2026-04-20 |
0834AE |
Rp. 49.740.000 |
7 Hari |
|
| 101 |
Pengelola Pengadaan Barang dan Jasa |
Mei 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-05-12 |
44/LS-SPP-LS-PPBJ-2026 |
2026-05-21 |
1112AE |
Rp. 258.433.000 |
9 Hari |
|
| 102 |
Pengelola Pengadaan Barang dan Jasa |
Juni 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-05-04 |
39/LS-SPP-PPBJ/2026 |
2026-06-30 |
1343AE |
Rp. 49.680.000 |
57 Hari |
|
| 103 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-07-09 |
59/LS-SPP-PPBJ/2026 |
2026-07-16 |
1634AE |
Rp. 30.263.000 |
7 Hari |
|
| 104 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-07-28 |
60/LS-SPP-PPBJ/2026 |
2026-08-03 |
1799AE |
Rp. 79.300.000 |
6 Hari |
|
| 105 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-08-24 |
67/SPP-LS/PPBJ/2026 |
|
|
Rp. 49.966.000 |
42 Hari |
Belum ada SP2D terhitung dari 24 Agustus 2026 hingga 05 Oktober 2026 (42 Hari) |
| 106 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-08-24 |
68/SPP-LS/PPBJ/2026 |
|
|
Rp. 49.978.000 |
42 Hari |
Belum ada SP2D terhitung dari 24 Agustus 2026 hingga 05 Oktober 2026 (42 Hari) |
| 107 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-08-24 |
70/SPP-LS/PPBJ/2026 |
|
|
Rp. 49.779.000 |
42 Hari |
Belum ada SP2D terhitung dari 24 Agustus 2026 hingga 05 Oktober 2026 (42 Hari) |
| 108 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-08-11 |
62/LS-SPP/PPBJ/2026 |
2026-09-11 |
2280AE |
Rp. 799.400.000 |
31 Hari |
|
| 109 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-09-22 |
85-LS-SPP/PPBJ-2026 |
|
|
Rp. 49.469.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 110 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-09-22 |
86-LS-SPP-PPBJ/2026 |
|
|
Rp. 49.347.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 111 |
Pengelola Pengadaan Barang dan Jasa |
Oktober 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-10-02 |
95/SPP-LS-PPBJ-2026 |
|
|
Rp. 219.229.000 |
3 Hari |
Belum ada SP2D terhitung dari 02 Oktober 2026 hingga 05 Oktober 2026 (3 Hari) |
| 112 |
Pengelola Pengadaan Barang dan Jasa |
April 2026 |
537111 |
Belanja Modal Tanah |
2026-03-16 |
32/SPP-LS/PPBJ/2026 |
2026-04-06 |
0636AE |
Rp. 1.284.978.450 |
21 Hari |
|
| 113 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525114 |
Pemeliharaan Alat Pemadam Kebakaran APAR |
2026-02-25 |
07/SPP-LS-PPBJ/2026 |
2026-03-02 |
0278AE |
Rp. 34.032.000 |
5 Hari |
|
| 114 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525114 |
Pemeliharaan Alat Pemadam Kebakaran APAR |
2026-02-25 |
08/SPP-LS-PPBJ/2026 |
2026-03-02 |
0279AE |
Rp. 62.581.000 |
5 Hari |
|
| 115 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525114 |
Pemeliharaan AC |
2026-09-24 |
91-GU-SPP-PPBJ-2026 |
|
|
Rp. 9.657.000 |
11 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 05 Oktober 2026 (11 Hari) |
| 116 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525114 |
Pemeliharaan Printer |
2026-09-24 |
91-GU-SPP-PPBJ-2026 |
|
|
Rp. 9.595.000 |
11 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 05 Oktober 2026 (11 Hari) |
| 117 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525114 |
Pemeliharaan Halaman Gedung Dan Bangunan Perkantoran Di Lingkungan UNG |
2026-02-25 |
10/SPP-LS-PPBJ/2026 |
2026-03-02 |
0276AE |
Rp. 49.763.000 |
5 Hari |
|
| 118 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525114 |
Pemeliharaan Halaman Gedung Dan Bangunan Perkantoran Di Lingkungan UNG |
2026-02-25 |
11/SPP-LS-PPBJ/2026 |
2026-03-02 |
0274AE |
Rp. 49.420.000 |
5 Hari |
|
| 119 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525114 |
Pemeliharaan Halaman Gedung Dan Bangunan Perkantoran Di Lingkungan UNG |
2026-02-25 |
12/SPP-LS-PPBJ/2026 |
2026-03-02 |
0277AE |
Rp. 49.713.000 |
5 Hari |
|
| 120 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525114 |
Pemeliharaan Halaman Gedung Dan Bangunan Perkantoran Di Lingkungan UNG |
2026-02-25 |
09/SPP-LS-PPBJ/2026 |
2026-03-02 |
0281AE |
Rp. 49.242.000 |
5 Hari |
|
| 121 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525114 |
Pemeliharaan Halaman Gedung Dan Bangunan Perkantoran Di Lingkungan UNG |
2026-03-02 |
18/SPP LS/PPBJ/2026 |
2026-03-04 |
0318AE |
Rp. 199.195.000 |
2 Hari |
|
| 122 |
Pengelola Pengadaan Barang dan Jasa |
Juni 2026 |
525114 |
Pemeliharaan Halaman Gedung Dan Bangunan Perkantoran Di Lingkungan UNG |
2026-05-11 |
42/LS-SPP-PPBJ/2026 |
2026-06-30 |
1368AE |
Rp. 49.580.000 |
50 Hari |
|
| 123 |
Pengelola Pengadaan Barang dan Jasa |
Juni 2026 |
525114 |
Pemeliharaan Halaman Gedung Dan Bangunan Perkantoran Di Lingkungan UNG |
2026-05-11 |
43/LS-SPP-PPBJ/2026 |
2026-06-30 |
1344AE |
Rp. 49.370.000 |
50 Hari |
|
| 124 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525114 |
Pemeliharaan Halaman Gedung Dan Bangunan Perkantoran Di Lingkungan UNG |
2026-06-09 |
50/SPP-LS-PPBJ/2026 |
2026-07-06 |
1513E |
Rp. 49.966.000 |
27 Hari |
|
| 125 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525114 |
Pemeliharaan Halaman Gedung Dan Bangunan Perkantoran Di Lingkungan UNG |
2026-06-09 |
51/SPP-LS-PPBJ/2026 |
2026-07-06 |
1514E |
Rp. 49.862.000 |
27 Hari |
|
| 126 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
525114 |
Pemeliharaan Halaman Gedung Dan Bangunan Perkantoran Di Lingkungan UNG |
2026-08-24 |
69/SPP-LS/PPBJ/20256 |
|
|
Rp. 49.734.000 |
42 Hari |
Belum ada SP2D terhitung dari 24 Agustus 2026 hingga 05 Oktober 2026 (42 Hari) |
| 127 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
525114 |
Pemeliharaan Halaman Gedung Dan Bangunan Perkantoran Di Lingkungan UNG |
2026-08-26 |
75/LS-SPP-PPBJ/2026 |
|
|
Rp. 249.147.000 |
40 Hari |
Belum ada SP2D terhitung dari 26 Agustus 2026 hingga 05 Oktober 2026 (40 Hari) |
| 128 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
525114 |
Pemeliharaan Halaman Gedung Dan Bangunan Perkantoran Di Lingkungan UNG |
2026-08-26 |
77/LS-SPP-PPBJ/2026 |
|
|
Rp. 49.950.000 |
40 Hari |
Belum ada SP2D terhitung dari 26 Agustus 2026 hingga 05 Oktober 2026 (40 Hari) |
| 129 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525114 |
Pemeliharaan Halaman Gedung Dan Bangunan Perkantoran Di Lingkungan UNG |
2026-09-21 |
83/LS-SPP-PPBJ-2026 |
|
|
Rp. 92.570.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 130 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525114 |
Pemeliharaan Halaman Gedung Dan Bangunan Perkantoran Di Lingkungan UNG |
2026-09-23 |
87-LS-SPP-PPBJ-2026 |
|
|
Rp. 49.250.000 |
12 Hari |
Belum ada SP2D terhitung dari 23 September 2026 hingga 05 Oktober 2026 (12 Hari) |
| 131 |
Pengelola Pengadaan Barang dan Jasa |
Januari 2026 |
525112 |
Belanja Konsumsi Ringan dan Konsumsi Berat (34 X 9) Kegiatan) |
2026-03-02 |
21/SPP-GU-PPBJ/2026 |
2026-03-05 |
0335AE |
Rp. 137.000 |
3 Hari |
|
| 132 |
Pengelola Pengadaan Barang dan Jasa |
Mei 2026 |
525112 |
Belanja Konsumsi Ringan dan Konsumsi Berat (34 X 9) Kegiatan) |
2026-05-25 |
47/GU-SPP-PPBJ-2026 |
2026-06-25 |
1340AE |
Rp. 2.500.000 |
31 Hari |
|
| 133 |
Pengelola Pengadaan Barang dan Jasa |
Juni 2026 |
525112 |
Belanja Konsumsi Ringan dan Konsumsi Berat (34 X 9) Kegiatan) |
2026-07-07 |
54/GU-SPP-PPBJ/2026 |
2026-07-09 |
1590AE |
Rp. 192.000 |
2 Hari |
|
| 134 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525112 |
Belanja Konsumsi Ringan dan Konsumsi Berat (34 X 9) Kegiatan) |
2026-08-26 |
72-GU-SPP-PPBJ/2026 |
2026-09-03 |
2211AE |
Rp. 3.866.050 |
8 Hari |
|
| 135 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525112 |
Belanja Konsumsi Ringan dan Konsumsi Berat (34 X 9) Kegiatan) |
2026-09-24 |
88-GU-SPP-PPBJ-2026 |
|
|
Rp. 931.000 |
11 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 05 Oktober 2026 (11 Hari) |
| 136 |
Pengelola Pengadaan Barang dan Jasa |
Januari 2026 |
525112 |
Belanja Kebutuhan Dasar Perkantoran |
2026-03-02 |
21/SPP-GU-PPBJ/2026 |
2026-03-05 |
0335AE |
Rp. 3.515.700 |
3 Hari |
|
| 137 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525112 |
Belanja Kebutuhan Dasar Perkantoran |
2026-04-02 |
34/SPP-GU- PPBJ/2026 |
2026-04-07 |
0661AE |
Rp. 925.400 |
5 Hari |
|
| 138 |
Pengelola Pengadaan Barang dan Jasa |
April 2026 |
525112 |
Belanja Kebutuhan Dasar Perkantoran |
2026-05-25 |
47/GU-SPP-PPBJ-2026 |
2026-06-25 |
1340AE |
Rp. 4.871.906 |
31 Hari |
|
| 139 |
Pengelola Pengadaan Barang dan Jasa |
Juni 2026 |
525112 |
Belanja Kebutuhan Dasar Perkantoran |
2026-07-07 |
54/GU-SPP-PPBJ/2026 |
2026-07-09 |
1590AE |
Rp. 4.186.734 |
2 Hari |
|
| 140 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525112 |
Belanja Kebutuhan Dasar Perkantoran |
2026-08-26 |
72-GU-SPP-PPBJ/2026 |
2026-09-03 |
2211AE |
Rp. 10.452.071 |
8 Hari |
|
| 141 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525112 |
Belanja Kebutuhan Dasar Perkantoran |
2026-09-24 |
88-GU-SPP-PPBJ-2026 |
|
|
Rp. 1.020.050 |
11 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 05 Oktober 2026 (11 Hari) |
| 142 |
Pengelola Pengadaan Barang dan Jasa |
Januari 2026 |
525115 |
Tiket PP |
2026-03-02 |
22/SPP-GU-PPBJ/2026 |
2026-03-05 |
0336AE |
Rp. 6.461.780 |
3 Hari |
|
| 143 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525115 |
Tiket PP |
2026-04-02 |
35/SPP-GU- PPBJ/2026 |
2026-04-07 |
0662AE |
Rp. 19.028.800 |
5 Hari |
|
| 144 |
Pengelola Pengadaan Barang dan Jasa |
April 2026 |
525115 |
Tiket PP |
2026-05-25 |
48/GU-SPP-PPBJ-2026 |
2026-06-25 |
1341AE |
Rp. 5.677.860 |
31 Hari |
|
| 145 |
Pengelola Pengadaan Barang dan Jasa |
Mei 2026 |
525115 |
Tiket PP |
2026-05-25 |
48/GU-SPP-PPBJ-2026 |
2026-06-25 |
1341AE |
Rp. 12.603.560 |
31 Hari |
|
| 146 |
Pengelola Pengadaan Barang dan Jasa |
Juni 2026 |
525115 |
Tiket PP |
2026-07-07 |
55/GU-SPP-PPBJ/2026 |
2026-07-09 |
1591AE |
Rp. 18.905.340 |
2 Hari |
|
| 147 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525115 |
Tiket PP |
2026-06-22 |
52/GU-SPP-PPBJ/2026 |
2026-07-03 |
1486AE |
Rp. 50.864.960 |
11 Hari |
|
| 148 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525115 |
Tiket PP |
2026-07-07 |
55/GU-SPP-PPBJ/2026 |
2026-07-09 |
1591AE |
Rp. 5.783.880 |
2 Hari |
|
| 149 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525115 |
Tiket PP |
2026-08-26 |
73-GU-SPP-PPBJ/2026 |
2026-09-03 |
2210AE |
Rp. 8.414.880 |
8 Hari |
|
| 150 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525115 |
Tiket PP |
2026-09-16 |
81/TUP-Nihil-SPP-PPBJ/2026 |
|
|
Rp. 10.950.000 |
19 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 05 Oktober 2026 (19 Hari) |
| 151 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525115 |
Tiket PP |
2026-09-24 |
89-GU-SPP-PPBJ-2026 |
|
|
Rp. 12.746.412 |
11 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 05 Oktober 2026 (11 Hari) |
| 152 |
Pengelola Pengadaan Barang dan Jasa |
Januari 2026 |
525115 |
Biaya Hotel Penginapan |
2026-03-02 |
22/SPP-GU-PPBJ/2026 |
2026-03-05 |
0336AE |
Rp. 6.227.142 |
3 Hari |
|
| 153 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525115 |
Biaya Hotel Penginapan |
2026-04-02 |
35/SPP-GU- PPBJ/2026 |
2026-04-07 |
0662AE |
Rp. 10.520.908 |
5 Hari |
|
| 154 |
Pengelola Pengadaan Barang dan Jasa |
April 2026 |
525115 |
Biaya Hotel Penginapan |
2026-05-25 |
48/GU-SPP-PPBJ-2026 |
2026-06-25 |
1341AE |
Rp. 3.695.124 |
31 Hari |
|
| 155 |
Pengelola Pengadaan Barang dan Jasa |
Mei 2026 |
525115 |
Biaya Hotel Penginapan |
2026-05-25 |
48/GU-SPP-PPBJ-2026 |
2026-06-25 |
1341AE |
Rp. 6.746.050 |
31 Hari |
|
| 156 |
Pengelola Pengadaan Barang dan Jasa |
Juni 2026 |
525115 |
Biaya Hotel Penginapan |
2026-07-07 |
55/GU-SPP-PPBJ/2026 |
2026-07-09 |
1591AE |
Rp. 9.488.792 |
2 Hari |
|
| 157 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525115 |
Biaya Hotel Penginapan |
2026-06-22 |
52/GU-SPP-PPBJ/2026 |
2026-07-03 |
1486AE |
Rp. 22.653.529 |
11 Hari |
|
| 158 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525115 |
Biaya Hotel Penginapan |
2026-07-07 |
55/GU-SPP-PPBJ/2026 |
2026-07-09 |
1591AE |
Rp. 1.916.254 |
2 Hari |
|
| 159 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525115 |
Biaya Hotel Penginapan |
2026-08-26 |
73-GU-SPP-PPBJ/2026 |
2026-09-03 |
2210AE |
Rp. 6.269.499 |
8 Hari |
|
| 160 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525115 |
Biaya Hotel Penginapan |
2026-09-16 |
81/TUP-Nihil-SPP-PPBJ/2026 |
|
|
Rp. 22.000.000 |
19 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 05 Oktober 2026 (19 Hari) |
| 161 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525115 |
Biaya Hotel Penginapan |
2026-09-24 |
89-GU-SPP-PPBJ-2026 |
|
|
Rp. 3.339.434 |
11 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 05 Oktober 2026 (11 Hari) |
| 162 |
Pengelola Pengadaan Barang dan Jasa |
Januari 2026 |
525115 |
Transport Lokal Bandara Hotel |
2026-03-02 |
22/SPP-GU-PPBJ/2026 |
2026-03-05 |
0336AE |
Rp. 346.000 |
3 Hari |
|
| 163 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525115 |
Transport Lokal Bandara Hotel |
2026-04-02 |
35/SPP-GU- PPBJ/2026 |
2026-04-07 |
0662AE |
Rp. 3.730.000 |
5 Hari |
|
| 164 |
Pengelola Pengadaan Barang dan Jasa |
April 2026 |
525115 |
Transport Lokal Bandara Hotel |
2026-05-25 |
48/GU-SPP-PPBJ-2026 |
2026-06-25 |
1341AE |
Rp. 500.500 |
31 Hari |
|
| 165 |
Pengelola Pengadaan Barang dan Jasa |
Mei 2026 |
525115 |
Transport Lokal Bandara Hotel |
2026-05-25 |
48/GU-SPP-PPBJ-2026 |
2026-06-25 |
1341AE |
Rp. 1.915.000 |
31 Hari |
|
| 166 |
Pengelola Pengadaan Barang dan Jasa |
Juni 2026 |
525115 |
Transport Lokal Bandara Hotel |
2026-07-07 |
55/GU-SPP-PPBJ/2026 |
2026-07-09 |
1591AE |
Rp. 2.128.000 |
2 Hari |
|
| 167 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525115 |
Transport Lokal Bandara Hotel |
2026-06-22 |
52/GU-SPP-PPBJ/2026 |
2026-07-03 |
1486AE |
Rp. 5.662.000 |
11 Hari |
|
| 168 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525115 |
Transport Lokal Bandara Hotel |
2026-07-07 |
55/GU-SPP-PPBJ/2026 |
2026-07-09 |
1591AE |
Rp. 329.000 |
2 Hari |
|
| 169 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525115 |
Transport Lokal Bandara Hotel |
2026-08-26 |
73-GU-SPP-PPBJ/2026 |
2026-09-03 |
2210AE |
Rp. 297.500 |
8 Hari |
|
| 170 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525115 |
Transport Lokal Bandara Hotel |
2026-09-16 |
81/TUP-Nihil-SPP-PPBJ/2026 |
|
|
Rp. 3.390.000 |
19 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 05 Oktober 2026 (19 Hari) |
| 171 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525115 |
Transport Lokal Bandara Hotel |
2026-09-24 |
89-GU-SPP-PPBJ-2026 |
|
|
Rp. 1.614.000 |
11 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 05 Oktober 2026 (11 Hari) |
| 172 |
Pengelola Pengadaan Barang dan Jasa |
Januari 2026 |
525115 |
Uang Harian |
2026-03-02 |
22/SPP-GU-PPBJ/2026 |
2026-03-05 |
0336AE |
Rp. 5.080.000 |
3 Hari |
|
| 173 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525115 |
Uang Harian |
2026-04-02 |
35/SPP-GU- PPBJ/2026 |
2026-04-07 |
0662AE |
Rp. 10.600.000 |
5 Hari |
|
| 174 |
Pengelola Pengadaan Barang dan Jasa |
April 2026 |
525115 |
Uang Harian |
2026-05-25 |
48/GU-SPP-PPBJ-2026 |
2026-06-25 |
1341AE |
Rp. 3.180.000 |
31 Hari |
|
| 175 |
Pengelola Pengadaan Barang dan Jasa |
Mei 2026 |
525115 |
Uang Harian |
2026-05-25 |
48/GU-SPP-PPBJ-2026 |
2026-06-25 |
1341AE |
Rp. 6.360.000 |
31 Hari |
|
| 176 |
Pengelola Pengadaan Barang dan Jasa |
Juni 2026 |
525115 |
Uang Harian |
2026-07-07 |
55/GU-SPP-PPBJ/2026 |
2026-07-09 |
1591AE |
Rp. 9.540.000 |
2 Hari |
|
| 177 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525115 |
Uang Harian |
2026-06-22 |
52/GU-SPP-PPBJ/2026 |
2026-07-03 |
1486AE |
Rp. 24.430.000 |
11 Hari |
|
| 178 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525115 |
Uang Harian |
2026-07-07 |
55/GU-SPP-PPBJ/2026 |
2026-07-09 |
1591AE |
Rp. 2.120.000 |
2 Hari |
|
| 179 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525115 |
Uang Harian |
2026-08-26 |
73-GU-SPP-PPBJ/2026 |
2026-09-03 |
2210AE |
Rp. 3.160.000 |
8 Hari |
|
| 180 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
525115 |
Uang Harian |
2026-08-26 |
73-GU-SPP-PPBJ/2026 |
2026-09-03 |
2210AE |
Rp. 1.040.000 |
8 Hari |
|
| 181 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525115 |
Uang Harian |
2026-09-16 |
81/TUP-Nihil-SPP-PPBJ/2026 |
|
|
Rp. 15.470.000 |
19 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 05 Oktober 2026 (19 Hari) |
| 182 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525115 |
Uang Harian |
2026-09-24 |
89-GU-SPP-PPBJ-2026 |
|
|
Rp. 2.120.000 |
11 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 05 Oktober 2026 (11 Hari) |
| 183 |
Pengelola Pengadaan Barang dan Jasa |
Februari 2026 |
525119 |
Kegiatan Pelaksanaan Barang/Jasa Lainnya |
2026-02-20 |
03/TUP-NIHIL/PPBJ/2026 |
2026-02-26 |
0246AE |
Rp. 145.500.960 |
6 Hari |
|
| 184 |
Pengelola Pengadaan Barang dan Jasa |
Mei 2026 |
525119 |
Kegiatan Pelaksanaan Barang/Jasa Lainnya |
2026-05-25 |
49/GU-SPP-PPBJ-2026 |
2026-06-25 |
1342AE |
Rp. 7.950.000 |
31 Hari |
|
| 185 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525119 |
Kegiatan Pelaksanaan Barang/Jasa Lainnya |
2026-09-16 |
82/TUP-Nihil-SPP-PPBJ/2026 |
|
|
Rp. 8.070.000 |
19 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 05 Oktober 2026 (19 Hari) |
| 186 |
Pengelola Pengadaan Barang dan Jasa |
April 2026 |
525119 |
Pengadaan Seragam Dinas Kantor (Karawo) |
2026-04-13 |
38/SPP/LS-PPBJ/2026 |
2026-04-20 |
0833AE |
Rp. 29.137.000 |
7 Hari |
|
| 187 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525119 |
Bantuan Kegiatan Perlengkapan Olaharga |
2026-02-23 |
15/SPP-LS-PPBJ/2026 |
2026-03-03 |
0299AE |
Rp. 19.147.000 |
8 Hari |
|
| 188 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525121 |
Pengadaan Persediaan ATM/ATK dan Bahan Habis Pakai |
2026-02-25 |
13/SPP-LS-PPBJ/2026 |
2026-03-02 |
0282AE |
Rp. 49.407.000 |
5 Hari |
|
| 189 |
Pengelola Pengadaan Barang dan Jasa |
Mei 2026 |
525121 |
Pengadaan Persediaan ATM/ATK dan Bahan Habis Pakai |
2026-05-04 |
40/LS-SPP-PBJ/2026 |
2026-05-26 |
1167AE |
Rp. 59.928.000 |
22 Hari |
|
| 190 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
525121 |
Pengadaan Persediaan ATM/ATK dan Bahan Habis Pakai |
2026-08-26 |
76/LS-SPTB-PPBJ/2026 |
|
|
Rp. 49.147.000 |
40 Hari |
Belum ada SP2D terhitung dari 26 Agustus 2026 hingga 05 Oktober 2026 (40 Hari) |
| 191 |
Pengelola Pengadaan Barang dan Jasa |
Januari 2026 |
525119 |
Belanja Barang dan Jasa Sewa Iklan Perkantoran |
2026-03-02 |
21/SPP/GU-PPBJ/2026 |
2026-03-05 |
0337AE |
Rp. 8.500.000 |
3 Hari |
|
| 192 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
525119 |
Belanja Barang dan Jasa Sewa Iklan Perkantoran |
2026-08-26 |
74-GU-SPP-PPBJ/2026 |
2026-09-03 |
2209AE |
Rp. 8.500.000 |
8 Hari |
|
| 193 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525119 |
Sewa Kenderaan pada Kegiatan |
2026-09-24 |
90-GU-SPP-PPBJ-2026 |
|
|
Rp. 5.324.457 |
11 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 05 Oktober 2026 (11 Hari) |
| 194 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525119 |
Biaya Sewa Cloud Server |
2026-09-24 |
92-GU-SPP-PPBJ-2026 |
|
|
Rp. 5.827.000 |
11 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 05 Oktober 2026 (11 Hari) |
| 195 |
Pengelola Pengadaan Barang dan Jasa |
April 2026 |
525111 |
Insentif Verifikator/Penguji Tagihan UK |
2026-04-02 |
36/SPP-GU- PPBJ/2026 |
2026-04-07 |
0663AE |
Rp. 1.410.000 |
5 Hari |
|
| 196 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525111 |
Insentif Verifikator/Penguji Tagihan UK |
2026-07-07 |
56/GU-SPP-PPBJ/2026 |
2026-07-09 |
1592AE |
Rp. 1.410.000 |
2 Hari |
|
| 197 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525119 |
Biaya Foto Copy dan Jilid Laporan Kegiatan Terkait Pengadaan Barang dan Jasa |
2026-09-24 |
92-GU-SPP-PPBJ-2026 |
|
|
Rp. 2.415.647 |
11 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 05 Oktober 2026 (11 Hari) |
| 198 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525176 |
Insentif verifikator/Penguji Tagihan UK |
2026-09-24 |
93-GU-SPP-PPBJ-2026 |
|
|
Rp. 1.410.000 |
11 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 05 Oktober 2026 (11 Hari) |
| 199 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-01-28 |
0060/UN47.A2/KU/LS-BKKU/2026 |
2026-02-04 |
0129P |
Rp. 40.292.808 |
7 Hari |
|
| 200 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-02-04 |
0068/UN47.A2/KU/LS-BKKU/2026 |
2026-02-09 |
0143P |
Rp. 49.700.000 |
5 Hari |
|
| 201 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
|
|
|
|
Rp. 15.430.000 |
218 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Maret 2026 hingga 05 Oktober 2026 (218 Hari) |
| 202 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-03-05 |
0158/UN47.A2/KU/LS-BKKU/2026 |
2026-03-06 |
0351P |
Rp. 47.600.000 |
1 Hari |
|
| 203 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-03-09 |
0174/UN47.A2/KU/LS-BKKU/2026 |
2026-03-11 |
0424P |
Rp. 29.737.000 |
2 Hari |
|
| 204 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-03-09 |
0176/UN47.A2/KU/LS-BKKU/2026 |
2026-03-11 |
0456P |
Rp. 31.515.000 |
2 Hari |
|
| 205 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-03-09 |
0175/UN47.A2/KU/LS-BKKU/2026 |
2026-03-11 |
0467P |
Rp. 47.500.000 |
2 Hari |
|
| 206 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-03-11 |
0205/UN47.A2/KU/LS-BKKU/2026 |
2026-03-11 |
0468P |
Rp. 15.430.000 |
0 Hari |
|
| 207 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-03-11 |
0209/UN47.A2/KU/LS-BKKU/2026 |
2026-03-12 |
0495P |
Rp. 26.150.000 |
1 Hari |
|
| 208 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-03-16 |
0229/UN47.A2/KU/LS-BKKU/2026 |
2026-03-17 |
0596P |
Rp. 47.758.000 |
1 Hari |
|
| 209 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-04-08 |
0273/UN47.A2/KU/GU.6-BKKU/2026 |
2026-04-09 |
0693P |
Rp. 29.616.000 |
1 Hari |
|
| 210 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-04-06 |
0259/UN47.A2/KU/LS-BKKU/2026 |
2026-04-07 |
0656P |
Rp. 27.700.000 |
1 Hari |
|
| 211 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-04-10 |
0278a/UN47.A2/KU/LS-BKKU/2026 |
2026-04-14 |
0742P |
Rp. 28.662.347 |
4 Hari |
|
| 212 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-04-13 |
0281/UN47.A2/KU/LS-BKKU/2026 |
2026-04-14 |
0783P |
Rp. 9.175.812 |
1 Hari |
|
| 213 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-04-28 |
0318/UN47.A2/KU/LS-BKKU/2026 |
2026-04-23 |
0885P |
Rp. 63.030.000 |
-5 Hari |
|
| 214 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-05-04 |
0343/UN47.A2/KU/LS-BKKU/2026 |
2026-05-05 |
0983P |
Rp. 49.250.000 |
1 Hari |
|
| 215 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-05-04 |
0344/UN47.A2/KU/LS-BKKU/2026 |
2026-05-04 |
0984P |
Rp. 45.600.000 |
0 Hari |
|
| 216 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-05-06 |
0361/UN47.A2/KU/LS-BKKU/2026 |
2026-05-07 |
1033P |
Rp. 19.486.459 |
1 Hari |
|
| 217 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-05-11 |
0377/UN47.A2/KU/GU.8-BKKU/2026 |
2026-05-11 |
1037P |
Rp. 7.700.000 |
0 Hari |
|
| 218 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-05-13 |
0394/UN47.A2/KU/LS-BKKU/2026 |
2026-05-21 |
1113P |
Rp. 48.500.000 |
8 Hari |
|
| 219 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-05-26 |
0427/UN47.A2/KU/LS-BKKU/2026 |
2026-06-02 |
1193P |
Rp. 34.500.000 |
7 Hari |
|
| 220 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-05-26 |
0426/UN47.A2/KU/LS-BKKU/2026 |
2026-06-04 |
1194P |
Rp. 32.230.000 |
9 Hari |
|
| 221 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-06-05 |
0457/UN47.A2/KU/LS-BKKU/2026 |
2026-06-05 |
1252P |
Rp. 49.692.000 |
0 Hari |
|
| 222 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-06-15 |
0484/UN47.A2/KU/LS-BKKU/2026 |
2026-06-26 |
1346P |
Rp. 24.100.000 |
11 Hari |
|
| 223 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-06-17 |
0489/UN47.A2/KU/LS-BKKU/2026 |
2026-06-30 |
1397P |
Rp. 29.737.000 |
13 Hari |
|
| 224 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-06-18 |
0495/UN47.A2/KU/GU.10-BKKU/2026 |
2026-06-24 |
1328P |
Rp. 5.500.000 |
6 Hari |
|
| 225 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-06-29 |
0512/UN47.A2/KU/LS-BKKU/2026 |
2026-07-03 |
1469P |
Rp. 31.732.870 |
4 Hari |
|
| 226 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-07-14 |
0585/UN47.A2/KU/LS-BKKU/2026 |
2026-07-16 |
1637P |
Rp. 29.393.000 |
2 Hari |
|
| 227 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-07-24 |
0630/UN47.A2/KU/LS-BKKU/2026 |
2026-07-28 |
1721P |
Rp. 25.500.000 |
4 Hari |
|
| 228 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
|
|
|
|
Rp. 20.000.000 |
65 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Agustus 2026 hingga 05 Oktober 2026 (65 Hari) |
| 229 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-08-13 |
0706/UN47.A2/KU/LS-BKKU/2026 |
2026-08-19 |
2011P |
Rp. 11.000.000 |
6 Hari |
|
| 230 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-08-18 |
0721/UN47.A2/KU/LS-BKKU/2026 |
2026-08-20 |
2042P |
Rp. 25.000.000 |
2 Hari |
|
| 231 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-08-20 |
0741/UN47.A2/KU/LS-BKKU/2026 |
2026-08-27 |
2087P |
Rp. 22.000.000 |
7 Hari |
|
| 232 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-08-28 |
0755/UN47.A2/KU/LS-BKKU/2026 |
2026-09-01 |
2155P |
Rp. 32.637.000 |
4 Hari |
|
| 233 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-09-15 |
0831/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 31.912.500 |
20 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 05 Oktober 2026 (20 Hari) |
| 234 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-09-15 |
0837/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 49.603.000 |
20 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 05 Oktober 2026 (20 Hari) |
| 235 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-09-15 |
0825/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 22.246.875 |
20 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 05 Oktober 2026 (20 Hari) |
| 236 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-02-11 |
0092/UN47.A2/KU/LS-BKKU/2026 |
2026-02-13 |
0185P |
Rp. 16.383.600 |
2 Hari |
|
| 237 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-03-04 |
0139/UN47.A2/KU/LS-BKKU/2026 |
2026-03-06 |
0347P |
Rp. 49.784.000 |
2 Hari |
|
| 238 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-03-04 |
0146/UN47.A2/KU/LS-BKKU/2026 |
2026-03-06 |
0350P |
Rp. 48.618.000 |
2 Hari |
|
| 239 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-03-04 |
0147/UN.A2/KU/LS-BKKU/2026 |
2026-03-06 |
0349P |
Rp. 48.701.000 |
2 Hari |
|
| 240 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-04-13 |
0287/UN47.A2/KU/LS-BKKU/2026 |
2026-04-15 |
0798N |
Rp. 49.603.000 |
2 Hari |
|
| 241 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-05-04 |
0342/UN47.A2/KU/LS-BKKU/2026 |
2026-05-05 |
0982P |
Rp. 34.136.000 |
1 Hari |
|
| 242 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-05-13 |
0399/UN47.A2/KU/LS-BKU/2026 |
2026-05-19 |
1093P |
Rp. 20.150.000 |
6 Hari |
|
| 243 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-05-25 |
0420/UN47.A2/KU/LS-BKKU/2026 |
2026-05-26 |
1168P |
Rp. 49.372.800 |
1 Hari |
|
| 244 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-05-25 |
0419/UN47.A2/KU/LS-BKKU/2026 |
2026-05-26 |
1169P |
Rp. 48.706.800 |
1 Hari |
|
| 245 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-05-25 |
0407/UN47.A2/KU/LS-BKKU/2026 |
2026-05-26 |
1153P |
Rp. 13.425.000 |
1 Hari |
|
| 246 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-06-03 |
0442/UN47.A2/KU/LS-BKKU/2026 |
2026-06-08 |
1253P |
Rp. 47.619.000 |
5 Hari |
|
| 247 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-06-04 |
0456/UN47.A2/KU/LS-BKKU/2026 |
2026-07-02 |
1426P |
Rp. 48.150.000 |
28 Hari |
|
| 248 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-07-24 |
0626/UN47.A2/KU/LS-BKKU/2026 |
2026-07-29 |
1756P |
Rp. 48.773.400 |
5 Hari |
|
| 249 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-07-24 |
0627/UN47.A2/KU/LS-BKKU/2026 |
2026-07-29 |
1740P |
Rp. 48.909.000 |
5 Hari |
|
| 250 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-07-27 |
0633/UN47.A2/KU/LS-BKKU/2026 |
2026-07-29 |
1742P |
Rp. 49.500.000 |
2 Hari |
|
| 251 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-07-27 |
0632/UN47.A2/KU/LS-BKKU/2026 |
2026-07-30 |
1769P |
Rp. 33.433.200 |
3 Hari |
|
| 252 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-08-13 |
0707/UN47.A2/KU/LS-BKKU/2026 |
2026-08-19 |
2012P |
Rp. 9.997.000 |
6 Hari |
|
| 253 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-08-13 |
0705/UN47.A2/KU/LS-BKKU/2026 |
2026-08-19 |
2002P |
Rp. 49.145.000 |
6 Hari |
|
| 254 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-09-01 |
0781/UN47.A2/KU/LS-BKKU/2026 |
2026-09-10 |
2252P |
Rp. 37.582.350 |
9 Hari |
|
| 255 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Pemeliharaan Peralatan dan Mesin Perkantoran |
2026-03-04 |
0145/UN47.A2/KU/LS-BKKU/2026 |
2026-03-06 |
0348P |
Rp. 46.620.000 |
2 Hari |
|
| 256 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Pemeliharaan Peralatan dan Mesin Perkantoran |
2026-03-10 |
0190/UN47.A2/KU/GU.4-BKKU/2026 |
2026-03-11 |
0438P |
Rp. 34.532.000 |
1 Hari |
|
| 257 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Pemeliharaan Peralatan dan Mesin Perkantoran |
2026-03-31 |
0243/UN47.A2/KU/GU.5-BKKU/2026 |
2026-03-31 |
0620P |
Rp. 15.000.000 |
0 Hari |
|
| 258 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Pemeliharaan Peralatan dan Mesin Perkantoran |
2026-04-08 |
0277/UN47.A2/KU/GU.6-BKKU/2026 |
2026-04-09 |
0697P |
Rp. 23.802.000 |
1 Hari |
|
| 259 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Pemeliharaan Peralatan dan Mesin Perkantoran |
2026-05-11 |
0381/UN47.A2/KU/GU.8-BKKU/2026 |
2026-05-11 |
1041P |
Rp. 33.980.000 |
0 Hari |
|
| 260 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Pemeliharaan Peralatan dan Mesin Perkantoran |
2026-05-30 |
0431/UN47.A2/KU/GU.9-BKKU/2026 |
2026-06-03 |
1216P |
Rp. 15.040.000 |
4 Hari |
|
| 261 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Pemeliharaan Peralatan dan Mesin Perkantoran |
2026-06-18 |
0499/UN47.A2/KU/GU.10-BKKU/2026 |
2026-06-24 |
1332P |
Rp. 10.650.000 |
6 Hari |
|
| 262 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Pemeliharaan Peralatan dan Mesin Perkantoran |
2026-07-10 |
0575/UN47.A2/KU/GU.11-BKKU/2026 |
2026-07-13 |
1608P |
Rp. 40.256.600 |
3 Hari |
|
| 263 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Pemeliharaan Peralatan dan Mesin Perkantoran |
2026-06-11 |
0472/UN47.A2/KU/LS-BKKU/2026 |
2026-07-06 |
1499P |
Rp. 36.335.000 |
25 Hari |
|
| 264 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Pemeliharaan Peralatan dan Mesin Perkantoran |
2026-09-15 |
0844/UN47.A2/KU-GU.15-BKKU/2026 |
2026-09-17 |
2351P |
Rp. 72.156.000 |
2 Hari |
|
| 265 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-02-09 |
0081/UN47.A2/KU/GU.2-BKKU/2026 |
2026-02-11 |
0155P |
Rp. 3.060.000 |
2 Hari |
|
| 266 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-02-26 |
0129/UN47.A2/KU/SPP-GU.3-BKKU |
2026-02-27 |
0255P |
Rp. 57.719.000 |
1 Hari |
|
| 267 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-03-10 |
0190/UN47.A2/KU/GU.4-BKKU/2026 |
2026-03-11 |
0438P |
Rp. 150.000 |
1 Hari |
|
| 268 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-03-31 |
0243/UN47.A2/KU/GU.5-BKKU/2026 |
2026-03-31 |
0620P |
Rp. 20.830.000 |
0 Hari |
|
| 269 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-04-27 |
0327/UN47.A2/KU/GU.7-BKKU/2026 |
2026-04-28 |
0904P |
Rp. 18.000.000 |
1 Hari |
|
| 270 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-05-11 |
0381/UN47.A2/KU/GU.8-BKKU/2026 |
2026-05-11 |
1041P |
Rp. 22.230.000 |
0 Hari |
|
| 271 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-05-13 |
0397/UN47.A2/KU/LS-BKKU/2026 |
2026-05-19 |
1094P |
Rp. 48.300.000 |
6 Hari |
|
| 272 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-05-21 |
0415/UN47.A2/KU/LS-BKKU/2026 |
2026-05-25 |
1135P |
Rp. 37.500.000 |
4 Hari |
|
| 273 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-05-21 |
0416/UN47.A2/KU/LS-BKKU/2026 |
2026-05-25 |
1136P |
Rp. 39.280.000 |
4 Hari |
|
| 274 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-05-30 |
0431/UN47.A2/KU/GU.9-BKKU/2026 |
2026-06-03 |
1216P |
Rp. 785.000 |
4 Hari |
|
| 275 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
|
|
|
|
Rp. 72.000.000 |
126 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Juni 2026 hingga 05 Oktober 2026 (126 Hari) |
| 276 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-06-18 |
0499/UN47.A2/KU/GU.10-BKKU/2026 |
2026-06-24 |
1332P |
Rp. 28.407.000 |
6 Hari |
|
| 277 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-06-23 |
0507/UN47.A2/KU/LS-BKKU/2026 |
2026-06-29 |
1365P |
Rp. 10.800.000 |
6 Hari |
|
| 278 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-07-10 |
0575/UN47.A2/KU/GU.11-BKKU/2026 |
2026-07-13 |
1608P |
Rp. 300.000 |
3 Hari |
|
| 279 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-08-03 |
0654/UN47.A2/KU/LS-BKKU/2026 |
2026-08-03 |
1833P |
Rp. 27.000.000 |
0 Hari |
|
| 280 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-08-13 |
0703/UN47.A2/KU/LS-BKKU/2026 |
2026-08-19 |
2010P |
Rp. 24.102.000 |
6 Hari |
|
| 281 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-08-28 |
0759/UN47.A2/KU/GU.14-BKKU/2026 |
2026-09-01 |
2135P |
Rp. 25.000.000 |
4 Hari |
|
| 282 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-08-28 |
0754/UN47.A2/KU/LS-BKKU/2026 |
2026-09-02 |
2191P |
Rp. 30.545.000 |
5 Hari |
|
| 283 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-09-15 |
0844/UN47.A2/KU-GU.15-BKKU/2026 |
2026-09-17 |
2351P |
Rp. 37.939.000 |
2 Hari |
|
| 284 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-09-28 |
0888/UN47.A2/KU/GU.16-BKKU/2026 |
|
|
Rp. 3.150.000 |
7 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 05 Oktober 2026 (7 Hari) |
| 285 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-01-09 |
0030/UN47.A2/KU/LS-BKKU/2026 |
2026-01-19 |
0055P |
Rp. 48.823.500 |
10 Hari |
|
| 286 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-01-21 |
0036/UN47.A2/KU/LS-BKKU/2026 |
2026-01-22 |
0081P |
Rp. 41.385.550 |
1 Hari |
|
| 287 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-01-21 |
0037/UN47.A2/KU/LS-BKKU/2026 |
2026-01-22 |
0083P |
Rp. 49.874.850 |
1 Hari |
|
| 288 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-01-23 |
0044/UN47.A2/KU/LS-BKKU/2026 |
2026-01-26 |
0098P |
Rp. 38.940.000 |
3 Hari |
|
| 289 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-01-28 |
0056/UN47.A2/KU/LS-BKKU/2026 |
2026-01-29 |
0121P |
Rp. 49.635.400 |
1 Hari |
|
| 290 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-01-28 |
0057/UN47.A2/KU/LS-BKKU/2026 |
2026-01-29 |
0120P |
Rp. 47.304.200 |
1 Hari |
|
| 291 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-02-09 |
0081/UN47.A2/KU/GU.2-BKKU/2026 |
2026-02-11 |
0155P |
Rp. 45.107.050 |
2 Hari |
|
| 292 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-02-05 |
0073/UN47.A2/KU/LS-BKKU/2026 |
2026-02-09 |
0142P |
Rp. 34.405.560 |
4 Hari |
|
| 293 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-02-06 |
0075/UN47.A2/KU/SPP-LS-BKKU/2026 |
2026-02-09 |
0149P |
Rp. 42.283.500 |
3 Hari |
|
| 294 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-02-11 |
0086/UN47.A2/KU/LS-BKKU/2026 |
2026-02-12 |
0161P |
Rp. 48.705.500 |
1 Hari |
|
| 295 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-02-11 |
0085/UN47.A2/KU/LS-BKKU/2026 |
2026-02-12 |
0160P |
Rp. 46.443.000 |
1 Hari |
|
| 296 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-02-11 |
0088/UN47.A2/KU/LS-BKKU/2026 |
2026-02-12 |
0159P |
Rp. 32.027.350 |
1 Hari |
|
| 297 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-02-13 |
0099/UN47.A2/KU/LS-BKKU/2026 |
2026-02-18 |
0189P |
Rp. 27.571.000 |
5 Hari |
|
| 298 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-02-26 |
0119/UN47.A2/KU/LS-BKKU/2026 |
2026-02-27 |
0268P |
Rp. 47.690.025 |
1 Hari |
|
| 299 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-02-26 |
0121/UN47.A2/KU/LS-BKKU/2026 |
2026-02-27 |
0259P |
Rp. 47.000.000 |
1 Hari |
|
| 300 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-02-26 |
0123/UN47.A2/KU/LS-BKKU/2026 |
2026-02-27 |
0269P |
Rp. 43.896.050 |
1 Hari |
|
| 301 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-02-26 |
0122/UN47.A2/KU/LS-BKKU/2026 |
2026-02-27 |
0260P |
Rp. 48.507.025 |
1 Hari |
|
| 302 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-03-04 |
0141/UN47.A2/KU/LS-BKKU/2026 |
2026-03-05 |
0326P |
Rp. 41.169.500 |
1 Hari |
|
| 303 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-03-04 |
0140/UN47.A2/KU/LS-BKKU/2026 |
2026-03-05 |
0325P |
Rp. 23.725.000 |
1 Hari |
|
| 304 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-03-09 |
0172/UN47.A2/KU/LS-BKKU/2026 |
2026-03-11 |
0457P |
Rp. 27.775.750 |
2 Hari |
|
| 305 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-03-09 |
0173/UN47.A2/KU/LS-BKKU/2026 |
2026-03-11 |
0458P |
Rp. 24.912.700 |
2 Hari |
|
| 306 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-03-10 |
0185/UN47.A2/KU/LS-BKKU/2026 |
2026-03-12 |
0459P |
Rp. 47.562.500 |
2 Hari |
|
| 307 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-03-10 |
0186/UN47.A2/KU/LS-BKKU/2026 |
2026-03-11 |
0472N |
Rp. 47.458.800 |
1 Hari |
|
| 308 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-03-10 |
0190/UN47.A2/KU/GU.4-BKKU/2026 |
2026-03-11 |
0438P |
Rp. 29.588.400 |
1 Hari |
|
| 309 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-03-11 |
0197/UN47.A2/KU/LS-BKKU/2026 |
2026-03-11 |
0470P |
Rp. 42.339.000 |
0 Hari |
|
| 310 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-03-13 |
0220/UN47.A2/KU-LS-BKKU/2026 |
2026-03-16 |
0559P |
Rp. 45.770.000 |
3 Hari |
|
| 311 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-03-13 |
0221/UN47.A2/KU/LS-BKKU/2026 |
2026-03-16 |
0560P |
Rp. 33.560.600 |
3 Hari |
|
| 312 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-03-31 |
0243/UN47.A2/KU/GU.5-BKKU/2026 |
2026-03-31 |
0620P |
Rp. 25.047.500 |
0 Hari |
|
| 313 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-04-06 |
0264/UN47.A2/KU/LS-BKKU/2026 |
2026-04-07 |
0668P |
Rp. 42.087.200 |
1 Hari |
|
| 314 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-04-07 |
0265/UN47.A2/KU/LS-BKKU/2026 |
2026-04-07 |
0669P |
Rp. 41.870.800 |
0 Hari |
|
| 315 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-04-08 |
0277/UN47.A2/KU/GU.6-BKKU/2026 |
2026-04-09 |
0697P |
Rp. 23.680.900 |
1 Hari |
|
| 316 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-04-08 |
0270/UN47.A2/KU/LS-BKKU/2026 |
2026-04-09 |
0701P |
Rp. 44.966.500 |
1 Hari |
|
| 317 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-04-08 |
0271/UN47.A2/KU/LS-BKKU/2026 |
2026-04-09 |
0702P |
Rp. 33.205.000 |
1 Hari |
|
| 318 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-04-15 |
0295/UN47.A2/KU/LS-BKKU/2026 |
2026-04-16 |
0818P |
Rp. 29.953.000 |
1 Hari |
|
| 319 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-04-15 |
0296/UN47.A2/KU/LS-BKKU/2026 |
2026-04-16 |
0819P |
Rp. 30.864.000 |
1 Hari |
|
| 320 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-04-23 |
0320/UN47.A2/KU/LS-BKKU/2026 |
2026-04-28 |
0891P |
Rp. 48.591.625 |
5 Hari |
|
| 321 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-04-23 |
0322/UN47.A2/KU/LS-BKKU/2026 |
2026-04-28 |
0890P |
Rp. 47.817.150 |
5 Hari |
|
| 322 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-04-23 |
0321/UN47.A2/KU/LS-BKKU/2026 |
2026-04-28 |
0889P |
Rp. 45.287.500 |
5 Hari |
|
| 323 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-04-27 |
0327/UN47.A2/KU/GU.7-BKKU/2026 |
2026-04-28 |
0904P |
Rp. 108.386.000 |
1 Hari |
|
| 324 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-04-30 |
0338/UN47.A2/KU/LS-BKKU/2026 |
2026-04-30 |
0967P |
Rp. 32.500.000 |
0 Hari |
|
| 325 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-05-05 |
0350/UN47.A2/KU/LS-BKKU/2026 |
2026-05-07 |
1032P |
Rp. 27.123.000 |
2 Hari |
|
| 326 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-05-11 |
0381/UN47.A2/KU/GU.8-BKKU/2026 |
2026-05-11 |
1041P |
Rp. 39.329.000 |
0 Hari |
|
| 327 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-05-13 |
0400/UN47.A2/KU/LS-BKKU/2026 |
2026-05-19 |
1087P |
Rp. 47.850.000 |
6 Hari |
|
| 328 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-05-13 |
0401/UN47.A2/KU/LS-BKKU/2026 |
2026-05-19 |
1086P |
Rp. 37.130.000 |
6 Hari |
|
| 329 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-05-21 |
0417/UN47.A2/KU/LS-BKKU/2026 |
2026-05-25 |
1137P |
Rp. 38.550.000 |
4 Hari |
|
| 330 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
|
|
|
|
Rp. 56.100.000 |
126 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Juni 2026 hingga 05 Oktober 2026 (126 Hari) |
| 331 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-06-03 |
0443/UN47.A2/KU/LS-BKKU/2026 |
2026-06-17 |
1303P |
Rp. 38.764.300 |
14 Hari |
|
| 332 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-06-03 |
0444/UN47.A2/KU/LS-BKKU/2026 |
2026-06-17 |
1304P |
Rp. 43.503.500 |
14 Hari |
|
| 333 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-06-03 |
0448/UN47.A2/KU/LS-BKKU/2026 |
2026-06-29 |
1361P |
Rp. 24.258.000 |
26 Hari |
|
| 334 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-06-18 |
0499/UN47.A2/KU/GU.10-BKKU/2026 |
2026-06-24 |
1332P |
Rp. 10.904.500 |
6 Hari |
|
| 335 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-06-23 |
0504/UN47.A2/KU/LS-BKKU/2026 |
2026-06-26 |
1347P |
Rp. 37.601.500 |
3 Hari |
|
| 336 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-06-29 |
0510/UN47.A2/KU/LS-BKKU/2026 |
2026-07-03 |
1468P |
Rp. 46.935.500 |
4 Hari |
|
| 337 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-07-10 |
0567/UN47.A2/KU/LS-BKKU/2026 |
2026-07-15 |
1630P |
Rp. 37.500.000 |
5 Hari |
|
| 338 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-07-10 |
0568/UN47.A2/KU/LS-BKKU/2026 |
2026-07-15 |
1627P |
Rp. 32.028.250 |
5 Hari |
|
| 339 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-07-10 |
0570/UN47.A2/KU/LS-BKKU/2026 |
2026-07-14 |
1625P |
Rp. 47.580.600 |
4 Hari |
|
| 340 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-07-10 |
0571/UN47.A2/KU/LS-BKKU/2026 |
2026-07-14 |
1626P |
Rp. 46.323.000 |
4 Hari |
|
| 341 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-07-22 |
0620/UN47.A2/KU/LS-BKKU/2026 |
2026-07-29 |
1741P |
Rp. 41.919.500 |
7 Hari |
|
| 342 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-07-28 |
0638/UN47.A2/KU/GU.12-BKKU/2026 |
2026-07-29 |
1764P |
Rp. 112.105.600 |
1 Hari |
|
| 343 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-08-13 |
0712/UN47.A2/KU/GU.13-BLU/2026 |
2026-08-18 |
2007P |
Rp. 67.450.000 |
5 Hari |
|
| 344 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-07-29 |
0643/UN47.A2/KU/LS-BKKU/2026 |
2026-08-03 |
1832P |
Rp. 39.048.900 |
5 Hari |
|
| 345 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-08-03 |
0642/UN47.A2/KU/LS-BKKU/2026 |
2026-08-03 |
1831P |
Rp. 38.050.000 |
0 Hari |
|
| 346 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-08-03 |
0657/UN47.A2/KU/LS-BKKU/2026 |
2026-08-04 |
1838P |
Rp. 35.509.000 |
1 Hari |
|
| 347 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-08-19 |
0724/UN47.A2/KU/LS-BKKU/2026 |
2026-08-20 |
2041P |
Rp. 47.600.475 |
1 Hari |
|
| 348 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-08-19 |
0725/UN47.A2/KU/LS-BKKU/2026 |
2026-08-21 |
2054P |
Rp. 7.076.000 |
2 Hari |
|
| 349 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-08-28 |
0759/UN47.A2/KU/GU.14-BKKU/2026 |
2026-09-01 |
2135P |
Rp. 44.163.350 |
4 Hari |
|
| 350 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-09-15 |
0827a/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 29.153.200 |
20 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 05 Oktober 2026 (20 Hari) |
| 351 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-09-15 |
0838/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 48.916.500 |
20 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 05 Oktober 2026 (20 Hari) |
| 352 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-09-15 |
0839/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 44.243.400 |
20 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 05 Oktober 2026 (20 Hari) |
| 353 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-09-15 |
0828/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 36.171.000 |
20 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 05 Oktober 2026 (20 Hari) |
| 354 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-09-15 |
0840/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 43.632.400 |
20 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 05 Oktober 2026 (20 Hari) |
| 355 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-09-15 |
0826/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 35.895.000 |
20 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 05 Oktober 2026 (20 Hari) |
| 356 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-09-16 |
0852/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 14.388.000 |
19 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 05 Oktober 2026 (19 Hari) |
| 357 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-09-16 |
0851/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 44.600.000 |
19 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 05 Oktober 2026 (19 Hari) |
| 358 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-09-25 |
0881/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 12.131.050 |
10 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 05 Oktober 2026 (10 Hari) |
| 359 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-09-28 |
0888/UN47.A2/KU/GU.16-BKKU/2026 |
|
|
Rp. 100.595.000 |
7 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 05 Oktober 2026 (7 Hari) |
| 360 |
Biro Keuangan, Kerja Sama dan Umum |
Oktober 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
|
|
|
|
Rp. 31.799.000 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 361 |
Biro Keuangan, Kerja Sama dan Umum |
Oktober 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-10-02 |
0897/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 49.231.500 |
3 Hari |
Belum ada SP2D terhitung dari 02 Oktober 2026 hingga 05 Oktober 2026 (3 Hari) |
| 362 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Pemeliharaan Lift |
2026-02-23 |
0114/UN47.A2/KU/LS-BKKU/2026 |
2026-02-25 |
0226P |
Rp. 30.000.000 |
2 Hari |
|
| 363 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Pemeliharaan Lift |
2026-04-16 |
0299/UN47.A2/KU/LS-BKKU/2026 |
2026-04-20 |
0829P |
Rp. 30.000.000 |
4 Hari |
|
| 364 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Pemeliharaan Lift |
2026-06-17 |
0491/UN47.A2/KU/LS-BKKU/2026 |
2026-06-30 |
1398P |
Rp. 30.000.000 |
13 Hari |
|
| 365 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Pemeliharaan Lift |
2026-09-25 |
0872/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 36.100.000 |
10 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 05 Oktober 2026 (10 Hari) |
| 366 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525114 |
Pemeliharaan AC |
2026-01-19 |
0029/UN47.A2/KU/LS-BKKU/2026 |
2026-01-19 |
0056P |
Rp. 48.432.000 |
0 Hari |
|
| 367 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Pemeliharaan AC |
2026-02-26 |
0129/UN47.A2/KU/SPP-GU.3-BKKU |
2026-02-27 |
0255P |
Rp. 6.125.000 |
1 Hari |
|
| 368 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Pemeliharaan AC |
2026-03-11 |
0210/UN47.A2/KU/LS-BKKU/2026 |
2026-03-13 |
0517P |
Rp. 20.000.000 |
2 Hari |
|
| 369 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Pemeliharaan AC |
2026-03-31 |
0243/UN47.A2/KU/GU.5-BKKU/2026 |
2026-03-31 |
0620P |
Rp. 20.592.500 |
0 Hari |
|
| 370 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Pemeliharaan AC |
2026-04-29 |
0332/UN7.A2/KU/LS-BKKU/2026 |
2026-04-30 |
0938P |
Rp. 35.629.500 |
1 Hari |
|
| 371 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Pemeliharaan AC |
2026-04-30 |
0337/UN47.A2/KU/LS-BKKU/2026 |
2026-05-04 |
0968P |
Rp. 8.637.195 |
4 Hari |
|
| 372 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Pemeliharaan AC |
2026-05-30 |
0431/UN47.A2/KU/GU.9-BKKU/2026 |
2026-06-03 |
1216P |
Rp. 29.950.000 |
4 Hari |
|
| 373 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Pemeliharaan AC |
2026-06-18 |
0499/UN47.A2/KU/GU.10-BKKU/2026 |
2026-06-24 |
1332P |
Rp. 26.679.000 |
6 Hari |
|
| 374 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Pemeliharaan AC |
2026-07-09 |
0558/UN47.A2/KU/LS-BKKU/2026 |
2026-07-13 |
1603P |
Rp. 27.800.000 |
4 Hari |
|
| 375 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Pemeliharaan AC |
|
|
|
|
Rp. 46.000.000 |
65 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Agustus 2026 hingga 05 Oktober 2026 (65 Hari) |
| 376 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Pemeliharaan AC |
2026-07-14 |
0584/UN47.A2/KU/LS-BKKU/2026 |
2026-08-10 |
1863P |
Rp. 35.400.000 |
27 Hari |
|
| 377 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Pemeliharaan AC |
2026-08-13 |
0704/UN47.A2/KU/LS-BKKU/2026 |
2026-08-18 |
2001P |
Rp. 12.425.000 |
5 Hari |
|
| 378 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Pemeliharaan AC |
2026-08-28 |
0759/UN47.A2/KU/GU.14-BKKU/2026 |
2026-09-01 |
2135P |
Rp. 4.582.714 |
4 Hari |
|
| 379 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Pemeliharaan AC |
2026-08-31 |
0756/UN47.A2/KU/LS-BKKU/2026 |
2026-09-02 |
2192P |
Rp. 15.300.000 |
2 Hari |
|
| 380 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Pemeliharaan AC |
2026-09-15 |
0844/UN47.A2/KU-GU.15-BKKU/2026 |
2026-09-17 |
2351P |
Rp. 34.879.000 |
2 Hari |
|
| 381 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Pemeliharaan AC |
2026-09-28 |
0888/UN47.A2/KU/GU.16-BKKU/2026 |
|
|
Rp. 61.501.000 |
7 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 05 Oktober 2026 (7 Hari) |
| 382 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Pemeliharaan AC |
2026-09-29 |
0891/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 23.000.000 |
6 Hari |
Belum ada SP2D terhitung dari 29 September 2026 hingga 05 Oktober 2026 (6 Hari) |
| 383 |
Biro Keuangan, Kerja Sama dan Umum |
Oktober 2026 |
525114 |
Pemeliharaan AC |
|
|
|
|
Rp. 17.785.000 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 384 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-01-26 |
0049/UN47.A2/KU/GU.1-BKKU/2026 |
2026-01-28 |
0112P |
Rp. 14.406.041 |
2 Hari |
|
| 385 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-02-09 |
0081/UN47.A2/KU/GU.2-BKKU/2026 |
2026-02-11 |
0155P |
Rp. 7.080.000 |
2 Hari |
|
| 386 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-02-26 |
0129/UN47.A2/KU/SPP-GU.3-BKKU |
2026-02-27 |
0255P |
Rp. 143.000 |
1 Hari |
|
| 387 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-03-02 |
0134/UN47.A2/KU/LS-BKKU/2026 |
2026-03-02 |
0289P |
Rp. 31.679.550 |
0 Hari |
|
| 388 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-03-10 |
0190/UN47.A2/KU/GU.4-BKKU/2026 |
2026-03-11 |
0438P |
Rp. 3.585.000 |
1 Hari |
|
| 389 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-03-11 |
0206/UN47.A2/KU/LS-BKKU/2026 |
2026-03-30 |
0610P |
Rp. 40.745.500 |
19 Hari |
|
| 390 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-03-11 |
0207/UN47.A2/KU/LS-BKKU/2026 |
2026-03-30 |
0611P |
Rp. 40.758.500 |
19 Hari |
|
| 391 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-03-31 |
0243/UN47.A2/KU/GU.5-BKKU/2026 |
2026-03-31 |
0620P |
Rp. 1.800.000 |
0 Hari |
|
| 392 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-04-08 |
0277/UN47.A2/KU/GU.6-BKKU/2026 |
2026-04-09 |
0697P |
Rp. 3.397.960 |
1 Hari |
|
| 393 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-04-27 |
0327/UN47.A2/KU/GU.7-BKKU/2026 |
2026-04-28 |
0904P |
Rp. 12.679.500 |
1 Hari |
|
| 394 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-05-11 |
0381/UN47.A2/KU/GU.8-BKKU/2026 |
2026-05-11 |
1041P |
Rp. 3.500.000 |
0 Hari |
|
| 395 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-06-18 |
0499/UN47.A2/KU/GU.10-BKKU/2026 |
2026-06-24 |
1332P |
Rp. 3.750.000 |
6 Hari |
|
| 396 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-07-10 |
0575/UN47.A2/KU/GU.11-BKKU/2026 |
2026-07-13 |
1608P |
Rp. 3.050.232 |
3 Hari |
|
| 397 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-07-10 |
0575/UN47.A2/KU/GU.11-BKKU/2026 |
2026-07-13 |
1608P |
Rp. 4.250.000 |
3 Hari |
|
| 398 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-07-28 |
0638/UN47.A2/KU/GU.12-BKKU/2026 |
2026-07-29 |
1764P |
Rp. 16.902.000 |
1 Hari |
|
| 399 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-08-28 |
0759/UN47.A2/KU/GU.14-BKKU/2026 |
2026-09-01 |
2135P |
Rp. 6.337.000 |
4 Hari |
|
| 400 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
|
|
|
|
Rp. 100.000.000 |
34 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 05 Oktober 2026 (34 Hari) |
| 401 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-09-08 |
0796/UN47.A2/KU/LS-BKKU/2026 |
2026-09-10 |
2244P |
Rp. 49.779.500 |
2 Hari |
|
| 402 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-09-15 |
0824/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 26.500.000 |
20 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 05 Oktober 2026 (20 Hari) |
| 403 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-09-17 |
0860/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 31.194.373 |
18 Hari |
Belum ada SP2D terhitung dari 17 September 2026 hingga 05 Oktober 2026 (18 Hari) |
| 404 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-09-28 |
0884/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 48.526.000 |
7 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 05 Oktober 2026 (7 Hari) |
| 405 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-09-28 |
0888/UN47.A2/KU/GU.16-BKKU/2026 |
|
|
Rp. 14.776.500 |
7 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 05 Oktober 2026 (7 Hari) |
| 406 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-09-28 |
0890/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 45.527.500 |
7 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 05 Oktober 2026 (7 Hari) |
| 407 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-01-20 |
0032/UN47.A2/KU/LS-BKKU/2026 |
2026-01-22 |
0080P |
Rp. 30.600.000 |
2 Hari |
|
| 408 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-01-20 |
0033/UN47.A2/KU/LS-BKKU/2026 |
2026-01-22 |
0082P |
Rp. 35.959.500 |
2 Hari |
|
| 409 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-01-28 |
0058a/UN47.A2/KU/LS-BKKU/2026 |
2026-02-04 |
0134P |
Rp. 45.380.000 |
7 Hari |
|
| 410 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-02-11 |
0089/UN47.A2/KU/LS-BKKU/2026 |
2026-02-13 |
0175P |
Rp. 30.567.075 |
2 Hari |
|
| 411 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-02-11 |
0091/UN47.A2/KU/LS-BKKU/2026 |
2026-02-12 |
0174P |
Rp. 31.228.339 |
1 Hari |
|
| 412 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-02-11 |
0087/UN47.A2/KU/LS-BKKU/2026 |
2026-02-13 |
0173P |
Rp. 25.962.287 |
2 Hari |
|
| 413 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-02-11 |
0090/UN47.A2/KU/LS-BKKU/2026 |
2026-02-13 |
0176P |
Rp. 31.340.945 |
2 Hari |
|
| 414 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-02-13 |
0095/UN47.A2/KU/LS-BKKU/2026 |
2026-02-18 |
0187P |
Rp. 25.197.000 |
5 Hari |
|
| 415 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-02-13 |
0096/UN47.A2/KU/LS-BKKU/2026 |
2026-02-18 |
0188P |
Rp. 24.920.000 |
5 Hari |
|
| 416 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-02-26 |
0129/UN47.A2/KU/SPP-GU.3-BKKU |
2026-02-27 |
0255P |
Rp. 15.000.000 |
1 Hari |
|
| 417 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-03-04 |
0137/UN47.A2/KU/LS-BKKU/2026 |
2026-03-05 |
0327P |
Rp. 47.744.090 |
1 Hari |
|
| 418 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-03-04 |
0142/UN47.A2/KU/LS-BKKU/2026 |
2026-03-05 |
0341 |
Rp. 29.880.000 |
1 Hari |
|
| 419 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-03-05 |
0153/UN47.A2/KU/LS-BKKU/2026 |
2026-03-05 |
0339P |
Rp. 25.962.287 |
0 Hari |
|
| 420 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-03-05 |
0152/UN47.A2/KU/LS-BKKU/2026 |
2026-03-05 |
0338P |
Rp. 35.150.000 |
0 Hari |
|
| 421 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-03-05 |
0151/UN47.A2/KU/LS-BKKU/2026 |
2026-03-05 |
0340P |
Rp. 37.380.982 |
0 Hari |
|
| 422 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-03-10 |
0190/UN47.A2/KU/GU.4-BKKU/2026 |
2026-03-11 |
0438P |
Rp. 60.026.361 |
1 Hari |
|
| 423 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-03-11 |
0208/UN47.A2/KU/LS-BKKU/2026 |
2026-03-13 |
0518P |
Rp. 47.380.713 |
2 Hari |
|
| 424 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-03-16 |
0227/UN47.A2/KU/LS-BKKU/2026 |
2026-03-16 |
0595P |
Rp. 33.730.000 |
0 Hari |
|
| 425 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-03-31 |
0243/UN47.A2/KU/GU.5-BKKU/2026 |
2026-03-31 |
0620P |
Rp. 46.638.187 |
0 Hari |
|
| 426 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-04-08 |
0277/UN47.A2/KU/GU.6-BKKU/2026 |
2026-04-09 |
0697P |
Rp. 15.000.000 |
1 Hari |
|
| 427 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-04-20 |
0302/UN47.A2/KU/LS-BKKU/2026 |
2026-04-21 |
0842P |
Rp. 49.145.000 |
1 Hari |
|
| 428 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-04-20 |
0303/UN47.A2/KU/LS-BKKU/2026 |
2026-04-21 |
0843P |
Rp. 49.018.000 |
1 Hari |
|
| 429 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-04-20 |
0304/UN47.A2/KU/LS-BKKU/2026 |
2026-04-21 |
0844P |
Rp. 49.469.000 |
1 Hari |
|
| 430 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-04-21 |
0306/UN47.A2/KU/LS-BKKU/2026 |
2026-04-23 |
0866P |
Rp. 41.750.907 |
2 Hari |
|
| 431 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-04-21 |
0308/UN47.A2/KU/LS-BKKU/2026 |
2026-04-22 |
0855P |
Rp. 38.672.755 |
1 Hari |
|
| 432 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-04-21 |
0309/UN47.A2/KU/LS-BKKU/2026 |
2026-04-22 |
0854P |
Rp. 34.624.152 |
1 Hari |
|
| 433 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-04-21 |
0311/UN47.A2/KU/LS-BKKU/2026 |
2026-04-23 |
0867P |
Rp. 29.651.300 |
2 Hari |
|
| 434 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-04-21 |
0310/UN47.A2/KU/LS-BKKU/2026 |
2026-04-22 |
0856P |
Rp. 29.710.904 |
1 Hari |
|
| 435 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-04-23 |
0307/UN47.A2/KU/LS-BKKU/2026 |
2026-04-27 |
0887P |
Rp. 38.400.000 |
4 Hari |
|
| 436 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-05-05 |
0351/UN47.A2/KU/LS-BKKU/2026 |
2026-05-07 |
1031P |
Rp. 38.500.000 |
2 Hari |
|
| 437 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-05-05 |
0357/UN47.A2/KU/LS-BKKU/2026 |
2026-05-07 |
1022P |
Rp. 39.319.133 |
2 Hari |
|
| 438 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-05-05 |
0358/UN47.A2/KU/LS-BKKU/2026 |
2026-05-07 |
1020P |
Rp. 41.008.100 |
2 Hari |
|
| 439 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-05-05 |
0359/UN47.A2/KU/LS-BKKU/2026 |
2026-05-07 |
1021P |
Rp. 37.250.754 |
2 Hari |
|
| 440 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-05-30 |
0431/UN47.A2/KU/GU.9-BKKU/2026 |
2026-06-03 |
1216P |
Rp. 23.100.000 |
4 Hari |
|
| 441 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-07-10 |
0575/UN47.A2/KU/GU.11-BKKU/2026 |
2026-07-13 |
1608P |
Rp. 15.000.000 |
3 Hari |
|
| 442 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
|
|
|
|
Rp. 37.000.000 |
96 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Juli 2026 hingga 05 Oktober 2026 (96 Hari) |
| 443 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-07-10 |
0569/UN47.A2/KU/LS-BKKU/2026 |
2026-07-14 |
1624P |
Rp. 28.700.000 |
4 Hari |
|
| 444 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-07-28 |
0638/UN47.A2/KU/GU.12-BKKU/2026 |
2026-07-29 |
1764P |
Rp. 15.000.000 |
1 Hari |
|
| 445 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-08-13 |
0712/UN47.A2/KU/GU.13-BLU/2026 |
2026-08-18 |
2007P |
Rp. 15.000.000 |
5 Hari |
|
| 446 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-08-03 |
0658/Un47.A2/KU/LS-BKKU/2026 |
2026-08-04 |
1837P |
Rp. 28.700.000 |
1 Hari |
|
| 447 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-08-04 |
0671/UN47.A2/KU/LS-BKKU/2026 |
2026-08-11 |
1888P |
Rp. 33.064.532 |
7 Hari |
|
| 448 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-08-11 |
0689/UN47.A2/KU/LS-BKKU/2026 |
2026-08-18 |
1984P |
Rp. 48.379.308 |
7 Hari |
|
| 449 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-08-19 |
0728/UN47.A2/KU/LS-BKKU/2026 |
2026-08-20 |
2052P |
Rp. 34.613.000 |
1 Hari |
|
| 450 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-08-19 |
0730/UN47.A2/KU/LS-BKKU/2026 |
2026-08-20 |
2053P |
Rp. 48.173.400 |
1 Hari |
|
| 451 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-08-24 |
0742/UN47.A2/KU/LS-BKKU/2026 |
2026-08-27 |
2091P |
Rp. 37.732.450 |
3 Hari |
|
| 452 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
|
|
|
|
Rp. 40.500.000 |
34 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 05 Oktober 2026 (34 Hari) |
| 453 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-08-31 |
0761/UN47.A2/KU/LS-BKKU/2026 |
2026-09-02 |
2170P |
Rp. 31.500.000 |
2 Hari |
|
| 454 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-08-31 |
0766/UN47.A2/KU/LS-BKKU/2026 |
2026-09-01 |
2151P |
Rp. 39.518.004 |
1 Hari |
|
| 455 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-09-01 |
0778/UN47.A2/KU/LS-BKKU/2026 |
2026-09-02 |
2180P |
Rp. 32.195.000 |
1 Hari |
|
| 456 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-09-15 |
0827/UN4.A2/KU/LS-BKKU/2026 |
|
|
Rp. 37.898.245 |
20 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 05 Oktober 2026 (20 Hari) |
| 457 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-09-25 |
0875/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 49.952.902 |
10 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 05 Oktober 2026 (10 Hari) |
| 458 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-09-25 |
0882/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 10.750.000 |
10 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 05 Oktober 2026 (10 Hari) |
| 459 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-09-25 |
0878/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 49.476.000 |
10 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 05 Oktober 2026 (10 Hari) |
| 460 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-09-25 |
0879/UN47.A2/KU/LS-BKK/2026 |
|
|
Rp. 34.382.000 |
10 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 05 Oktober 2026 (10 Hari) |
| 461 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-09-25 |
0880/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 24.420.000 |
10 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 05 Oktober 2026 (10 Hari) |
| 462 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-09-28 |
0888/UN47.A2/KU/GU.16-BKKU/2026 |
|
|
Rp. 19.374.306 |
7 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 05 Oktober 2026 (7 Hari) |
| 463 |
Biro Keuangan, Kerja Sama dan Umum |
Oktober 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-10-05 |
0904/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 35.401.264 |
0 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 05 Oktober 2026 (0 Hari) |
| 464 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-03-04 |
0149/UN47.A2/KU/LS-BKKU/2026 |
2026-03-05 |
0328P |
Rp. 26.200.000 |
1 Hari |
|
| 465 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-03-05 |
0154/UN47.A2/KU-LS/BKKU-2026 |
2026-03-06 |
0346P |
Rp. 30.000.000 |
1 Hari |
|
| 466 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-03-31 |
0239/UN47.A2/KU/GU.5-BKKU/2026 |
2026-03-31 |
0616P |
Rp. 1.800.000 |
0 Hari |
|
| 467 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-03-13 |
0218/UN47.A2/KU/LS-BKKU/2026 |
2026-03-13 |
0520P |
Rp. 43.800.000 |
0 Hari |
|
| 468 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-04-13 |
0285/UN47.A2/KU/LS-BKKU/2026 |
2026-04-15 |
0799P |
Rp. 214.900.000 |
2 Hari |
|
| 469 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-04-20 |
0305/UN47.A2/KU/LS-BKKU/2026 |
2026-04-21 |
0845P |
Rp. 24.750.000 |
1 Hari |
|
| 470 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-04-21 |
0312/UN47.A2/KU/LS-BKKU/2026 |
2026-04-22 |
0861P |
Rp. 6.400.000 |
1 Hari |
|
| 471 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-04-21 |
0313/UN47.A2/KU/LS-BKKU/2026 |
2026-04-22 |
0862P |
Rp. 17.400.000 |
1 Hari |
|
| 472 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-04-29 |
0333/UN47.A2/KU/LS-BKKU/2026 |
2026-04-30 |
0966P |
Rp. 26.200.000 |
1 Hari |
|
| 473 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-05-11 |
0378/UN47.A2/KU/GU.8-BKKU/2026 |
2026-05-11 |
1038P |
Rp. 2.500.000 |
0 Hari |
|
| 474 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-05-13 |
0392/UN47.A2/KU/LS-BKKU/2026 |
2026-05-19 |
1092P |
Rp. 5.150.000 |
6 Hari |
|
| 475 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-05-13 |
0366/UN47.A2/KU/LS-BKKU/2026 |
2026-05-20 |
1099P |
Rp. 17.500.000 |
7 Hari |
|
| 476 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-05-21 |
0413/UN47.A2/KU/LS-BKKU/2026 |
2026-05-25 |
1147P |
Rp. 8.800.000 |
4 Hari |
|
| 477 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-05-21 |
0414/UN47.A2/KU/LS-BKKU/2026 |
2026-05-25 |
1148P |
Rp. 30.200.000 |
4 Hari |
|
| 478 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-06-30 |
0514/UN47.A2/KU/LS-BKKU/2026 |
2026-07-07 |
1526P |
Rp. 26.200.000 |
7 Hari |
|
| 479 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-06-30 |
0513/UN47.A2/KU/LS-BKKU/2026 |
2026-07-07 |
1525P |
Rp. 63.000.000 |
7 Hari |
|
| 480 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-07-10 |
0565/UN47.A2/KU/LS-BKKU/2026 |
2026-07-14 |
1613P |
Rp. 4.850.000 |
4 Hari |
|
| 481 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-07-10 |
0564/UN47.A2/KU/LS-BKKU/2026 |
2026-07-14 |
1612P |
Rp. 47.100.000 |
4 Hari |
|
| 482 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-07-13 |
0581/UN47.A2/KU/LS-BKKU/2026 |
2026-07-16 |
1636P |
Rp. 41.250.000 |
3 Hari |
|
| 483 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-07-15 |
0595/UN47.A2/KU/LS-BKKU/2026 |
2026-07-28 |
1720P |
Rp. 69.600.000 |
13 Hari |
|
| 484 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525111 |
Honorarium Sidang Senat |
2026-02-27 |
0117/UN47.A2/KU/LS-BKKU/2026 |
2026-02-27 |
0263P |
Rp. 66.000.000 |
0 Hari |
|
| 485 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525111 |
Honorarium Sidang Senat |
2026-06-09 |
0462/UN47.A2/KU/LS-BKKU/2026 |
2026-06-29 |
1362P |
Rp. 112.500.000 |
20 Hari |
|
| 486 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525111 |
Honorarium Sidang Senat |
2026-06-09 |
0463/UN47.A2/KU/LS-BKKU/2026 |
2026-06-11 |
1287P |
Rp. 20.000.000 |
2 Hari |
|
| 487 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525112 |
Belanja Kebutuhan Dasar Perkantoran |
2026-01-26 |
0050/UN47.A2/KU/GU.1-BKKU/2026 |
2026-01-28 |
0113P |
Rp. 13.236.500 |
2 Hari |
|
| 488 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525112 |
Belanja Kebutuhan Dasar Perkantoran |
2026-02-09 |
0078/UN47.A2/KU/GU.2-BKKU/2026 |
2026-02-11 |
0153P |
Rp. 28.308.900 |
2 Hari |
|
| 489 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525112 |
Belanja Kebutuhan Dasar Perkantoran |
2026-02-09 |
0078/UN47.A2/KU/GU.2-BKKU/2026 |
2026-02-11 |
0153P |
Rp. 14.491.116 |
2 Hari |
|
| 490 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525112 |
Belanja Kebutuhan Dasar Perkantoran |
2026-02-26 |
0126/UN47.A2/KU/SPP-GU.3-BKKU |
2026-02-27 |
0252P |
Rp. 787.000 |
1 Hari |
|
| 491 |
Fakultas Sastra dan Budaya |
Maret 2026 |
537112 |
Pembelian barang/peralatan Invetaris kantor dan penunjang lainnya berupa laptop dan printer |
2026-03-12 |
16/SPP-LS-5/2026 |
2026-03-30 |
0612D |
Rp. 59.916.690 |
18 Hari |
|
| 492 |
Fakultas Sastra dan Budaya |
April 2026 |
525114 |
Pemeliharaan AC Perkantoran |
2026-04-02 |
24/SPP-GU-1/2026 |
2026-04-09 |
0716D |
Rp. 5.946.429 |
7 Hari |
|
| 493 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525114 |
Pemeliharaan AC Perkantoran |
2026-08-06 |
071/SPP-GU-3/2026 |
2026-08-28 |
2098D |
Rp. 600.000 |
22 Hari |
|
| 494 |
Fakultas Sastra dan Budaya |
September 2026 |
525114 |
Pemeliharaan AC Perkantoran |
2026-09-18 |
0080/SPP-LS-19/2026 |
|
|
Rp. 43.661.963 |
17 Hari |
Belum ada SP2D terhitung dari 18 September 2026 hingga 05 Oktober 2026 (17 Hari) |
| 495 |
Fakultas Sastra dan Budaya |
Oktober 2026 |
525114 |
Pemeliharaan AC Perkantoran |
2026-10-06 |
0090/SPP-LS-24/2026 |
|
|
Rp. 36.003.869 |
-1 Hari |
Belum ada SP2D terhitung dari 06 Oktober 2026 hingga 05 Oktober 2026 (-1 Hari) |
| 496 |
Fakultas Sastra dan Budaya |
April 2026 |
525114 |
Pemeliharaan Komputer dan Printer Perkantoran |
2026-04-02 |
24/SPP-GU-1/2026 |
2026-04-09 |
0716D |
Rp. 200.000 |
7 Hari |
|
| 497 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525114 |
Pemeliharaan Komputer dan Printer Perkantoran |
2026-08-06 |
071/SPP-GU-3/2026 |
2026-08-28 |
2098D |
Rp. 665.000 |
22 Hari |
|
| 498 |
Fakultas Sastra dan Budaya |
Agustus 2026 |
525114 |
Pemeliharaan Komputer dan Printer Perkantoran |
2026-09-30 |
0086/SPP-GU-NIHIL/2026 |
|
|
Rp. 1.537.500 |
5 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 05 Oktober 2026 (5 Hari) |
| 499 |
Fakultas Sastra dan Budaya |
September 2026 |
525114 |
Pemeliharaan Komputer dan Printer Perkantoran |
2026-09-30 |
0086/SPP-GU-NIHIL/2026 |
|
|
Rp. 2.180.000 |
5 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 05 Oktober 2026 (5 Hari) |
| 500 |
Fakultas Sastra dan Budaya |
April 2026 |
525114 |
Pemeliharaan Jaringan Internet, Listrik dan Instalasi Air |
2026-04-02 |
24/SPP-GU-1/2026 |
2026-04-09 |
0716D |
Rp. 1.084.000 |
7 Hari |
|
| 501 |
Fakultas Sastra dan Budaya |
Mei 2026 |
525114 |
Pemeliharaan Jaringan Internet, Listrik dan Instalasi Air |
2026-04-27 |
36/SPP-GU-2/2026 |
2026-05-12 |
1054D |
Rp. 1.200.000 |
15 Hari |
|
| 502 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525114 |
Pemeliharaan Jaringan Internet, Listrik dan Instalasi Air |
2026-08-06 |
071/SPP-GU-3/2026 |
2026-08-28 |
2098D |
Rp. 2.159.680 |
22 Hari |
|
| 503 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525114 |
Pemeliharaan Jaringan Internet, Listrik dan Instalasi Air |
2026-09-30 |
0086/SPP-GU-NIHIL/2026 |
|
|
Rp. 2.000.000 |
5 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 05 Oktober 2026 (5 Hari) |
| 504 |
Fakultas Sastra dan Budaya |
September 2026 |
525114 |
Pemeliharaan Jaringan Internet, Listrik dan Instalasi Air |
2026-09-14 |
0076/SPP-GU-4/2026 |
|
|
Rp. 3.000.000 |
21 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 05 Oktober 2026 (21 Hari) |
| 505 |
Fakultas Sastra dan Budaya |
September 2026 |
525114 |
Pemeliharaan Jaringan Internet, Listrik dan Instalasi Air |
2026-09-30 |
0086/SPP-GU-NIHIL/2026 |
|
|
Rp. 500.000 |
5 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 05 Oktober 2026 (5 Hari) |
| 506 |
Fakultas Sastra dan Budaya |
Agustus 2026 |
525114 |
Bantuan Biaya Pemeliharaan Halaman Gedung dan Bangunan |
2026-09-30 |
0086/SPP-GU-NIHIL/2026 |
|
|
Rp. 3.500.000 |
5 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 05 Oktober 2026 (5 Hari) |
| 507 |
Fakultas Sastra dan Budaya |
September 2026 |
525114 |
Bantuan Biaya Pemeliharaan Halaman Gedung dan Bangunan |
2026-09-30 |
0086/SPP-GU-NIHIL/2026 |
|
|
Rp. 1.500.000 |
5 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 05 Oktober 2026 (5 Hari) |
| 508 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525119 |
Penguatan Implementasi Kurikulum Berbasis OBE |
2026-08-06 |
073/SPP-GU-3/2026 |
2026-08-28 |
2100D |
Rp. 8.400.000 |
22 Hari |
|
| 509 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Penguatan Implementasi Kurikulum Berbasis OBE |
2026-09-30 |
0088/SPP-GU-NIHIL/2026 |
|
|
Rp. 1.600.000 |
5 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 05 Oktober 2026 (5 Hari) |
| 510 |
Fakultas Sastra dan Budaya |
April 2026 |
525119 |
Bantuan Kegiatan Seleksi dan Pelatihan/Pendampingan PPK Ormawa |
2026-04-02 |
26/SPP-GU-1/2026 |
2026-04-09 |
0717D |
Rp. 2.000.000 |
7 Hari |
|
| 511 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525119 |
Bantuan Kegiatan Seleksi dan Pelatihan/Pendampingan PPK Ormawa |
2026-08-06 |
073/SPP-GU-3/2026 |
2026-08-28 |
2100D |
Rp. 1.000.000 |
22 Hari |
|
| 512 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan Kegiatan Seleksi dan Pelatihan/Pendampingan PPK Ormawa |
2026-09-30 |
0088/SPP-GU-NIHIL/2026 |
|
|
Rp. 1.000.000 |
5 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 05 Oktober 2026 (5 Hari) |
| 513 |
Fakultas Sastra dan Budaya |
Mei 2026 |
525119 |
Bantuan Kegiatan Tata Kelola Ormawa (Mubes,Sekretariat Ormawa) |
2026-04-27 |
40/SPP-GU-2/2026 |
2026-05-12 |
1056D |
Rp. 4.000.000 |
15 Hari |
|
| 514 |
Fakultas Sastra dan Budaya |
Mei 2026 |
525119 |
Bantuan Kegiatan Pembinaan Prestasi Nasional |
2026-04-27 |
40/SPP-GU-2/2026 |
2026-05-12 |
1056D |
Rp. 2.500.000 |
15 Hari |
|
| 515 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525119 |
Bantuan Kegiatan Pembinaan Prestasi Nasional |
2026-08-06 |
073/SPP-GU-3/2026 |
2026-08-28 |
2100D |
Rp. 2.500.000 |
22 Hari |
|
| 516 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan Kegiatan Pembinaan Prestasi Nasional |
|
|
|
|
Rp. 5.000.000 |
34 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 05 Oktober 2026 (34 Hari) |
| 517 |
Fakultas Sastra dan Budaya |
April 2026 |
525119 |
Bantuan Kegiatan Pembinaan PEKSIMINAS |
2026-04-02 |
26/SPP-GU-1/2026 |
2026-04-09 |
0717D |
Rp. 3.500.000 |
7 Hari |
|
| 518 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525119 |
Bantuan Kegiatan Pembinaan PEKSIMINAS |
2026-08-06 |
073/SPP-GU-3/2026 |
2026-08-28 |
2100D |
Rp. 4.000.000 |
22 Hari |
|
| 519 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan Kegiatan Pembinaan PEKSIMINAS |
2026-09-30 |
0088/SPP-GU-NIHIL/2026 |
|
|
Rp. 2.500.000 |
5 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 05 Oktober 2026 (5 Hari) |
| 520 |
Fakultas Sastra dan Budaya |
April 2026 |
525119 |
Bantuan Kegiatan Seleksi dan Pelatihan/Pendampingan P2MW |
2026-04-02 |
26/SPP-GU-1/2026 |
2026-04-09 |
0717D |
Rp. 1.000.000 |
7 Hari |
|
| 521 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan Kegiatan Seleksi dan Pelatihan/Pendampingan P2MW |
2026-09-14 |
0078/SPP-GU-4/2026 |
|
|
Rp. 1.000.000 |
21 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 05 Oktober 2026 (21 Hari) |
| 522 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525119 |
Bantuan Kegiatan PILMAPRES |
2026-08-06 |
073/SPP-GU-3/2026 |
2026-08-28 |
2100D |
Rp. 5.000.000 |
22 Hari |
|
| 523 |
Fakultas Sastra dan Budaya |
Oktober 2026 |
525119 |
Bantuan Presenter Seminar Internasional |
2026-10-06 |
0094/SPP-LS-27/2026 |
|
|
Rp. 4.800.000 |
-1 Hari |
Belum ada SP2D terhitung dari 06 Oktober 2026 hingga 05 Oktober 2026 (-1 Hari) |
| 524 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan Kegiatan Penerimaan Mahasiswa Baru |
2026-09-14 |
0078/SPP-GU-4/2026 |
|
|
Rp. 20.000.000 |
21 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 05 Oktober 2026 (21 Hari) |
| 525 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525119 |
Bantuan Kegiatan Pekan Ilmiah Mahasiswa Nasional (PIMNAS) |
2026-08-06 |
073/SPP-GU-3/2026 |
2026-08-28 |
2100D |
Rp. 350.000 |
22 Hari |
|
| 526 |
Fakultas Sastra dan Budaya |
Agustus 2026 |
525119 |
Bantuan Kegiatan Pekan Ilmiah Mahasiswa Nasional (PIMNAS) |
2026-09-14 |
0078/SPP-GU-4/2026 |
|
|
Rp. 350.000 |
21 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 05 Oktober 2026 (21 Hari) |
| 527 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan Kegiatan Pekan Ilmiah Mahasiswa Nasional (PIMNAS) |
2026-09-14 |
0078/SPP-GU-4/2026 |
|
|
Rp. 350.000 |
21 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 05 Oktober 2026 (21 Hari) |
| 528 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan Kegiatan Pembinaan Prestasi Internasional |
|
|
|
|
Rp. 15.000.000 |
34 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 05 Oktober 2026 (34 Hari) |
| 529 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan Biaya Yudisium (120 Org x 5 Kegiatan) |
2026-09-14 |
0078/SPP-GU-4/2026 |
|
|
Rp. 2.000.000 |
21 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 05 Oktober 2026 (21 Hari) |
| 530 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan Biaya Semester Antara |
2026-10-06 |
0094/SPP-LS-27/2026 |
|
|
Rp. 6.300.000 |
-1 Hari |
Belum ada SP2D terhitung dari 06 Oktober 2026 hingga 05 Oktober 2026 (-1 Hari) |
| 531 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan Biaya Kegiatan Laboratorium |
2026-09-30 |
0088/SPP-GU-NIHIL/2026 |
|
|
Rp. 1.500.000 |
5 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 05 Oktober 2026 (5 Hari) |
| 532 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan Biaya Kegiatan Penjaminan Mutu Fakultas |
2026-09-30 |
0088/SPP-GU-NIHIL/2026 |
|
|
Rp. 5.000.000 |
5 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 05 Oktober 2026 (5 Hari) |
| 533 |
Fakultas Sastra dan Budaya |
April 2026 |
525112 |
Belanja Barang Kebutuhan Sehari-hari dan BelanjaATM/ATK |
2026-04-02 |
20/SPP-GU-1/2026 |
2026-04-09 |
0714D |
Rp. 7.207.300 |
7 Hari |
|
| 534 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525112 |
Belanja Barang Kebutuhan Sehari-hari dan BelanjaATM/ATK |
2026-08-06 |
069/SPP-GU-3/2026 |
2026-08-28 |
2096D |
Rp. 8.303.900 |
22 Hari |
|
| 535 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525112 |
Belanja Barang Kebutuhan Sehari-hari dan BelanjaATM/ATK |
2026-09-30 |
0084/SPP-GU-NIHIL/2026 |
|
|
Rp. 1.922.500 |
5 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 05 Oktober 2026 (5 Hari) |
| 536 |
Fakultas Sastra dan Budaya |
Agustus 2026 |
525112 |
Belanja Barang Kebutuhan Sehari-hari dan BelanjaATM/ATK |
2026-08-06 |
069/SPP-GU-3/2026 |
2026-08-28 |
2096D |
Rp. 1.428.000 |
22 Hari |
|
| 537 |
Fakultas Sastra dan Budaya |
Agustus 2026 |
525112 |
Belanja Barang Kebutuhan Sehari-hari dan BelanjaATM/ATK |
2026-09-14 |
0074/SPTB-GU-4/2026 |
|
|
Rp. 500.000 |
21 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 05 Oktober 2026 (21 Hari) |
| 538 |
Fakultas Sastra dan Budaya |
Agustus 2026 |
525112 |
Belanja Barang Kebutuhan Sehari-hari dan BelanjaATM/ATK |
2026-09-30 |
0084/SPP-GU-NIHIL/2026 |
|
|
Rp. 1.815.000 |
5 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 05 Oktober 2026 (5 Hari) |
| 539 |
Fakultas Sastra dan Budaya |
September 2026 |
525112 |
Belanja Barang Kebutuhan Sehari-hari dan BelanjaATM/ATK |
2026-09-14 |
0074/SPTB-GU-4/2026 |
|
|
Rp. 993.000 |
21 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 05 Oktober 2026 (21 Hari) |
| 540 |
Fakultas Sastra dan Budaya |
September 2026 |
525112 |
Belanja Barang Kebutuhan Sehari-hari dan BelanjaATM/ATK |
2026-09-30 |
0084/SPP-GU-NIHIL/2026 |
|
|
Rp. 5.750.000 |
5 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 05 Oktober 2026 (5 Hari) |
| 541 |
Fakultas Sastra dan Budaya |
April 2026 |
525119 |
Bantuan Biaya Kegiatan Pendukung Tri Dharma Fakultas Sastra dan Budaya |
2026-04-02 |
22/SPP-GU-1/2026 |
2026-04-09 |
0715D |
Rp. 48.579.271 |
7 Hari |
|
| 542 |
Fakultas Sastra dan Budaya |
Mei 2026 |
525119 |
Bantuan Biaya Kegiatan Pendukung Tri Dharma Fakultas Sastra dan Budaya |
2026-04-27 |
34/SPP-GU-2/2026 |
2026-05-12 |
1053D |
Rp. 9.868.100 |
15 Hari |
|
| 543 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525119 |
Bantuan Biaya Kegiatan Pendukung Tri Dharma Fakultas Sastra dan Budaya |
2026-08-06 |
070/SPP-GU-3/2026 |
2026-08-28 |
2097D |
Rp. 15.000.000 |
22 Hari |
|
| 544 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan Biaya Kegiatan Pendukung Tri Dharma Fakultas Sastra dan Budaya |
2026-09-14 |
075/SPP-GU-4/2026 |
|
|
Rp. 22.178.000 |
21 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 05 Oktober 2026 (21 Hari) |
| 545 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan Biaya Kegiatan Pendukung Tri Dharma Fakultas Sastra dan Budaya |
2026-09-30 |
0085/SPP-GU-NIHIL/2026 |
|
|
Rp. 5.000.000 |
5 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 05 Oktober 2026 (5 Hari) |
| 546 |
Fakultas Sastra dan Budaya |
April 2026 |
525112 |
Pelaksanaan Rapat Kerja dan Konsumsi Tamu Pimpinan |
2026-04-02 |
20/SPP-GU-1/2026 |
2026-04-09 |
0714D |
Rp. 483.000 |
7 Hari |
|
| 547 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525112 |
Pelaksanaan Rapat Kerja dan Konsumsi Tamu Pimpinan |
2026-08-06 |
069/SPP-GU-3/2026 |
2026-08-28 |
2096D |
Rp. 4.916.500 |
22 Hari |
|
| 548 |
Fakultas Sastra dan Budaya |
Agustus 2026 |
525112 |
Pelaksanaan Rapat Kerja dan Konsumsi Tamu Pimpinan |
2026-08-06 |
069/SPP-GU-3/2026 |
2026-08-28 |
2096D |
Rp. 980.000 |
22 Hari |
|
| 549 |
Fakultas Sastra dan Budaya |
Agustus 2026 |
525112 |
Pelaksanaan Rapat Kerja dan Konsumsi Tamu Pimpinan |
2026-09-14 |
0074/SPTB-GU-4/2026 |
|
|
Rp. 6.320.000 |
21 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 05 Oktober 2026 (21 Hari) |
| 550 |
Fakultas Sastra dan Budaya |
Agustus 2026 |
525112 |
Pelaksanaan Rapat Kerja dan Konsumsi Tamu Pimpinan |
2026-09-30 |
0084/SPP-GU-NIHIL/2026 |
|
|
Rp. 3.100.000 |
5 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 05 Oktober 2026 (5 Hari) |
| 551 |
Fakultas Sastra dan Budaya |
September 2026 |
525112 |
Pelaksanaan Rapat Kerja dan Konsumsi Tamu Pimpinan |
2026-09-14 |
0074/SPTB-GU-4/2026 |
|
|
Rp. 1.449.000 |
21 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 05 Oktober 2026 (21 Hari) |
| 552 |
Fakultas Sastra dan Budaya |
September 2026 |
525112 |
Pelaksanaan Rapat Kerja dan Konsumsi Tamu Pimpinan |
2026-09-30 |
0084/SPP-GU-NIHIL/2026 |
|
|
Rp. 5.112.500 |
5 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 05 Oktober 2026 (5 Hari) |
| 553 |
Fakultas Sastra dan Budaya |
Mei 2026 |
525112 |
Konsumsi Berat dan Ringan Rapat Rutin Fakultas dan Jurusan |
2026-04-27 |
30/SPP-GU-2/2026 |
2026-05-12 |
1051D |
Rp. 1.697.500 |
15 Hari |
|
| 554 |
Fakultas Sastra dan Budaya |
Agustus 2026 |
525112 |
Konsumsi Berat dan Ringan Rapat Rutin Fakultas dan Jurusan |
2026-09-30 |
0084/SPP-GU-NIHIL/2026 |
|
|
Rp. 3.747.500 |
5 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 05 Oktober 2026 (5 Hari) |
| 555 |
Fakultas Sastra dan Budaya |
September 2026 |
525112 |
Konsumsi Berat dan Ringan Rapat Rutin Fakultas dan Jurusan |
2026-09-30 |
0084/SPP-GU-NIHIL/2026 |
|
|
Rp. 16.985.000 |
5 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 05 Oktober 2026 (5 Hari) |
| 556 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525119 |
Bantuan Biaya Kegiatan Sekretariat dan Kehumasan |
2026-08-06 |
070/SPP-GU-3/2026 |
2026-08-28 |
2097D |
Rp. 6.500.000 |
22 Hari |
|
| 557 |
Fakultas Sastra dan Budaya |
Mei 2026 |
525115 |
Tiket Perjalanan PP Pimpinan dalam Rangka Forum Dekanat FSB (4 org x 1 keg) |
2026-04-27 |
32/SPP-GU-2/2026 |
2026-05-12 |
1052D |
Rp. 19.007.172 |
15 Hari |
|
| 558 |
Fakultas Sastra dan Budaya |
Mei 2026 |
525115 |
Biaya Akomodasi Pimpinan Dalam Rangka Forum Dekanat FSB (4 org x 4 hari x 1 kegiatan) |
2026-04-27 |
32/SPP-GU-2/2026 |
2026-05-12 |
1052D |
Rp. 11.625.436 |
15 Hari |
|
| 559 |
Fakultas Sastra dan Budaya |
Mei 2026 |
525115 |
Biaya Uang Harian Pimpinan dalam Rangka Forum Dekanat FSB (4 Orang x 5 Hari x 1 Kegiatan) |
2026-04-27 |
32/SPP-GU-2/2026 |
2026-05-12 |
1052D |
Rp. 8.101.436 |
15 Hari |
|
| 560 |
Fakultas Sastra dan Budaya |
Mei 2026 |
525119 |
Operasional Kendaraan Dinas Pimpinan |
2026-04-27 |
34/SPP-GU-2/2026 |
2026-05-12 |
1053D |
Rp. 2.000.000 |
15 Hari |
|
| 561 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525119 |
Operasional Kendaraan Dinas Pimpinan |
2026-08-06 |
070/SPP-GU-3/2026 |
2026-08-28 |
2097D |
Rp. 1.900.000 |
22 Hari |
|
| 562 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Operasional Kendaraan Dinas Pimpinan |
2026-09-30 |
0085/SPP-GU-NIHIL/2026 |
|
|
Rp. 2.750.000 |
5 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 05 Oktober 2026 (5 Hari) |
| 563 |
Fakultas Sastra dan Budaya |
Februari 2026 |
525111 |
Remunerasi Insentif Kelola (19 Org x12 Bulan) |
2026-01-13 |
06/SPP-LS-1/2026 |
2026-02-04 |
0131D |
Rp. 45.300.000 |
22 Hari |
|
| 564 |
Fakultas Sastra dan Budaya |
Maret 2026 |
525111 |
Remunerasi Insentif Kelola (19 Org x12 Bulan) |
2026-03-03 |
08/SPP-LS-2/2026 |
2026-03-11 |
0474D |
Rp. 80.200.000 |
8 Hari |
|
| 565 |
Fakultas Sastra dan Budaya |
April 2026 |
525111 |
Remunerasi Insentif Kelola (19 Org x12 Bulan) |
2026-04-06 |
28/SPP-LS-6/2026 |
2026-04-09 |
0718D |
Rp. 40.100.000 |
3 Hari |
|
| 566 |
Fakultas Sastra dan Budaya |
Mei 2026 |
525111 |
Remunerasi Insentif Kelola (19 Org x12 Bulan) |
2026-05-04 |
42/SPP-LS-7/2026 |
2026-05-07 |
1023D |
Rp. 40.100.000 |
3 Hari |
|
| 567 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525111 |
Remunerasi Insentif Kelola (19 Org x12 Bulan) |
2026-06-02 |
48/SPP-LS-9/2026 |
2026-07-01 |
1429D |
Rp. 40.100.000 |
29 Hari |
|
| 568 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525111 |
Remunerasi Insentif Kelola (19 Org x12 Bulan) |
2026-07-07 |
066/SPP-LS-11/2026 |
2026-08-05 |
1848D |
Rp. 40.100.000 |
29 Hari |
|
| 569 |
Fakultas Sastra dan Budaya |
Agustus 2026 |
525111 |
Remunerasi Insentif Kelola (19 Org x12 Bulan) |
2026-08-31 |
075/SPP-LS-15/2026 |
|
|
Rp. 46.600.000 |
35 Hari |
Belum ada SP2D terhitung dari 31 Agustus 2026 hingga 05 Oktober 2026 (35 Hari) |
| 570 |
Fakultas Sastra dan Budaya |
September 2026 |
525111 |
Remunerasi Insentif Kelola (19 Org x12 Bulan) |
2026-08-10 |
074/SPP-LS-14/2026 |
2026-08-20 |
2037D |
Rp. 46.600.000 |
10 Hari |
|
| 571 |
Fakultas Sastra dan Budaya |
Oktober 2026 |
525111 |
Remunerasi Insentif Kelola (19 Org x12 Bulan) |
2026-10-06 |
0094/SPP-LS-28/2026 |
|
|
Rp. 46.600.000 |
-1 Hari |
Belum ada SP2D terhitung dari 06 Oktober 2026 hingga 05 Oktober 2026 (-1 Hari) |
| 572 |
Fakultas Sastra dan Budaya |
Januari 2026 |
525111 |
Remunerasi Tugas Tambahan Tenaga Pendidik (5 Dosen x 12 Bulan) |
2026-01-13 |
04/SPP-LS-1/2026 |
2026-01-21 |
0077D |
Rp. 141.120.000 |
8 Hari |
|
| 573 |
Fakultas Sastra dan Budaya |
Maret 2026 |
525111 |
Remunerasi Tugas Tambahan Tenaga Pendidik (5 Dosen x 12 Bulan) |
2026-03-09 |
14/SPP-LS-4/2026 |
2026-03-16 |
0561D |
Rp. 60.480.000 |
7 Hari |
|
| 574 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525111 |
Remunerasi Tugas Tambahan Tenaga Pendidik (5 Dosen x 12 Bulan) |
2026-07-07 |
067/SPP-LS-12/2026 |
2026-07-30 |
1773D |
Rp. 141.120.000 |
23 Hari |
|
| 575 |
Fakultas Sastra dan Budaya |
September 2026 |
525111 |
Remunerasi Tugas Tambahan Tenaga Pendidik (5 Dosen x 12 Bulan) |
2026-09-08 |
0077/SPP-LS-17/2026 |
|
|
Rp. 60.480.000 |
27 Hari |
Belum ada SP2D terhitung dari 08 September 2026 hingga 05 Oktober 2026 (27 Hari) |
| 576 |
Fakultas Sastra dan Budaya |
Januari 2026 |
525111 |
Remunerasi Fungsional Tenaga Pendidik (77 Dosen x 12 Bulan) |
2026-01-13 |
02/SPP-LS-1/2026 |
2026-01-19 |
0046D |
Rp. 930.360.000 |
6 Hari |
|
| 577 |
Fakultas Sastra dan Budaya |
Maret 2026 |
525111 |
Remunerasi Fungsional Tenaga Pendidik (77 Dosen x 12 Bulan) |
2026-03-09 |
12/SPP-LS-4/2026 |
2026-03-13 |
0533D |
Rp. 392.880.000 |
4 Hari |
|
| 578 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525111 |
Remunerasi Fungsional Tenaga Pendidik (77 Dosen x 12 Bulan) |
2026-07-07 |
068/SPP-LS-13/2026 |
2026-07-20 |
1649D |
Rp. 924.180.000 |
13 Hari |
|
| 579 |
Fakultas Sastra dan Budaya |
September 2026 |
525111 |
Remunerasi Fungsional Tenaga Pendidik (77 Dosen x 12 Bulan) |
2026-09-18 |
0078/SPP/LS-18/2026 |
|
|
Rp. 404.106.000 |
17 Hari |
Belum ada SP2D terhitung dari 18 September 2026 hingga 05 Oktober 2026 (17 Hari) |
| 580 |
Fakultas Sastra dan Budaya |
Mei 2026 |
525119 |
Bantuan Biaya SIDAPRO dan SIKPRODI |
2026-04-27 |
38/SPP-GU-2/2026 |
2026-05-12 |
1055D |
Rp. 10.000.000 |
15 Hari |
|
| 581 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525119 |
Bantuan Biaya SIDAPRO dan SIKPRODI |
2026-08-06 |
072/SPP-GU-3/2026 |
2026-08-28 |
2099D |
Rp. 5.000.000 |
22 Hari |
|
| 582 |
Fakultas Sastra dan Budaya |
Maret 2026 |
525111 |
Insentif PPK UK |
2026-03-03 |
10/SPP-LS-3/2026 |
2026-03-06 |
0343D |
Rp. 3.630.000 |
3 Hari |
|
| 583 |
Fakultas Sastra dan Budaya |
Juni 2026 |
525111 |
Insentif PPK UK |
2026-06-02 |
48/SPP-LS-10/2026 |
2026-06-30 |
1400D |
Rp. 3.450.000 |
28 Hari |
|
| 584 |
Fakultas Sastra dan Budaya |
Maret 2026 |
525111 |
Insentif Penguji Tagihan/Verifikator UK |
2026-03-03 |
10/SPP-LS-3/2026 |
2026-03-06 |
0343D |
Rp. 1.470.000 |
3 Hari |
|
| 585 |
Fakultas Sastra dan Budaya |
Juni 2026 |
525111 |
Insentif Penguji Tagihan/Verifikator UK |
2026-06-02 |
48/SPP-LS-10/2026 |
2026-06-30 |
1400D |
Rp. 1.410.000 |
28 Hari |
|
| 586 |
Fakultas Sastra dan Budaya |
Agustus 2026 |
525115 |
Biaya Perjalanan Dinas PP Petugas Keuangan Kegiatan Perencanaan dan Keuangan (2 Orang x 1 Kegiatan ) |
2026-09-14 |
0077/SPP-GU-4/2026 |
|
|
Rp. 2.800.000 |
21 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 05 Oktober 2026 (21 Hari) |
| 587 |
Fakultas Sastra dan Budaya |
September 2026 |
525115 |
Biaya Perjalanan Dinas PP Petugas Keuangan Kegiatan Perencanaan dan Keuangan (2 Orang x 1 Kegiatan ) |
2026-09-14 |
0077/SPP-GU-4/2026 |
|
|
Rp. 3.600.000 |
21 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 05 Oktober 2026 (21 Hari) |
| 588 |
Fakultas Sastra dan Budaya |
Agustus 2026 |
525115 |
Biaya Uang Harian Kegiatan Perencanaan dan Pegelolaan Keuangan (2 Orang x 4 hari) |
2026-09-14 |
0077/SPP-GU-4/2026 |
|
|
Rp. 1.000.000 |
21 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 05 Oktober 2026 (21 Hari) |
| 589 |
Fakultas Sastra dan Budaya |
September 2026 |
525115 |
Biaya Uang Harian Kegiatan Perencanaan dan Pegelolaan Keuangan (2 Orang x 4 hari) |
2026-09-14 |
0077/SPP-GU-4/2026 |
|
|
Rp. 2.260.000 |
21 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 05 Oktober 2026 (21 Hari) |
| 590 |
Fakultas Sastra dan Budaya |
September 2026 |
525115 |
Bantuan Biaya Akomodasi Kegiatan Perencanaan dan Pegelolaan Keuangan (2Orang x 4 hari) |
2026-09-14 |
0077/SPP-GU-4/2026 |
|
|
Rp. 2.200.000 |
21 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 05 Oktober 2026 (21 Hari) |
| 591 |
Fakultas Sastra dan Budaya |
Oktober 2026 |
525176 |
Insentif PPK UK |
2026-10-05 |
0092/SPP-LS-26/2026 |
|
|
Rp. 4.480.000 |
0 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 05 Oktober 2026 (0 Hari) |
| 592 |
Fakultas Sastra dan Budaya |
Oktober 2026 |
525176 |
Insentif Penguji Tagihan/Verifikator UK |
2026-10-05 |
0092/SPP-LS-26/2026 |
|
|
Rp. 1.840.000 |
0 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 05 Oktober 2026 (0 Hari) |
| 593 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan Kegiatan Workshop Analisis Manajemen Resiko |
2026-09-30 |
0087/SPP-GU-NIHIL/2026 |
|
|
Rp. 1.000.000 |
5 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 05 Oktober 2026 (5 Hari) |
| 594 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525119 |
Kolaborasi Riset dan Publikasi Berbasis Research and Development |
2026-06-02 |
44/SPP-LS-8/2026 |
2026-07-06 |
1509D |
Rp. 14.000.000 |
34 Hari |
|
| 595 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Kolaborasi Riset dan Publikasi Berbasis Research and Development |
2026-09-18 |
0081/SPP-LS-20/2026 |
|
|
Rp. 6.000.000 |
17 Hari |
Belum ada SP2D terhitung dari 18 September 2026 hingga 05 Oktober 2026 (17 Hari) |
| 596 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan biaya Artikel Ilmiah diterbitkan di Jurnal Internasional Bereputasi (Scopus) |
2026-10-06 |
0089/SPP-LS-23/2026 |
|
|
Rp. 10.000.000 |
-1 Hari |
Belum ada SP2D terhitung dari 06 Oktober 2026 hingga 05 Oktober 2026 (-1 Hari) |
| 597 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525119 |
Penelitian berbasis Pengembangan kawasan dan SDGs |
2026-06-02 |
44/SPP-LS-8/2026 |
2026-07-06 |
1509D |
Rp. 42.000.000 |
34 Hari |
|
| 598 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Penelitian berbasis Pengembangan kawasan dan SDGs |
2026-09-18 |
0082/SPP-LS-21/2026 |
|
|
Rp. 18.000.000 |
17 Hari |
Belum ada SP2D terhitung dari 18 September 2026 hingga 05 Oktober 2026 (17 Hari) |
| 599 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525119 |
Pengabdian kepada masyarakat berbasis Pengembangan Kawasan dan SDGs |
2026-06-02 |
46/SPP-LS-8/2026 |
2026-07-07 |
1508D |
Rp. 42.000.000 |
35 Hari |
|
| 600 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Pengabdian kepada masyarakat berbasis Pengembangan Kawasan dan SDGs |
2026-09-18 |
0083/SPP-LS-22/2026 |
|
|
Rp. 18.000.000 |
17 Hari |
Belum ada SP2D terhitung dari 18 September 2026 hingga 05 Oktober 2026 (17 Hari) |
| 601 |
Badan Pengelola Usaha |
Maret 2026 |
537112 |
Pengadaan Peralatan Perkantoran |
2026-03-09 |
12/UN47.H/LS5-SPP/BPU/2026 |
2026-03-12 |
0484U |
Rp. 49.839.000 |
3 Hari |
|
| 602 |
Badan Pengelola Usaha |
Maret 2026 |
537112 |
Pengadaan Peralatan Perkantoran |
2026-03-09 |
13/UN47.H/LS5-SPP/BPU/2026 |
2026-03-12 |
0485U |
Rp. 49.950.000 |
3 Hari |
|
| 603 |
Badan Pengelola Usaha |
Maret 2026 |
537112 |
Pengadaan Peralatan Perkantoran |
2026-03-09 |
14/UN47.H/LS5-SPP/BPU/2026 |
2026-03-12 |
0496U |
Rp. 49.772.400 |
3 Hari |
|
| 604 |
Badan Pengelola Usaha |
April 2026 |
537112 |
Pengadaan Peralatan Perkantoran |
2026-03-30 |
19/UN47.H/LS7-SPP/BPU/2026 |
2026-04-01 |
0626U |
Rp. 49.977.750 |
2 Hari |
|
| 605 |
Badan Pengelola Usaha |
April 2026 |
537112 |
Pengadaan Peralatan Perkantoran |
2026-03-30 |
20/UN47.H/LS7-SPP/BPU/2026 |
2026-04-01 |
0627U |
Rp. 30.591.600 |
2 Hari |
|
| 606 |
Badan Pengelola Usaha |
Mei 2026 |
537112 |
Pengadaan Peralatan Perkantoran |
2026-04-28 |
34/UN47.H/LS10-SPP/BPU/2026 |
2026-05-06 |
1000U |
Rp. 37.022.000 |
8 Hari |
|
| 607 |
Badan Pengelola Usaha |
Agustus 2026 |
537112 |
Pengadaan Peralatan Perkantoran |
2026-08-27 |
61/UN47.H/LS18-SPP/BPU/2026 |
2026-09-09 |
2232U |
Rp. 20.434.000 |
13 Hari |
|
| 608 |
Badan Pengelola Usaha |
Agustus 2026 |
537112 |
Pengadaan Peralatan Perkantoran |
2026-09-22 |
71/UN47.H/GUP5-SPP/BPU/2026 |
|
|
Rp. 19.862.406 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 609 |
Badan Pengelola Usaha |
September 2026 |
537112 |
Pengadaan Peralatan Perkantoran |
2026-09-22 |
71/UN47.H/GUP5-SPP/BPU/2026 |
|
|
Rp. 6.925.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 610 |
Badan Pengelola Usaha |
Juli 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-08-07 |
50/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1987U |
Rp. 17.749.000 |
12 Hari |
|
| 611 |
Badan Pengelola Usaha |
Agustus 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-09-22 |
71/UN47.H/GUP5-SPP/BPU/2026 |
|
|
Rp. 19.428.100 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 612 |
Badan Pengelola Usaha |
Maret 2026 |
525114 |
Pemeliharaan AC Split |
2026-04-13 |
26/UN47.H/GUP2-SPP/BPU/2026 |
2026-04-15 |
0804U |
Rp. 1.500.000 |
2 Hari |
|
| 613 |
Badan Pengelola Usaha |
April 2026 |
525114 |
Pemeliharaan AC Split |
2026-05-29 |
40/UN47.H/GUP3-SPP/BPU/2026 |
2026-06-29 |
1372U |
Rp. 800.000 |
31 Hari |
|
| 614 |
Badan Pengelola Usaha |
Juni 2026 |
525114 |
Pemeliharaan AC Split |
2026-08-07 |
56/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1993U |
Rp. 1.120.000 |
12 Hari |
|
| 615 |
Badan Pengelola Usaha |
Agustus 2026 |
525114 |
Pemeliharaan AC Split |
2026-09-22 |
75/UN47.H/GUP5-SPP/BPU/2026 |
|
|
Rp. 1.260.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 616 |
Badan Pengelola Usaha |
September 2026 |
525114 |
Pemeliharaan Komputer / Laptop |
|
|
|
|
Rp. 350.000 |
34 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 05 Oktober 2026 (34 Hari) |
| 617 |
Badan Pengelola Usaha |
Januari 2026 |
525114 |
Pemeilharaan Gedung Kantor dan Unit Usaha |
2026-03-04 |
10/UN47.H/GUP1-SPP/BPU/2026 |
2026-03-11 |
0426U |
Rp. 165.000 |
7 Hari |
|
| 618 |
Badan Pengelola Usaha |
Maret 2026 |
525114 |
Pemeilharaan Gedung Kantor dan Unit Usaha |
2026-04-13 |
26/UN47.H/GUP2-SPP/BPU/2026 |
2026-04-15 |
0804U |
Rp. 27.872.000 |
2 Hari |
|
| 619 |
Badan Pengelola Usaha |
April 2026 |
525114 |
Pemeilharaan Gedung Kantor dan Unit Usaha |
2026-04-14 |
30/UN47.H/LS9-SPP/BPU/2026 |
2026-04-22 |
0853U |
Rp. 48.852.000 |
8 Hari |
|
| 620 |
Badan Pengelola Usaha |
April 2026 |
525114 |
Pemeilharaan Gedung Kantor dan Unit Usaha |
2026-05-29 |
40/UN47.H/GUP3-SPP/BPU/2026 |
2026-06-29 |
1372U |
Rp. 292.000 |
31 Hari |
|
| 621 |
Badan Pengelola Usaha |
Mei 2026 |
525114 |
Pemeilharaan Gedung Kantor dan Unit Usaha |
2026-05-07 |
31/UN47.H/LS11-SPP/BPU/2026 |
2026-05-21 |
1098U |
Rp. 47.123.500 |
14 Hari |
|
| 622 |
Badan Pengelola Usaha |
Juli 2026 |
525114 |
Pemeilharaan Gedung Kantor dan Unit Usaha |
2026-08-07 |
56/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1993U |
Rp. 292.000 |
12 Hari |
|
| 623 |
Badan Pengelola Usaha |
Agustus 2026 |
525114 |
Pemeilharaan Gedung Kantor dan Unit Usaha |
2026-08-12 |
59/UN47.H/LS17-SPP/BPU/2026 |
2026-08-24 |
2083U |
Rp. 24.373.000 |
12 Hari |
|
| 624 |
Badan Pengelola Usaha |
Agustus 2026 |
525114 |
Pemeilharaan Gedung Kantor dan Unit Usaha |
2026-09-22 |
75/UN47.H/GUP5-SPP/BPU/2026 |
|
|
Rp. 1.400.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 625 |
Badan Pengelola Usaha |
September 2026 |
525114 |
Pemeilharaan Gedung Kantor dan Unit Usaha |
2026-09-28 |
79/UN47.H/LS21-SPP/BPU/2026 |
|
|
Rp. 28.717.245 |
7 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 05 Oktober 2026 (7 Hari) |
| 626 |
Badan Pengelola Usaha |
Maret 2026 |
525112 |
Biaya Kebutuhan Dasar Perkantoran |
2026-04-13 |
24/UN47.H/GUP2-SPP/BPU/2026 |
2026-04-15 |
0802U |
Rp. 8.061.324 |
2 Hari |
|
| 627 |
Badan Pengelola Usaha |
April 2026 |
525112 |
Biaya Kebutuhan Dasar Perkantoran |
2026-05-29 |
37/UN47.H/GUP3-SPP/BPU/2026 |
2026-06-29 |
1369U |
Rp. 20.276.930 |
31 Hari |
|
| 628 |
Badan Pengelola Usaha |
Juni 2026 |
525112 |
Biaya Kebutuhan Dasar Perkantoran |
2026-08-07 |
51/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1988U |
Rp. 1.944.870 |
12 Hari |
|
| 629 |
Badan Pengelola Usaha |
Juli 2026 |
525112 |
Biaya Kebutuhan Dasar Perkantoran |
2026-08-07 |
51/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1988U |
Rp. 14.342.210 |
12 Hari |
|
| 630 |
Badan Pengelola Usaha |
Agustus 2026 |
525112 |
Biaya Kebutuhan Dasar Perkantoran |
|
|
|
|
Rp. 66.500 |
65 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Agustus 2026 hingga 05 Oktober 2026 (65 Hari) |
| 631 |
Badan Pengelola Usaha |
Agustus 2026 |
525112 |
Biaya Kebutuhan Dasar Perkantoran |
2026-08-12 |
57/UN47.H/LS17-SPP/BPU/2026 |
2026-08-26 |
2081U |
Rp. 13.189.000 |
14 Hari |
|
| 632 |
Badan Pengelola Usaha |
Agustus 2026 |
525112 |
Biaya Kebutuhan Dasar Perkantoran |
2026-09-22 |
72/UN47.H/GUP5-SPP/BPU/2026 |
|
|
Rp. 7.164.310 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 633 |
Badan Pengelola Usaha |
Oktober 2026 |
525112 |
Biaya Kebutuhan Dasar Perkantoran |
|
|
|
|
Rp. 7.797.300 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 634 |
Badan Pengelola Usaha |
Januari 2026 |
525112 |
Biaya Rapat Kerja dan Evaluasi Unit Usaha Per Triwulan (9 Org x 3 Keg x 12 Bulan) |
2026-03-04 |
08/UN47.H/GUP1-SPP/BPU/2026 |
2026-03-11 |
0428U |
Rp. 150.500 |
7 Hari |
|
| 635 |
Badan Pengelola Usaha |
Maret 2026 |
525112 |
Biaya Rapat Kerja dan Evaluasi Unit Usaha Per Triwulan (9 Org x 3 Keg x 12 Bulan) |
2026-04-13 |
24/UN47.H/GUP2-SPP/BPU/2026 |
2026-04-15 |
0802U |
Rp. 2.880.000 |
2 Hari |
|
| 636 |
Badan Pengelola Usaha |
April 2026 |
525112 |
Biaya Rapat Kerja dan Evaluasi Unit Usaha Per Triwulan (9 Org x 3 Keg x 12 Bulan) |
2026-05-29 |
37/UN47.H/GUP3-SPP/BPU/2026 |
2026-06-29 |
1369U |
Rp. 14.721.000 |
31 Hari |
|
| 637 |
Badan Pengelola Usaha |
Mei 2026 |
525112 |
Biaya Rapat Kerja dan Evaluasi Unit Usaha Per Triwulan (9 Org x 3 Keg x 12 Bulan) |
2026-04-30 |
31/UN47.H/LS10-SPP/BPU/2026 |
2026-05-06 |
0997U |
Rp. 23.400.000 |
6 Hari |
|
| 638 |
Badan Pengelola Usaha |
Juli 2026 |
525112 |
Biaya Rapat Kerja dan Evaluasi Unit Usaha Per Triwulan (9 Org x 3 Keg x 12 Bulan) |
2026-05-25 |
34/UN47.H/LS13-SPP/BPU/2026 |
2026-07-02 |
1438U |
Rp. 13.750.000 |
38 Hari |
|
| 639 |
Badan Pengelola Usaha |
Juli 2026 |
525112 |
Biaya Rapat Kerja dan Evaluasi Unit Usaha Per Triwulan (9 Org x 3 Keg x 12 Bulan) |
2026-08-07 |
51/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1988U |
Rp. 3.187.700 |
12 Hari |
|
| 640 |
Badan Pengelola Usaha |
Agustus 2026 |
525112 |
Biaya Rapat Kerja dan Evaluasi Unit Usaha Per Triwulan (9 Org x 3 Keg x 12 Bulan) |
2026-08-27 |
62/UN47.H/LS18-SPP/BPU/2026 |
2026-09-09 |
2233U |
Rp. 9.250.000 |
13 Hari |
|
| 641 |
Badan Pengelola Usaha |
Agustus 2026 |
525112 |
Biaya Rapat Kerja dan Evaluasi Unit Usaha Per Triwulan (9 Org x 3 Keg x 12 Bulan) |
2026-09-22 |
72/UN47.H/GUP5-SPP/BPU/2026 |
|
|
Rp. 867.500 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 642 |
Badan Pengelola Usaha |
April 2026 |
525115 |
Tiket Perjalanan Dinas PP |
2026-04-14 |
28/UN47.H/LS9-SPP/BPU/2026 |
2026-04-22 |
0851U |
Rp. 17.163.166 |
8 Hari |
|
| 643 |
Badan Pengelola Usaha |
Mei 2026 |
525115 |
Tiket Perjalanan Dinas PP |
2026-04-28 |
32/UN47.H/LS10-SPP/BPU/2026 |
2026-05-06 |
0998U |
Rp. 10.063.560 |
8 Hari |
|
| 644 |
Badan Pengelola Usaha |
Juli 2026 |
525115 |
Tiket Perjalanan Dinas PP |
2026-07-09 |
44/UN47.H/LS15-SPP/BPU/2026 |
2026-07-29 |
1748U |
Rp. 29.012.540 |
20 Hari |
|
| 645 |
Badan Pengelola Usaha |
Agustus 2026 |
525115 |
Tiket Perjalanan Dinas PP |
2026-08-27 |
63/UN47.H/LS18-SPP/BPU/2026 |
2026-09-09 |
2234U |
Rp. 7.103.880 |
13 Hari |
|
| 646 |
Badan Pengelola Usaha |
September 2026 |
525115 |
Tiket Perjalanan Dinas PP |
2026-09-11 |
70/UN47.H/LS20-SPP/BPU/2026 |
|
|
Rp. 3.385.508 |
24 Hari |
Belum ada SP2D terhitung dari 11 September 2026 hingga 05 Oktober 2026 (24 Hari) |
| 647 |
Badan Pengelola Usaha |
Oktober 2026 |
525115 |
Tiket Perjalanan Dinas PP |
|
|
|
|
Rp. 5.847.500 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 648 |
Badan Pengelola Usaha |
Januari 2026 |
525115 |
Biaya Hotel / Penginapan |
2026-03-04 |
09/UN47.H/GUP1-SPP/BPU/2026 |
2026-03-11 |
0427U |
Rp. 32.055.000 |
7 Hari |
|
| 649 |
Badan Pengelola Usaha |
April 2026 |
525115 |
Biaya Hotel / Penginapan |
2026-04-14 |
28/UN47.H/LS9-SPP/BPU/2026 |
2026-04-22 |
0851U |
Rp. 13.067.874 |
8 Hari |
|
| 650 |
Badan Pengelola Usaha |
Mei 2026 |
525115 |
Biaya Hotel / Penginapan |
2026-04-28 |
32/UN47.H/LS10-SPP/BPU/2026 |
2026-05-06 |
0998U |
Rp. 4.128.060 |
8 Hari |
|
| 651 |
Badan Pengelola Usaha |
Juli 2026 |
525115 |
Biaya Hotel / Penginapan |
2026-07-09 |
44/UN47.H/LS15-SPP/BPU/2026 |
2026-07-29 |
1748U |
Rp. 6.574.265 |
20 Hari |
|
| 652 |
Badan Pengelola Usaha |
Juli 2026 |
525115 |
Biaya Hotel / Penginapan |
2026-08-07 |
52/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1989U |
Rp. 6.420.000 |
12 Hari |
|
| 653 |
Badan Pengelola Usaha |
Agustus 2026 |
525115 |
Biaya Hotel / Penginapan |
2026-08-27 |
63/UN47.H/LS18-SPP/BPU/2026 |
2026-09-09 |
2234U |
Rp. 5.517.599 |
13 Hari |
|
| 654 |
Badan Pengelola Usaha |
September 2026 |
525115 |
Biaya Hotel / Penginapan |
2026-09-11 |
70/UN47.H/LS20-SPP/BPU/2026 |
|
|
Rp. 3.679.690 |
24 Hari |
Belum ada SP2D terhitung dari 11 September 2026 hingga 05 Oktober 2026 (24 Hari) |
| 655 |
Badan Pengelola Usaha |
Oktober 2026 |
525115 |
Biaya Hotel / Penginapan |
|
|
|
|
Rp. 1.829.000 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 656 |
Badan Pengelola Usaha |
Januari 2026 |
525115 |
Uang Harian Terkait Perjalanan Dinas |
2026-03-04 |
09/UN47.H/GUP1-SPP/BPU/2026 |
2026-03-11 |
0427U |
Rp. 34.800.000 |
7 Hari |
|
| 657 |
Badan Pengelola Usaha |
April 2026 |
525115 |
Uang Harian Terkait Perjalanan Dinas |
2026-04-14 |
28/UN47.H/LS9-SPP/BPU/2026 |
2026-04-22 |
0851U |
Rp. 10.460.000 |
8 Hari |
|
| 658 |
Badan Pengelola Usaha |
Mei 2026 |
525115 |
Uang Harian Terkait Perjalanan Dinas |
2026-04-28 |
32/UN47.H/LS10-SPP/BPU/2026 |
2026-05-06 |
0998U |
Rp. 2.650.000 |
8 Hari |
|
| 659 |
Badan Pengelola Usaha |
Juli 2026 |
525115 |
Uang Harian Terkait Perjalanan Dinas |
2026-07-09 |
44/UN47.H/LS15-SPP/BPU/2026 |
2026-07-29 |
1748U |
Rp. 6.890.000 |
20 Hari |
|
| 660 |
Badan Pengelola Usaha |
Juli 2026 |
525115 |
Uang Harian Terkait Perjalanan Dinas |
2026-08-07 |
52/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1989U |
Rp. 4.100.000 |
12 Hari |
|
| 661 |
Badan Pengelola Usaha |
Agustus 2026 |
525115 |
Uang Harian Terkait Perjalanan Dinas |
2026-08-27 |
63/UN47.H/LS18-SPP/BPU/2026 |
2026-09-09 |
2234U |
Rp. 8.780.000 |
13 Hari |
|
| 662 |
Badan Pengelola Usaha |
September 2026 |
525115 |
Uang Harian Terkait Perjalanan Dinas |
|
|
|
|
Rp. 39.628.000 |
34 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 05 Oktober 2026 (34 Hari) |
| 663 |
Badan Pengelola Usaha |
September 2026 |
525115 |
Uang Harian Terkait Perjalanan Dinas |
2026-09-11 |
70/UN47.H/LS20-SPP/BPU/2026 |
|
|
Rp. 10.360.000 |
24 Hari |
Belum ada SP2D terhitung dari 11 September 2026 hingga 05 Oktober 2026 (24 Hari) |
| 664 |
Badan Pengelola Usaha |
Oktober 2026 |
525115 |
Uang Harian Terkait Perjalanan Dinas |
|
|
|
|
Rp. 2.460.000 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 665 |
Badan Pengelola Usaha |
Januari 2026 |
525115 |
Uang Transport |
2026-03-04 |
09/UN47.H/GUP1-SPP/BPU/2026 |
2026-03-11 |
0427U |
Rp. 11.700.000 |
7 Hari |
|
| 666 |
Badan Pengelola Usaha |
April 2026 |
525115 |
Uang Transport |
2026-03-04 |
09/UN47.H/GUP1-SPP/BPU/2026 |
2026-03-11 |
0427U |
Rp. 300.000 |
7 Hari |
|
| 667 |
Badan Pengelola Usaha |
April 2026 |
525115 |
Uang Transport |
2026-04-14 |
28/UN47.H/LS9-SPP/BPU/2026 |
2026-04-22 |
0851U |
Rp. 3.140.000 |
8 Hari |
|
| 668 |
Badan Pengelola Usaha |
April 2026 |
525115 |
Uang Transport |
2026-05-29 |
38/UN47.H/GUP3-SPP/BPU/2026 |
2026-06-29 |
1370U |
Rp. 2.000.000 |
31 Hari |
|
| 669 |
Badan Pengelola Usaha |
Mei 2026 |
525115 |
Uang Transport |
2026-04-28 |
32/UN47.H/LS10-SPP/BPU/2026 |
2026-05-06 |
0998U |
Rp. 500.000 |
8 Hari |
|
| 670 |
Badan Pengelola Usaha |
Mei 2026 |
525115 |
Uang Transport |
2026-05-29 |
38/UN47.H/GUP3-SPP/BPU/2026 |
2026-06-29 |
1370U |
Rp. 2.000.000 |
31 Hari |
|
| 671 |
Badan Pengelola Usaha |
Juli 2026 |
525115 |
Uang Transport |
2026-07-09 |
44/UN47.H/LS15-SPP/BPU/2026 |
2026-07-29 |
1748U |
Rp. 2.800.000 |
20 Hari |
|
| 672 |
Badan Pengelola Usaha |
Juli 2026 |
525115 |
Uang Transport |
2026-08-07 |
52/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1989U |
Rp. 1.900.000 |
12 Hari |
|
| 673 |
Badan Pengelola Usaha |
Agustus 2026 |
525115 |
Uang Transport |
2026-08-27 |
63/UN47.H/LS18-SPP/BPU/2026 |
2026-09-09 |
2234U |
Rp. 4.500.000 |
13 Hari |
|
| 674 |
Badan Pengelola Usaha |
September 2026 |
525115 |
Uang Transport |
|
|
|
|
Rp. 18.900.000 |
34 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 05 Oktober 2026 (34 Hari) |
| 675 |
Badan Pengelola Usaha |
September 2026 |
525115 |
Uang Transport |
2026-09-11 |
70/UN47.H/LS20-SPP/BPU/2026 |
|
|
Rp. 5.100.000 |
24 Hari |
Belum ada SP2D terhitung dari 11 September 2026 hingga 05 Oktober 2026 (24 Hari) |
| 676 |
Badan Pengelola Usaha |
Oktober 2026 |
525115 |
Uang Transport |
|
|
|
|
Rp. 1.150.000 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 677 |
Badan Pengelola Usaha |
Maret 2026 |
525119 |
Biaya Operasional Kenderaan Dinas (4 Minggu x 15 Liter x 12 Bulan) |
2026-04-13 |
25/UN47.H/GUP2-SPP/BPU/2026 |
2026-04-15 |
0803U |
Rp. 900.000 |
2 Hari |
|
| 678 |
Badan Pengelola Usaha |
April 2026 |
525119 |
Biaya Operasional Kenderaan Dinas (4 Minggu x 15 Liter x 12 Bulan) |
2026-05-29 |
39/UN47.H/GUP3-SPP/BPU/2026 |
2026-06-29 |
1371U |
Rp. 1.850.000 |
31 Hari |
|
| 679 |
Badan Pengelola Usaha |
Mei 2026 |
525119 |
Biaya Operasional Kenderaan Dinas (4 Minggu x 15 Liter x 12 Bulan) |
2026-05-29 |
39/UN47.H/GUP3-SPP/BPU/2026 |
2026-06-29 |
1371U |
Rp. 650.000 |
31 Hari |
|
| 680 |
Badan Pengelola Usaha |
Juni 2026 |
525119 |
Biaya Operasional Kenderaan Dinas (4 Minggu x 15 Liter x 12 Bulan) |
2026-08-07 |
53/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1990U |
Rp. 778.000 |
12 Hari |
|
| 681 |
Badan Pengelola Usaha |
Agustus 2026 |
525119 |
Biaya Operasional Kenderaan Dinas (4 Minggu x 15 Liter x 12 Bulan) |
2026-09-22 |
73/UN47.H/GUP5-SPP/BPU/2026 |
|
|
Rp. 2.673.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 682 |
Badan Pengelola Usaha |
Januari 2026 |
525119 |
Biaya Sewa Kenderaan Operasional Fakultas/Unit Kerja (16 Unit x 12 Bln) |
2026-01-19 |
02/UN47.H/LS1-SPP/BPU/2026 |
2026-01-27 |
0103U |
Rp. 118.880.000 |
8 Hari |
|
| 683 |
Badan Pengelola Usaha |
Februari 2026 |
525119 |
Biaya Sewa Kenderaan Operasional Fakultas/Unit Kerja (16 Unit x 12 Bln) |
2026-02-23 |
04/UN47.H/LS3-SPP/BPU/2026 |
2026-02-25 |
0230U |
Rp. 118.880.000 |
2 Hari |
|
| 684 |
Badan Pengelola Usaha |
Maret 2026 |
525119 |
Biaya Sewa Kenderaan Operasional Fakultas/Unit Kerja (16 Unit x 12 Bln) |
2026-03-09 |
15/UN47.H/LS5-SPP/BPU/2026 |
2026-03-12 |
0486U |
Rp. 118.880.000 |
3 Hari |
|
| 685 |
Badan Pengelola Usaha |
April 2026 |
525119 |
Biaya Sewa Kenderaan Operasional Fakultas/Unit Kerja (16 Unit x 12 Bln) |
2026-04-08 |
21/UN47.H/LS8-SPP/BPU/2026 |
2026-04-10 |
0764U |
Rp. 118.880.000 |
2 Hari |
|
| 686 |
Badan Pengelola Usaha |
Mei 2026 |
525119 |
Biaya Sewa Kenderaan Operasional Fakultas/Unit Kerja (16 Unit x 12 Bln) |
2026-05-07 |
33/UN47.H/LS11-SPP/BPU/2026 |
2026-05-13 |
1067U |
Rp. 118.880.000 |
6 Hari |
|
| 687 |
Badan Pengelola Usaha |
Juni 2026 |
525119 |
Biaya Sewa Kenderaan Operasional Fakultas/Unit Kerja (16 Unit x 12 Bln) |
2026-06-05 |
42/UN47.H/LS14-SPP/BPU/2026 |
2026-06-26 |
1345U |
Rp. 118.880.000 |
21 Hari |
|
| 688 |
Badan Pengelola Usaha |
Juli 2026 |
525119 |
Biaya Sewa Kenderaan Operasional Fakultas/Unit Kerja (16 Unit x 12 Bln) |
2026-07-09 |
47/UN47.H/LS15-SPP/BPU/2026 |
2026-07-22 |
1681U |
Rp. 118.880.000 |
13 Hari |
|
| 689 |
Badan Pengelola Usaha |
Agustus 2026 |
525119 |
Biaya Sewa Kenderaan Operasional Fakultas/Unit Kerja (16 Unit x 12 Bln) |
2026-08-12 |
58/UN47.H/LS17-SPP/BPU/2026 |
2026-08-24 |
2080U |
Rp. 118.880.000 |
12 Hari |
|
| 690 |
Badan Pengelola Usaha |
September 2026 |
525119 |
Biaya Sewa Kenderaan Operasional Fakultas/Unit Kerja (16 Unit x 12 Bln) |
2026-09-11 |
67/UN47.H/LS20-SPP/BPU/2026 |
|
|
Rp. 118.880.000 |
24 Hari |
Belum ada SP2D terhitung dari 11 September 2026 hingga 05 Oktober 2026 (24 Hari) |
| 691 |
Badan Pengelola Usaha |
September 2026 |
525119 |
Biaya Sewa Kenderaan Operasional Fakultas/Unit Kerja (16 Unit x 12 Bln) |
2026-09-28 |
77/UN47.H/LS21-SPP/BPU/2026 |
|
|
Rp. 118.880.000 |
7 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 05 Oktober 2026 (7 Hari) |
| 692 |
Badan Pengelola Usaha |
Januari 2026 |
525119 |
Biaya Sewa Kenderaan Operasional BPU (1 Unit x 12 Bln) |
2026-01-19 |
02/UN47.H/LS1-SPP/BPU/2026 |
2026-01-27 |
0103U |
Rp. 7.430.000 |
8 Hari |
|
| 693 |
Badan Pengelola Usaha |
Februari 2026 |
525119 |
Biaya Sewa Kenderaan Operasional BPU (1 Unit x 12 Bln) |
2026-02-23 |
04/UN47.H/LS3-SPP/BPU/2026 |
2026-02-25 |
0230U |
Rp. 7.430.000 |
2 Hari |
|
| 694 |
Badan Pengelola Usaha |
Maret 2026 |
525119 |
Biaya Sewa Kenderaan Operasional BPU (1 Unit x 12 Bln) |
2026-03-09 |
15/UN47.H/LS5-SPP/BPU/2026 |
2026-03-12 |
0486U |
Rp. 7.430.000 |
3 Hari |
|
| 695 |
Badan Pengelola Usaha |
April 2026 |
525119 |
Biaya Sewa Kenderaan Operasional BPU (1 Unit x 12 Bln) |
2026-04-08 |
21/UN47.H/LS8-SPP/BPU/2026 |
2026-04-10 |
0764U |
Rp. 7.430.000 |
2 Hari |
|
| 696 |
Badan Pengelola Usaha |
Mei 2026 |
525119 |
Biaya Sewa Kenderaan Operasional BPU (1 Unit x 12 Bln) |
2026-05-07 |
33/UN47.H/LS11-SPP/BPU/2026 |
2026-05-13 |
1067U |
Rp. 7.430.000 |
6 Hari |
|
| 697 |
Badan Pengelola Usaha |
Juni 2026 |
525119 |
Biaya Sewa Kenderaan Operasional BPU (1 Unit x 12 Bln) |
2026-06-05 |
42/UN47.H/LS14-SPP/BPU/2026 |
2026-06-26 |
1345U |
Rp. 7.430.000 |
21 Hari |
|
| 698 |
Badan Pengelola Usaha |
Juli 2026 |
525119 |
Biaya Sewa Kenderaan Operasional BPU (1 Unit x 12 Bln) |
2026-07-09 |
47/UN47.H/LS15-SPP/BPU/2026 |
2026-07-22 |
1681U |
Rp. 7.430.000 |
13 Hari |
|
| 699 |
Badan Pengelola Usaha |
Agustus 2026 |
525119 |
Biaya Sewa Kenderaan Operasional BPU (1 Unit x 12 Bln) |
2026-08-12 |
58/UN47.H/LS17-SPP/BPU/2026 |
2026-08-24 |
2080U |
Rp. 7.430.000 |
12 Hari |
|
| 700 |
Badan Pengelola Usaha |
September 2026 |
525119 |
Biaya Sewa Kenderaan Operasional BPU (1 Unit x 12 Bln) |
2026-09-11 |
67/UN47.H/LS20-SPP/BPU/2026 |
|
|
Rp. 7.430.000 |
24 Hari |
Belum ada SP2D terhitung dari 11 September 2026 hingga 05 Oktober 2026 (24 Hari) |
| 701 |
Badan Pengelola Usaha |
September 2026 |
525119 |
Biaya Sewa Kenderaan Operasional BPU (1 Unit x 12 Bln) |
2026-09-28 |
77/UN47.H/LS21-SPP/BPU/2026 |
|
|
Rp. 7.430.000 |
7 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 05 Oktober 2026 (7 Hari) |
| 702 |
Badan Pengelola Usaha |
Februari 2026 |
525111 |
Remunerasi Insentif Kelola |
2026-01-29 |
03/UN47.H/LS2-SPP/BPU/2026 |
2026-02-09 |
0132U |
Rp. 37.200.000 |
11 Hari |
|
| 703 |
Badan Pengelola Usaha |
Maret 2026 |
525111 |
Remunerasi Insentif Kelola |
2026-03-09 |
18/UN47.H/LS6-SPP/BPU/2026 |
2026-03-13 |
0542U |
Rp. 42.200.000 |
4 Hari |
|
| 704 |
Badan Pengelola Usaha |
Juni 2026 |
525111 |
Remunerasi Insentif Kelola |
2026-05-07 |
35/UN47.H/LS12-SPP/BPU/2026 |
2026-06-02 |
1198U |
Rp. 42.200.000 |
26 Hari |
|
| 705 |
Badan Pengelola Usaha |
Juli 2026 |
525111 |
Remunerasi Insentif Kelola |
2026-07-13 |
49/UN47.H/LS17-SPP/BPU/2026 |
2026-08-05 |
1852U |
Rp. 42.200.000 |
23 Hari |
|
| 706 |
Badan Pengelola Usaha |
Agustus 2026 |
525111 |
Remunerasi Insentif Kelola |
2026-09-01 |
66/UN47.H/LS18-SPP/BPU/2026 |
|
|
Rp. 42.200.000 |
34 Hari |
Belum ada SP2D terhitung dari 01 September 2026 hingga 05 Oktober 2026 (34 Hari) |
| 707 |
Badan Pengelola Usaha |
Maret 2026 |
525119 |
Operasional Kegiatan Usaha / unit Usaha BPU (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
2026-02-24 |
06/UN47.H/LS4-SPP/BPU/2026 |
2026-03-03 |
0291U |
Rp. 49.950.000 |
7 Hari |
|
| 708 |
Badan Pengelola Usaha |
Maret 2026 |
525119 |
Operasional Kegiatan Usaha / unit Usaha BPU (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
2026-02-26 |
05/UN47.H/LS4-SPP/BPU/2026 |
2026-03-03 |
0290U |
Rp. 50.970.300 |
5 Hari |
|
| 709 |
Badan Pengelola Usaha |
Maret 2026 |
525119 |
Operasional Kegiatan Usaha / unit Usaha BPU (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
2026-02-26 |
07/UN47.H/LS4-SPP/BPU/2026 |
2026-03-03 |
0292U |
Rp. 49.783.500 |
5 Hari |
|
| 710 |
Badan Pengelola Usaha |
Maret 2026 |
525119 |
Operasional Kegiatan Usaha / unit Usaha BPU (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
2026-03-09 |
17/UN47.H/LS5-SPP/BPU/2026 |
2026-03-12 |
0487U |
Rp. 23.684.000 |
3 Hari |
|
| 711 |
Badan Pengelola Usaha |
Maret 2026 |
525119 |
Operasional Kegiatan Usaha / unit Usaha BPU (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
2026-04-13 |
25/UN47.H/GUP2-SPP/BPU/2026 |
2026-04-15 |
0803U |
Rp. 95.494.180 |
2 Hari |
|
| 712 |
Badan Pengelola Usaha |
April 2026 |
525119 |
Operasional Kegiatan Usaha / unit Usaha BPU (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
2026-04-08 |
23/UN47.H/LS8-SPP/BPU/2026 |
2026-04-10 |
0766U |
Rp. 42.475.000 |
2 Hari |
|
| 713 |
Badan Pengelola Usaha |
April 2026 |
525119 |
Operasional Kegiatan Usaha / unit Usaha BPU (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
2026-05-29 |
39/UN47.H/GUP3-SPP/BPU/2026 |
2026-06-29 |
1371U |
Rp. 94.169.462 |
31 Hari |
|
| 714 |
Badan Pengelola Usaha |
Juni 2026 |
525119 |
Operasional Kegiatan Usaha / unit Usaha BPU (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
2026-08-07 |
53/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1990U |
Rp. 15.900.000 |
12 Hari |
|
| 715 |
Badan Pengelola Usaha |
Juli 2026 |
525119 |
Operasional Kegiatan Usaha / unit Usaha BPU (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
2026-08-07 |
53/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1990U |
Rp. 28.219.069 |
12 Hari |
|
| 716 |
Badan Pengelola Usaha |
Agustus 2026 |
525119 |
Operasional Kegiatan Usaha / unit Usaha BPU (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
|
|
|
|
Rp. 5.400.000 |
65 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Agustus 2026 hingga 05 Oktober 2026 (65 Hari) |
| 717 |
Badan Pengelola Usaha |
Agustus 2026 |
525119 |
Operasional Kegiatan Usaha / unit Usaha BPU (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
2026-08-27 |
64/UN47.H/LS18-SPP/BPU/2026 |
2026-09-09 |
2235U |
Rp. 22.580.000 |
13 Hari |
|
| 718 |
Badan Pengelola Usaha |
Agustus 2026 |
525119 |
Operasional Kegiatan Usaha / unit Usaha BPU (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
2026-09-22 |
73/UN47.H/GUP5-SPP/BPU/2026 |
|
|
Rp. 27.900.210 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 719 |
Badan Pengelola Usaha |
September 2026 |
525119 |
Operasional Kegiatan Usaha / unit Usaha BPU (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
|
|
|
|
Rp. 38.085.000 |
34 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 05 Oktober 2026 (34 Hari) |
| 720 |
Badan Pengelola Usaha |
Oktober 2026 |
525119 |
Operasional Kegiatan Usaha / unit Usaha BPU (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
|
|
|
|
Rp. 16.009.070 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 721 |
Badan Pengelola Usaha |
Juli 2026 |
525119 |
Biaya Persiapan, Penyelenggaraan dan Evaluasi KSO/KSM (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
2026-05-25 |
35/UN47.H/LS13-SPP/BPU/2026 |
2026-07-02 |
1439U |
Rp. 17.242.000 |
38 Hari |
|
| 722 |
Badan Pengelola Usaha |
September 2026 |
525119 |
Biaya Penyusunan SOP dan Regulasi Usaha |
2026-09-28 |
78/UN47.H/LS21-SPP/BPU/2026 |
|
|
Rp. 13.000.000 |
7 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 05 Oktober 2026 (7 Hari) |
| 723 |
Badan Pengelola Usaha |
Juni 2026 |
525174 |
Honor Tenaga Kontrak |
2026-08-07 |
54/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1991U |
Rp. 17.400.000 |
12 Hari |
|
| 724 |
Badan Pengelola Usaha |
Juli 2026 |
525174 |
Honor Tenaga Kontrak |
2026-08-07 |
54/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1991U |
Rp. 6.800.000 |
12 Hari |
|
| 725 |
Badan Pengelola Usaha |
Juli 2026 |
525176 |
Honorarium Kepala Divisi |
2026-08-07 |
55/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1992U |
Rp. 5.000.000 |
12 Hari |
|
| 726 |
Badan Pengelola Usaha |
Agustus 2026 |
525176 |
Honorarium Kepala Divisi |
2026-09-22 |
74/UN47.H/GUP5-SPP/BPU/2026 |
|
|
Rp. 7.000.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 727 |
Badan Pengelola Usaha |
Juni 2026 |
525176 |
Tunjangan Manajer Unit Usaha |
2026-08-07 |
55/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1992U |
Rp. 11.304.049 |
12 Hari |
|
| 728 |
Badan Pengelola Usaha |
Juli 2026 |
525176 |
Tunjangan Manajer Unit Usaha |
2026-08-07 |
55/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1992U |
Rp. 3.519.615 |
12 Hari |
|
| 729 |
Badan Pengelola Usaha |
Agustus 2026 |
525176 |
Tunjangan Manajer Unit Usaha |
2026-09-22 |
74/UN47.H/GUP5-SPP/BPU/2026 |
|
|
Rp. 40.160.627 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 730 |
Badan Pengelola Usaha |
Januari 2026 |
525119 |
Biaya Pengembangan Sistem Informasi dan Pengelolaan Usaha Universitas |
2026-03-04 |
11/UN47.H/GUP1-SPP/BPU/2026 |
2026-03-11 |
0425U |
Rp. 35.000.000 |
7 Hari |
|
| 731 |
Badan Pengelola Usaha |
Mei 2026 |
525119 |
Biaya Pengembangan Sistem Informasi dan Pengelolaan Usaha Universitas |
2026-05-07 |
34/UN47.H/LS11-SPP/BPU/2026 |
2026-05-19 |
1088U |
Rp. 88.700.000 |
12 Hari |
|
| 732 |
Badan Pengelola Usaha |
Maret 2026 |
525119 |
Biaya Maintenance dan Pengembangan Sistem Administrasi BPU/Universitas |
2026-03-09 |
16/UN47.H/LS5-SPP/BPU/2026 |
2026-03-12 |
0488U |
Rp. 60.000.000 |
3 Hari |
|
| 733 |
Badan Pengelola Usaha |
April 2026 |
525119 |
Biaya Maintenance dan Pengembangan Sistem Administrasi BPU/Universitas |
2026-04-08 |
22/UN47.H/LS8-SPP/BPU/2026 |
2026-04-10 |
0765U |
Rp. 15.000.000 |
2 Hari |
|
| 734 |
Badan Pengelola Usaha |
April 2026 |
525119 |
Biaya Maintenance dan Pengembangan Sistem Administrasi BPU/Universitas |
2026-04-14 |
29/UN47.H/LS9-SPP/BPU/2026 |
2026-04-22 |
0852U |
Rp. 15.000.000 |
8 Hari |
|
| 735 |
Badan Pengelola Usaha |
Juli 2026 |
525119 |
Biaya Maintenance dan Pengembangan Sistem Administrasi BPU/Universitas |
2026-05-25 |
36/UN47.H/LS13-SPP/BPU/2026 |
2026-07-02 |
1440U |
Rp. 25.000.000 |
38 Hari |
|
| 736 |
Badan Pengelola Usaha |
Juli 2026 |
525119 |
Biaya Maintenance dan Pengembangan Sistem Administrasi BPU/Universitas |
2026-06-05 |
43/UN47.H/LS14-SPP/BPU/2026 |
2026-07-06 |
1512U |
Rp. 25.000.000 |
31 Hari |
|
| 737 |
Badan Pengelola Usaha |
Juli 2026 |
525119 |
Biaya Maintenance dan Pengembangan Sistem Administrasi BPU/Universitas |
2026-07-09 |
46/UN47.H/LS15-SPP/BPU/2026 |
2026-07-29 |
1747U |
Rp. 30.000.000 |
20 Hari |
|
| 738 |
Badan Pengelola Usaha |
Agustus 2026 |
525119 |
Biaya Maintenance dan Pengembangan Sistem Administrasi BPU/Universitas |
2026-08-12 |
60/UN47.H/LS17-SPP/BPU/2026 |
2026-08-24 |
2082U |
Rp. 25.000.000 |
12 Hari |
|
| 739 |
Badan Pengelola Usaha |
September 2026 |
525119 |
Biaya Maintenance dan Pengembangan Sistem Administrasi BPU/Universitas |
2026-09-11 |
68/UN47.H/LS20-SPP/BPU/2026 |
|
|
Rp. 35.000.000 |
24 Hari |
Belum ada SP2D terhitung dari 11 September 2026 hingga 05 Oktober 2026 (24 Hari) |
| 740 |
Badan Pengelola Usaha |
September 2026 |
525119 |
Biaya Maintenance dan Pengembangan Sistem Administrasi BPU/Universitas |
2026-09-28 |
80/UN47.H/LS21-SPP/BPU/2026 |
|
|
Rp. 35.000.000 |
7 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 05 Oktober 2026 (7 Hari) |
| 741 |
Badan Pengelola Usaha |
April 2026 |
525119 |
Biaya Maintenance dan Pengembangan Website |
2026-04-08 |
22/UN47.H/LS8-SPP/BPU/2026 |
2026-04-10 |
0765U |
Rp. 45.000.000 |
2 Hari |
|
| 742 |
Badan Pengelola Usaha |
April 2026 |
525119 |
Biaya Maintenance dan Pengembangan Website |
2026-04-14 |
29/UN47.H/LS9-SPP/BPU/2026 |
2026-04-22 |
0852U |
Rp. 25.000.000 |
8 Hari |
|
| 743 |
Badan Pengelola Usaha |
Juli 2026 |
525119 |
Biaya Maintenance dan Pengembangan Website |
2026-05-25 |
36/UN47.H/LS13-SPP/BPU/2026 |
2026-07-02 |
1440U |
Rp. 15.000.000 |
38 Hari |
|
| 744 |
Badan Pengelola Usaha |
Juli 2026 |
525119 |
Biaya Maintenance dan Pengembangan Website |
2026-06-05 |
43/UN47.H/LS14-SPP/BPU/2026 |
2026-07-06 |
1512U |
Rp. 15.000.000 |
31 Hari |
|
| 745 |
Badan Pengelola Usaha |
Juli 2026 |
525119 |
Biaya Maintenance dan Pengembangan Website |
2026-07-09 |
46/UN47.H/LS15-SPP/BPU/2026 |
2026-07-29 |
1747U |
Rp. 10.000.000 |
20 Hari |
|
| 746 |
Badan Pengelola Usaha |
Agustus 2026 |
525119 |
Biaya Maintenance dan Pengembangan Website |
2026-08-12 |
60/UN47.H/LS17-SPP/BPU/2026 |
2026-08-24 |
2082U |
Rp. 10.000.000 |
12 Hari |
|
| 747 |
Badan Pengelola Usaha |
Maret 2026 |
525119 |
Biaya Cloud Server dan Lisensi cPanel |
2026-03-09 |
16/UN47.H/LS5-SPP/BPU/2026 |
2026-03-12 |
0488U |
Rp. 21.700.000 |
3 Hari |
|
| 748 |
Badan Pengelola Usaha |
April 2026 |
525119 |
Biaya Cloud Server dan Lisensi cPanel |
2026-04-08 |
22/UN47.H/LS8-SPP/BPU/2026 |
2026-04-10 |
0765U |
Rp. 8.000.000 |
2 Hari |
|
| 749 |
Badan Pengelola Usaha |
April 2026 |
525119 |
Biaya Cloud Server dan Lisensi cPanel |
2026-04-14 |
29/UN47.H/LS9-SPP/BPU/2026 |
2026-04-22 |
0852U |
Rp. 13.700.000 |
8 Hari |
|
| 750 |
Badan Pengelola Usaha |
Juli 2026 |
525119 |
Biaya Cloud Server dan Lisensi cPanel |
2026-05-25 |
36/UN47.H/LS13-SPP/BPU/2026 |
2026-07-02 |
1440U |
Rp. 8.000.000 |
38 Hari |
|
| 751 |
Badan Pengelola Usaha |
Juli 2026 |
525119 |
Biaya Cloud Server dan Lisensi cPanel |
2026-06-05 |
43/UN47.H/LS14-SPP/BPU/2026 |
2026-07-06 |
1512U |
Rp. 13.700.000 |
31 Hari |
|
| 752 |
Badan Pengelola Usaha |
Juli 2026 |
525119 |
Biaya Cloud Server dan Lisensi cPanel |
2026-07-09 |
46/UN47.H/LS15-SPP/BPU/2026 |
2026-07-29 |
1747U |
Rp. 10.000.000 |
20 Hari |
|
| 753 |
Badan Pengelola Usaha |
Agustus 2026 |
525119 |
Biaya Cloud Server dan Lisensi cPanel |
2026-08-12 |
60/UN47.H/LS17-SPP/BPU/2026 |
2026-08-24 |
2082U |
Rp. 15.700.000 |
12 Hari |
|
| 754 |
Badan Pengelola Usaha |
September 2026 |
525119 |
Biaya Cloud Server dan Lisensi cPanel |
2026-09-11 |
68/UN47.H/LS20-SPP/BPU/2026 |
|
|
Rp. 10.000.000 |
24 Hari |
Belum ada SP2D terhitung dari 11 September 2026 hingga 05 Oktober 2026 (24 Hari) |
| 755 |
Badan Pengelola Usaha |
September 2026 |
525119 |
Biaya Cloud Server dan Lisensi cPanel |
2026-09-28 |
80/UN47.H/LS21-SPP/BPU/2026 |
|
|
Rp. 15.700.000 |
7 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 05 Oktober 2026 (7 Hari) |
| 756 |
Badan Pengelola Usaha |
Maret 2026 |
525111 |
Honorarium PPK Unit Kerja |
2026-04-13 |
27/UN47.H/GUP2-SPP/BPU/2026 |
2026-04-15 |
0805U |
Rp. 2.300.000 |
2 Hari |
|
| 757 |
Badan Pengelola Usaha |
April 2026 |
525111 |
Honorarium PPK Unit Kerja |
2026-05-29 |
41/UN47.H/GUP3-SPP/BPU/2026 |
2026-06-29 |
1373U |
Rp. 2.300.000 |
31 Hari |
|
| 758 |
Badan Pengelola Usaha |
Maret 2026 |
525111 |
Honorarium Penguji Tagihan / Verifikator |
2026-04-13 |
27/UN47.H/GUP2-SPP/BPU/2026 |
2026-04-15 |
0805U |
Rp. 940.000 |
2 Hari |
|
| 759 |
Badan Pengelola Usaha |
April 2026 |
525111 |
Honorarium Penguji Tagihan / Verifikator |
2026-05-29 |
41/UN47.H/GUP3-SPP/BPU/2026 |
2026-06-29 |
1373U |
Rp. 940.000 |
31 Hari |
|
| 760 |
Badan Pengelola Usaha |
Agustus 2026 |
525176 |
Honorarium PPK Unit Kerja |
2026-09-22 |
76/UN47.H/GUP5-SPP/BPU/2026 |
|
|
Rp. 5.330.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 761 |
Badan Pengelola Usaha |
Januari 2026 |
525119 |
Biaya Pengembangan Karakter dan Team Work |
2026-03-04 |
11/UN47.H/GUP1-SPP/BPU/2026 |
2026-03-11 |
0425U |
Rp. 25.681.100 |
7 Hari |
|
| 762 |
Badan Pengelola Usaha |
Mei 2026 |
525119 |
Biaya Pengembangan Karakter dan Team Work |
2026-04-28 |
33/UN47.H/LS10-SPP/BPU/2026 |
2026-05-06 |
0999U |
Rp. 53.725.000 |
8 Hari |
|
| 763 |
Badan Pengelola Usaha |
September 2026 |
525119 |
Workshop Pengembangan Unit Usaha |
2026-09-11 |
69/UN47.H/LS20-SPP/BPU/2026 |
|
|
Rp. 49.520.000 |
24 Hari |
Belum ada SP2D terhitung dari 11 September 2026 hingga 05 Oktober 2026 (24 Hari) |
| 764 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Januari 2026 |
537112 |
Pengadaan Ac |
2026-02-20 |
2/UN47.D2/KU.01.00/SPP-GUP1/2026 |
2026-02-24 |
0212L |
Rp. 23.950.000 |
4 Hari |
|
| 765 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
537112 |
Pengadaan Laptop |
2026-06-17 |
47/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1352L |
Rp. 44.987.000 |
12 Hari |
|
| 766 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
537112 |
Pengadaan Laptop |
2026-08-31 |
78/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2265L |
Rp. 14.428.900 |
11 Hari |
|
| 767 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
537112 |
Pengadaan PC All In One |
2026-04-14 |
21/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0773L |
Rp. 36.630.000 |
0 Hari |
|
| 768 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
537112 |
Pengadaan Printer |
2026-02-23 |
10/UN47.D2/KU.01.00/SPP-LS1/2026 |
2026-02-25 |
0233L |
Rp. 12.000.000 |
2 Hari |
|
| 769 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
537112 |
Pengadaan Printer |
2026-08-03 |
61/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1938L |
Rp. 3.885.000 |
9 Hari |
|
| 770 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
537112 |
Pengadaan Meubelair Pendukung Perkantoran |
2026-04-27 |
31/UN47.D2/KU.01.00/SPP-GUP3/2026 |
2026-04-29 |
0933L |
Rp. 17.237.125 |
2 Hari |
|
| 771 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
537112 |
Pengadaan Meubelair Pendukung Perkantoran |
2026-07-06 |
58/UN47.D2/KU.01.00/SPP-LS6/2026 |
2026-07-15 |
1628L |
Rp. 31.976.880 |
9 Hari |
|
| 772 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525114 |
Pemeliharaan Komputer/Laptop Pendukung Perkantoran |
2026-04-10 |
24/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0776L |
Rp. 1.400.000 |
4 Hari |
|
| 773 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525114 |
Pemeliharaan Komputer/Laptop Pendukung Perkantoran |
2026-08-03 |
65/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1942L |
Rp. 500.000 |
9 Hari |
|
| 774 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Januari 2026 |
525114 |
Pemeliharaan AC Pendukung Perkantoran |
2026-02-20 |
5/UN47.D2/KU.01.00/SPP-GUP1/2026 |
2026-02-24 |
0215L |
Rp. 1.950.000 |
4 Hari |
|
| 775 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Mei 2026 |
525114 |
Pemeliharaan AC Pendukung Perkantoran |
2026-05-25 |
42/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1182L |
Rp. 1.880.000 |
8 Hari |
|
| 776 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525114 |
Pemeliharaan AC Pendukung Perkantoran |
2026-06-17 |
50/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1355L |
Rp. 1.720.000 |
12 Hari |
|
| 777 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525114 |
Pemeliharaan AC Pendukung Perkantoran |
2026-08-31 |
82/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2269L |
Rp. 1.250.000 |
11 Hari |
|
| 778 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525114 |
Pemeliharaan AC Pendukung Perkantoran |
2026-09-22 |
91/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 1.175.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 779 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525114 |
Pemeliharaan Printer Pendukung Perkantoran |
2026-04-10 |
24/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0776L |
Rp. 525.000 |
4 Hari |
|
| 780 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525114 |
Pemeliharaan Jaringan LIstrik/Internet Pendukung Perkantoran |
2026-04-10 |
24/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0776L |
Rp. 586.500 |
4 Hari |
|
| 781 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525114 |
Pemeliharaan Peralatan Micro Teaching LPMPP |
2026-08-03 |
65/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1942L |
Rp. 5.750.000 |
9 Hari |
|
| 782 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525114 |
Pemeliharaan Gedung dan Bangunan Pendukung Perkantoran di Lingkungan LPMPP |
2026-04-10 |
24/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0776L |
Rp. 645.200 |
4 Hari |
|
| 783 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Maret 2026 |
525114 |
Pemeliharaan Gedung dan Bangunan Pendukung Perkantoran di Lingkungan LPMPP |
2026-03-30 |
13/UN47.D2/KU.01.00/SPP-LS2/2026 |
2026-03-31 |
0615L |
Rp. 38.067.772 |
1 Hari |
|
| 784 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525114 |
Pemeliharaan Gedung dan Bangunan Pendukung Perkantoran di Lingkungan LPMPP |
2026-04-27 |
33/UN47.D2/KU.01.00/SPP-GUP3/2026 |
2026-04-29 |
0935L |
Rp. 36.821.948 |
2 Hari |
|
| 785 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525114 |
Pemeliharaan Gedung dan Bangunan Pendukung Perkantoran di Lingkungan LPMPP |
2026-05-25 |
42/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1182L |
Rp. 39.360.515 |
8 Hari |
|
| 786 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Mei 2026 |
525114 |
Pemeliharaan Gedung dan Bangunan Pendukung Perkantoran di Lingkungan LPMPP |
2026-05-25 |
42/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1182L |
Rp. 388.200 |
8 Hari |
|
| 787 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525114 |
Pemeliharaan Gedung dan Bangunan Pendukung Perkantoran di Lingkungan LPMPP |
2026-09-22 |
91/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 19.916.784 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 788 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525114 |
Pemeliharaan Halaman Perkantoran di Lingkungan LPMPP |
2026-08-03 |
65/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1942L |
Rp. 8.087.004 |
9 Hari |
|
| 789 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525115 |
Tiket perjalanan dinas dalam rangka konsultasi dan pelaporan program RPL (2 Org) |
2026-06-17 |
54/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1359L |
Rp. 5.850.000 |
12 Hari |
|
| 790 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525119 |
Bantuan kegiatan Sosialisasi Rekognisi Pembelajaran Lampau (RPL) |
2026-04-10 |
30/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0782L |
Rp. 15.000.000 |
4 Hari |
|
| 791 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525119 |
Bantuan kegiatan Sosialisasi Rekognisi Pembelajaran Lampau (RPL) |
2026-05-25 |
45/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1185L |
Rp. 20.000.000 |
8 Hari |
|
| 792 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525119 |
Bantuan kegiatan Sosialisasi Rekognisi Pembelajaran Lampau (RPL) |
2026-08-03 |
68/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1935L |
Rp. 5.000.000 |
9 Hari |
|
| 793 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525112 |
Konsumsi Panitia, peserta pada pelaksanaan Pelatihan Guru pamong UNG Mengajar (Bacth 9 & 10) di Kota Gorontalo, Kab. Gorontalo dan. Bone Bolango |
2026-04-01 |
15/UN47.D2/KU.01.00/SPP-TUPN/2026 |
2026-04-08 |
0681L |
Rp. 38.500.000 |
7 Hari |
|
| 794 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525112 |
Konsumsi Panitia, peserta pada pelaksanaan Pelatihan Guru pamong UNG Mengajar (Bacth 9 & 10) di Kota Gorontalo, Kab. Gorontalo dan. Bone Bolango |
2026-08-27 |
71/UN47.D2/KU.01.00/SPP-TUPN4/2026 |
2026-09-01 |
2157L |
Rp. 19.135.000 |
5 Hari |
|
| 795 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525112 |
ATK, fotocopy, spanduk pada pelatihan Guru Pamong UNG Mengajar (Bacth 9 & 10) di (Kab. Gorontalo, Kab. Bone Bolango) |
2026-09-22 |
95/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 900.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 796 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525112 |
Konsumsi Panitia, Narasumber, dan peserta pada kegiatan coaching umum dan pelepasan mahasiswa peserta UNG Mengajar (Bacth 9 & 10) |
2026-04-01 |
15/UN47.D2/KU.01.00/SPP-TUPN/2026 |
2026-04-08 |
0681L |
Rp. 33.159.150 |
7 Hari |
|
| 797 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525112 |
Konsumsi Panitia, Narasumber, dan peserta pada kegiatan coaching umum dan pelepasan mahasiswa peserta UNG Mengajar (Bacth 9 & 10) |
2026-08-27 |
71/UN47.D2/KU.01.00/SPP-TUPN4/2026 |
2026-09-01 |
2157L |
Rp. 15.015.000 |
5 Hari |
|
| 798 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525112 |
Konsumsi Panitia, Narasumber, dan peserta pada kegiatan coaching umum dan pelepasan mahasiswa peserta UNG Mengajar (Bacth 9 & 10) |
2026-08-31 |
84/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2271L |
Rp. 4.250.000 |
11 Hari |
|
| 799 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Januari 2026 |
525112 |
ATK, fotocopy, spanduk pada Coaching umum dan pelepasan UNG Mengajar (Bacth 9 & 10) |
2026-02-20 |
7/UN47.D2/KU.01.00/SPP-GUP1/2026 |
2026-02-24 |
0217L |
Rp. 1.226.500 |
4 Hari |
|
| 800 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525112 |
Sertifikat (Peserta, Guru Pamong, dan Kepala Sekolah) UNG Mengajar (Bacth 9 & 10) |
2026-04-01 |
15/UN47.D2/KU.01.00/SPP-TUPN/2026 |
2026-04-08 |
0681L |
Rp. 10.000.000 |
7 Hari |
|
| 801 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525112 |
Sertifikat (Peserta, Guru Pamong, dan Kepala Sekolah) UNG Mengajar (Bacth 9 & 10) |
2026-08-28 |
75/UN47.D2/KU.01.00/SPP-LS7/2026 |
2026-09-01 |
2165L |
Rp. 10.000.000 |
4 Hari |
|
| 802 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525112 |
Sertifikat (Peserta, Guru Pamong, dan Kepala Sekolah) UNG Mengajar (Bacth 9 & 10) |
2026-08-31 |
84/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2271L |
Rp. 7.000.000 |
11 Hari |
|
| 803 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525112 |
Konsumsi Peserta (dosen Pembimbing lapangan) dalam rangka workshop Penyamaan Presepsi Kegiatan UNG Mengajar (Bacth 9 & 10) |
2026-04-02 |
20/UN47.D2/KU.01.00/SPP-LS3/2026 |
2026-04-07 |
0660J |
Rp. 10.000.000 |
5 Hari |
|
| 804 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525112 |
Konsumsi Peserta (dosen Pembimbing lapangan) dalam rangka workshop Penyamaan Presepsi Kegiatan UNG Mengajar (Bacth 9 & 10) |
2026-08-27 |
71/UN47.D2/KU.01.00/SPP-TUPN4/2026 |
2026-09-01 |
2157L |
Rp. 13.050.000 |
5 Hari |
|
| 805 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525112 |
Konsumsi pada kegiatan FGD Mekanisme dan Teknis Pelaksanaan Pembelajaran di Luar Program Studi (Magang, Kewirausahaan, Riset, Membangun Desa, Pertukaran Pelajar)Bersama Pelaksana Teknis (LPPM, UPA PKK, UPA Bahasa dan Unit/Bagian Kerjasama) |
2026-08-31 |
84/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2271L |
Rp. 1.850.000 |
11 Hari |
|
| 806 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Januari 2026 |
525115 |
transportasi pada kegiatan Survey sekolah dan rekruitmen calon guru pamong UNG Mengajar (Bacth 9 & 10) Wilayah Kota Gorontalo |
2026-02-20 |
8/UN47.D2/KU.01.00/SPP-GUP1/2026 |
2026-02-24 |
0218L |
Rp. 2.250.000 |
4 Hari |
|
| 807 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
transportasi pada kegiatan Survey sekolah dan rekruitmen calon guru pamong UNG Mengajar (Bacth 9 & 10) Wilayah Kota Gorontalo |
2026-08-27 |
72/UN47.D2/KU.01.00/SPP-TUPN4/2026 |
2026-09-01 |
2158L |
Rp. 2.000.000 |
5 Hari |
|
| 808 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525115 |
transportasi pada kegiatan Survey sekolah dan rekruitmen calon guru pamong UNG Mengajar (Bacth 9 & 10) Wilayah Kota Gorontalo |
|
|
|
|
Rp. 250.000 |
34 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 05 Oktober 2026 (34 Hari) |
| 809 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525115 |
trnsportasi pada kegiatan Survey sekolah dan rekruitmen calon guru pamong UNG Mengajar (Bacth 9 & 10) Wilayah Kabupaten Gorontalo & Bone Bolango |
2026-02-20 |
8/UN47.D2/KU.01.00/SPP-GUP1/2026 |
2026-02-24 |
0218L |
Rp. 19.500.000 |
4 Hari |
|
| 810 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
trnsportasi pada kegiatan Survey sekolah dan rekruitmen calon guru pamong UNG Mengajar (Bacth 9 & 10) Wilayah Kabupaten Gorontalo & Bone Bolango |
2026-08-27 |
72/UN47.D2/KU.01.00/SPP-TUPN4/2026 |
2026-09-01 |
2158L |
Rp. 20.400.000 |
5 Hari |
|
| 811 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525115 |
Transportasi lokal peserta/guru pada pelatihan Guru Pamong UNG Mengajar (Bacth 9 & 10) di Kota Gorontalo, Kab. Gorontalo, Kab. Bone Bolango |
2026-04-01 |
16/UN47.D2/KU.01.00/SPP-TUPN/2026 |
2026-04-08 |
0682L |
Rp. 32.130.000 |
7 Hari |
|
| 812 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
Transportasi lokal peserta/guru pada pelatihan Guru Pamong UNG Mengajar (Bacth 9 & 10) di Kota Gorontalo, Kab. Gorontalo, Kab. Bone Bolango |
2026-08-27 |
72/UN47.D2/KU.01.00/SPP-TUPN4/2026 |
2026-09-01 |
2158L |
Rp. 64.400.000 |
5 Hari |
|
| 813 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525115 |
Transportasi lokal peserta/guru pada pelatihan Guru Pamong UNG Mengajar (Bacth 9 & 10) di Kota Gorontalo, Kab. Gorontalo, Kab. Bone Bolango |
2026-09-22 |
96/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 750.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 814 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525115 |
Transportasi narasumber Eksternal (Dinas Pendidikan Provinsi dan Kabupaten/kota, dan Depag) pada pelatihan Guru Pamong UNG Mengajar (Bacth 9 & 10). |
2026-04-01 |
16/UN47.D2/KU.01.00/SPP-TUPN/2026 |
2026-04-08 |
0682L |
Rp. 500.000 |
7 Hari |
|
| 815 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525115 |
Transportasi narasumber Eksternal (Dinas Pendidikan Provinsi dan Kabupaten/kota, dan Depag) pada pelatihan Guru Pamong UNG Mengajar (Bacth 9 & 10). |
2026-09-22 |
96/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 2.500.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 816 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525115 |
Transportasi Panitia dan narausmber internal pada pelatihan Guru Pamong UNG Mengajar (Bacth 9 & 10) di Kab. Gorontalo, Bone Bolango, dan Kota Gorontalo |
2026-04-01 |
16/UN47.D2/KU.01.00/SPP-TUPN/2026 |
2026-04-08 |
0682L |
Rp. 4.300.000 |
7 Hari |
|
| 817 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
Transportasi Panitia dan narausmber internal pada pelatihan Guru Pamong UNG Mengajar (Bacth 9 & 10) di Kab. Gorontalo, Bone Bolango, dan Kota Gorontalo |
2026-08-27 |
72/UN47.D2/KU.01.00/SPP-TUPN4/2026 |
2026-09-01 |
2158L |
Rp. 9.500.000 |
5 Hari |
|
| 818 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525115 |
Transportasi koordninasi Panitia Pelaksana pada penyerahan Mahasiswa/peserta UNG Mengajar (Bacth 9 & 10) Ke Dinas (Dinas Pendidikan Kota Gorontalo, Kab. Gorontalo, Kab. Bone Bolango, Dinas Pendidikan Prov. Gorontalo, Kanwil Depag Prov. Gorontalo) |
2026-04-01 |
16/UN47.D2/KU.01.00/SPP-TUPN/2026 |
2026-04-08 |
0682L |
Rp. 1.250.000 |
7 Hari |
|
| 819 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525115 |
Transportasi koordninasi Panitia Pelaksana pada penyerahan Mahasiswa/peserta UNG Mengajar (Bacth 9 & 10) Ke Dinas (Dinas Pendidikan Kota Gorontalo, Kab. Gorontalo, Kab. Bone Bolango, Dinas Pendidikan Prov. Gorontalo, Kanwil Depag Prov. Gorontalo) |
2026-09-22 |
96/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 1.400.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 820 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Maret 2026 |
525115 |
Transportasi dosen pembimbing lapangan UNG Mengajar (Bacth 9 & 10) di Kota Gorontalo (50 orang x 2 kali) |
2026-04-10 |
29/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0781L |
Rp. 4.050.000 |
4 Hari |
|
| 821 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525115 |
Transportasi dosen pembimbing lapangan UNG Mengajar (Bacth 9 & 10) di Kota Gorontalo (50 orang x 2 kali) |
2026-05-25 |
44/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1184L |
Rp. 250.000 |
8 Hari |
|
| 822 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525115 |
Transportasi dosen pembimbing lapangan UNG Mengajar (Bacth 9 & 10) di Kota Gorontalo (50 orang x 2 kali) |
2026-05-25 |
46/UN47.D2/KU.01.00/SPP-LS4/2026 |
2026-05-26 |
1160L |
Rp. 4.650.000 |
1 Hari |
|
| 823 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525115 |
Transportasi dosen pembimbing lapangan UNG Mengajar (Bacth 9 & 10) di Kota Gorontalo (50 orang x 2 kali) |
|
|
|
|
Rp. 250.000 |
34 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 05 Oktober 2026 (34 Hari) |
| 824 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Maret 2026 |
525115 |
Transportasi dosen pembimbing lapangan UNG Mengajar (Bacth 9 & 10) di Kabupaten Gorontalo dan Bone Bolango (517 orang x 2 kali) |
2026-04-10 |
29/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0781L |
Rp. 30.250.000 |
4 Hari |
|
| 825 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525115 |
Transportasi dosen pembimbing lapangan UNG Mengajar (Bacth 9 & 10) di Kabupaten Gorontalo dan Bone Bolango (517 orang x 2 kali) |
2026-05-25 |
44/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1184L |
Rp. 22.500.000 |
8 Hari |
|
| 826 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525115 |
Transportasi dosen pembimbing lapangan UNG Mengajar (Bacth 9 & 10) di Kabupaten Gorontalo dan Bone Bolango (517 orang x 2 kali) |
2026-05-25 |
46/UN47.D2/KU.01.00/SPP-LS4/2026 |
2026-05-26 |
1160L |
Rp. 6.500.000 |
1 Hari |
|
| 827 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525115 |
Transportasi dosen pembimbing lapangan UNG Mengajar (Bacth 9 & 10) di Kabupaten Gorontalo dan Bone Bolango (517 orang x 2 kali) |
|
|
|
|
Rp. 73.200.000 |
34 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 05 Oktober 2026 (34 Hari) |
| 828 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525115 |
Transportasi monitoring dan evaluasi pelaksanaan UNG Mengajar (Bacth 9 & 10) tahap pertama di Kota Gorontalo (Pimpinan Universitas dan panitia) |
2026-05-25 |
44/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1184L |
Rp. 1.800.000 |
8 Hari |
|
| 829 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525115 |
Transportasi monitoring dan evaluasi pelaksanaan UNG Mengajar (Bacth 9 & 10) tahap pertama di Kabupaten Gorontalo dan Bone Bolango (Pimpinan Universitas dan panitia). |
2026-05-25 |
44/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1184L |
Rp. 9.000.000 |
8 Hari |
|
| 830 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525115 |
Transportasi monitoring dan evaluasi pelaksanaan UNG Mengajar (Bacth 9 & 10) tahap pertama di Kabupaten Gorontalo dan Bone Bolango (Pimpinan Universitas dan panitia). |
2026-08-03 |
67/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1936L |
Rp. 600.000 |
9 Hari |
|
| 831 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525115 |
Transportasi monitoring dan evaluasi pelaksanaan UNG Mengajar (Bacth 9 & 10) tahap Kedua/ Pameran Produk di Kota Gorontalo (Pimpinan Universitas dan panitia) |
2026-07-30 |
59/UN47.D2/KU.01.00/SPP-TUPN3/2026 |
2026-08-12 |
1932L |
Rp. 250.000 |
13 Hari |
|
| 832 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525115 |
Transportasi monitoring dan evaluasi pelaksanaan UNG Mengajar (Bacth 9 & 10) tahap Kedua/ pameran produk di Kabupaten Gorontalo dan Bone Bolango (Pimpinan Universitas dan panitia) |
2026-07-30 |
59/UN47.D2/KU.01.00/SPP-TUPN3/2026 |
2026-08-12 |
1932L |
Rp. 19.850.000 |
13 Hari |
|
| 833 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
Transportasi monitoring dan evaluasi pelaksanaan UNG Mengajar (Bacth 9 & 10) tahap Kedua/ pameran produk di Kabupaten Gorontalo dan Bone Bolango (Pimpinan Universitas dan panitia) |
2026-08-27 |
72/UN47.D2/KU.01.00/SPP-TUPN4/2026 |
2026-09-01 |
2158L |
Rp. 6.600.000 |
5 Hari |
|
| 834 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525115 |
Transportasi yang mewakili pimpinan pada penyerahan Mahasiswa/peserta UNG Mengajar (Bacth 9 & 10) di Kota Gorontalo |
2026-04-01 |
16/UN47.D2/KU.01.00/SPP-TUPN/2026 |
2026-04-08 |
0682L |
Rp. 600.000 |
7 Hari |
|
| 835 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
Transportasi yang mewakili pimpinan pada penyerahan Mahasiswa/peserta UNG Mengajar (Bacth 9 & 10) di Kota Gorontalo |
2026-08-27 |
72/UN47.D2/KU.01.00/SPP-TUPN4/2026 |
2026-09-01 |
2158L |
Rp. 750.000 |
5 Hari |
|
| 836 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525115 |
Transportasi yang mewakili pimpinan pada penyerahan Mahasiswa/peserta UNG Mengajar (Bacth 9 & 10) di Kota Gorontalo |
2026-09-22 |
96/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 2.750.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 837 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525115 |
Transportasi yang mewakili pimpinan pada penyerahan Mahasiswa/peserta UNG Mengajar (Bacth 9 & 10) di Kab. Gorontalo dan Bone Bolango |
2026-04-01 |
16/UN47.D2/KU.01.00/SPP-TUPN/2026 |
2026-04-08 |
0682L |
Rp. 9.500.000 |
7 Hari |
|
| 838 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Maret 2026 |
525115 |
Transportasi yang mewakili pimpinan pada penyerahan Mahasiswa/peserta UNG Mengajar (Bacth 9 & 10) di Kab. Gorontalo dan Bone Bolango |
2026-04-01 |
16/UN47.D2/KU.01.00/SPP-TUPN/2026 |
2026-04-08 |
0682L |
Rp. 500.000 |
7 Hari |
|
| 839 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
Transportasi yang mewakili pimpinan pada penyerahan Mahasiswa/peserta UNG Mengajar (Bacth 9 & 10) di Kab. Gorontalo dan Bone Bolango |
2026-08-27 |
72/UN47.D2/KU.01.00/SPP-TUPN4/2026 |
2026-09-01 |
2158L |
Rp. 8.000.000 |
5 Hari |
|
| 840 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525115 |
Transportasi yang mewakili pimpinan pada penyerahan Mahasiswa/peserta UNG Mengajar (Bacth 9 & 10) di Kab. Gorontalo dan Bone Bolango |
2026-09-22 |
96/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 2.850.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 841 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525115 |
Transportasi yang mewakili pimpinan pada penarikan Mahasiswa/peserta UNG Mengajar (Bacth 9 & 10) di Kota Gorontalo |
2026-08-03 |
67/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1936L |
Rp. 750.000 |
9 Hari |
|
| 842 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525115 |
Transportasi yang mewakili pimpinan pada penarikan Mahasiswa/peserta UNG Mengajar (Bacth 9 & 10) di Kab. Gorontalo dan Bone Bolango |
2026-08-03 |
67/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1936L |
Rp. 10.500.000 |
9 Hari |
|
| 843 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525115 |
Tiket Perjalanan Dinas Pendampingan dan Koordinasi Program SAPA KAMPUS MBKB (Merdeka Belajar Kampus Berdampak) Badan POM RI dengan UPT Balai Provinsi Mitra Magang dalam Aktivitas Mahasiswa Mendampingi UMKM Pangan Olahan (1 Org x 2 Keg) |
2026-06-17 |
54/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1359L |
Rp. 900.000 |
12 Hari |
|
| 844 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525115 |
Tiket Perjalanan Dinas Pendampingan dan Koordinasi Program SAPA KAMPUS MBKB (Merdeka Belajar Kampus Berdampak) Badan POM RI dengan UPT Balai Provinsi Mitra Magang dalam Aktivitas Mahasiswa Mendampingi UMKM Pangan Olahan (1 Org x 2 Keg) |
2026-08-03 |
67/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1936L |
Rp. 11.841.720 |
9 Hari |
|
| 845 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525115 |
Uang harian dalam rangka Perjalanan Dinas Pendampingan dan Koordinasi Program SAPA KAMPUS MBKB Badan POM RI dengan UPT Balai Provinsi Mitra Magang dalam Aktivitas Mahasiswa Mendampingi UMKM Pangan Olahan (1 Org x 5 hari x 2 Keg) |
2026-08-03 |
67/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1936L |
Rp. 5.250.000 |
9 Hari |
|
| 846 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
Pnginapan dalam rangka Perjalanan Dinas Pendampingan dan Koordinasi Program SAPA KAMPUS MBKB Badan POM RI dengan UPT Balai Provinsi Mitra Magang dalam Aktivitas Mahasiswa Mendampingi UMKM Pangan Olahan (1 Org x 4 hari x 2 Keg) |
2026-08-31 |
85/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2272L |
Rp. 3.541.156 |
11 Hari |
|
| 847 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525119 |
Sewa gedung pada pelathan guru Pamong UNG Mengajar (Bacth 9 & 10) di Kab. Gorontalo, Bone Bolango, dan Kota Gorontalo (2 x 2 lokasi) |
2026-04-01 |
17/UN47.D2/KU.01.00/SPP-TUPN/2026 |
2026-04-08 |
0683L |
Rp. 15.000.000 |
7 Hari |
|
| 848 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525119 |
Sewa gedung pada pelathan guru Pamong UNG Mengajar (Bacth 9 & 10) di Kab. Gorontalo, Bone Bolango, dan Kota Gorontalo (2 x 2 lokasi) |
2026-09-22 |
97/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 5.000.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 849 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525119 |
Insentif Guru pamong pada pelaksana kegiatan UNG Mengajar (Bacth 9 & 10) di tempat praktek |
2026-08-03 |
68/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1935L |
Rp. 36.800.000 |
9 Hari |
|
| 850 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525119 |
Insentif Guru pamong pada pelaksana kegiatan UNG Mengajar (Bacth 9 & 10) di tempat praktek |
2026-08-03 |
69/UN47.D2/KU.01.00/SPP-LS6/2026 |
2026-08-12 |
1943L |
Rp. 34.400.000 |
9 Hari |
|
| 851 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525119 |
Asuransi Keselamatan Peserta |
2026-04-01 |
17/UN47.D2/KU.01.00/SPP-TUPN/2026 |
2026-04-08 |
0683L |
Rp. 10.220.000 |
7 Hari |
|
| 852 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525119 |
Asuransi Keselamatan Peserta |
2026-08-31 |
86/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2273L |
Rp. 22.400.000 |
11 Hari |
|
| 853 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525119 |
Bantuan Pelaksanaan Pelatihan PEKERTI bagi Dosen |
2026-04-27 |
35/UN47.D2/KU.01.00/SPP-GUP3/2026 |
2026-04-29 |
0937L |
Rp. 25.000.000 |
2 Hari |
|
| 854 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525119 |
Bantuan Pelaksanaan Pelatihan PEKERTI Batch 2 bagi Dosen |
2026-06-17 |
55/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1360L |
Rp. 20.000.000 |
12 Hari |
|
| 855 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525119 |
Bantuan Pelaksanaan Pelatihan PEKERTI Batch 2 bagi Dosen |
2026-07-30 |
60/UN47.D2/KU.01.00/SPP-TUPN3/2026 |
2026-08-12 |
1933L |
Rp. 5.000.000 |
13 Hari |
|
| 856 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525112 |
Konsumsi pada Kegiatan Pendampingan Akreditasi Nasional (50 org x 2 hari x 2 keg) |
2026-09-22 |
95/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 10.000.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 857 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525112 |
Konsumsi pada Kegiatan Pendampingan Akreditasi Internasional (50 org x 2 hari x 2 keg) |
2026-09-22 |
95/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 10.000.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 858 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Mei 2026 |
525112 |
Konsumsi pada kegiatan workshop penyusunan standar mutu dan formulir mutu (50 Org x 5 Hari) |
2026-05-13 |
37/UN47.D2/KU.01.00/SPP-TUPN2/2026 |
2026-05-25 |
1149L |
Rp. 1.300.000 |
12 Hari |
|
| 859 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525112 |
Konsumsi kegiatan persiapan dan penetapan prodi terakreditasi unggul mengikuti akreditasi internasional (100 Org x 2 Keg) |
2026-09-22 |
95/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 5.000.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 860 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
Tiket Perjalanan dinas dalam rangka perangkat SPMI (10 Org) |
2026-08-27 |
72/UN47.D2/KU.01.00/SPP-TUPN4/2026 |
2026-09-01 |
2158L |
Rp. 56.150.000 |
5 Hari |
|
| 861 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
Tiket Perjalanan dinas dalam rangka perangkat SPMI (10 Org) |
2026-08-31 |
85/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2272L |
Rp. 8.500.000 |
11 Hari |
|
| 862 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525119 |
Bantuan kegiatan Pelaksanaan Audit Mutu Internal (AMI) |
2026-04-27 |
35/UN47.D2/KU.01.00/SPP-GUP3/2026 |
2026-04-29 |
0937L |
Rp. 15.000.000 |
2 Hari |
|
| 863 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Mei 2026 |
525119 |
Bantuan kegiatan Pelaksanaan Audit Mutu Internal (AMI) |
2026-05-13 |
38/UN47.D2/KU.01.00/SPP-TUPN2/2026 |
2026-05-25 |
1150L |
Rp. 20.000.000 |
12 Hari |
|
| 864 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525119 |
Bantuan kegiatan Pelaksanaan Audit Mutu Internal (AMI) |
2026-07-30 |
60/UN47.D2/KU.01.00/SPP-TUPN3/2026 |
2026-08-12 |
1933L |
Rp. 20.000.000 |
13 Hari |
|
| 865 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525119 |
Bantuan kegiatan Pelaksanaan Audit Mutu Internal (AMI) |
2026-08-27 |
73/UN47.D2/KU.01.00/SPP-TUPN4/2026 |
2026-09-01 |
2159L |
Rp. 15.000.000 |
5 Hari |
|
| 866 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525119 |
Bantuan Kegiatan pada pusat MKWK, MK Penciri, Disabilitas, Kajian Pancasila dan Pendidikan Karakter |
2026-05-25 |
45/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1185L |
Rp. 15.000.000 |
8 Hari |
|
| 867 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Mei 2026 |
525119 |
Honorarium Narasumber pada kegiatan pusat pengembangan standar, AMI dan Manajemen Resiko (3 Org x 6 jam) |
2026-05-13 |
38/UN47.D2/KU.01.00/SPP-TUPN2/2026 |
2026-05-25 |
1150L |
Rp. 16.200.000 |
12 Hari |
|
| 868 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Mei 2026 |
525119 |
Bantuan kegiatan pelatihan calon Auditor AMI |
2026-05-13 |
38/UN47.D2/KU.01.00/SPP-TUPN2/2026 |
2026-05-25 |
1150L |
Rp. 47.500.000 |
12 Hari |
|
| 869 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Mei 2026 |
525119 |
Paket Meeting Room pada Kegiatan
SPMI UNG (64 x 4) |
2026-05-13 |
38/UN47.D2/KU.01.00/SPP-TUPN2/2026 |
2026-05-25 |
1150L |
Rp. 15.000.000 |
12 Hari |
|
| 870 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525119 |
Paket Meeting Room pada Kegiatan
SPMI UNG (64 x 4) |
2026-08-27 |
73/UN47.D2/KU.01.00/SPP-TUPN4/2026 |
2026-09-01 |
2159L |
Rp. 20.000.000 |
5 Hari |
|
| 871 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525119 |
Paket Meeting Room pada Kegiatan
SPMI UNG (64 x 4) |
2026-08-31 |
86/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2273L |
Rp. 20.000.000 |
11 Hari |
|
| 872 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525119 |
Paket Meeting Room pada Kegiatan
SPMI UNG (64 x 4) |
2026-09-22 |
97/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 15.000.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 873 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525119 |
Bantuan kegiatan pendampingan penyusunan dokumen akreditasi |
2026-04-10 |
30/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0782L |
Rp. 9.000.000 |
4 Hari |
|
| 874 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525119 |
Bantuan kegiatan pendampingan penyusunan dokumen akreditasi |
2026-05-25 |
45/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1185L |
Rp. 6.000.000 |
8 Hari |
|
| 875 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525119 |
Bantuan kegiatan pendampingan penyusunan dokumen akreditasi |
2026-08-03 |
68/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1935L |
Rp. 18.500.000 |
9 Hari |
|
| 876 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525119 |
Bantuan kegiatan pendampingan penyusunan dokumen akreditasi |
2026-09-22 |
97/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 6.000.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 877 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525119 |
Bantuan kegiatan Klinik dan Simulasi Akreditasi serta Pendampingan |
2026-04-10 |
30/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0782L |
Rp. 7.500.000 |
4 Hari |
|
| 878 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525119 |
Bantuan kegiatan Klinik dan Simulasi Akreditasi serta Pendampingan |
2026-08-03 |
68/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1935L |
Rp. 11.250.000 |
9 Hari |
|
| 879 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525119 |
Bantuan kegiatan Klinik dan Simulasi Akreditasi serta Pendampingan |
2026-09-22 |
97/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 5.000.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 880 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525119 |
Bantuan kegiatan penguatan pengelolaan sistem akreditasi |
2026-09-22 |
97/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 10.000.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 881 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525119 |
Honorarium Narasumber pada kegiatan
pendampingan Akreditasi (2 Org x 7 jam x 2 Keg) |
2026-08-03 |
68/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1935L |
Rp. 5.400.000 |
9 Hari |
|
| 882 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525112 |
Konsumsi pada kegiatan Workshop
Penguatan Sistem Digital Penjaminan Mutu Internal UNG |
2026-09-22 |
95/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 5.000.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 883 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525112 |
Konsumsi Berat dan Ringan, pada Kegiatan pendampingan penyusunan kurikulum prodi (40 org x 2 Keg) |
2026-04-10 |
28/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0780L |
Rp. 1.950.000 |
4 Hari |
|
| 884 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Maret 2026 |
525112 |
Konsumsi Berat dan Ringan, pada Kegiatan pendampingan penyusunan kurikulum prodi (40 org x 2 Keg) |
2026-04-10 |
28/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0780L |
Rp. 1.600.000 |
4 Hari |
|
| 885 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525112 |
Konsumsi pada kegiaatan Evaluasi Implementasi Kurikulum Prodi (50 Org x 2 Keg) |
2026-09-22 |
95/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 5.000.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 886 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525115 |
Tiket Perjalanan dinas narasumber pada kegiatan Penguatan Kurikulum OBE Bermuatan Inovasi Berbasis Kawasan (2 Org) |
2026-07-30 |
61/UN47.D2/KU.01.00/SPP-TUPN3/2026 |
2026-08-12 |
1934L |
Rp. 11.041.000 |
13 Hari |
|
| 887 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525115 |
Penginapan dalam rangka Perjalanan dinas narasumber pada kegiatan Penguatan Kurikulum OBE Bermuatan Inovasi Berbasis Kawasan (3 Org 4 Hari)) |
2026-07-30 |
61/UN47.D2/KU.01.00/SPP-TUPN3/2026 |
2026-08-12 |
1934L |
Rp. 7.920.000 |
13 Hari |
|
| 888 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525119 |
Bantuan kegiatan penyusunan kurikulum inovatif berbasis model pembelajaran baru |
2026-06-17 |
55/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1360L |
Rp. 22.000.000 |
12 Hari |
|
| 889 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Januari 2026 |
525119 |
Bantuan kegiatan strategi implementasi pedoman kurikulum Universitas Negeri Gorontalo |
2026-02-20 |
9/UN47.D2/KU.01.00/SPP-GUP1/2026 |
2026-02-24 |
0219L |
Rp. 42.000.000 |
4 Hari |
|
| 890 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525119 |
Insentif narasumber pada kegiatan Penguatan Kurikulum OBE Bermuatan Inovasi Berbasis Kawasan (2 Org x 8 Jam ) |
2026-07-30 |
60/UN47.D2/KU.01.00/SPP-TUPN3/2026 |
2026-08-12 |
1933L |
Rp. 14.400.000 |
13 Hari |
|
| 891 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525119 |
Bantuan kegiatan Evaluasi Kurikulum Penyusunan Dokumen Kurikulum OBE, Penyusunan Kurikulum OBE Tahap 2, Penyusunan Rancangan Assesment tiap mata kuliah |
2026-06-30 |
57/UN47.D2/KU.01.00/SPP-LS5/2026 |
2026-07-09 |
1584L |
Rp. 192.000.000 |
9 Hari |
|
| 892 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525119 |
Bantuan kegiatan Evaluasi Kurikulum Penyusunan Dokumen Kurikulum OBE, Penyusunan Kurikulum OBE Tahap 2, Penyusunan Rancangan Assesment tiap mata kuliah |
2026-08-28 |
77/UN47.D2/KU.01.00/SPP-LS9/2026 |
2026-09-02 |
2177L |
Rp. 128.000.000 |
5 Hari |
|
| 893 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525119 |
Bantuan kegiatan pendampingan penyusunan, Penilaian Akreditasi Nasional dan Internasional serta Bantuan kegiatan review dan validasi kurikulum dengan narasumber intenal dan eksternal |
2026-07-30 |
60/UN47.D2/KU.01.00/SPP-TUPN3/2026 |
2026-08-12 |
1933L |
Rp. 50.000.000 |
13 Hari |
|
| 894 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525119 |
Bantuan kegiatan pendampingan penyusunan, Penilaian Akreditasi Nasional dan Internasional serta Bantuan kegiatan review dan validasi kurikulum dengan narasumber intenal dan eksternal |
2026-08-31 |
86/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2273L |
Rp. 30.000.000 |
11 Hari |
|
| 895 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525119 |
Zoom Meeting |
2026-09-21 |
88/UN47.D2/KU.01.00/SPP-LS10/2026 |
|
|
Rp. 5.000.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 896 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Januari 2026 |
525112 |
ATK Perkantoran LPMPP |
2026-02-20 |
3/UN47.D2/KU.01.00/SPP-GUP1/2026 |
2026-02-24 |
0213L |
Rp. 3.773.690 |
4 Hari |
|
| 897 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525112 |
ATK Perkantoran LPMPP |
2026-02-23 |
11/UN47.D2/KU.01.00/SPP-LS1/2026 |
2026-02-26 |
0234L |
Rp. 19.945.000 |
3 Hari |
|
| 898 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525112 |
ATK Perkantoran LPMPP |
2026-04-10 |
22/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0774L |
Rp. 3.939.790 |
4 Hari |
|
| 899 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525112 |
ATK Perkantoran LPMPP |
2026-05-25 |
39/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1179L |
Rp. 2.603.000 |
8 Hari |
|
| 900 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525112 |
ATK Perkantoran LPMPP |
2026-06-17 |
48/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1353L |
Rp. 14.035.170 |
12 Hari |
|
| 901 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525112 |
ATK Perkantoran LPMPP |
2026-08-31 |
79/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2266L |
Rp. 1.489.500 |
11 Hari |
|
| 902 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Januari 2026 |
525112 |
Spanduk Kegiatan LPMPP |
2026-02-20 |
3/UN47.D2/KU.01.00/SPP-GUP1/2026 |
2026-02-24 |
0213L |
Rp. 1.258.000 |
4 Hari |
|
| 903 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525112 |
Spanduk Kegiatan LPMPP |
2026-04-01 |
14/UN47.D2/KU.01.00/SPP-TUPN/2026 |
2026-04-08 |
0680L |
Rp. 1.750.000 |
7 Hari |
|
| 904 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525112 |
Spanduk Kegiatan LPMPP |
2026-04-10 |
22/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0774L |
Rp. 633.400 |
4 Hari |
|
| 905 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525112 |
Spanduk Kegiatan LPMPP |
2026-05-25 |
39/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1179L |
Rp. 350.000 |
8 Hari |
|
| 906 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525112 |
Spanduk Kegiatan LPMPP |
2026-06-17 |
48/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1353L |
Rp. 660.900 |
12 Hari |
|
| 907 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525112 |
Spanduk Kegiatan LPMPP |
2026-08-03 |
62/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1939L |
Rp. 898.000 |
9 Hari |
|
| 908 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525112 |
Spanduk Kegiatan LPMPP |
2026-08-31 |
79/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2266L |
Rp. 600.000 |
11 Hari |
|
| 909 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525112 |
Spanduk Kegiatan LPMPP |
|
|
|
|
Rp. 1.710.200 |
34 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 05 Oktober 2026 (34 Hari) |
| 910 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525112 |
Operasional Perkantoran sehari hari |
2026-06-17 |
48/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1353L |
Rp. 2.543.000 |
12 Hari |
|
| 911 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525112 |
Operasional Perkantoran sehari hari |
2026-08-03 |
62/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1939L |
Rp. 4.018.150 |
9 Hari |
|
| 912 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525112 |
Operasional Perkantoran sehari hari |
2026-08-31 |
79/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2266L |
Rp. 2.186.100 |
11 Hari |
|
| 913 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Januari 2026 |
525112 |
Konsumsi Berat dan Ringan, Rapat Tamu Pimpinan (20 Org x 40 Keg) |
2026-02-20 |
3/UN47.D2/KU.01.00/SPP-GUP1/2026 |
2026-02-24 |
0213L |
Rp. 3.691.500 |
4 Hari |
|
| 914 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Maret 2026 |
525112 |
Konsumsi Berat dan Ringan, Rapat Tamu Pimpinan (20 Org x 40 Keg) |
2026-04-10 |
22/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0774L |
Rp. 1.000.000 |
4 Hari |
|
| 915 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525112 |
Konsumsi Berat dan Ringan, Rapat Tamu Pimpinan (20 Org x 40 Keg) |
2026-06-17 |
48/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1353L |
Rp. 1.537.500 |
12 Hari |
|
| 916 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525112 |
Konsumsi Berat dan Ringan, Rapat Tamu Pimpinan (20 Org x 40 Keg) |
2026-08-03 |
62/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1939L |
Rp. 1.875.000 |
9 Hari |
|
| 917 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525112 |
Konsumsi Berat dan Ringan, Rapat Tamu Pimpinan (20 Org x 40 Keg) |
2026-08-28 |
74/UN47.D2/KU.01.00/SPP-LS7/2026 |
2026-09-01 |
2166L |
Rp. 15.000.000 |
4 Hari |
|
| 918 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525112 |
Konsumsi Berat dan Ringan, Rapat Tamu Pimpinan (20 Org x 40 Keg) |
2026-08-31 |
79/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2266L |
Rp. 7.425.000 |
11 Hari |
|
| 919 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525112 |
Konsumsi Berat dan Ringan, Rapat Tamu Pimpinan (20 Org x 40 Keg) |
2026-09-22 |
89/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 6.400.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 920 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525115 |
Tiket PP Perjalanan Dinas dalam rangka
pengembangan SDM Tenaga Kependidikan (6 Org) |
2026-04-10 |
23/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0775L |
Rp. 700.000 |
4 Hari |
|
| 921 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525115 |
Tiket PP Perjalanan Dinas dalam rangka
pengembangan SDM Tenaga Kependidikan (6 Org) |
2026-04-02 |
18/UN47.D2/KU.01.00/SPP-LS3/2026 |
2026-04-07 |
0658L |
Rp. 5.988.280 |
5 Hari |
|
| 922 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Mei 2026 |
525115 |
Tiket PP Perjalanan Dinas dalam rangka
pengembangan SDM Tenaga Kependidikan (6 Org) |
2026-05-25 |
40/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1180L |
Rp. 15.727.760 |
8 Hari |
|
| 923 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525115 |
Tiket PP Perjalanan Dinas dalam rangka
pengembangan SDM Tenaga Kependidikan (6 Org) |
2026-06-17 |
49/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1354L |
Rp. 2.747.460 |
12 Hari |
|
| 924 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525115 |
Tiket PP Perjalanan Dinas dalam rangka
pengembangan SDM Tenaga Kependidikan (6 Org) |
2026-08-03 |
63/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1940L |
Rp. 3.682.560 |
9 Hari |
|
| 925 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
Tiket PP Perjalanan Dinas dalam rangka
pengembangan SDM Tenaga Kependidikan (6 Org) |
2026-08-31 |
80/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2267L |
Rp. 1.700.000 |
11 Hari |
|
| 926 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525115 |
Uang Harian Perjalanan Dinas dalam Rangka pengembangan SDM Tenaga Kependidikan (6 Org x 5 hari) |
2026-04-10 |
23/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0775L |
Rp. 3.330.000 |
4 Hari |
|
| 927 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525115 |
Uang Harian Perjalanan Dinas dalam Rangka pengembangan SDM Tenaga Kependidikan (6 Org x 5 hari) |
2026-04-02 |
18/UN47.D2/KU.01.00/SPP-LS3/2026 |
2026-04-07 |
0658L |
Rp. 3.600.000 |
5 Hari |
|
| 928 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525115 |
Uang Harian Perjalanan Dinas dalam Rangka pengembangan SDM Tenaga Kependidikan (6 Org x 5 hari) |
2026-04-27 |
32/UN47.D2/KU.01.00/SPP-GUP3/2026 |
2026-04-29 |
0934L |
Rp. 4.440.000 |
2 Hari |
|
| 929 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525115 |
Uang Harian Perjalanan Dinas dalam Rangka pengembangan SDM Tenaga Kependidikan (6 Org x 5 hari) |
2026-05-25 |
40/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1180L |
Rp. 1.110.000 |
8 Hari |
|
| 930 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525115 |
Uang Harian Perjalanan Dinas dalam Rangka pengembangan SDM Tenaga Kependidikan (6 Org x 5 hari) |
2026-08-03 |
63/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1940L |
Rp. 2.330.000 |
9 Hari |
|
| 931 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
Uang Harian Perjalanan Dinas dalam Rangka pengembangan SDM Tenaga Kependidikan (6 Org x 5 hari) |
2026-08-31 |
80/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2267L |
Rp. 1.000.000 |
11 Hari |
|
| 932 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525115 |
Penginapan Peerjalanan Dinas dalam rangka pengembangan SDM Tenaga Kependidikan (5 Org x 4 hari) |
2026-04-10 |
23/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0775L |
Rp. 2.400.000 |
4 Hari |
|
| 933 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525115 |
Penginapan Peerjalanan Dinas dalam rangka pengembangan SDM Tenaga Kependidikan (5 Org x 4 hari) |
2026-04-02 |
18/UN47.D2/KU.01.00/SPP-LS3/2026 |
2026-04-07 |
0658L |
Rp. 1.606.636 |
5 Hari |
|
| 934 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525115 |
Penginapan Peerjalanan Dinas dalam rangka pengembangan SDM Tenaga Kependidikan (5 Org x 4 hari) |
2026-04-27 |
32/UN47.D2/KU.01.00/SPP-GUP3/2026 |
2026-04-29 |
0934L |
Rp. 1.480.000 |
2 Hari |
|
| 935 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Mei 2026 |
525115 |
Penginapan Peerjalanan Dinas dalam rangka pengembangan SDM Tenaga Kependidikan (5 Org x 4 hari) |
2026-05-25 |
40/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1180L |
Rp. 2.086.645 |
8 Hari |
|
| 936 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525115 |
Penginapan Peerjalanan Dinas dalam rangka pengembangan SDM Tenaga Kependidikan (5 Org x 4 hari) |
2026-06-17 |
49/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1354L |
Rp. 2.796.504 |
12 Hari |
|
| 937 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
Penginapan Peerjalanan Dinas dalam rangka pengembangan SDM Tenaga Kependidikan (5 Org x 4 hari) |
2026-08-31 |
80/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2267L |
Rp. 1.440.000 |
11 Hari |
|
| 938 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525115 |
Biaya Transport Bandara PP |
2026-04-02 |
18/UN47.D2/KU.01.00/SPP-LS3/2026 |
2026-04-07 |
0658L |
Rp. 1.000.000 |
5 Hari |
|
| 939 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Mei 2026 |
525115 |
Biaya Transport Bandara PP |
2026-05-25 |
40/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1180L |
Rp. 500.000 |
8 Hari |
|
| 940 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525119 |
Bantuan biaya registrasi kegiatan dalam rangka
pengembangan SDM Tenaga Kependidikan |
2026-09-22 |
90/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 5.252.500 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 941 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Januari 2026 |
525119 |
Biaya Operasional Mobil KDO Pimpinan |
2026-02-20 |
4/UN47.D2/KU.01.00/SPP-GUP1/2026 |
2026-02-24 |
0214L |
Rp. 400.000 |
4 Hari |
|
| 942 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Mei 2026 |
525119 |
Biaya Operasional Mobil KDO Pimpinan |
2026-05-25 |
41/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1181L |
Rp. 200.000 |
8 Hari |
|
| 943 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525119 |
Biaya Operasional Mobil KDO Pimpinan |
2026-08-03 |
64/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1941L |
Rp. 1.000.000 |
9 Hari |
|
| 944 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525119 |
Biaya Operasional Mobil KDO Pimpinan |
2026-08-31 |
81/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2268L |
Rp. 850.000 |
11 Hari |
|
| 945 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525115 |
Tiket PP (Perjalanan Dinas Pimpinan dalam rangka pengembangan kelembagaan dan kerjasama (10 Org x 1 Keg) |
2026-04-10 |
26/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0778L |
Rp. 1.000.000 |
4 Hari |
|
| 946 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525115 |
Tiket PP (Perjalanan Dinas Pimpinan dalam rangka pengembangan kelembagaan dan kerjasama (10 Org x 1 Keg) |
2026-04-02 |
19/UN47.D2/KU.01.00/SPP-LS3/2026 |
2026-04-07 |
0659L |
Rp. 5.721.412 |
5 Hari |
|
| 947 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525115 |
Tiket PP (Perjalanan Dinas Pimpinan dalam rangka pengembangan kelembagaan dan kerjasama (10 Org x 1 Keg) |
2026-06-17 |
52/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1357L |
Rp. 3.902.300 |
12 Hari |
|
| 948 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
Tiket PP (Perjalanan Dinas Pimpinan dalam rangka pengembangan kelembagaan dan kerjasama (10 Org x 1 Keg) |
2026-08-28 |
76/UN47.D2/KU.01.00/SPP-LS8/2026 |
2026-09-01 |
2167L |
Rp. 26.660.935 |
4 Hari |
|
| 949 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
Tiket PP (Perjalanan Dinas Pimpinan dalam rangka pengembangan kelembagaan dan kerjasama (10 Org x 1 Keg) |
2026-08-31 |
83/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2270L |
Rp. 10.085.396 |
11 Hari |
|
| 950 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Oktober 2026 |
525115 |
Tiket PP (Perjalanan Dinas Pimpinan dalam rangka pengembangan kelembagaan dan kerjasama (10 Org x 1 Keg) |
|
|
|
|
Rp. 17.252.722 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 951 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525115 |
Uang Harian Jakarta (Perjalanan Dinas Pimpinan dalam rangka pengembangan
kelembagaan dan kerjasama (10 Org x 5 hari x 1 Keg) |
2026-04-10 |
26/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0778L |
Rp. 2.220.000 |
4 Hari |
|
| 952 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525115 |
Uang Harian Jakarta (Perjalanan Dinas Pimpinan dalam rangka pengembangan
kelembagaan dan kerjasama (10 Org x 5 hari x 1 Keg) |
2026-04-02 |
19/UN47.D2/KU.01.00/SPP-LS3/2026 |
2026-04-07 |
0659L |
Rp. 2.980.000 |
5 Hari |
|
| 953 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Mei 2026 |
525115 |
Uang Harian Jakarta (Perjalanan Dinas Pimpinan dalam rangka pengembangan
kelembagaan dan kerjasama (10 Org x 5 hari x 1 Keg) |
2026-05-25 |
43/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1183L |
Rp. 1.060.000 |
8 Hari |
|
| 954 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525115 |
Uang Harian Jakarta (Perjalanan Dinas Pimpinan dalam rangka pengembangan
kelembagaan dan kerjasama (10 Org x 5 hari x 1 Keg) |
2026-08-03 |
66/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1937L |
Rp. 2.070.000 |
9 Hari |
|
| 955 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Oktober 2026 |
525115 |
Uang Harian Jakarta (Perjalanan Dinas Pimpinan dalam rangka pengembangan
kelembagaan dan kerjasama (10 Org x 5 hari x 1 Keg) |
|
|
|
|
Rp. 9.300.000 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 956 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525115 |
Penginapan (Perjalanan Dinas Pimpinan dalam rangka pengembangan kelembagaan dan kerjasama) (10 Org x 4) |
2026-04-10 |
26/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0778L |
Rp. 2.400.000 |
4 Hari |
|
| 957 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525115 |
Penginapan (Perjalanan Dinas Pimpinan dalam rangka pengembangan kelembagaan dan kerjasama) (10 Org x 4) |
2026-04-02 |
19/UN47.D2/KU.01.00/SPP-LS3/2026 |
2026-04-07 |
0659L |
Rp. 2.784.736 |
5 Hari |
|
| 958 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525115 |
Penginapan (Perjalanan Dinas Pimpinan dalam rangka pengembangan kelembagaan dan kerjasama) (10 Org x 4) |
2026-06-17 |
52/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1357L |
Rp. 990.000 |
12 Hari |
|
| 959 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Oktober 2026 |
525115 |
Penginapan (Perjalanan Dinas Pimpinan dalam rangka pengembangan kelembagaan dan kerjasama) (10 Org x 4) |
|
|
|
|
Rp. 2.190.000 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 960 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Januari 2026 |
525119 |
Upgrade Hosting Web LPMPP, |
2026-02-20 |
6/UN47.D2/KU.01.00/SPP-GUP1/2026 |
2026-02-24 |
0216L |
Rp. 15.000.000 |
4 Hari |
|
| 961 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525119 |
Pengembangan Sistem Kampus Merdeka UNG (Upgrade Modul Kampus Berdampak) |
2026-04-27 |
34/UN47.D2/KU.01.00/SPP-GUP3/2026 |
2026-04-29 |
0936L |
Rp. 10.000.000 |
2 Hari |
|
| 962 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525119 |
Pengembangan sistem monitoring dokumen kurikulum program studi |
2026-09-21 |
87/UN47.D2/KU.01.00/SPP-LS10/2026 |
|
|
Rp. 10.000.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 963 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525119 |
Pengembangan Sistem Survei Mitra Kerjasama |
2026-04-27 |
34/UN47.D2/KU.01.00/SPP-GUP3/2026 |
2026-04-29 |
0936L |
Rp. 10.000.000 |
2 Hari |
|
| 964 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525119 |
Pengembangan Sistem Digital Rencana Tindak Lanjut (RTL) |
2026-04-10 |
27/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0779L |
Rp. 10.000.000 |
4 Hari |
|
| 965 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525119 |
Pengembangan Sistem Digital Audit Mutu Internal (Upgrade Modul Penilaian dan Perangkingan) |
2026-04-27 |
34/UN47.D2/KU.01.00/SPP-GUP3/2026 |
2026-04-29 |
0936L |
Rp. 10.000.000 |
2 Hari |
|
| 966 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525119 |
Pengembangan Sistem Integrasi Survei Kepuasan SPMI |
2026-04-27 |
34/UN47.D2/KU.01.00/SPP-GUP3/2026 |
2026-04-29 |
0936L |
Rp. 10.000.000 |
2 Hari |
|
| 967 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525119 |
Pelaksanaan Survei Kepuasan SPMI (Dosen, Tendik, Dan Mahasiswa) Tahun 2026 |
2026-06-17 |
53/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1358L |
Rp. 10.000.000 |
12 Hari |
|
| 968 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525119 |
Pengembangan sitem digital dasboard terformat kinerja dosen |
2026-09-21 |
87/UN47.D2/KU.01.00/SPP-LS10/2026 |
|
|
Rp. 10.000.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 969 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525111 |
Honorarium PPK UK LPMPP |
2026-04-10 |
25/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0777L |
Rp. 2.300.000 |
4 Hari |
|
| 970 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525111 |
Honorarium PPK UK LPMPP |
2026-06-17 |
51/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1356L |
Rp. 3.450.000 |
12 Hari |
|
| 971 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525111 |
Honorarium Verifikator UK (penguji tagihan) LPMPP |
2026-04-10 |
25/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0777L |
Rp. 940.000 |
4 Hari |
|
| 972 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525111 |
Honorarium Verifikator UK (penguji tagihan) LPMPP |
2026-06-17 |
51/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1356L |
Rp. 1.880.000 |
12 Hari |
|
| 973 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
Tiket PP Perjalanan Dinas dalam rangka kegiatan perencanaan dan pengelolaan keuangan (3 Org) |
2026-08-28 |
76/UN47.D2/KU.01.00/SPP-LS8/2026 |
2026-09-01 |
2167L |
Rp. 9.630.000 |
4 Hari |
|
| 974 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525115 |
Tiket PP Perjalanan Dinas dalam rangka kegiatan perencanaan dan pengelolaan keuangan (3 Org) |
2026-09-22 |
92/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 6.512.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 975 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Oktober 2026 |
525115 |
Tiket PP Perjalanan Dinas dalam rangka kegiatan perencanaan dan pengelolaan keuangan (3 Org) |
|
|
|
|
Rp. 3.925.397 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 976 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Oktober 2026 |
525115 |
Uang Harian dalam rangka Perjalanan Dinas dalam rangka kegiatan perencanaan dan pengelolaan keuangan (3 Org x 5 hari) |
|
|
|
|
Rp. 6.639.862 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 977 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Oktober 2026 |
525115 |
Uang penginapan dalam rangka Perjalanan Dinas dalam rangka kegiatan perencanaan dan pengelolaan keuangan (3 Org x 4 hari) |
|
|
|
|
Rp. 7.324.680 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 978 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Januari 2026 |
525119 |
Bantuan kegiatan penyusunan/Rapat/Evaluasi kinerja LPMPP |
2026-02-20 |
6/UN47.D2/KU.01.00/SPP-GUP1/2026 |
2026-02-24 |
0216L |
Rp. 25.000.000 |
4 Hari |
|
| 979 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525119 |
Bantuan kegiatan penyusunan/Rapat/Evaluasi kinerja LPMPP |
2026-09-22 |
93/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 7.500.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 980 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525176 |
Honorarium PPK UK LPMPP |
2026-09-22 |
94/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 4.600.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 981 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525176 |
Honorarium Verifikator UK (penguji tagihan) LPMPP |
2026-09-22 |
94/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 1.410.000 |
13 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 05 Oktober 2026 (13 Hari) |
| 982 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525119 |
Bantuan Peresmian dan Pameran Produk Mahasiswa UNG Mengajar |
2026-07-30 |
58/UN47.D2/KU.01.00/SPP-TUPN3/2026 |
2026-08-12 |
1931L |
Rp. 40.000.000 |
13 Hari |
|
| 983 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
537112 |
Pengadaan SmartTV |
2026-04-20 |
032/SPP-LS/FEB/2026 |
2026-05-13 |
1068H |
Rp. 39.960.000 |
23 Hari |
|
| 984 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
537112 |
Pengadaan SmartTV |
2026-07-14 |
064/SPP-LS/FEB/2026 |
2026-08-13 |
1945H |
Rp. 19.980.000 |
30 Hari |
|
| 985 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
537112 |
Pengadaan AC |
2026-02-20 |
008/SPP-LS/FEB/2026 |
2026-03-03 |
0300H |
Rp. 48.951.000 |
11 Hari |
|
| 986 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
537112 |
Pengadaan AC |
2026-09-21 |
095/SPP-LS/FEB/2026 |
|
|
Rp. 6.700.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 987 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
537112 |
Pengadaan VideoTron |
2026-03-04 |
014/SPP-LS/FEB/2026 |
2026-03-16 |
0576H |
Rp. 49.944.500 |
12 Hari |
|
| 988 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
537112 |
Pengadaan Meja/Kursi Kuliah |
2026-03-04 |
015/SPP-LS/FEB/2026 |
2026-03-17 |
0598H |
Rp. 10.000.000 |
13 Hari |
|
| 989 |
Fakultas Ekonomi dan Bisnis |
Juni 2026 |
537112 |
Pengadaan Komputer |
2026-05-21 |
042/SPP-LS/FEB/2026 |
2026-06-30 |
1401H |
Rp. 15.722.650 |
40 Hari |
|
| 990 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
537112 |
Pengadaan Scanner |
2026-05-21 |
044/SPP-LS/FEB/2026 |
2026-07-03 |
1484H |
Rp. 7.199.900 |
43 Hari |
|
| 991 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
537112 |
Pengadaan Sound System Ruang Rapat |
2026-03-04 |
012/SPP-LS/FEB/2026 |
2026-03-10 |
0400H |
Rp. 30.000.000 |
6 Hari |
|
| 992 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525114 |
Pemeliharaan Gedung Perkuliahan, Ruangan Laboratorium, Ruangan Kuliah |
2026-04-20 |
031/SPP-LS/FEB/2026 |
2026-04-30 |
0945H |
Rp. 49.450.000 |
10 Hari |
|
| 993 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525114 |
Pemeliharaan Gedung Perkuliahan, Ruangan Laboratorium, Ruangan Kuliah |
2026-04-20 |
030/SPP-LS/FEB/2026 |
2026-04-30 |
0965H |
Rp. 49.589.000 |
10 Hari |
|
| 994 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525114 |
Pemeliharaan Gedung Perkuliahan, Ruangan Laboratorium, Ruangan Kuliah |
2026-08-07 |
072/SPP-LS/FEB/2026 |
2026-09-01 |
2156H |
Rp. 44.961.000 |
25 Hari |
|
| 995 |
Fakultas Ekonomi dan Bisnis |
Januari 2026 |
525114 |
Pemeliharaan AC |
2026-02-13 |
006/SPP-GU.1/FEB/2026 |
2026-02-26 |
0249H |
Rp. 330.000 |
13 Hari |
|
| 996 |
Fakultas Ekonomi dan Bisnis |
Februari 2026 |
525114 |
Pemeliharaan AC |
2026-02-13 |
006/SPP-GU.1/FEB/2026 |
2026-02-26 |
0249H |
Rp. 20.000.000 |
13 Hari |
|
| 997 |
Fakultas Ekonomi dan Bisnis |
Februari 2026 |
525114 |
Pemeliharaan AC |
2026-03-10 |
024/SPP-GU.2/FEB/2026 |
2026-03-17 |
0548H |
Rp. 1.000.000 |
7 Hari |
|
| 998 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525114 |
Pemeliharaan AC |
2026-04-20 |
035/SPP-GU.3/FEB/2026 |
2026-04-28 |
0898H |
Rp. 100.000 |
8 Hari |
|
| 999 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525114 |
Pemeliharaan AC |
2026-04-20 |
035/SPP-GU.3/FEB/2026 |
2026-04-28 |
0898H |
Rp. 5.550.000 |
8 Hari |
|
| 1000 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
525114 |
Pemeliharaan AC |
2026-05-21 |
047/SPP-GU.4/FEB/2026 |
2026-06-04 |
1249H |
Rp. 1.350.000 |
14 Hari |
|
| 1001 |
Fakultas Ekonomi dan Bisnis |
Juni 2026 |
525114 |
Pemeliharaan AC |
2026-06-15 |
054/SPP-GU.5/FEB/2026 |
2026-07-07 |
1540H |
Rp. 2.000.000 |
22 Hari |
|
| 1002 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525114 |
Pemeliharaan AC |
2026-07-31 |
068/SPP-GU.6/FEB/2026 |
2026-08-12 |
1928H |
Rp. 850.000 |
12 Hari |
|
| 1003 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525114 |
Pemeliharaan AC |
|
|
|
|
Rp. 1.000.000 |
34 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 05 Oktober 2026 (34 Hari) |
| 1004 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525114 |
Pemeliharaan AC |
2026-09-21 |
089/SPP-GU.8/FEB/2026 |
|
|
Rp. 1.750.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1005 |
Fakultas Ekonomi dan Bisnis |
Februari 2026 |
525114 |
Pemeliharaan Jaringan Listrik |
2026-03-10 |
024/SPP-GU.2/FEB/2026 |
2026-03-17 |
0548H |
Rp. 23.725.000 |
7 Hari |
|
| 1006 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525114 |
Pemeliharaan Jaringan Listrik |
2026-08-07 |
073/SPP-LS/FEB/2026 |
2026-08-28 |
2118E |
Rp. 14.950.000 |
21 Hari |
|
| 1007 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525114 |
Pemeliharaan Gedung Fakultas, Ruangan Dosen |
2026-03-04 |
013/SPP-LS/FEB/2026 |
2026-03-16 |
0544H |
Rp. 49.473.700 |
12 Hari |
|
| 1008 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525114 |
Pemeliharaan Gedung Fakultas, Ruangan Dosen |
2026-04-20 |
038/SPP-LS/FEB/2026 |
2026-04-30 |
0944H |
Rp. 49.620.600 |
10 Hari |
|
| 1009 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525112 |
Konsumsi terkait kegiatan Workshop/Pelatihan/Lokakarya/Seminar/Diskusi/Temu Ilmiah Keilmuan Program Studi |
2026-07-06 |
058/SPP-LS/FEB/2026 |
2026-07-31 |
1789H |
Rp. 26.500.000 |
25 Hari |
|
| 1010 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525112 |
Konsumsi terkait kegiatan Workshop penyusunan Rencana PerkuliahanSemester (RPS) Mata Kuliah Berbasis Outcome Based Education (OBE) |
2026-09-21 |
091/SPP-GU.8/FEB/2026 |
|
|
Rp. 4.485.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1011 |
Fakultas Ekonomi dan Bisnis |
Februari 2026 |
525119 |
Bantuan Biaya terkait Kegiatan Lokakarya/Workshop/Pelatihan/Seminar/Diskusi/Temu Ilmiah/Sosialisasi Keilmuan Program Studi |
2026-03-10 |
027/SPP-GU.2/FEB/2026 |
2026-03-17 |
0551H |
Rp. 2.200.000 |
7 Hari |
|
| 1012 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525119 |
Bantuan Biaya terkait Kegiatan Lokakarya/Workshop/Pelatihan/Seminar/Diskusi/Temu Ilmiah/Sosialisasi Keilmuan Program Studi |
2026-04-20 |
037/SPP-GU.3/FEB/2026 |
2026-04-28 |
0900H |
Rp. 4.500.000 |
8 Hari |
|
| 1013 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525119 |
Bantuan Biaya terkait Kegiatan Lokakarya/Workshop/Pelatihan/Seminar/Diskusi/Temu Ilmiah/Sosialisasi Keilmuan Program Studi |
2026-04-20 |
037/SPP-GU.3/FEB/2026 |
2026-04-28 |
0900H |
Rp. 26.098.000 |
8 Hari |
|
| 1014 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525119 |
Bantuan Biaya terkait Kegiatan Lokakarya/Workshop/Pelatihan/Seminar/Diskusi/Temu Ilmiah/Sosialisasi Keilmuan Program Studi |
2026-07-31 |
070/SPP-GU.6/FEB/2026 |
2026-08-12 |
1930H |
Rp. 2.350.000 |
12 Hari |
|
| 1015 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525119 |
Bantuan Biaya terkait Kegiatan Lokakarya/Workshop/Pelatihan/Seminar/Diskusi/Temu Ilmiah/Sosialisasi Keilmuan Program Studi |
2026-08-20 |
079/SPP-GU.7/FEB/2026 |
2026-09-01 |
2143H |
Rp. 4.800.000 |
12 Hari |
|
| 1016 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525119 |
Bantuan Biaya terkait Kegiatan Lokakarya/Workshop/Pelatihan/Seminar/Diskusi/Temu Ilmiah/Sosialisasi Keilmuan Program Studi |
2026-09-07 |
081/SPP-LS/FEB/2026 |
|
|
Rp. 25.000.000 |
28 Hari |
Belum ada SP2D terhitung dari 07 September 2026 hingga 05 Oktober 2026 (28 Hari) |
| 1017 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525119 |
Bantuan Biaya terkait Kegiatan Lokakarya/Workshop/Pelatihan/Seminar/Diskusi/Temu Ilmiah/Sosialisasi Keilmuan Program Studi |
2026-09-21 |
093/SPP-LS/FEB/2026 |
|
|
Rp. 25.000.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1018 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525119 |
Honor Narasumber Kegiatan Workshop/Seminar/Lokakarya/Pelatihan(4 Org x 2 Jam x 4 Keg) |
2026-05-21 |
050/SPP-GU.4/FEB/2026 |
2026-06-04 |
1248H |
Rp. 10.800.000 |
14 Hari |
|
| 1019 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525112 |
Konsumsi Kegiatan Coacing Magang/PKL/MBKM |
2026-03-10 |
026/SPP-GU.2/FEB/2026 |
2026-03-17 |
0550H |
Rp. 1.515.000 |
7 Hari |
|
| 1020 |
Fakultas Ekonomi dan Bisnis |
Februari 2026 |
525119 |
Bantuan Biaya Kegiatan Kemahasiswaan dan Ormawa |
2026-03-10 |
027/SPP-GU.2/FEB/2026 |
2026-03-17 |
0551H |
Rp. 2.000.000 |
7 Hari |
|
| 1021 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525119 |
Bantuan Biaya Kegiatan Kemahasiswaan dan Ormawa |
2026-03-10 |
027/SPP-GU.2/FEB/2026 |
2026-03-17 |
0551H |
Rp. 5.000.000 |
7 Hari |
|
| 1022 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525119 |
Bantuan Biaya Kegiatan Kemahasiswaan dan Ormawa |
2026-04-20 |
037/SPP-GU.3/FEB/2026 |
2026-04-28 |
0900H |
Rp. 4.286.400 |
8 Hari |
|
| 1023 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525119 |
Bantuan Biaya Kegiatan Kemahasiswaan dan Ormawa |
2026-04-20 |
037/SPP-GU.3/FEB/2026 |
2026-04-28 |
0900H |
Rp. 3.000.000 |
8 Hari |
|
| 1024 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525119 |
Bantuan Biaya Kegiatan Kemahasiswaan dan Ormawa |
2026-05-21 |
050/SPP-GU.4/FEB/2026 |
2026-06-04 |
1248H |
Rp. 10.000.000 |
14 Hari |
|
| 1025 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
525119 |
Bantuan Biaya Kegiatan Kemahasiswaan dan Ormawa |
2026-05-21 |
050/SPP-GU.4/FEB/2026 |
2026-06-04 |
1248H |
Rp. 7.000.000 |
14 Hari |
|
| 1026 |
Fakultas Ekonomi dan Bisnis |
Juni 2026 |
525119 |
Bantuan Biaya Kegiatan Kemahasiswaan dan Ormawa |
2026-06-15 |
056/SPP-GU.5/FEB/2026 |
2026-07-07 |
1542H |
Rp. 13.442.500 |
22 Hari |
|
| 1027 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525119 |
Bantuan Biaya Kegiatan Kemahasiswaan dan Ormawa |
2026-08-20 |
079/SPP-GU.7/FEB/2026 |
2026-09-01 |
2143H |
Rp. 3.686.400 |
12 Hari |
|
| 1028 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525119 |
Bantuan Biaya Kegiatan Kemahasiswaan dan Ormawa |
2026-09-21 |
092/SPP-GU.8/FEB/2026 |
|
|
Rp. 30.500.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1029 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525119 |
Bantuan Kegiatan Kemahasiswaan Internasional |
2026-08-20 |
079/SPP-GU.7/FEB/2026 |
2026-09-01 |
2143H |
Rp. 1.650.000 |
12 Hari |
|
| 1030 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525119 |
Bantuan Publikasi Artikel/Jurnal terindex |
2026-04-20 |
037/SPP-GU.3/FEB/2026 |
2026-04-28 |
0900H |
Rp. 2.500.000 |
8 Hari |
|
| 1031 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
525119 |
Bantuan Publikasi Artikel/Jurnal terindex |
2026-05-21 |
050/SPP-GU.4/FEB/2026 |
2026-06-04 |
1248H |
Rp. 2.500.000 |
14 Hari |
|
| 1032 |
Fakultas Ekonomi dan Bisnis |
Juni 2026 |
525119 |
Biaya terkait kegiatan Sertifikasi Kompetensi |
2026-06-15 |
056/SPP-GU.5/FEB/2026 |
2026-07-07 |
1542H |
Rp. 2.000.000 |
22 Hari |
|
| 1033 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525119 |
Iuran Asosiasi Fakultas dan Program Studi |
2026-09-21 |
092/SPP-GU.8/FEB/2026 |
|
|
Rp. 15.000.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1034 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525119 |
Biaya Terkait Kegiatan Semester Antara |
2026-09-14 |
085/SPP-LS.ANTARA/FEB/2026 |
|
|
Rp. 25.620.000 |
21 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 05 Oktober 2026 (21 Hari) |
| 1035 |
Fakultas Ekonomi dan Bisnis |
Februari 2026 |
525112 |
ATM/ATK Operasional Perkantoran dan Kebutuhan dasar perkantoran di dalam negeri |
2026-03-10 |
021/SPP-GU.2/FEB/2026 |
2026-03-17 |
0545H |
Rp. 2.095.000 |
7 Hari |
|
| 1036 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525112 |
ATM/ATK Operasional Perkantoran dan Kebutuhan dasar perkantoran di dalam negeri |
2026-03-10 |
021/SPP-GU.2/FEB/2026 |
2026-03-17 |
0545H |
Rp. 24.132.200 |
7 Hari |
|
| 1037 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525112 |
ATM/ATK Operasional Perkantoran dan Kebutuhan dasar perkantoran di dalam negeri |
2026-04-20 |
033/SPP-GU.3/FEB/2026 |
2026-04-28 |
0896H |
Rp. 1.652.100 |
8 Hari |
|
| 1038 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525112 |
ATM/ATK Operasional Perkantoran dan Kebutuhan dasar perkantoran di dalam negeri |
2026-05-21 |
045/SPP-GU.4/FEB/2026 |
2026-06-04 |
1245H |
Rp. 735.000 |
14 Hari |
|
| 1039 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
525112 |
ATM/ATK Operasional Perkantoran dan Kebutuhan dasar perkantoran di dalam negeri |
2026-05-21 |
045/SPP-GU.4/FEB/2026 |
2026-06-04 |
1245H |
Rp. 2.629.500 |
14 Hari |
|
| 1040 |
Fakultas Ekonomi dan Bisnis |
Juni 2026 |
525112 |
ATM/ATK Operasional Perkantoran dan Kebutuhan dasar perkantoran di dalam negeri |
2026-06-15 |
052/SPP-GU.5/FEB/2026 |
2026-07-07 |
1538H |
Rp. 1.620.000 |
22 Hari |
|
| 1041 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525112 |
ATM/ATK Operasional Perkantoran dan Kebutuhan dasar perkantoran di dalam negeri |
2026-05-21 |
043/SPP-LS/FEB/2026 |
2026-07-02 |
1432H |
Rp. 28.184.300 |
42 Hari |
|
| 1042 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525112 |
ATM/ATK Operasional Perkantoran dan Kebutuhan dasar perkantoran di dalam negeri |
2026-07-31 |
065/SPP-GU.6/FEB/2026 |
2026-08-12 |
1925H |
Rp. 4.676.600 |
12 Hari |
|
| 1043 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525112 |
ATM/ATK Operasional Perkantoran dan Kebutuhan dasar perkantoran di dalam negeri |
2026-08-20 |
075/SPP-GU.7/FEB/2026 |
2026-09-01 |
2139H |
Rp. 2.520.900 |
12 Hari |
|
| 1044 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525112 |
ATM/ATK Operasional Perkantoran dan Kebutuhan dasar perkantoran di dalam negeri |
|
|
|
|
Rp. 4.716.800 |
34 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 05 Oktober 2026 (34 Hari) |
| 1045 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525112 |
ATM/ATK Operasional Perkantoran dan Kebutuhan dasar perkantoran di dalam negeri |
2026-09-21 |
087/SPP-GU.8/FEB/2026 |
|
|
Rp. 1.919.600 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1046 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525112 |
Pengandaan Dokumen |
2026-03-10 |
021/SPP-GU.2/FEB/2026 |
2026-03-17 |
0545H |
Rp. 836.300 |
7 Hari |
|
| 1047 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525112 |
Pengandaan Dokumen |
2026-04-20 |
033/SPP-GU.3/FEB/2026 |
2026-04-28 |
0896H |
Rp. 311.600 |
8 Hari |
|
| 1048 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
525112 |
Pengandaan Dokumen |
2026-05-21 |
045/SPP-GU.4/FEB/2026 |
2026-06-04 |
1245H |
Rp. 1.585.800 |
14 Hari |
|
| 1049 |
Fakultas Ekonomi dan Bisnis |
Juni 2026 |
525112 |
Pengandaan Dokumen |
2026-06-15 |
052/SPP-GU.5/FEB/2026 |
2026-07-07 |
1538H |
Rp. 1.766.200 |
22 Hari |
|
| 1050 |
Fakultas Ekonomi dan Bisnis |
Februari 2026 |
525112 |
Brosur,Leaflet, Spanduk, Banner |
2026-03-10 |
021/SPP-GU.2/FEB/2026 |
2026-03-17 |
0545H |
Rp. 1.650.000 |
7 Hari |
|
| 1051 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525112 |
Brosur,Leaflet, Spanduk, Banner |
2026-07-31 |
065/SPP-GU.6/FEB/2026 |
2026-08-12 |
1925H |
Rp. 224.700 |
12 Hari |
|
| 1052 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525112 |
Brosur,Leaflet, Spanduk, Banner |
|
|
|
|
Rp. 593.000 |
34 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 05 Oktober 2026 (34 Hari) |
| 1053 |
Fakultas Ekonomi dan Bisnis |
Oktober 2026 |
525112 |
Brosur,Leaflet, Spanduk, Banner |
|
|
|
|
Rp. 3.300.000 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 1054 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525112 |
Papan Informasi Akrilik |
2026-09-25 |
096/SPP-LS/FEB/2026 |
|
|
Rp. 29.960.000 |
10 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 05 Oktober 2026 (10 Hari) |
| 1055 |
Fakultas Ekonomi dan Bisnis |
Januari 2026 |
525112 |
Konsumsi Berat Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg) |
2026-02-20 |
004/SPP-GU.1/FEB/2026 |
2026-02-26 |
0247H |
Rp. 306.000 |
6 Hari |
|
| 1056 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525112 |
Konsumsi Berat Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg) |
2026-03-10 |
021/SPP-GU.2/FEB/2026 |
2026-03-17 |
0545H |
Rp. 2.100.000 |
7 Hari |
|
| 1057 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
525112 |
Konsumsi Berat Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg) |
2026-05-21 |
045/SPP-GU.4/FEB/2026 |
2026-06-04 |
1245H |
Rp. 1.330.000 |
14 Hari |
|
| 1058 |
Fakultas Ekonomi dan Bisnis |
Juni 2026 |
525112 |
Konsumsi Berat Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg) |
2026-06-15 |
052/SPP-GU.5/FEB/2026 |
2026-07-07 |
1538H |
Rp. 2.502.500 |
22 Hari |
|
| 1059 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525112 |
Konsumsi Berat Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg) |
2026-07-31 |
065/SPP-GU.6/FEB/2026 |
2026-08-12 |
1925H |
Rp. 962.500 |
12 Hari |
|
| 1060 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525112 |
Konsumsi Berat Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg) |
2026-08-20 |
075/SPP-GU.7/FEB/2026 |
2026-09-01 |
2139H |
Rp. 3.400.000 |
12 Hari |
|
| 1061 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525112 |
Konsumsi Berat Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg) |
|
|
|
|
Rp. 2.625.000 |
34 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 05 Oktober 2026 (34 Hari) |
| 1062 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525112 |
Konsumsi Berat Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg) |
2026-09-21 |
087/SPP-GU.8/FEB/2026 |
|
|
Rp. 770.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1063 |
Fakultas Ekonomi dan Bisnis |
Januari 2026 |
525112 |
Konsumsi Ringan Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg |
2026-02-20 |
004/SPP-GU.1/FEB/2026 |
2026-02-26 |
0247H |
Rp. 847.000 |
6 Hari |
|
| 1064 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525112 |
Konsumsi Ringan Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg |
2026-03-10 |
021/SPP-GU.2/FEB/2026 |
2026-03-17 |
0545H |
Rp. 990.000 |
7 Hari |
|
| 1065 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
525112 |
Konsumsi Ringan Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg |
2026-05-21 |
045/SPP-GU.4/FEB/2026 |
2026-06-04 |
1245H |
Rp. 1.017.500 |
14 Hari |
|
| 1066 |
Fakultas Ekonomi dan Bisnis |
Juni 2026 |
525112 |
Konsumsi Ringan Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg |
2026-06-15 |
052/SPP-GU.5/FEB/2026 |
2026-07-07 |
1538H |
Rp. 815.000 |
22 Hari |
|
| 1067 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525112 |
Konsumsi Ringan Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg |
2026-07-31 |
065/SPP-GU.6/FEB/2026 |
2026-08-12 |
1925H |
Rp. 375.000 |
12 Hari |
|
| 1068 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525112 |
Konsumsi Ringan Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg |
2026-08-20 |
075/SPP-GU.7/FEB/2026 |
2026-09-01 |
2139H |
Rp. 2.525.000 |
12 Hari |
|
| 1069 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525112 |
Konsumsi Ringan Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg |
|
|
|
|
Rp. 1.050.000 |
34 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 05 Oktober 2026 (34 Hari) |
| 1070 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525112 |
Konsumsi Ringan Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg |
2026-09-21 |
087/SPP-GU.8/FEB/2026 |
|
|
Rp. 2.172.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1071 |
Fakultas Ekonomi dan Bisnis |
Februari 2026 |
525119 |
Pelaksanaan Musyawarah Kerja/Rapat Kerja |
2026-02-20 |
005/SPP-GU.1/FEB/2026 |
2026-02-26 |
0248H |
Rp. 32.400.000 |
6 Hari |
|
| 1072 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525119 |
Pelaksanaan Musyawarah Kerja/Rapat Kerja |
2026-02-20 |
009/SPP-LS/FEB/2026 |
2026-03-04 |
0317H |
Rp. 37.500.000 |
12 Hari |
|
| 1073 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525115 |
Akomodasi Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan (9 Org x 3 Hari x 2 Keg) |
2026-03-10 |
022/SPP-GU.2/FEB/2026 |
2026-03-17 |
0546H |
Rp. 3.636.000 |
7 Hari |
|
| 1074 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
525115 |
Akomodasi Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan (9 Org x 3 Hari x 2 Keg) |
2026-05-21 |
046/SPP-GU.4/FEB/2026 |
2026-06-04 |
1250H |
Rp. 6.125.500 |
14 Hari |
|
| 1075 |
Fakultas Ekonomi dan Bisnis |
Juni 2026 |
525115 |
Akomodasi Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan (9 Org x 3 Hari x 2 Keg) |
2026-06-15 |
057/SPP-GU.5/FEB/2026 |
2026-07-07 |
1543H |
Rp. 450.000 |
22 Hari |
|
| 1076 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525115 |
Akomodasi Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan (9 Org x 3 Hari x 2 Keg) |
2026-07-31 |
066/SPP-GU.6/FEB/2026 |
2026-08-12 |
1926H |
Rp. 10.495.500 |
12 Hari |
|
| 1077 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525115 |
Akomodasi Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan (9 Org x 3 Hari x 2 Keg) |
2026-08-20 |
076/SPP-GU.7/FEB/2026 |
2026-09-01 |
2140H |
Rp. 17.221.500 |
12 Hari |
|
| 1078 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525115 |
Akomodasi Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan (9 Org x 3 Hari x 2 Keg) |
2026-09-21 |
088/SPP-GU.8/FEB/2026 |
|
|
Rp. 11.167.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1079 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525115 |
Uang Harian Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan(9 Org x 4 Hari x 2 Keg) |
2026-03-10 |
022/SPP-GU.2/FEB/2026 |
2026-03-17 |
0546H |
Rp. 2.080.000 |
7 Hari |
|
| 1080 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
525115 |
Uang Harian Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan(9 Org x 4 Hari x 2 Keg) |
2026-05-21 |
046/SPP-GU.4/FEB/2026 |
2026-06-04 |
1250H |
Rp. 4.390.000 |
14 Hari |
|
| 1081 |
Fakultas Ekonomi dan Bisnis |
Juni 2026 |
525115 |
Uang Harian Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan(9 Org x 4 Hari x 2 Keg) |
2026-06-15 |
057/SPP-GU.5/FEB/2026 |
2026-07-07 |
1543H |
Rp. 2.120.000 |
22 Hari |
|
| 1082 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525115 |
Uang Harian Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan(9 Org x 4 Hari x 2 Keg) |
2026-07-31 |
066/SPP-GU.6/FEB/2026 |
2026-08-12 |
1926H |
Rp. 9.430.000 |
12 Hari |
|
| 1083 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525115 |
Uang Harian Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan(9 Org x 4 Hari x 2 Keg) |
2026-08-20 |
076/SPP-GU.7/FEB/2026 |
2026-09-01 |
2140H |
Rp. 14.560.000 |
12 Hari |
|
| 1084 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525115 |
Uang Harian Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan(9 Org x 4 Hari x 2 Keg) |
2026-09-21 |
088/SPP-GU.8/FEB/2026 |
|
|
Rp. 7.180.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1085 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525115 |
Transport Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan (9 Org x 2 Keg) |
2026-03-10 |
022/SPP-GU.2/FEB/2026 |
2026-03-17 |
0546H |
Rp. 1.100.000 |
7 Hari |
|
| 1086 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
525115 |
Transport Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan (9 Org x 2 Keg) |
2026-05-21 |
046/SPP-GU.4/FEB/2026 |
2026-06-04 |
1250H |
Rp. 11.411.500 |
14 Hari |
|
| 1087 |
Fakultas Ekonomi dan Bisnis |
Juni 2026 |
525115 |
Transport Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan (9 Org x 2 Keg) |
2026-06-15 |
057/SPP-GU.5/FEB/2026 |
2026-07-07 |
1543H |
Rp. 5.429.600 |
22 Hari |
|
| 1088 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525115 |
Transport Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan (9 Org x 2 Keg) |
2026-07-31 |
066/SPP-GU.6/FEB/2026 |
2026-08-12 |
1926H |
Rp. 34.123.600 |
12 Hari |
|
| 1089 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525115 |
Transport Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan (9 Org x 2 Keg) |
2026-08-20 |
076/SPP-GU.7/FEB/2026 |
2026-09-01 |
2140H |
Rp. 18.759.100 |
12 Hari |
|
| 1090 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525115 |
Transport Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan (9 Org x 2 Keg) |
2026-09-21 |
088/SPP-GU.8/FEB/2026 |
|
|
Rp. 7.547.400 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1091 |
Fakultas Ekonomi dan Bisnis |
Februari 2026 |
525119 |
Biaya Operasional Kenderaan Dinas (4 Minggu x 20 Liter x 12 Bulan) |
2026-03-10 |
023/SPP-GU.2/FEB/2026 |
2026-03-17 |
0547H |
Rp. 744.400 |
7 Hari |
|
| 1092 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525119 |
Biaya Operasional Kenderaan Dinas (4 Minggu x 20 Liter x 12 Bulan) |
2026-03-10 |
023/SPP-GU.2/FEB/2026 |
2026-03-17 |
0547H |
Rp. 742.000 |
7 Hari |
|
| 1093 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525119 |
Biaya Operasional Kenderaan Dinas (4 Minggu x 20 Liter x 12 Bulan) |
2026-04-20 |
034/SPP-GU.3/FEB/2026 |
2026-04-28 |
0897H |
Rp. 750.000 |
8 Hari |
|
| 1094 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525119 |
Biaya Operasional Kenderaan Dinas (4 Minggu x 20 Liter x 12 Bulan) |
2026-04-20 |
034/SPP-GU.3/FEB/2026 |
2026-04-28 |
0897H |
Rp. 500.000 |
8 Hari |
|
| 1095 |
Fakultas Ekonomi dan Bisnis |
Juni 2026 |
525119 |
Biaya Operasional Kenderaan Dinas (4 Minggu x 20 Liter x 12 Bulan) |
2026-06-15 |
053/SPP-GU.5/FEB/2026 |
2026-07-07 |
1539H |
Rp. 1.400.000 |
22 Hari |
|
| 1096 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525119 |
Biaya Operasional Kenderaan Dinas (4 Minggu x 20 Liter x 12 Bulan) |
2026-08-20 |
077/SPP-GU.7/FEB/2026 |
2026-09-01 |
2141H |
Rp. 1.850.000 |
12 Hari |
|
| 1097 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525119 |
Biaya Operasional Kenderaan Dinas (4 Minggu x 20 Liter x 12 Bulan) |
|
|
|
|
Rp. 700.000 |
34 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 05 Oktober 2026 (34 Hari) |
| 1098 |
Fakultas Ekonomi dan Bisnis |
Januari 2026 |
525111 |
Remunerasi Tugas Tambahan |
2026-01-14 |
003/SPP-LS REMUN/FEB/2026 |
2026-01-21 |
0067H |
Rp. 166.320.000 |
7 Hari |
|
| 1099 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525111 |
Remunerasi Tugas Tambahan |
2026-03-04 |
017/SPP-LS REMUN/FEB/2026 |
2026-03-17 |
0565H |
Rp. 71.280.000 |
13 Hari |
|
| 1100 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525111 |
Remunerasi Tugas Tambahan |
2026-07-06 |
060/SPP-LS REMUN/FEB/2026 |
2026-07-30 |
1772H |
Rp. 166.320.000 |
24 Hari |
|
| 1101 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525111 |
Remunerasi Tugas Tambahan |
2026-09-07 |
084/SPP-LS.REMUN/FEB/2026 |
|
|
Rp. 71.280.000 |
28 Hari |
Belum ada SP2D terhitung dari 07 September 2026 hingga 05 Oktober 2026 (28 Hari) |
| 1102 |
Fakultas Ekonomi dan Bisnis |
Januari 2026 |
525111 |
Remunerasi Fungsional |
2026-01-14 |
002/SPP-LS REMUN/FEB/2026 |
2026-01-15 |
0041H |
Rp. 1.176.204.000 |
1 Hari |
|
| 1103 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525111 |
Remunerasi Fungsional |
2026-03-04 |
016/SPP-LS.REMUN/FEB/2026 |
2026-03-16 |
0564H |
Rp. 482.130.000 |
12 Hari |
|
| 1104 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525111 |
Remunerasi Fungsional |
2026-07-06 |
059/SPP-LS REMUN/FEB/2026 |
2026-07-16 |
1645H |
Rp. 1.157.436.000 |
10 Hari |
|
| 1105 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525111 |
Remunerasi Fungsional |
2026-07-31 |
071/SPP-LS REMUN/FEB/2026 |
2026-08-19 |
2014H |
Rp. 11.736.000 |
19 Hari |
|
| 1106 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525111 |
Remunerasi Fungsional |
2026-09-07 |
083/SPP-LS.REMUN/FEB/2026 |
|
|
Rp. 510.318.000 |
28 Hari |
Belum ada SP2D terhitung dari 07 September 2026 hingga 05 Oktober 2026 (28 Hari) |
| 1107 |
Fakultas Ekonomi dan Bisnis |
Februari 2026 |
525111 |
Insentif Kelola |
2026-02-24 |
011/SPP-LS.REMUN/FEB/2026 |
2026-02-27 |
0273H |
Rp. 38.000.000 |
3 Hari |
|
| 1108 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525111 |
Insentif Kelola |
2026-03-04 |
018/SPP-LS REMUN/FEB/2026 |
2026-03-11 |
0447H |
Rp. 38.000.000 |
7 Hari |
|
| 1109 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525111 |
Insentif Kelola |
2026-04-08 |
029/SPP-LS/FEB/2026 |
2026-04-10 |
0767H |
Rp. 38.000.000 |
2 Hari |
|
| 1110 |
Fakultas Ekonomi dan Bisnis |
Juni 2026 |
525111 |
Insentif Kelola |
2026-05-04 |
041/SPP-LS/FEB/2026 |
2026-06-02 |
1199H |
Rp. 36.000.000 |
29 Hari |
|
| 1111 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525111 |
Insentif Kelola |
2026-06-03 |
051/SPP-LS INSENTIF KELOLA/FEB/2026 |
2026-07-01 |
1433H |
Rp. 36.000.000 |
28 Hari |
|
| 1112 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525111 |
Insentif Kelola |
2026-07-06 |
061/SPP-LS REMUN/FEB/2026 |
2026-08-03 |
1826H |
Rp. 36.000.000 |
28 Hari |
|
| 1113 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525111 |
Insentif Kelola |
2026-08-07 |
074/SPP-LS REMUN/FEB/2026 |
|
|
Rp. 36.000.000 |
59 Hari |
Belum ada SP2D terhitung dari 07 Agustus 2026 hingga 05 Oktober 2026 (59 Hari) |
| 1114 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525111 |
Insentif Kelola |
2026-09-07 |
082/SPP-LS.REMUN/FEB/2026 |
|
|
Rp. 36.000.000 |
28 Hari |
Belum ada SP2D terhitung dari 07 September 2026 hingga 05 Oktober 2026 (28 Hari) |
| 1115 |
Fakultas Ekonomi dan Bisnis |
Februari 2026 |
525119 |
Biaya Pengelolaan Website, Sistem Informasi Laboratorium/Fakultas/Program Studi |
2026-02-23 |
010/SPP-LS/FEB/2026 |
2026-02-27 |
0272H |
Rp. 14.000.000 |
4 Hari |
|
| 1116 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525119 |
Biaya Pengelolaan Website, Sistem Informasi Laboratorium/Fakultas/Program Studi |
2026-03-09 |
019/SPP-LS/FEB/2026 |
2026-03-13 |
0525H |
Rp. 13.500.000 |
4 Hari |
|
| 1117 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525119 |
Pengembangan SIM Klinik Bumdes |
2026-04-08 |
028/SPP-LS/FEB/2026 |
2026-04-10 |
0763H |
Rp. 35.000.000 |
2 Hari |
|
| 1118 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
525111 |
Honor PPK Fakultas |
2026-05-21 |
048/SPP-GU.4/FEB/2026 |
2026-06-04 |
1246H |
Rp. 4.600.000 |
14 Hari |
|
| 1119 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
525111 |
Honor Penguji Tagihan/Verifikator UK |
2026-05-21 |
048/SPP-GU.4/FEB/2026 |
2026-06-04 |
1246H |
Rp. 1.880.000 |
14 Hari |
|
| 1120 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525176 |
Honor PPK Fakultas |
2026-08-20 |
080/SPP-GU.7/FEB/2026 |
2026-09-01 |
2144H |
Rp. 3.450.000 |
12 Hari |
|
| 1121 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525176 |
Honor PPK Fakultas |
|
|
|
|
Rp. 1.150.000 |
34 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 05 Oktober 2026 (34 Hari) |
| 1122 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525176 |
Honor Penguji Tagihan/Verfikator UK |
2026-08-20 |
080/SPP-GU.7/FEB/2026 |
2026-09-01 |
2144H |
Rp. 1.410.000 |
12 Hari |
|
| 1123 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525176 |
Honor Penguji Tagihan/Verfikator UK |
|
|
|
|
Rp. 470.000 |
34 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 05 Oktober 2026 (34 Hari) |
| 1124 |
Fakultas Ekonomi dan Bisnis |
Februari 2026 |
525119 |
Bantuan Biaya Pembinaan Karakter |
2026-02-20 |
007/SPP-GU.1/FEB/2026 |
2026-02-26 |
0250H |
Rp. 33.500.000 |
6 Hari |
|
| 1125 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525119 |
Bantuan Biaya Kegiatan Pendampingan Asesmen Akreditasi Program Studi |
2026-03-10 |
025/SPP-GU.2/FEB/2026 |
2026-03-17 |
0549H |
Rp. 11.953.000 |
7 Hari |
|
| 1126 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525119 |
Bantuan Biaya Kegiatan Pendampingan Asesmen Akreditasi Program Studi |
2026-04-20 |
036/SPP-GU.3/FEB/2026 |
2026-04-28 |
0899H |
Rp. 31.391.300 |
8 Hari |
|
| 1127 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525119 |
Bantuan Biaya Kegiatan Pendampingan Asesmen Akreditasi Program Studi |
2026-04-20 |
036/SPP-GU.3/FEB/2026 |
2026-04-28 |
0899H |
Rp. 6.860.000 |
8 Hari |
|
| 1128 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525119 |
Bantuan Biaya Kegiatan Pendampingan Asesmen Akreditasi Program Studi |
2026-04-20 |
039/SPP-LS/FEB/2026 |
2026-04-30 |
0946H |
Rp. 42.400.000 |
10 Hari |
|
| 1129 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
525119 |
Bantuan Biaya Kegiatan Pendampingan Asesmen Akreditasi Program Studi |
2026-04-29 |
040/SPP-LS/FEB/2026 |
2026-05-05 |
1007H |
Rp. 36.800.000 |
6 Hari |
|
| 1130 |
Fakultas Ekonomi dan Bisnis |
Juni 2026 |
525119 |
Bantuan Biaya Kegiatan Pendampingan Asesmen Akreditasi Program Studi |
2026-06-15 |
055/SPP-GU.5/FEB/2026 |
2026-07-07 |
1541H |
Rp. 44.131.000 |
22 Hari |
|
| 1131 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525119 |
Bantuan Biaya Kegiatan Pendampingan Asesmen Akreditasi Program Studi |
2026-07-14 |
063/SPP-LS/FEB/2026 |
2026-07-29 |
1749H |
Rp. 16.410.000 |
15 Hari |
|
| 1132 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525119 |
Bantuan Biaya Kegiatan Pendampingan Asesmen Akreditasi Program Studi |
2026-07-31 |
069/SPP-GU.6/FEB/2026 |
2026-08-12 |
1929H |
Rp. 18.745.000 |
12 Hari |
|
| 1133 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525119 |
Bantuan Biaya Kegiatan Pendampingan Asesmen Akreditasi Program Studi |
2026-08-20 |
078/SPP-GU.7/FEB/2026 |
2026-09-01 |
2142H |
Rp. 8.780.300 |
12 Hari |
|
| 1134 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525119 |
Kegiatan kuliah pakar/praktisi internasional |
2026-05-21 |
049/SPP-GU.4/FEB/2026 |
2026-06-04 |
1247H |
Rp. 20.145.000 |
14 Hari |
|
| 1135 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525112 |
Pengandaan Dokumen Laporan |
2026-09-21 |
090/SPP-GU.8/FEB/2026 |
|
|
Rp. 1.998.800 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1136 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525119 |
Bantuan Biaya Terkait Kegiatan Pencegahan dan Penanganan Anti Kekerasan , Anti Narkoba dan Anti Korupsi |
2026-08-20 |
078/SPP-GU.7/FEB/2026 |
2026-09-01 |
2142H |
Rp. 2.440.000 |
12 Hari |
|
| 1137 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525119 |
Skim Penelitian Kolaboratif Dosen dan Mahasiswa Berbasis Kawasan |
2026-07-06 |
062/SPP-LS PENELITIAN/FEB/2026 |
2026-07-28 |
1718H |
Rp. 84.000.000 |
22 Hari |
|
| 1138 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525119 |
Skim Penelitian Kolaboratif Dosen dan Mahasiswa Berbasis Kawasan |
2026-09-21 |
086/SPP-LS.PENELITIAN/FEB/2026 |
|
|
Rp. 36.000.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1139 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525119 |
Bantuan Publikasi Jurnal Nasional terindex |
2026-07-31 |
067/SPP-GU.6/FEB/2026 |
2026-08-12 |
1927H |
Rp. 5.000.000 |
12 Hari |
|
| 1140 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525119 |
Pengabdian Kolaboratif Berbasis Kawasan |
2026-09-21 |
094/SPP-LS.PENGABDIAN/FEB/2026 |
|
|
Rp. 6.000.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1141 |
Fakultas Olahraga dan Kesehatan |
Maret 2026 |
537112 |
Pengadaan Leptop, Komputer, AC, Printer, Scenner dan LCD |
2026-04-06 |
18/UN47.B7.2/SPP -GUP.02/2026 |
2026-04-10 |
0740G |
Rp. 9.000.000 |
4 Hari |
|
| 1142 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
537112 |
Pengadaan Leptop, Komputer, AC, Printer, Scenner dan LCD |
2026-04-20 |
29/UN47.B7.2/SPP -GUP.03/2026 |
2026-04-23 |
0878G |
Rp. 22.648.500 |
3 Hari |
|
| 1143 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
537112 |
Pengadaan Leptop, Komputer, AC, Printer, Scenner dan LCD |
2026-05-12 |
36/UN47.B7.2/SPP -GUP.04/2026 |
2026-06-03 |
1228G |
Rp. 13.400.000 |
22 Hari |
|
| 1144 |
Fakultas Olahraga dan Kesehatan |
Juni 2026 |
537112 |
Pengadaan Leptop, Komputer, AC, Printer, Scenner dan LCD |
2026-06-18 |
48/UN47.B7.2/SPP -GUP.5/2026 |
2026-07-03 |
1478G |
Rp. 7.150.000 |
15 Hari |
|
| 1145 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
537112 |
Pengadaan Leptop, Komputer, AC, Printer, Scenner dan LCD |
2026-07-15 |
62/UN47.B7.2/SPP -GUP.6 /2026 |
2026-07-29 |
1727G |
Rp. 7.000.000 |
14 Hari |
|
| 1146 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
537112 |
Pengadaan Leptop, Komputer, AC, Printer, Scenner dan LCD |
2026-08-10 |
68/UN47.B7.2/SPP - GUP.07 /2026 |
2026-08-12 |
1912G |
Rp. 10.000.000 |
2 Hari |
|
| 1147 |
Fakultas Olahraga dan Kesehatan |
Agustus 2026 |
537112 |
Pengadaan Leptop, Komputer, AC, Printer, Scenner dan LCD |
2026-08-19 |
82/UN47.B7.2/SPP - GUP.08 /2026 |
2026-08-28 |
2109G |
Rp. 15.000.000 |
9 Hari |
|
| 1148 |
Fakultas Olahraga dan Kesehatan |
Agustus 2026 |
537112 |
Pengadaan Leptop, Komputer, AC, Printer, Scenner dan LCD |
2026-09-09 |
79/UN47.B7.2/SPP - GUP .09/2026 |
2026-09-11 |
2276G |
Rp. 19.750.000 |
2 Hari |
|
| 1149 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525114 |
Pemeliharaan Alat -alat Laboratorium Jurusan |
2026-04-20 |
31/UN47.B7.2/SPP -GUP.03/2026 |
2026-04-23 |
0880G |
Rp. 16.755.000 |
3 Hari |
|
| 1150 |
Fakultas Olahraga dan Kesehatan |
Maret 2026 |
525114 |
Pemeliharaan Gedung Pendukung Pembelajaran |
2026-04-06 |
20/UN47.B7.2/SPP -GUP.02/2026 |
2026-04-10 |
0738G |
Rp. 15.000.000 |
4 Hari |
|
| 1151 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525114 |
Pemeliharaan Gedung Pendukung Pembelajaran |
2026-08-10 |
70/UN47.B7.2/SPP - GUP.07 /2026 |
2026-08-12 |
1914G |
Rp. 615.000 |
2 Hari |
|
| 1152 |
Fakultas Olahraga dan Kesehatan |
Agustus 2026 |
525114 |
Pemeliharaan Gedung Pendukung Pembelajaran |
2026-08-19 |
84/UN47.B7.2/SPP - GUP.08 /2026 |
2026-08-28 |
2111G |
Rp. 11.810.400 |
9 Hari |
|
| 1153 |
Fakultas Olahraga dan Kesehatan |
September 2026 |
525114 |
Pemeliharaan Gedung Pendukung Pembelajaran |
2026-09-14 |
87/UN47.B7.2/SPP - GUP.10/2026 |
|
|
Rp. 29.950.000 |
21 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 05 Oktober 2026 (21 Hari) |
| 1154 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525114 |
Pemeliharaan AC, Jaringan Listrik, Instalasi Air dan Jaringan Internet |
2026-04-20 |
33/UN47.B7.2/SPP -GUP.03/2026 |
2026-04-23 |
0882G |
Rp. 8.205.000 |
3 Hari |
|
| 1155 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525114 |
Pemeliharaan AC, Jaringan Listrik, Instalasi Air dan Jaringan Internet |
2026-05-12 |
40/UN47.B7.2/SPP -GUP.04/2026 |
2026-06-03 |
1223G |
Rp. 8.950.000 |
22 Hari |
|
| 1156 |
Fakultas Olahraga dan Kesehatan |
Juni 2026 |
525114 |
Pemeliharaan AC, Jaringan Listrik, Instalasi Air dan Jaringan Internet |
2026-06-18 |
52/UN47.B7.2/SPP -GUP.5/2026 |
2026-07-03 |
1474G |
Rp. 5.244.500 |
15 Hari |
|
| 1157 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525114 |
Pemeliharaan AC, Jaringan Listrik, Instalasi Air dan Jaringan Internet |
2026-08-10 |
72/UN47.B7.2/SPP - GUP.07 /2026 |
2026-08-12 |
1916G |
Rp. 17.400.000 |
2 Hari |
|
| 1158 |
Fakultas Olahraga dan Kesehatan |
Agustus 2026 |
525114 |
Pemeliharaan AC, Jaringan Listrik, Instalasi Air dan Jaringan Internet |
2026-08-19 |
86/UN47.B7.2/SPP - GUP.08 /2026 |
2026-08-28 |
2113G |
Rp. 9.830.000 |
9 Hari |
|
| 1159 |
Fakultas Olahraga dan Kesehatan |
September 2026 |
525114 |
Pemeliharaan AC, Jaringan Listrik, Instalasi Air dan Jaringan Internet |
2026-09-14 |
89/UN47.B7.2/SPP - GUP.10/2026 |
|
|
Rp. 2.755.000 |
21 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 05 Oktober 2026 (21 Hari) |
| 1160 |
Fakultas Olahraga dan Kesehatan |
Maret 2026 |
525114 |
Pemeliharaan Printer dan Komputer |
2026-04-06 |
23/UN47.B7.2/SPP -GUP.02/2026 |
2026-04-10 |
0735G |
Rp. 1.950.000 |
4 Hari |
|
| 1161 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525114 |
Pemeliharaan Printer dan Komputer |
2026-08-10 |
72/UN47.B7.2/SPP - GUP.07 /2026 |
2026-08-12 |
1916G |
Rp. 1.850.000 |
2 Hari |
|
| 1162 |
Fakultas Olahraga dan Kesehatan |
September 2026 |
525114 |
Pemeliharaan Printer dan Komputer |
2026-09-14 |
89/UN47.B7.2/SPP - GUP.10/2026 |
|
|
Rp. 750.000 |
21 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 05 Oktober 2026 (21 Hari) |
| 1163 |
Fakultas Olahraga dan Kesehatan |
Agustus 2026 |
525114 |
Pemeliharaan Gedung Perkantoran |
2026-08-19 |
86/UN47.B7.2/SPP - GUP.08 /2026 |
2026-08-28 |
2113G |
Rp. 9.317.550 |
9 Hari |
|
| 1164 |
Fakultas Olahraga dan Kesehatan |
Agustus 2026 |
525114 |
Pemeliharaan Gedung Perkantoran |
2026-09-09 |
80/UN47.B7.2/SPP - GUP .09/2026 |
2026-09-11 |
2275G |
Rp. 1.900.000 |
2 Hari |
|
| 1165 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Bantuan Biaya Kegiatan Sosialisasi Penerimaan Mahasiswa Baru |
2026-06-24 |
58/UN47.B7.2/SPP -LS.12 /2026 |
2026-07-09 |
1585G |
Rp. 10.000.000 |
15 Hari |
|
| 1166 |
Fakultas Olahraga dan Kesehatan |
September 2026 |
525119 |
Bantuan Biaya Kegiatan Sosialisasi Penerimaan Mahasiswa Baru |
2026-09-23 |
97/UN47.B7.2/SPP - LS.20/2026 |
|
|
Rp. 20.000.000 |
12 Hari |
Belum ada SP2D terhitung dari 23 September 2026 hingga 05 Oktober 2026 (12 Hari) |
| 1167 |
Fakultas Olahraga dan Kesehatan |
September 2026 |
525119 |
Bantuan Biaya Kegiatan Kuliah Umum |
2026-09-23 |
97/UN47.B7.2/SPP - LS.20/2026 |
|
|
Rp. 35.000.000 |
12 Hari |
Belum ada SP2D terhitung dari 23 September 2026 hingga 05 Oktober 2026 (12 Hari) |
| 1168 |
Fakultas Olahraga dan Kesehatan |
Mei 2026 |
525119 |
Bantuan Biaya Kegiatan Kuliah Pakar Berbasis Case Method dan Team Based
Project |
2026-05-12 |
43/UN47.B7.2/SPP -GUP.04/2026 |
2026-06-03 |
1221G |
Rp. 20.000.000 |
22 Hari |
|
| 1169 |
Fakultas Olahraga dan Kesehatan |
Mei 2026 |
525119 |
Bantuan Biaya Kegiatan Kuliah Pakar Berbasis Case Method dan Team Based
Project |
2026-05-12 |
44/UN47.B7.2/SPP -LS.10/2026 |
2026-05-26 |
1152G |
Rp. 19.776.000 |
14 Hari |
|
| 1170 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Bantuan Biaya Kegiatan Kuliah Pakar Berbasis Case Method dan Team Based
Project |
2026-06-24 |
58/UN47.B7.2/SPP -LS.12 /2026 |
2026-07-09 |
1585G |
Rp. 20.000.000 |
15 Hari |
|
| 1171 |
Fakultas Olahraga dan Kesehatan |
Agustus 2026 |
525119 |
Bantuan Biaya Kegiatan Kuliah Pakar Berbasis Case Method dan Team Based
Project |
2026-08-19 |
88/UN47.B7.2/SPP - GUP.08 /2026 |
2026-08-28 |
2114G |
Rp. 20.000.000 |
9 Hari |
|
| 1172 |
Fakultas Olahraga dan Kesehatan |
September 2026 |
525119 |
Bantuan Biaya Kegiatan Kuliah Pakar Berbasis Case Method dan Team Based
Project |
2026-09-23 |
97/UN47.B7.2/SPP - LS.20/2026 |
|
|
Rp. 40.000.000 |
12 Hari |
Belum ada SP2D terhitung dari 23 September 2026 hingga 05 Oktober 2026 (12 Hari) |
| 1173 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Biaya Penyusunan Rancangan Pembelajaran Semester (RPS) |
2026-06-24 |
58/UN47.B7.2/SPP -LS.12 /2026 |
2026-07-09 |
1585G |
Rp. 24.000.000 |
15 Hari |
|
| 1174 |
Fakultas Olahraga dan Kesehatan |
Mei 2026 |
525119 |
Biaya Kegiatan Tracer Study dan Temu Alumni |
2026-05-12 |
44/UN47.B7.2/SPP -LS.10/2026 |
2026-05-26 |
1152G |
Rp. 30.000.000 |
14 Hari |
|
| 1175 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Biaya Sewa Kolam Renang Untuk kegiatan Praktek MK Renang Mahasiswa
Jurusan Penjas dan Pendidikan Kepelatihan Olahraga Semester Genap dan
Semester Ganjil (250 Mahasiswa x 10 Pertemuan x 1 Kelas x Pr.20.000) |
2026-06-24 |
58/UN47.B7.2/SPP -LS.12 /2026 |
2026-07-09 |
1585G |
Rp. 11.400.000 |
15 Hari |
|
| 1176 |
Fakultas Olahraga dan Kesehatan |
Mei 2026 |
525119 |
Pelaksanaan PKL/PBL/PPL (100 Mahasiswa x 6 Prodi) |
2026-05-12 |
44/UN47.B7.2/SPP -LS.10/2026 |
2026-05-26 |
1152G |
Rp. 7.500.000 |
14 Hari |
|
| 1177 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Pelaksanaan PKL/PBL/PPL (100 Mahasiswa x 6 Prodi) |
2026-06-24 |
58/UN47.B7.2/SPP -LS.12 /2026 |
2026-07-09 |
1585G |
Rp. 7.500.000 |
15 Hari |
|
| 1178 |
Fakultas Olahraga dan Kesehatan |
September 2026 |
525119 |
Pelaksanaan Magang Industri dan Rumah Sakit Prodi D3 Farmasi |
2026-09-23 |
97/UN47.B7.2/SPP - LS.20/2026 |
|
|
Rp. 25.000.000 |
12 Hari |
Belum ada SP2D terhitung dari 23 September 2026 hingga 05 Oktober 2026 (12 Hari) |
| 1179 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Pengadaan Alat dan Barang Olahraga untuk menunjang praktik olahraga Jurusan Penjas dan PKO |
2026-06-24 |
59/UN47.B7.2/SPP -LS.13 /2026 |
2026-07-09 |
1588G |
Rp. 49.200.000 |
15 Hari |
|
| 1180 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Pengadaan Alat dan Barang Olahraga untuk menunjang praktik olahraga Jurusan Penjas dan PKO |
2026-06-24 |
60/UN47.B7.2/SPP -LS.13 /2026 |
2026-07-09 |
1587G |
Rp. 49.800.000 |
15 Hari |
|
| 1181 |
Fakultas Olahraga dan Kesehatan |
Juni 2026 |
525112 |
Biaya bahan laboratorium, ATM/ATK terkait pembelajaran mahasiswa
keperawatan non reguler angkatan 12 Semester 2 |
2026-06-18 |
53/UN47.B7.2/SPP -GUP.5/2026 |
2026-07-03 |
1473G |
Rp. 525.000 |
15 Hari |
|
| 1182 |
Fakultas Olahraga dan Kesehatan |
Mei 2026 |
525119 |
Kegiatan Pelatihan Ujian Kompetensi Mahasiswa (UKOM) D3 Farmasi |
2026-05-12 |
44/UN47.B7.2/SPP -LS.10/2026 |
2026-05-26 |
1152G |
Rp. 25.000.000 |
14 Hari |
|
| 1183 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525119 |
Biaya Kegiatan Stase Keperawatan Gawat Darurat Profesi Ners Angkatan 22 |
2026-04-20 |
35/UN47.B7.2/SPP -LS.09/2026 |
2026-04-28 |
0911G |
Rp. 123.267.000 |
8 Hari |
|
| 1184 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525119 |
Biaya Kegiatan Stase Keperawatan Gerontik Profesi Ners Angkatan 22 |
2026-04-20 |
35/UN47.B7.2/SPP -LS.09/2026 |
2026-04-28 |
0911G |
Rp. 65.219.800 |
8 Hari |
|
| 1185 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525119 |
Biaya Kegiatan Stase Keperawatan Komunitas Profesi Ners Angkatan 22 |
2026-04-20 |
35/UN47.B7.2/SPP -LS.09/2026 |
2026-04-28 |
0911G |
Rp. 78.185.600 |
8 Hari |
|
| 1186 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525119 |
Biaya Kegiatan Stase Keperawatan Keluarga Profesi Ners Angkatan 22 |
2026-04-20 |
35/UN47.B7.2/SPP -LS.09/2026 |
2026-04-28 |
0911G |
Rp. 61.975.600 |
8 Hari |
|
| 1187 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525119 |
Biaya Kegiatan Stase Keperawatan Peminatan Profesi Ners Angkatan 22 |
2026-04-20 |
35/UN47.B7.2/SPP -LS.09/2026 |
2026-04-28 |
0911G |
Rp. 66.876.900 |
8 Hari |
|
| 1188 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525119 |
Biaya Kegiatan Karya Ilmiah Ners Profesi Ners Angkatan 22 |
2026-04-20 |
35/UN47.B7.2/SPP -LS.09/2026 |
2026-04-28 |
0911G |
Rp. 35.014.000 |
8 Hari |
|
| 1189 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525119 |
Biaya Kegiatan Pelatihan BTCLS Profesi Ners Angkatan 23 |
2026-04-20 |
35/UN47.B7.2/SPP -LS.09/2026 |
2026-04-28 |
0911G |
Rp. 157.455.000 |
8 Hari |
|
| 1190 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525119 |
Biaya Kegiatan Stase Keperawatan Dasar Profesi Ners Angkatan 23 |
2026-04-20 |
35/UN47.B7.2/SPP -LS.09/2026 |
2026-04-28 |
0911G |
Rp. 75.450.000 |
8 Hari |
|
| 1191 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525119 |
Biaya Kegiatan Stase Keperawatan Medikal Bedah Profesi Ners Angkatan 23 |
2026-04-20 |
35/UN47.B7.2/SPP -LS.09/2026 |
2026-04-28 |
0911G |
Rp. 140.350.000 |
8 Hari |
|
| 1192 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525119 |
Biaya Kegiatan PKPA Rumah Sakit Profesi Apoteker Angkatan 1 Semester 2 |
2026-04-15 |
26/UN47.B7.2/SPP -LS.07/2026 |
2026-04-16 |
0827G |
Rp. 210.760.000 |
1 Hari |
|
| 1193 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525119 |
Biaya Kegiatan PKPA Industri Farmasi Profesi Apoteker Angkatan 1 Semester 2 |
2026-04-15 |
26/UN47.B7.2/SPP -LS.07/2026 |
2026-04-16 |
0827G |
Rp. 261.320.000 |
1 Hari |
|
| 1194 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525119 |
Biaya Kegiatan Kepanitraan Umum (PANUM) Profesi Apoteker Angkatan 2 |
2026-04-15 |
26/UN47.B7.2/SPP -LS.07/2026 |
2026-04-16 |
0827G |
Rp. 111.000.000 |
1 Hari |
|
| 1195 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525119 |
Biaya Kegiatan PKPA Apotek Profesi Apoteker Angkatan 2 Semester 1 |
2026-04-15 |
26/UN47.B7.2/SPP -LS.07/2026 |
2026-04-16 |
0827G |
Rp. 85.300.000 |
1 Hari |
|
| 1196 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525119 |
Biaya Kegiatan PKPA Puskesmas Profesi Apoteker Angkatan 2 Semester 1 |
2026-04-15 |
26/UN47.B7.2/SPP -LS.07/2026 |
2026-04-16 |
0827G |
Rp. 87.800.000 |
1 Hari |
|
| 1197 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Biaya Kegiatan PKPA Distribusi Farmasi Profesi Apoteker Angkatan 2 Semester 1 |
2026-06-19 |
55/UN47.B7.2/SPP -LS.11 Apoteker/2026 |
2026-07-06 |
1505G |
Rp. 129.560.000 |
17 Hari |
|
| 1198 |
Fakultas Olahraga dan Kesehatan |
Juni 2026 |
525119 |
Honorarium Mengajar, honorarium Koordinator, Honorarium penyusunan GBPM,
dan kegiatan lainnya terkait pembelajaran mahasiswa keperawatan non reguler
angkatan 12 Semester 2 |
2026-05-12 |
46/UN47.B7.2/SPP -LS.10 Program Non reguler/2026 |
2026-06-25 |
1338G |
Rp. 145.150.000 |
44 Hari |
|
| 1199 |
Fakultas Olahraga dan Kesehatan |
Mei 2026 |
525119 |
Biaya Kegiatan Pelatihan OSCE Prodi D3 Farmasi |
2026-05-12 |
44/UN47.B7.2/SPP -LS.10/2026 |
2026-05-26 |
1152G |
Rp. 30.000.000 |
14 Hari |
|
| 1200 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Biaya Kegiatan Ujian Kompetensi Mahasiswa (UKOM) Profesi Ners Angkatan 22 |
2026-07-13 |
61/UN47.B7.2/SPP -LS.14 /2026 |
2026-07-22 |
1677G |
Rp. 117.400.000 |
9 Hari |
|
| 1201 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
biaya Kegiatan Pelatihan OSCE Profesi Ners Angkatan 22 |
2026-07-13 |
61/UN47.B7.2/SPP -LS.14 /2026 |
2026-07-22 |
1677G |
Rp. 60.491.000 |
9 Hari |
|
| 1202 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Biaya Kegiatan Stase Keperawatan Maternitas Profesi ners Angkatan 23 |
2026-07-13 |
61/UN47.B7.2/SPP -LS.14 /2026 |
2026-07-22 |
1677G |
Rp. 90.160.000 |
9 Hari |
|
| 1203 |
Fakultas Olahraga dan Kesehatan |
September 2026 |
525119 |
Biaya Kegiatan Stase Keperawatan Maternitas Profesi ners Angkatan 23 |
2026-09-14 |
85//UN47.B7.2/SPP - LS.18 PROFESI NERS/2026 |
|
|
Rp. 3.675.000 |
21 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 05 Oktober 2026 (21 Hari) |
| 1204 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Biaya Kegiatan Stase Keperawatan Anak Profesi Ners Angkatan 23 |
2026-07-13 |
61/UN47.B7.2/SPP -LS.14 /2026 |
2026-07-22 |
1677G |
Rp. 90.310.000 |
9 Hari |
|
| 1205 |
Fakultas Olahraga dan Kesehatan |
September 2026 |
525119 |
Biaya Kegiatan Stase Keperawatan Anak Profesi Ners Angkatan 23 |
2026-09-14 |
85//UN47.B7.2/SPP - LS.18 PROFESI NERS/2026 |
|
|
Rp. 3.325.000 |
21 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 05 Oktober 2026 (21 Hari) |
| 1206 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Biaya Kegiatan Stase Keperawatan Jiwa Profesi Ners Angkatan 23 |
2026-07-13 |
61/UN47.B7.2/SPP -LS.14 /2026 |
2026-07-22 |
1677G |
Rp. 87.310.000 |
9 Hari |
|
| 1207 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Biaya Kegiatan Stase Keperawatan Manajemen Profesi Ners Angkatan 23 |
2026-07-13 |
61/UN47.B7.2/SPP -LS.14 /2026 |
2026-07-22 |
1677G |
Rp. 74.705.000 |
9 Hari |
|
| 1208 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Biaya Kegiatan Kepanitraan Umum (PANUM) Profesi Ners angkatan 24 |
2026-07-13 |
61/UN47.B7.2/SPP -LS.14 /2026 |
2026-07-22 |
1677G |
Rp. 147.640.000 |
9 Hari |
|
| 1209 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Biaya Kegiatan Pelatihan BTCLS Profesi Ners Angkatan 24 |
2026-07-13 |
61/UN47.B7.2/SPP -LS.14 /2026 |
2026-07-22 |
1677G |
Rp. 94.775.000 |
9 Hari |
|
| 1210 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Biaya Kegiatan Stase Keperawatan Dasar Profesi Ners Angkatan 24 |
2026-07-13 |
61/UN47.B7.2/SPP -LS.14 /2026 |
2026-07-22 |
1677G |
Rp. 49.855.000 |
9 Hari |
|
| 1211 |
Fakultas Pertanian |
Januari 2026 |
525114 |
Pemeliharaan Instalasi Listrik dan Air |
2026-03-05 |
06/SPP-GU1/2026 |
2026-03-10 |
0403F |
Rp. 2.385.000 |
5 Hari |
|
| 1212 |
Fakultas Pertanian |
Maret 2026 |
525114 |
Pemeliharaan Instalasi Listrik dan Air |
2026-04-10 |
15/SPP-GU2/2026 |
2026-04-15 |
0807F |
Rp. 1.000.000 |
5 Hari |
|
| 1213 |
Fakultas Pertanian |
April 2026 |
525114 |
Pemeliharaan Instalasi Listrik dan Air |
2026-04-22 |
23/SPP-GU3/2026 |
2026-04-29 |
0918F |
Rp. 1.500.000 |
7 Hari |
|
| 1214 |
Fakultas Pertanian |
Juli 2026 |
525114 |
Pemeliharaan Instalasi Listrik dan Air |
2026-08-18 |
50/SPP-GU6/2026 |
2026-08-28 |
2102F |
Rp. 115.000 |
10 Hari |
|
| 1215 |
Fakultas Pertanian |
Juli 2026 |
525114 |
Biaya Pemeliharaan dan pengembangan Laboratorium Alam/ Miniranch Jurusan Peternakan |
2026-08-18 |
50/SPP-GU6/2026 |
2026-08-28 |
2102F |
Rp. 16.100.000 |
10 Hari |
|
| 1216 |
Fakultas Pertanian |
Agustus 2026 |
525114 |
Biaya Pemeliharaan dan pengembangan Laboratorium Alam/ Miniranch Jurusan Peternakan |
2026-08-31 |
57/SPP-LS12/2026 |
|
|
Rp. 23.899.500 |
35 Hari |
Belum ada SP2D terhitung dari 31 Agustus 2026 hingga 05 Oktober 2026 (35 Hari) |
| 1217 |
Fakultas Pertanian |
September 2026 |
525114 |
Biaya Pemeliharaan dan pengembangan Laboratorium Alam/ Miniranch Jurusan Peternakan |
2026-09-29 |
67/SPP-LS16/2026 |
|
|
Rp. 60.000.000 |
6 Hari |
Belum ada SP2D terhitung dari 29 September 2026 hingga 05 Oktober 2026 (6 Hari) |
| 1218 |
Fakultas Pertanian |
Juli 2026 |
525114 |
Pemeliharaan Personal Computer/ Laptop |
2026-08-18 |
53/SPP-GU6/2026 |
2026-08-28 |
2105F |
Rp. 1.975.000 |
10 Hari |
|
| 1219 |
Fakultas Pertanian |
Agustus 2026 |
525114 |
Pemeliharaan Personal Computer/ Laptop |
2026-08-18 |
53/SPP-GU6/2026 |
2026-08-28 |
2105F |
Rp. 1.750.000 |
10 Hari |
|
| 1220 |
Fakultas Pertanian |
September 2026 |
525114 |
Pemeliharaan Personal Computer/ Laptop |
2026-09-30 |
71/SPP-GUNIHIL/2026 |
|
|
Rp. 5.035.000 |
5 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 05 Oktober 2026 (5 Hari) |
| 1221 |
Fakultas Pertanian |
Januari 2026 |
525114 |
Pemeliharaan AC |
2026-03-05 |
08/SPP-GU1/2026 |
2026-03-10 |
0405F |
Rp. 750.000 |
5 Hari |
|
| 1222 |
Fakultas Pertanian |
April 2026 |
525114 |
Pemeliharaan AC |
2026-04-22 |
25/SPP-GU3/2026 |
2026-04-29 |
0919F |
Rp. 2.075.000 |
7 Hari |
|
| 1223 |
Fakultas Pertanian |
April 2026 |
525114 |
Pemeliharaan AC |
2026-05-25 |
31/SPP-GU4/2026 |
2026-06-18 |
1316F |
Rp. 1.900.000 |
24 Hari |
|
| 1224 |
Fakultas Pertanian |
Agustus 2026 |
525114 |
Pemeliharaan AC |
2026-08-18 |
53/SPP-GU6/2026 |
2026-08-28 |
2105F |
Rp. 1.550.000 |
10 Hari |
|
| 1225 |
Fakultas Pertanian |
September 2026 |
525114 |
Pemeliharaan AC |
2026-09-30 |
71/SPP-GUNIHIL/2026 |
|
|
Rp. 3.475.000 |
5 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 05 Oktober 2026 (5 Hari) |
| 1226 |
Fakultas Pertanian |
Januari 2026 |
525114 |
Pemeliharaan Mesin Printer |
2026-03-05 |
08/SPP-GU1/2026 |
2026-03-10 |
0405F |
Rp. 2.140.000 |
5 Hari |
|
| 1227 |
Fakultas Pertanian |
Maret 2026 |
525114 |
Pemeliharaan Mesin Printer |
2026-04-10 |
17/SPP-GU2/2026 |
2026-04-15 |
0809F |
Rp. 550.000 |
5 Hari |
|
| 1228 |
Fakultas Pertanian |
Agustus 2026 |
525114 |
Pemeliharaan Mesin Printer |
2026-08-18 |
53/SPP-GU6/2026 |
2026-08-28 |
2105F |
Rp. 1.842.500 |
10 Hari |
|
| 1229 |
Fakultas Pertanian |
September 2026 |
525114 |
Pemeliharaan Mesin Printer |
2026-09-30 |
71/SPP-GUNIHIL/2026 |
|
|
Rp. 3.267.500 |
5 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 05 Oktober 2026 (5 Hari) |
| 1230 |
Fakultas Pertanian |
April 2026 |
525114 |
Pemeliharaan Gedung Perkantoran Fakultas Pertanian |
2026-04-22 |
25/SPP-GU3/2026 |
2026-04-29 |
0919F |
Rp. 22.600.000 |
7 Hari |
|
| 1231 |
Fakultas Pertanian |
April 2026 |
525114 |
Pemeliharaan Gedung Perkantoran Fakultas Pertanian |
2026-05-25 |
31/SPP-GU4/2026 |
2026-06-18 |
1316F |
Rp. 756.000 |
24 Hari |
|
| 1232 |
Fakultas Pertanian |
Juni 2026 |
525114 |
Pemeliharaan Gedung Perkantoran Fakultas Pertanian |
2026-07-14 |
41/SPP-GU5/2026 |
2026-07-29 |
1735F |
Rp. 5.077.000 |
15 Hari |
|
| 1233 |
Fakultas Pertanian |
Juli 2026 |
525114 |
Pemeliharaan Gedung Perkantoran Fakultas Pertanian |
2026-07-14 |
41/SPP-GU5/2026 |
2026-07-29 |
1735F |
Rp. 14.167.000 |
15 Hari |
|
| 1234 |
Fakultas Pertanian |
September 2026 |
525114 |
Pemeliharaan Gedung Perkantoran Fakultas Pertanian |
2026-09-30 |
71/SPP-GUNIHIL/2026 |
|
|
Rp. 1.903.000 |
5 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 05 Oktober 2026 (5 Hari) |
| 1235 |
Fakultas Pertanian |
Maret 2026 |
525114 |
Pemeliharaan Halaman Perkantoran Fakultas Pertanian |
2026-04-10 |
17/SPP-GU2/2026 |
2026-04-15 |
0809F |
Rp. 1.870.000 |
5 Hari |
|
| 1236 |
Fakultas Pertanian |
April 2026 |
525114 |
Pemeliharaan Halaman Perkantoran Fakultas Pertanian |
2026-04-22 |
25/SPP-GU3/2026 |
2026-04-29 |
0919F |
Rp. 5.019.000 |
7 Hari |
|
| 1237 |
Fakultas Pertanian |
April 2026 |
525114 |
Pemeliharaan Halaman Perkantoran Fakultas Pertanian |
2026-05-25 |
31/SPP-GU4/2026 |
2026-06-18 |
1316F |
Rp. 1.644.000 |
24 Hari |
|
| 1238 |
Fakultas Pertanian |
Mei 2026 |
525114 |
Pemeliharaan Halaman Perkantoran Fakultas Pertanian |
2026-05-25 |
31/SPP-GU4/2026 |
2026-06-18 |
1316F |
Rp. 1.800.000 |
24 Hari |
|
| 1239 |
Fakultas Pertanian |
Agustus 2026 |
525114 |
Pemeliharaan Halaman Perkantoran Fakultas Pertanian |
2026-08-18 |
53/SPP-GU6/2026 |
2026-08-28 |
2105F |
Rp. 2.389.000 |
10 Hari |
|
| 1240 |
Fakultas Pertanian |
Agustus 2026 |
525114 |
Pemeliharaan Halaman Perkantoran Fakultas Pertanian |
2026-09-30 |
71/SPP-GUNIHIL/2026 |
|
|
Rp. 1.681.500 |
5 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 05 Oktober 2026 (5 Hari) |
| 1241 |
Fakultas Pertanian |
September 2026 |
525114 |
Biaya pemeliharaan dan pengembangan Green House Fakultas Pertanian |
2026-09-28 |
64/SPP-LS16/2026 |
|
|
Rp. 234.500.000 |
7 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 05 Oktober 2026 (7 Hari) |
| 1242 |
Fakultas Pertanian |
September 2026 |
525114 |
Biaya pemeliharaan dan pengembangan Green House Fakultas Pertanian |
2026-09-30 |
71/SPP-GUNIHIL/2026 |
|
|
Rp. 500.000 |
5 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 05 Oktober 2026 (5 Hari) |
| 1243 |
Fakultas Pertanian |
Maret 2026 |
525119 |
Bantuan Biaya Pelaksanaan Sosialisasi Calon Mahasiswa Baru dan Pembuatan Liflet untuk 4 Prodi. |
2026-04-10 |
19/SPP-GU2/2026 |
2026-04-15 |
0811F |
Rp. 20.000.000 |
5 Hari |
|
| 1244 |
Fakultas Pertanian |
Mei 2026 |
525119 |
Bantuan Biaya Pelaksanaan Sosialisasi Calon Mahasiswa Baru dan Pembuatan Liflet untuk 4 Prodi. |
2026-05-25 |
33/SPP-GU4/2026 |
2026-06-18 |
1314F |
Rp. 10.000.000 |
24 Hari |
|
| 1245 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Bantuan Biaya Pelaksanaan Kegiatan Seminar, Workshop Pembelajaran di Jurusan |
2026-07-15 |
47/SPP-LS10/2026 |
2026-07-29 |
1761F |
Rp. 1.500.000 |
14 Hari |
|
| 1246 |
Fakultas Pertanian |
Juni 2026 |
525119 |
Bantuan Biaya Pelaksanaan Kegiatan Mahasiswa yang Melakukan Student On Project Expo Jurusan |
2026-07-14 |
44/SPP-GU5/2026 |
2026-07-29 |
1737F |
Rp. 2.000.000 |
15 Hari |
|
| 1247 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Bantuan Biaya Pelaksanaan Kegiatan Mahasiswa yang Melakukan Student On Project Expo Jurusan |
2026-08-31 |
56/SPP-LS12/2026 |
2026-09-11 |
2262F |
Rp. 2.000.000 |
11 Hari |
|
| 1248 |
Fakultas Pertanian |
April 2026 |
525119 |
Bantuan Biaya Pelaksanaan Lokakarya Kurikulum dilingkungan Fakultas Pertanian Universitas Negeri Gorontalo |
2026-04-22 |
26/SPP-GU3/2026 |
2026-04-29 |
0920F |
Rp. 10.000.000 |
7 Hari |
|
| 1249 |
Fakultas Pertanian |
April 2026 |
525119 |
Bantuan Biaya Pelaksanaan Lokakarya Kurikulum dilingkungan Fakultas Pertanian Universitas Negeri Gorontalo |
2026-05-25 |
33/SPP-GU4/2026 |
2026-06-18 |
1314F |
Rp. 10.000.000 |
24 Hari |
|
| 1250 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Bantuan Biaya Pelaksanaan Lokakarya Kurikulum dilingkungan Fakultas Pertanian Universitas Negeri Gorontalo |
2026-07-15 |
47/SPP-LS10/2026 |
2026-07-29 |
1761F |
Rp. 10.000.000 |
14 Hari |
|
| 1251 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Bantuan Biaya Pelaksanaan Lokakarya Kurikulum dilingkungan Fakultas Pertanian Universitas Negeri Gorontalo |
2026-08-31 |
56/SPP-LS12/2026 |
2026-09-11 |
2262F |
Rp. 10.000.000 |
11 Hari |
|
| 1252 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Bantuan Biaya Kegiatan Terkait Tracer Studi dan Penelusuran Biodata Alumni |
2026-08-31 |
56/SPP-LS12/2026 |
2026-09-11 |
2262F |
Rp. 7.000.000 |
11 Hari |
|
| 1253 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Bantuan Biaya Pelaksanaan Kegiatan Sinkronisasi SIAT dan PDDIKTI |
2026-08-31 |
56/SPP-LS12/2026 |
2026-09-11 |
2262F |
Rp. 6.000.000 |
11 Hari |
|
| 1254 |
Fakultas Pertanian |
Maret 2026 |
525119 |
Bantuan Biaya Kegiatan Musyawarah Besar Ormawa dan Rapat Kerja Ormawa. |
2026-04-10 |
19/SPP-GU2/2026 |
2026-04-15 |
0811F |
Rp. 5.000.000 |
5 Hari |
|
| 1255 |
Fakultas Pertanian |
April 2026 |
525119 |
Bantuan Biaya Kegiatan Musyawarah Besar Ormawa dan Rapat Kerja Ormawa. |
2026-05-25 |
33/SPP-GU4/2026 |
2026-06-18 |
1314F |
Rp. 500.000 |
24 Hari |
|
| 1256 |
Fakultas Ilmu Pendidikan |
Juli 2026 |
537112 |
Pengadaan Kursi Direksi |
2026-08-07 |
045/UN47.B1/SPP/GUP-06/2026 |
2026-08-18 |
1994A |
Rp. 5.193.020 |
11 Hari |
|
| 1257 |
Fakultas Pertanian |
Juli 2026 |
525119 |
Bantuan Biaya Kegiatan Musyawarah Besar Ormawa dan Rapat Kerja Ormawa. |
2026-08-18 |
55/SPP-GU6/2026 |
2026-08-28 |
2107F |
Rp. 500.000 |
10 Hari |
|
| 1258 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Bantuan Biaya Penguatan Kapasitas Mahasiswa Baru (PKKMB) Dilingkungan Fakultas Pertanian. |
2026-03-30 |
012/UN47.B1/SPP/GUP-02/2026 |
2026-04-06 |
0641A |
Rp. 12.000.000 |
7 Hari |
|
| 1259 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Bantuan Biaya Penguatan Kapasitas Mahasiswa Baru (PKKMB) Dilingkungan Fakultas Pertanian. |
2026-08-31 |
56/SPP-LS12/2026 |
2026-09-11 |
2262F |
Rp. 15.000.000 |
11 Hari |
|
| 1260 |
Fakultas Pertanian |
Maret 2026 |
525119 |
Bantuan Biaya Kegiatan Latihan Dasar Kepemimpinan Senat, HMJ Dilingkungan Fakultas Pertanian |
2026-03-30 |
012/UN47.B1/SPP/GUP-02/2026 |
2026-04-06 |
0641A |
Rp. 10.000.000 |
7 Hari |
|
| 1261 |
Fakultas Pertanian |
Juli 2026 |
525119 |
Bantuan Biaya Kegiatan Latihan Dasar Kepemimpinan Senat, HMJ Dilingkungan Fakultas Pertanian |
2026-08-18 |
55/SPP-GU6/2026 |
2026-08-28 |
2107F |
Rp. 1.000.000 |
10 Hari |
|
| 1262 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
537112 |
Pengadaan AC 2 Pk Untuk Ruang Kelas |
2026-07-21 |
043/UN47.B1/SPP/LS-13/2026 |
2026-07-29 |
1743A |
Rp. 39.600.000 |
8 Hari |
|
| 1263 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Bantuan Biaya Kegiatan Latihan Dasar Kepemimpinan Senat, HMJ Dilingkungan Fakultas Pertanian |
2026-08-31 |
56/SPP-LS12/2026 |
2026-09-11 |
2262F |
Rp. 1.000.000 |
11 Hari |
|
| 1264 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
537112 |
Pengadaan Laptop |
2026-08-07 |
045/UN47.B1/SPP/GUP-06/2026 |
2026-08-18 |
1994A |
Rp. 16.734.525 |
11 Hari |
|
| 1265 |
Fakultas Ilmu Pendidikan |
September 2026 |
537112 |
Pengadaan mesin Scanner |
2026-09-29 |
68/SPP-LS16/2026 |
|
|
Rp. 5.000.000 |
6 Hari |
Belum ada SP2D terhitung dari 29 September 2026 hingga 05 Oktober 2026 (6 Hari) |
| 1266 |
Fakultas Ilmu Pendidikan |
Juli 2026 |
537112 |
Pengadaan printer |
2026-08-07 |
045/UN47.B1/SPP/GUP-06/2026 |
2026-08-18 |
1994A |
Rp. 2.817.275 |
11 Hari |
|
| 1267 |
Fakultas Pertanian |
Maret 2026 |
525119 |
Bantuan Biaya Kegiatan Program Kreaktivitas/Kewirausahaan Mahasiswa (PKM) |
2026-04-10 |
19/SPP-GU2/2026 |
2026-04-15 |
0811F |
Rp. 7.000.000 |
5 Hari |
|
| 1268 |
Fakultas Ilmu Pendidikan |
Oktober 2026 |
537112 |
Pengadaan sarana Penunjang Pendidikan untuk Jurusan terakreditasi Unggul |
|
|
|
|
Rp. 56.756.065 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 1269 |
Fakultas Pertanian |
Maret 2026 |
525119 |
Bantuan biaya pelaksanaan kegiatan pembinaan kerohanian dilingkungan Fakultas Pertanian Universitas Negeri Gorontalo |
2026-04-10 |
19/SPP-GU2/2026 |
2026-04-15 |
0811F |
Rp. 20.000.000 |
5 Hari |
|
| 1270 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
537112 |
Pengadaan Kipas Angin Standing |
2026-08-31 |
054/UN47.B1/SPP/GUP-07/2026 |
2026-09-14 |
2289A |
Rp. 11.998.000 |
14 Hari |
|
| 1271 |
Fakultas Ilmu Pendidikan |
Oktober 2026 |
537112 |
Pengadaan Kursi Kuliah Dosen |
2026-07-14 |
44/SPP-GU5/2026 |
2026-07-29 |
1737F |
Rp. 2.000.000 |
15 Hari |
|
| 1272 |
Fakultas Ilmu Pendidikan |
Oktober 2026 |
537112 |
Pengadaan Kursi Kuliah Dosen |
|
|
|
|
Rp. 8.777.800 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 1273 |
Fakultas Ilmu Pendidikan |
September 2026 |
537112 |
Pengadaan AC 1 Pk |
2026-09-21 |
065/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 6.564.200 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1274 |
Fakultas Pertanian |
Januari 2026 |
525119 |
Bantuan Biaya Kegiatan Pembinaan Mahasiswa Mengikuti Penelusuran Minat dan Bakat |
2026-03-05 |
09/SPP-GU1/2026 |
2026-03-10 |
0406F |
Rp. 4.000.000 |
5 Hari |
|
| 1275 |
Fakultas Pertanian |
Maret 2026 |
525119 |
Bantuan Biaya Kegiatan Pekan Seni Mahasiswa Nasional |
2026-03-30 |
014/UN47.B1/SPP/GUP-02/2026 |
2026-04-06 |
0643A |
Rp. 21.500.000 |
7 Hari |
|
| 1276 |
Fakultas Pertanian |
Mei 2026 |
525119 |
Bantuan Biaya Kegiatan Pekan Seni Mahasiswa Nasional |
2026-05-25 |
33/SPP-GU4/2026 |
2026-06-18 |
1314F |
Rp. 13.000.000 |
24 Hari |
|
| 1277 |
Fakultas Pertanian |
Mei 2026 |
525119 |
Bantuan Biaya Kegiatan Pekan Seni Mahasiswa Nasional |
2026-06-02 |
026/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1267A |
Rp. 8.500.000 |
7 Hari |
|
| 1278 |
Fakultas Pertanian |
Mei 2026 |
525119 |
Bantuan Biaya Kegiatan Pelaksanaan Yudisium. |
2026-05-25 |
33/SPP-GU4/2026 |
2026-06-18 |
1314F |
Rp. 2.000.000 |
24 Hari |
|
| 1279 |
Fakultas Pertanian |
September 2026 |
525119 |
Bantuan Biaya Kegiatan Pekan Seni Mahasiswa Nasional |
2026-09-21 |
069/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 16.426.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1280 |
Fakultas Pertanian |
Juli 2026 |
525119 |
Bantuan Biaya Kegiatan Pelaksanaan Yudisium. |
2026-07-14 |
44/SPP-GU5/2026 |
2026-07-29 |
1737F |
Rp. 2.000.000 |
15 Hari |
|
| 1281 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525114 |
Pemeliharaan AC |
2026-03-30 |
014/UN47.B1/SPP/GUP-02/2026 |
2026-04-06 |
0643A |
Rp. 14.137.800 |
7 Hari |
|
| 1282 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Bantuan Biaya Kegiatan Pelaksanaan Yudisium. |
2026-08-31 |
56/SPP-LS12/2026 |
2026-09-11 |
2262F |
Rp. 1.500.000 |
11 Hari |
|
| 1283 |
Fakultas Ilmu Pendidikan |
Juni 2026 |
525114 |
Pemeliharaan AC |
2026-06-25 |
036/UN47.B1/SPP/GUP-05/2026 |
2026-07-06 |
1518A |
Rp. 16.701.500 |
11 Hari |
|
| 1284 |
Fakultas Ilmu Pendidikan |
Juli 2026 |
525114 |
Pemeliharaan AC |
2026-08-07 |
049/UN47.B1/SPP/GUP-06/2026 |
2026-08-18 |
1998A |
Rp. 5.347.250 |
11 Hari |
|
| 1285 |
Fakultas Pertanian |
Juni 2026 |
525119 |
Bantuan Biaya Penyelenggaraan Praktikum (Ganjil/Genap) |
2026-07-14 |
44/SPP-GU5/2026 |
2026-07-29 |
1737F |
Rp. 2.500.000 |
15 Hari |
|
| 1286 |
Fakultas Ilmu Pendidikan |
September 2026 |
525114 |
Pemeliharaan AC |
2026-09-21 |
069/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 3.855.550 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1287 |
Fakultas Pertanian |
Oktober 2026 |
525112 |
Biaya Konsumsi Pelaksanaan Visitasi Akreditasi Nasional |
2026-06-02 |
026/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1267A |
Rp. 100.000 |
7 Hari |
|
| 1288 |
Fakultas Pertanian |
Oktober 2026 |
525112 |
Biaya Konsumsi Pelaksanaan Visitasi Akreditasi Nasional |
|
|
|
|
Rp. 60.000.000 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 1289 |
Fakultas Pertanian |
Mei 2026 |
525119 |
Bantuan Biaya Penetapan Pelaksanaan Evaluasi Pengendalian dan Peningkatan (PPEPP) |
2026-06-02 |
026/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1267A |
Rp. 35.000.000 |
7 Hari |
|
| 1290 |
Fakultas Pertanian |
April 2026 |
525119 |
Bantuan Biaya Pelaksanaan Akreditasi Program Studi |
2026-04-22 |
26/SPP-GU3/2026 |
2026-04-29 |
0920F |
Rp. 10.000.000 |
7 Hari |
|
| 1291 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525114 |
Pembuatan lapangan Petanque |
2026-03-30 |
014/UN47.B1/SPP/GUP-02/2026 |
2026-04-06 |
0643A |
Rp. 15.000.000 |
7 Hari |
|
| 1292 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Bantuan Biaya Pelaksanaan Akreditasi Program Studi |
2026-07-15 |
47/SPP-LS10/2026 |
2026-07-29 |
1761F |
Rp. 10.000.000 |
14 Hari |
|
| 1293 |
Fakultas Pertanian |
Juli 2026 |
525119 |
Bantuan biaya Pendampingan Akreditasi |
2026-03-09 |
010/UN47.B1/SPP/GUP-01/2026 |
2026-03-13 |
0511A |
Rp. 10.485.000 |
4 Hari |
|
| 1294 |
Fakultas Pertanian |
Juli 2026 |
525119 |
Bantuan biaya Pendampingan Akreditasi |
2026-07-14 |
44/SPP-GU5/2026 |
2026-07-29 |
1737F |
Rp. 24.915.500 |
15 Hari |
|
| 1295 |
Fakultas Pertanian |
April 2026 |
525119 |
Bantuan biaya Pendampingan Akreditasi |
2026-04-29 |
019/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0989A |
Rp. 13.900.000 |
6 Hari |
|
| 1296 |
Fakultas Pertanian |
Januari 2026 |
525112 |
Belanja Barang Kebutuhan Dasar Perkantoran |
2026-03-05 |
10/SPP-GU1/2026 |
2026-03-10 |
0407F |
Rp. 16.276.430 |
5 Hari |
|
| 1297 |
Fakultas Pertanian |
Juni 2026 |
525119 |
Bantuan biaya Pendampingan Akreditasi |
2026-06-25 |
036/UN47.B1/SPP/GUP-05/2026 |
2026-07-06 |
1518A |
Rp. 9.174.500 |
11 Hari |
|
| 1298 |
Fakultas Pertanian |
Maret 2026 |
525112 |
Belanja Barang Kebutuhan Dasar Perkantoran |
2026-04-10 |
14/SPP-GU2/2026 |
2026-04-15 |
0806F |
Rp. 3.000.014 |
5 Hari |
|
| 1299 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Bantuan biaya Pendampingan Akreditasi |
2026-08-31 |
058/UN47.B1/SPP/GUP-07/2026 |
2026-09-14 |
2293A |
Rp. 10.500.000 |
14 Hari |
|
| 1300 |
Fakultas Pertanian |
April 2026 |
525112 |
Belanja Barang Kebutuhan Dasar Perkantoran |
2026-04-22 |
22/SPP-GU3/2026 |
2026-04-29 |
0917F |
Rp. 11.525.700 |
7 Hari |
|
| 1301 |
Fakultas Pertanian |
April 2026 |
525112 |
Belanja Barang Kebutuhan Dasar Perkantoran |
2026-05-25 |
28/SPP-GU4/2026 |
2026-06-18 |
1319F |
Rp. 4.374.100 |
24 Hari |
|
| 1302 |
Fakultas Pertanian |
September 2026 |
525119 |
Bantuan biaya Pendampingan Akreditasi |
2026-09-21 |
069/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 19.570.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1303 |
Fakultas Pertanian |
Mei 2026 |
525112 |
Belanja Barang Kebutuhan Dasar Perkantoran |
2026-05-25 |
28/SPP-GU4/2026 |
2026-06-18 |
1319F |
Rp. 3.784.400 |
24 Hari |
|
| 1304 |
Fakultas Ilmu Pendidikan |
Juni 2026 |
525114 |
Renovasi Aula Fakultas |
2026-04-29 |
019/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0989A |
Rp. 24.990.000 |
6 Hari |
|
| 1305 |
Fakultas Pertanian |
Juni 2026 |
525112 |
Belanja Barang Kebutuhan Dasar Perkantoran |
2026-07-14 |
39/SPP-GU5/2026 |
2026-07-29 |
1734F |
Rp. 1.783.300 |
15 Hari |
|
| 1306 |
Fakultas Pertanian |
September 2026 |
525112 |
Belanja Barang Kebutuhan Dasar Perkantoran |
2026-07-14 |
39/SPP-GU5/2026 |
2026-07-29 |
1734F |
Rp. 2.310.500 |
15 Hari |
|
| 1307 |
Fakultas Ilmu Pendidikan |
September 2026 |
525114 |
Pemeliharaan 7 Lab Prodi |
2026-09-21 |
069/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 918.700 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1308 |
Fakultas Pertanian |
Oktober 2026 |
525112 |
Belanja Barang Kebutuhan Dasar Perkantoran |
2026-08-18 |
49/SPP-GU6/2026 |
2026-08-28 |
2101F |
Rp. 6.463.200 |
10 Hari |
|
| 1309 |
Fakultas Pertanian |
Oktober 2026 |
525112 |
Belanja Barang Kebutuhan Dasar Perkantoran |
2026-10-01 |
70/SPP-GUNIHIL/2026 |
|
|
Rp. 6.027.363 |
4 Hari |
Belum ada SP2D terhitung dari 01 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 1310 |
Fakultas Pertanian |
September 2026 |
525112 |
Belanja Barang Kebutuhan Dasar Perkantoran |
2026-10-01 |
70/SPP-GUNIHIL/2026 |
|
|
Rp. 34.937.090 |
4 Hari |
Belum ada SP2D terhitung dari 01 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 1311 |
Fakultas Ilmu Pendidikan |
September 2026 |
525119 |
Bantuan Biaya Workshop Kurikulum dan Penyusunan RPS |
2026-09-21 |
073/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 8.000.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1312 |
Fakultas Pertanian |
Januari 2026 |
525112 |
Biaya Konsumsi Rapat Pimpinan |
2026-03-05 |
10/SPP-GU1/2026 |
2026-03-10 |
0407F |
Rp. 5.464.286 |
5 Hari |
|
| 1313 |
Fakultas Ilmu Pendidikan |
Januari 2026 |
525119 |
Bantuan Biaya Workshop Kurikulum dan Penyusunan RPS |
|
|
|
|
Rp. 4.255.050 |
277 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Januari 2026 hingga 05 Oktober 2026 (277 Hari) |
| 1314 |
Fakultas Pertanian |
Maret 2026 |
525112 |
Biaya Konsumsi Rapat Pimpinan |
2026-04-10 |
14/SPP-GU2/2026 |
2026-04-15 |
0806F |
Rp. 5.464.286 |
5 Hari |
|
| 1315 |
Fakultas Pertanian |
Juli 2026 |
525112 |
Biaya Konsumsi Rapat Pimpinan |
2026-04-22 |
22/SPP-GU3/2026 |
2026-04-29 |
0917F |
Rp. 5.205.000 |
7 Hari |
|
| 1316 |
Fakultas Pertanian |
Juli 2026 |
525112 |
Biaya Konsumsi Rapat Pimpinan |
2026-05-25 |
28/SPP-GU4/2026 |
2026-06-18 |
1319F |
Rp. 1.250.000 |
24 Hari |
|
| 1317 |
Fakultas Pertanian |
Mei 2026 |
525112 |
Biaya Konsumsi Rapat Pimpinan |
2026-05-25 |
28/SPP-GU4/2026 |
2026-06-18 |
1319F |
Rp. 6.225.000 |
24 Hari |
|
| 1318 |
Fakultas Ilmu Pendidikan |
Mei 2026 |
525119 |
Bantuan Biaya Kegiatan Kuliah Umum |
2026-06-02 |
030/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1271A |
Rp. 1.825.000 |
7 Hari |
|
| 1319 |
Fakultas Pertanian |
Juli 2026 |
525112 |
Biaya Konsumsi Rapat Pimpinan |
2026-07-14 |
39/SPP-GU5/2026 |
2026-07-29 |
1734F |
Rp. 906.700 |
15 Hari |
|
| 1320 |
Fakultas Pertanian |
Juli 2026 |
525112 |
Biaya Konsumsi Rapat Pimpinan |
2026-08-18 |
49/SPP-GU6/2026 |
2026-08-28 |
2101F |
Rp. 484.000 |
10 Hari |
|
| 1321 |
Fakultas Ilmu Pendidikan |
Juni 2026 |
525119 |
Bantuan Biaya Kegiatan Kuliah Umum |
2026-06-25 |
038/UN47.B1/SPP/GUP-05/2026 |
2026-07-06 |
1520A |
Rp. 2.663.900 |
11 Hari |
|
| 1322 |
Fakultas Pertanian |
Agustus 2026 |
525112 |
Biaya Konsumsi Rapat Pimpinan |
2026-10-01 |
70/SPP-GUNIHIL/2026 |
|
|
Rp. 1.428.800 |
4 Hari |
Belum ada SP2D terhitung dari 01 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 1323 |
Fakultas Pertanian |
April 2026 |
525112 |
Biaya Konsumsi Rapat Pimpinan |
2026-10-01 |
70/SPP-GUNIHIL/2026 |
|
|
Rp. 4.200.000 |
4 Hari |
Belum ada SP2D terhitung dari 01 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 1324 |
Fakultas Ilmu Pendidikan |
April 2026 |
525119 |
Workshop Penulisan Skripsi, Luaran Skripsi dengan dukungan AI |
2026-04-29 |
022/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0992A |
Rp. 1.500.000 |
6 Hari |
|
| 1325 |
Fakultas Ilmu Pendidikan |
Mei 2026 |
525119 |
Workshop Penulisan Skripsi, Luaran Skripsi dengan dukungan AI |
2026-06-02 |
030/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1271A |
Rp. 1.000.000 |
7 Hari |
|
| 1326 |
Fakultas Pertanian |
Januari 2026 |
525112 |
Biaya Konsumsi Tamu Pimpinan |
2026-03-05 |
10/SPP-GU1/2026 |
2026-03-10 |
0407F |
Rp. 2.034.743 |
5 Hari |
|
| 1327 |
Fakultas Ilmu Pendidikan |
Juni 2026 |
525119 |
Workshop Penulisan Skripsi, Luaran Skripsi dengan dukungan AI |
2026-06-25 |
038/UN47.B1/SPP/GUP-05/2026 |
2026-07-06 |
1520A |
Rp. 4.500.000 |
11 Hari |
|
| 1328 |
Fakultas Pertanian |
Maret 2026 |
525112 |
Biaya Konsumsi Tamu Pimpinan |
2026-04-10 |
14/SPP-GU2/2026 |
2026-04-15 |
0806F |
Rp. 655.700 |
5 Hari |
|
| 1329 |
Fakultas Pertanian |
Mei 2026 |
525112 |
Biaya Konsumsi Tamu Pimpinan |
2026-05-25 |
28/SPP-GU4/2026 |
2026-06-18 |
1319F |
Rp. 2.046.500 |
24 Hari |
|
| 1330 |
Fakultas Pertanian |
Juli 2026 |
525112 |
Biaya Konsumsi Tamu Pimpinan |
2026-07-14 |
39/SPP-GU5/2026 |
2026-07-29 |
1734F |
Rp. 2.850.000 |
15 Hari |
|
| 1331 |
Fakultas Pertanian |
Juli 2026 |
525112 |
Biaya Konsumsi Tamu Pimpinan |
2026-08-18 |
49/SPP-GU6/2026 |
2026-08-28 |
2101F |
Rp. 218.500 |
10 Hari |
|
| 1332 |
Fakultas Ilmu Pendidikan |
Januari 2026 |
525119 |
Pendampingan/Pembinaan dan pengembangan prestasi mahasiswa serta bantuan biaya kegiatan organisasi kemahasiswaan |
2026-03-09 |
011/UN47.B1/SPP/GUP-01/2026 |
2026-03-13 |
0512A |
Rp. 2.045.250 |
4 Hari |
|
| 1333 |
Fakultas Pertanian |
April 2026 |
525112 |
Biaya Konsumsi Tamu Pimpinan |
2026-08-18 |
49/SPP-GU6/2026 |
2026-08-28 |
2101F |
Rp. 1.619.750 |
10 Hari |
|
| 1334 |
Fakultas Pertanian |
April 2026 |
525112 |
Biaya Konsumsi Tamu Pimpinan |
2026-10-01 |
70/SPP-GUNIHIL/2026 |
|
|
Rp. 1.120.247 |
4 Hari |
Belum ada SP2D terhitung dari 01 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 1335 |
Fakultas Ilmu Pendidikan |
April 2026 |
525119 |
Pendampingan/Pembinaan dan pengembangan prestasi mahasiswa serta bantuan biaya kegiatan organisasi kemahasiswaan |
2026-04-29 |
022/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0992A |
Rp. 4.100.000 |
6 Hari |
|
| 1336 |
Fakultas Pertanian |
Mei 2026 |
525112 |
Biaya Konsumsi Tamu Pimpinan |
2026-10-01 |
70/SPP-GUNIHIL/2026 |
|
|
Rp. 4.424.500 |
4 Hari |
Belum ada SP2D terhitung dari 01 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 1337 |
Fakultas Ilmu Pendidikan |
Mei 2026 |
525119 |
Pendampingan/Pembinaan dan pengembangan prestasi mahasiswa serta bantuan biaya kegiatan organisasi kemahasiswaan |
2026-06-02 |
030/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1271A |
Rp. 300.000 |
7 Hari |
|
| 1338 |
Fakultas Ilmu Pendidikan |
Juni 2026 |
525119 |
Pendampingan/Pembinaan dan pengembangan prestasi mahasiswa serta bantuan biaya kegiatan organisasi kemahasiswaan |
2026-06-25 |
038/UN47.B1/SPP/GUP-05/2026 |
2026-07-06 |
1520A |
Rp. 200.000 |
11 Hari |
|
| 1339 |
Fakultas Pertanian |
Januari 2026 |
525119 |
Bantuan Biaya Pelaksanaan Kegiatan Rapat Kerja dan Penyamaan Persepsi Fakultas Pertanian Universitas Negeri Gorontalo |
2026-03-05 |
07/SPP-GU1/2026 |
2026-03-10 |
0404F |
Rp. 15.000.000 |
5 Hari |
|
| 1340 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525119 |
Pendampingan/Pembinaan dan pengembangan prestasi mahasiswa serta bantuan biaya kegiatan organisasi kemahasiswaan |
2026-08-31 |
062/UN47.B1/SPP/GUP-07/2026 |
2026-09-14 |
2297A |
Rp. 250.000 |
14 Hari |
|
| 1341 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525119 |
Pendampingan/Pembinaan dan pengembangan prestasi mahasiswa serta bantuan biaya kegiatan organisasi kemahasiswaan |
2026-09-21 |
073/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 2.050.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1342 |
Fakultas Pertanian |
Agustus 2026 |
525115 |
Biaya Transport (PP) |
2026-08-18 |
51/SPP-GU6/2026 |
2026-08-28 |
2103F |
Rp. 3.660.000 |
10 Hari |
|
| 1343 |
Fakultas Pertanian |
September 2026 |
525115 |
Biaya Transport (PP) |
2026-09-28 |
69/SPP-LS16/2026 |
|
|
Rp. 8.020.000 |
7 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 05 Oktober 2026 (7 Hari) |
| 1344 |
Fakultas Ilmu Pendidikan |
Oktober 2026 |
525119 |
Bantuan Biaya Pelatihan Kepemimpinan Mahasiswa |
|
|
|
|
Rp. 800.000 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 1345 |
Fakultas Pertanian |
Mei 2026 |
525115 |
Biaya Uang Harian |
2026-05-25 |
29/SPP-GU4/2026 |
2026-06-18 |
1318F |
Rp. 2.000.000 |
24 Hari |
|
| 1346 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525119 |
Bantuan Biaya pelaksanaan PKKMB Fakultas |
2026-08-31 |
062/UN47.B1/SPP/GUP-07/2026 |
2026-09-14 |
2297A |
Rp. 9.925.000 |
14 Hari |
|
| 1347 |
Fakultas Pertanian |
Januari 2026 |
525119 |
Operasional Kenderaan Pimpinan |
2026-03-05 |
07/SPP-GU1/2026 |
2026-03-10 |
0404F |
Rp. 1.200.000 |
5 Hari |
|
| 1348 |
Fakultas Ilmu Pendidikan |
September 2026 |
525119 |
Bantuan Biaya pelaksanaan PKKMB Fakultas |
2026-09-21 |
073/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 1.375.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1349 |
Fakultas Pertanian |
Maret 2026 |
525119 |
Operasional Kenderaan Pimpinan |
2026-04-10 |
16/SPP-GU2/2026 |
2026-04-15 |
0808F |
Rp. 600.000 |
5 Hari |
|
| 1350 |
Fakultas Pertanian |
April 2026 |
525119 |
Operasional Kenderaan Pimpinan |
2026-04-22 |
24/SPP-GU3/2026 |
2026-04-29 |
0921F |
Rp. 450.000 |
7 Hari |
|
| 1351 |
Fakultas Ilmu Pendidikan |
Oktober 2026 |
525119 |
Bantuan Biaya pelaksanaan PKKMB Fakultas |
|
|
|
|
Rp. 875.000 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 1352 |
Fakultas Pertanian |
Mei 2026 |
525119 |
Operasional Kenderaan Pimpinan |
2026-05-25 |
30/SPP-GU4/2026 |
2026-06-18 |
1317F |
Rp. 600.000 |
24 Hari |
|
| 1353 |
Fakultas Pertanian |
Juni 2026 |
525119 |
Operasional Kenderaan Pimpinan |
2026-07-14 |
40/SPP-GU5/2026 |
2026-07-29 |
1739F |
Rp. 750.000 |
15 Hari |
|
| 1354 |
Fakultas Ilmu Pendidikan |
Juni 2026 |
525119 |
Bantuan Pelatihan Penalaran Penulisan karya Ilmiah dan Talenta Prestasi |
2026-04-29 |
022/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0992A |
Rp. 1.500.000 |
6 Hari |
|
| 1355 |
Fakultas Pertanian |
Mei 2026 |
525119 |
Operasional Kenderaan Pimpinan |
2026-08-18 |
52/SPP-GU6/2026 |
2026-08-28 |
2104F |
Rp. 1.200.000 |
10 Hari |
|
| 1356 |
Fakultas Ilmu Pendidikan |
Mei 2026 |
525119 |
Bantuan Pelatihan Penalaran Penulisan karya Ilmiah dan Talenta Prestasi |
2026-06-02 |
030/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1271A |
Rp. 9.300.000 |
7 Hari |
|
| 1357 |
Fakultas Pertanian |
September 2026 |
525111 |
Remunerasi Dosen Fungsional |
2026-01-14 |
02/SPP-LS1/2026 |
2026-01-15 |
0033F |
Rp. 1.002.840.000 |
1 Hari |
|
| 1358 |
Fakultas Ilmu Pendidikan |
September 2026 |
525119 |
Bantuan Pelatihan Penalaran Penulisan karya Ilmiah dan Talenta Prestasi |
2026-09-21 |
073/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 1.000.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1359 |
Fakultas Pertanian |
Maret 2026 |
525111 |
Remunerasi Dosen Fungsional |
2026-03-09 |
12/SPP-LS3/2026 |
2026-03-13 |
0534F |
Rp. 425.580.000 |
4 Hari |
|
| 1360 |
Fakultas Pertanian |
Juli 2026 |
525111 |
Remunerasi Dosen Fungsional |
2026-07-06 |
37/SPP-LS9/2026 |
2026-07-13 |
1604F |
Rp. 991.284.000 |
7 Hari |
|
| 1361 |
Fakultas Ilmu Pendidikan |
Mei 2026 |
525119 |
Bantuan Biaya kegiatan MUBES Senat Mahasiswa Fakultas/Jurusan/Prodi |
2026-06-02 |
030/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1271A |
Rp. 500.000 |
7 Hari |
|
| 1362 |
Fakultas Pertanian |
September 2026 |
525111 |
Remunerasi Dosen Fungsional |
2026-09-18 |
62/SPP-LS14/2026 |
|
|
Rp. 443.004.000 |
17 Hari |
Belum ada SP2D terhitung dari 18 September 2026 hingga 05 Oktober 2026 (17 Hari) |
| 1363 |
Fakultas Ilmu Pendidikan |
Januari 2026 |
525119 |
Bantuan biaya bagi mahasiswa ikut kegiatan pertukaran pelajar/kredit transfer luar negeri. (Erasmus) |
2026-03-09 |
011/UN47.B1/SPP/GUP-01/2026 |
2026-03-13 |
0512A |
Rp. 10.000.000 |
4 Hari |
|
| 1364 |
Fakultas Pertanian |
Februari 2026 |
525111 |
Remunerasi Dosen Insentif Kelola |
2026-01-28 |
04/SPP-LS2/2026 |
2026-01-30 |
0127F |
Rp. 36.500.000 |
2 Hari |
|
| 1365 |
Fakultas Pertanian |
April 2026 |
525111 |
Remunerasi Dosen Insentif Kelola |
2026-03-09 |
11/SPP-LS3/2026 |
2026-03-16 |
0571F |
Rp. 73.000.000 |
7 Hari |
|
| 1366 |
Fakultas Ilmu Pendidikan |
April 2026 |
525119 |
Bantuan Biaya pendampingan/pembinaan dan persiapan bagi mahasiswa ikut kegiatan Lomba Penalaran/Kompetisi Minat Bakat/Teknologi/Sosial Budaya dari Tingkat Prodi/Fakultas/Universitas/Regional/Internasional/KPMI/Kompetisi Pedagog Muda Indonesia |
2026-04-29 |
022/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0992A |
Rp. 500.000 |
6 Hari |
|
| 1367 |
Fakultas Pertanian |
April 2026 |
525111 |
Remunerasi Dosen Insentif Kelola |
2026-04-14 |
21/SPP-LS5/2026 |
2026-04-16 |
0817F |
Rp. 36.500.000 |
2 Hari |
|
| 1368 |
Fakultas Ilmu Pendidikan |
Mei 2026 |
525119 |
Bantuan Biaya pendampingan/pembinaan dan persiapan bagi mahasiswa ikut kegiatan Lomba Penalaran/Kompetisi Minat Bakat/Teknologi/Sosial Budaya dari Tingkat Prodi/Fakultas/Universitas/Regional/Internasional/KPMI/Kompetisi Pedagog Muda Indonesia |
2026-06-02 |
030/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1271A |
Rp. 7.994.000 |
7 Hari |
|
| 1369 |
Fakultas Pertanian |
Juni 2026 |
525111 |
Remunerasi Dosen Insentif Kelola |
2026-05-25 |
35/SPP-LS7/2026 |
2026-06-04 |
1236F |
Rp. 36.500.000 |
10 Hari |
|
| 1370 |
Fakultas Ilmu Pendidikan |
Juni 2026 |
525119 |
Bantuan Biaya pendampingan/pembinaan dan persiapan bagi mahasiswa ikut kegiatan Lomba Penalaran/Kompetisi Minat Bakat/Teknologi/Sosial Budaya dari Tingkat Prodi/Fakultas/Universitas/Regional/Internasional/KPMI/Kompetisi Pedagog Muda Indonesia |
2026-06-25 |
038/UN47.B1/SPP/GUP-05/2026 |
2026-07-06 |
1520A |
Rp. 1.000.000 |
11 Hari |
|
| 1371 |
Fakultas Pertanian |
Agustus 2026 |
525111 |
Remunerasi Dosen Insentif Kelola |
2026-06-23 |
36/SPP-LS8/2026 |
2026-08-06 |
1845F |
Rp. 36.500.000 |
44 Hari |
|
| 1372 |
Fakultas Pertanian |
Agustus 2026 |
525111 |
Remunerasi Dosen Insentif Kelola |
2026-08-03 |
48/SPP-LS11/2026 |
2026-08-13 |
1955F |
Rp. 36.500.000 |
10 Hari |
|
| 1373 |
Fakultas Pertanian |
September 2026 |
525111 |
Remunerasi Dosen Insentif Kelola |
2026-09-25 |
63/SPP-LS15/2026 |
|
|
Rp. 73.000.000 |
10 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 05 Oktober 2026 (10 Hari) |
| 1374 |
Fakultas Ilmu Pendidikan |
Oktober 2026 |
525115 |
Bantuan Biaya Perjalanan bagi Dosen Ikut Kegiatan (Presenter) pada Seminar/workshop/Forum asosiasi/Faklutas/Jurusan |
2026-06-02 |
029/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1270A |
Rp. 5.000.000 |
7 Hari |
|
| 1375 |
Fakultas Pertanian |
Oktober 2026 |
525111 |
Remunerasi Dosen Insentif Kelola |
2026-10-05 |
73/SPP-LS17/2026 |
|
|
Rp. 36.500.000 |
0 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 05 Oktober 2026 (0 Hari) |
| 1376 |
Fakultas Ilmu Pendidikan |
Oktober 2026 |
525115 |
Bantuan Biaya Perjalanan bagi Dosen Ikut Kegiatan (Presenter) pada Seminar/workshop/Forum asosiasi/Faklutas/Jurusan |
|
|
|
|
Rp. 10.000.000 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 1377 |
Fakultas Pertanian |
Januari 2026 |
525111 |
Remunerasi Tugas Tambahan |
2026-01-14 |
03/SPP-LS1/2026 |
2026-01-21 |
0068F |
Rp. 105.000.000 |
7 Hari |
|
| 1378 |
Fakultas Ilmu Pendidikan |
Maret 2026 |
525119 |
Bantuan Biaya Keanggotaan Asosiasi Internasional |
2026-06-02 |
030/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1271A |
Rp. 6.000.000 |
7 Hari |
|
| 1379 |
Fakultas Pertanian |
Maret 2026 |
525111 |
Remunerasi Tugas Tambahan |
2026-03-09 |
13/SPP-LS3/2026 |
2026-03-16 |
0555F |
Rp. 45.000.000 |
7 Hari |
|
| 1380 |
Fakultas Pertanian |
Juli 2026 |
525111 |
Remunerasi Tugas Tambahan |
2026-07-06 |
38/SPP-LS9/2026 |
2026-07-30 |
1795F |
Rp. 105.000.000 |
24 Hari |
|
| 1381 |
Fakultas Ilmu Pendidikan |
April 2026 |
525119 |
Bantuan Registrasi Dosen Ikut Kegiatan Seminar/workshop/Forum asosiasi Jurusan |
2026-04-29 |
022/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0992A |
Rp. 4.088.675 |
6 Hari |
|
| 1382 |
Fakultas Pertanian |
September 2026 |
525111 |
Remunerasi Tugas Tambahan |
2026-09-18 |
61/SPP-LS14/2026 |
|
|
Rp. 45.000.000 |
17 Hari |
Belum ada SP2D terhitung dari 18 September 2026 hingga 05 Oktober 2026 (17 Hari) |
| 1383 |
Fakultas Ilmu Pendidikan |
Mei 2026 |
525119 |
Bantuan Registrasi Dosen Ikut Kegiatan Seminar/workshop/Forum asosiasi Jurusan |
2026-06-02 |
030/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1271A |
Rp. 1.000.000 |
7 Hari |
|
| 1384 |
Fakultas Pertanian |
Maret 2026 |
525111 |
Insentif Pejabat Pembuat Komitmen Unit Kerja (PPK/UK) |
2026-04-10 |
18/SPP-GU2/2026 |
2026-04-15 |
0810F |
Rp. 3.450.000 |
5 Hari |
|
| 1385 |
Fakultas Ilmu Pendidikan |
September 2026 |
525119 |
Bantuan Program Smart Entepreneusship (Penguatan Income Generating Unit) / Pusat Kajian |
2026-09-21 |
073/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 1.250.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1386 |
Fakultas Pertanian |
Mei 2026 |
525111 |
Insentif Pejabat Pembuat Komitmen Unit Kerja (PPK/UK) |
2026-05-25 |
32/SPP-GU4/2026 |
2026-06-18 |
1315F |
Rp. 1.150.000 |
24 Hari |
|
| 1387 |
Fakultas Pertanian |
Juni 2026 |
525111 |
Insentif Pejabat Pembuat Komitmen Unit Kerja (PPK/UK) |
2026-07-14 |
43/SPP-GU5/2026 |
2026-07-29 |
1736F |
Rp. 2.300.000 |
15 Hari |
|
| 1388 |
Fakultas Ilmu Pendidikan |
Juni 2026 |
525119 |
Bantuan Akreditasi MP |
2026-06-25 |
038/UN47.B1/SPP/GUP-05/2026 |
2026-07-06 |
1520A |
Rp. 10.000.000 |
11 Hari |
|
| 1389 |
Fakultas Pertanian |
Maret 2026 |
525111 |
Insentif Penguji Tagihan/ Verifikator UK |
2026-04-10 |
18/SPP-GU2/2026 |
2026-04-15 |
0810F |
Rp. 1.410.000 |
5 Hari |
|
| 1390 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525119 |
Bantuan Akreditasi MP |
2026-08-31 |
062/UN47.B1/SPP/GUP-07/2026 |
2026-09-14 |
2297A |
Rp. 5.000.000 |
14 Hari |
|
| 1391 |
Fakultas Pertanian |
Mei 2026 |
525111 |
Insentif Penguji Tagihan/ Verifikator UK |
2026-05-25 |
32/SPP-GU4/2026 |
2026-06-18 |
1315F |
Rp. 470.000 |
24 Hari |
|
| 1392 |
Fakultas Pertanian |
Juli 2026 |
525111 |
Insentif Penguji Tagihan/ Verifikator UK |
2026-07-14 |
43/SPP-GU5/2026 |
2026-07-29 |
1736F |
Rp. 940.000 |
15 Hari |
|
| 1393 |
Fakultas Ilmu Pendidikan |
April 2026 |
525119 |
Bantuan Akreditasi Psikologi |
2026-04-29 |
022/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0992A |
Rp. 10.000.000 |
6 Hari |
|
| 1394 |
Fakultas Ilmu Pendidikan |
Januari 2026 |
525119 |
Bantuan Kegiatan Akreditasi tingkat Fakultas |
2026-08-18 |
54/SPP-GU6/2026 |
2026-08-28 |
2106F |
Rp. 1.150.000 |
10 Hari |
|
| 1395 |
Fakultas Ilmu Pendidikan |
Januari 2026 |
525119 |
Bantuan Kegiatan Akreditasi tingkat Fakultas |
2026-03-09 |
011/UN47.B1/SPP/GUP-01/2026 |
2026-03-13 |
0512A |
Rp. 1.804.500 |
4 Hari |
|
| 1396 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525119 |
Bantuan Kegiatan Akreditasi tingkat Fakultas |
2026-03-09 |
011/UN47.B1/SPP/GUP-01/2026 |
2026-03-13 |
0512A |
Rp. 13.179.375 |
4 Hari |
|
| 1397 |
Fakultas Pertanian |
Agustus 2026 |
525176 |
Insentif Penguji Tagihan/ Verifikator UK |
2026-08-18 |
54/SPP-GU6/2026 |
2026-08-28 |
2106F |
Rp. 470.000 |
10 Hari |
|
| 1398 |
Fakultas Pertanian |
September 2026 |
525119 |
Bantuan Biaya Penyusunan Laporan Tahunan LAKIN Fakultas Pertanian Universitas Negeri Gorontalo, |
2026-09-21 |
073/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 3.500.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1399 |
Fakultas Pertanian |
Oktober 2026 |
525119 |
Bantuan Biaya Penyusunan Laporan Tahunan LAKIN Fakultas Pertanian Universitas Negeri Gorontalo, |
|
|
|
|
Rp. 4.237.000 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 1400 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Penelitian Dosen Asisten Ahli/P3K |
2026-07-15 |
45/SPP-LS10/2026 |
2026-07-29 |
1750F |
Rp. 8.000.000 |
14 Hari |
|
| 1401 |
Fakultas Ilmu Pendidikan |
September 2026 |
525119 |
Biaya pendampingan Akreditasi Internasional Prodi yang memilki Nilai Tertinggi di Fakultas |
2026-09-21 |
073/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 5.000.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1402 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Penelitian Dosen Lektor |
2026-07-15 |
45/SPP-LS10/2026 |
2026-07-29 |
1750F |
Rp. 10.000.000 |
14 Hari |
|
| 1403 |
Fakultas Pertanian |
Januari 2026 |
525119 |
Penelitian Dosen Lektor Kepala |
2026-03-09 |
008/UN47.B1/SPP/GUP-01/2026 |
2026-03-13 |
0509A |
Rp. 18.690.300 |
4 Hari |
|
| 1404 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Penelitian Dosen Lektor Kepala |
2026-07-15 |
45/SPP-LS10/2026 |
2026-07-29 |
1750F |
Rp. 10.000.000 |
14 Hari |
|
| 1405 |
Fakultas Pertanian |
Maret 2026 |
525119 |
Penelitian Dosen Lektor Kepala |
2026-03-30 |
013/UN47.B1/SPP/GUP-02/2026 |
2026-04-06 |
0642A |
Rp. 3.862.200 |
7 Hari |
|
| 1406 |
Fakultas Pertanian |
September 2026 |
525119 |
Insentif Jurnal Sinta 3/4 |
2026-09-14 |
60/SPP-LS13/2026 |
|
|
Rp. 800.000 |
21 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 05 Oktober 2026 (21 Hari) |
| 1407 |
Fakultas Pertanian |
April 2026 |
525119 |
Penelitian Dosen Lektor Kepala |
2026-04-29 |
016/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0986A |
Rp. 6.336.500 |
6 Hari |
|
| 1408 |
Fakultas Pertanian |
Mei 2026 |
525119 |
Penelitian Dosen Lektor Kepala |
2026-06-02 |
024/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1265A |
Rp. 23.558.000 |
7 Hari |
|
| 1409 |
Fakultas Pertanian |
September 2026 |
525119 |
Insentif Jurnal Sinta 1/ Sinta 2 |
2026-09-14 |
60/SPP-LS13/2026 |
|
|
Rp. 3.000.000 |
21 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 05 Oktober 2026 (21 Hari) |
| 1410 |
Fakultas Pertanian |
Juni 2026 |
525119 |
Penelitian Dosen Lektor Kepala |
2026-06-25 |
033/UN47.B1/SPP/GUP-05/2026 |
2026-07-06 |
1515A |
Rp. 32.741.425 |
11 Hari |
|
| 1411 |
Fakultas Pertanian |
Juli 2026 |
525119 |
Penelitian Dosen Lektor Kepala |
2026-08-07 |
046/UN47.B1/SPP/GUP-06/2026 |
2026-08-18 |
1995A |
Rp. 37.477.700 |
11 Hari |
|
| 1412 |
Fakultas Pertanian |
September 2026 |
525119 |
Insentif Jurnal Scopus Q1 dan Q2 |
2026-09-14 |
60/SPP-LS13/2026 |
|
|
Rp. 5.000.000 |
21 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 05 Oktober 2026 (21 Hari) |
| 1413 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Penelitian Dosen Lektor Kepala |
2026-08-07 |
046/UN47.B1/SPP/GUP-06/2026 |
2026-08-18 |
1995A |
Rp. 9.747.750 |
11 Hari |
|
| 1414 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Penelitian Dosen Lektor Kepala |
2026-08-31 |
055/UN47.B1/SPP/GUP-07/2026 |
2026-09-14 |
2290A |
Rp. 24.028.000 |
14 Hari |
|
| 1415 |
Fakultas Pertanian |
September 2026 |
525119 |
Insentif Jurnal Scopus Q3 |
2026-09-14 |
60/SPP-LS13/2026 |
|
|
Rp. 21.000.000 |
21 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 05 Oktober 2026 (21 Hari) |
| 1416 |
Fakultas Pertanian |
September 2026 |
525119 |
Penelitian Dosen Lektor Kepala |
2026-09-21 |
066/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 7.767.500 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1417 |
Fakultas Pertanian |
Oktober 2026 |
525119 |
Penelitian Dosen Lektor Kepala |
|
|
|
|
Rp. 14.910.950 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 1418 |
Fakultas Pertanian |
Oktober 2026 |
525119 |
Bantuan Biaya Pelaksanaan Pengabdian Kolaboratif |
2026-07-14 |
42/SPP-GU5/2026 |
2026-07-29 |
1738F |
Rp. 5.000.000 |
15 Hari |
|
| 1419 |
Fakultas Pertanian |
Januari 2026 |
525119 |
Bantuan Biaya Pelaksanaan Pengabdian Kolaboratif |
2026-07-15 |
46/SPP-LS10/2026 |
2026-07-29 |
1760F |
Rp. 7.500.000 |
14 Hari |
|
| 1420 |
Fakultas Ilmu Pendidikan |
Januari 2026 |
525112 |
Konsumsi Berat/Ringan rapat kerja/Senat/Pimpinan/Raker dan Pelayanan Tamu Pimpinan |
2026-03-09 |
008/UN47.B1/SPP/GUP-01/2026 |
2026-03-13 |
0509A |
Rp. 14.692.500 |
4 Hari |
|
| 1421 |
Fakultas Ilmu Pendidikan |
Maret 2026 |
525112 |
Konsumsi Berat/Ringan rapat kerja/Senat/Pimpinan/Raker dan Pelayanan Tamu Pimpinan |
2026-03-09 |
008/UN47.B1/SPP/GUP-01/2026 |
2026-03-13 |
0509A |
Rp. 1.800.000 |
4 Hari |
|
| 1422 |
Fakultas Pertanian |
Januari 2026 |
537112 |
Belanja Laptop |
2026-03-05 |
05/SPP-GU1/2026 |
2026-03-10 |
0402F |
Rp. 10.339.340 |
5 Hari |
|
| 1423 |
Fakultas Ilmu Pendidikan |
April 2026 |
525112 |
Konsumsi Berat/Ringan rapat kerja/Senat/Pimpinan/Raker dan Pelayanan Tamu Pimpinan |
2026-04-29 |
016/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0986A |
Rp. 14.076.000 |
6 Hari |
|
| 1424 |
Fakultas Pertanian |
Juni 2026 |
537112 |
Belanja LCD |
2026-09-28 |
65/SPP-LS16/2026 |
|
|
Rp. 12.950.000 |
7 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 05 Oktober 2026 (7 Hari) |
| 1425 |
Fakultas Ilmu Pendidikan |
Juni 2026 |
525112 |
Konsumsi Berat/Ringan rapat kerja/Senat/Pimpinan/Raker dan Pelayanan Tamu Pimpinan |
2026-06-25 |
033/UN47.B1/SPP/GUP-05/2026 |
2026-07-06 |
1515A |
Rp. 6.958.900 |
11 Hari |
|
| 1426 |
Fakultas Ilmu Pendidikan |
Juli 2026 |
525112 |
Konsumsi Berat/Ringan rapat kerja/Senat/Pimpinan/Raker dan Pelayanan Tamu Pimpinan |
2026-08-07 |
046/UN47.B1/SPP/GUP-06/2026 |
2026-08-18 |
1995A |
Rp. 4.809.500 |
11 Hari |
|
| 1427 |
Fakultas Pertanian |
April 2026 |
537112 |
Belanja AC |
2026-05-25 |
27/SPP-GU4/2026 |
2026-06-18 |
1320F |
Rp. 6.500.000 |
24 Hari |
|
| 1428 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525112 |
Konsumsi Berat/Ringan rapat kerja/Senat/Pimpinan/Raker dan Pelayanan Tamu Pimpinan |
2026-08-31 |
055/UN47.B1/SPP/GUP-07/2026 |
2026-09-14 |
2290A |
Rp. 19.175.500 |
14 Hari |
|
| 1429 |
Fakultas Pertanian |
September 2026 |
537112 |
Belanja AC |
2026-09-14 |
58/SPP-LS13/2026 |
|
|
Rp. 52.500.000 |
21 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 05 Oktober 2026 (21 Hari) |
| 1430 |
Fakultas Pertanian |
September 2026 |
537112 |
Belanja AC |
2026-09-14 |
59/SPP-LS13/2026 |
|
|
Rp. 38.200.000 |
21 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 05 Oktober 2026 (21 Hari) |
| 1431 |
Fakultas Pertanian |
September 2026 |
537112 |
Belanja AC |
2026-09-28 |
66/SPP-LS16/2026 |
|
|
Rp. 10.800.000 |
7 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 05 Oktober 2026 (7 Hari) |
| 1432 |
Fakultas Ilmu Pendidikan |
September 2026 |
525112 |
Konsumsi Berat/Ringan rapat kerja/Senat/Pimpinan/Raker dan Pelayanan Tamu Pimpinan |
2026-09-21 |
066/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 9.000.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1433 |
Fakultas Ilmu Pendidikan |
Oktober 2026 |
525112 |
Konsumsi Berat/Ringan rapat kerja/Senat/Pimpinan/Raker dan Pelayanan Tamu Pimpinan |
|
|
|
|
Rp. 11.854.250 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 1434 |
Fakultas Ilmu Pendidikan |
Januari 2026 |
525119 |
Bantuan terkait Pelaksanaan Rapat Kerja Tahunan Fakultas |
2026-03-09 |
009/UN47.B1/SPP/GUP-01/2026 |
2026-03-13 |
0510A |
Rp. 31.800.000 |
4 Hari |
|
| 1435 |
Fakultas Ilmu Pendidikan |
April 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Tiket 10 orang ) |
2026-04-29 |
017/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0987A |
Rp. 9.672.850 |
6 Hari |
|
| 1436 |
Fakultas Ilmu Pendidikan |
Juni 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Tiket 10 orang ) |
2026-06-25 |
034/UN47.B1/SPP/GUP-05/2026 |
2026-07-06 |
1516A |
Rp. 6.622.341 |
11 Hari |
|
| 1437 |
Fakultas Ilmu Pendidikan |
Juli 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Tiket 10 orang ) |
2026-08-07 |
047/UN47.B1/SPP/GUP-06/2026 |
2026-08-18 |
1996A |
Rp. 12.634.735 |
11 Hari |
|
| 1438 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Tiket 10 orang ) |
2026-08-31 |
056/UN47.B1/SPP/GUP-07/2026 |
2026-09-14 |
2291A |
Rp. 6.843.257 |
14 Hari |
|
| 1439 |
Fakultas Ilmu Pendidikan |
September 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Tiket 10 orang ) |
2026-09-21 |
067/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 2.000.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1440 |
Fakultas Ilmu Pendidikan |
Oktober 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Tiket 10 orang ) |
|
|
|
|
Rp. 7.262.300 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 1441 |
Fakultas Ilmu Pendidikan |
April 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Uang Harian 9 orang x 4 Hari ) |
2026-04-29 |
017/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0987A |
Rp. 520.000 |
6 Hari |
|
| 1442 |
Fakultas Ilmu Pendidikan |
Juni 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Uang Harian 9 orang x 4 Hari ) |
2026-06-25 |
034/UN47.B1/SPP/GUP-05/2026 |
2026-07-06 |
1516A |
Rp. 1.920.000 |
11 Hari |
|
| 1443 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Uang Harian 9 orang x 4 Hari ) |
2026-08-31 |
056/UN47.B1/SPP/GUP-07/2026 |
2026-09-14 |
2291A |
Rp. 2.290.000 |
14 Hari |
|
| 1444 |
Fakultas Ilmu Pendidikan |
September 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Uang Harian 9 orang x 4 Hari ) |
2026-09-21 |
067/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 2.260.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1445 |
Fakultas Ilmu Pendidikan |
Oktober 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Uang Harian 9 orang x 4 Hari ) |
|
|
|
|
Rp. 1.220.000 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 1446 |
Fakultas Ilmu Pendidikan |
April 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Akomodasi 9 orang x 3 Hari) |
2026-04-29 |
017/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0987A |
Rp. 2.805.975 |
6 Hari |
|
| 1447 |
Fakultas Ilmu Pendidikan |
Juni 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Akomodasi 9 orang x 3 Hari) |
2026-06-25 |
034/UN47.B1/SPP/GUP-05/2026 |
2026-07-06 |
1516A |
Rp. 2.999.577 |
11 Hari |
|
| 1448 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Akomodasi 9 orang x 3 Hari) |
2026-08-31 |
056/UN47.B1/SPP/GUP-07/2026 |
2026-09-14 |
2291A |
Rp. 3.530.203 |
14 Hari |
|
| 1449 |
Fakultas Ilmu Pendidikan |
September 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Akomodasi 9 orang x 3 Hari) |
2026-09-21 |
067/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 4.875.000 |
14 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 05 Oktober 2026 (14 Hari) |
| 1450 |
Fakultas Ilmu Pendidikan |
Oktober 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Akomodasi 9 orang x 3 Hari) |
|
|
|
|
Rp. 1.800.000 |
4 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 05 Oktober 2026 (4 Hari) |
| 1451 |
Fakultas Ilmu Pendidikan |
Januari 2026 |
525119 |
Operasional Kenderaan Dinas Pimpinan BBM Pertamax |
2026-03-09 |
009/UN47.B1/SPP/GUP-01/2026 |
2026-03-13 |
0510A |
Rp. 450.000 |
4 Hari |
|
| 1452 |
Fakultas Ilmu Pendidikan |
April 2026 |
525119 |
Operasional Kenderaan Dinas Pimpinan BBM Pertamax |
2026-04-29 |
018/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0988A |
Rp. 1.650.000 |
6 Hari |
|
| 1453 |
Fakultas Ilmu Pendidikan |
Mei 2026 |
525119 |
Operasional Kenderaan Dinas Pimpinan BBM Pertamax |
2026-06-02 |
025/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1266A |
Rp. 450.000 |
7 Hari |
|
| 1454 |
Fakultas Ilmu Pendidikan |
Juni 2026 |
525119 |
Operasional Kenderaan Dinas Pimpinan BBM Pertamax |
2026-06-25 |
035/UN47.B1/SPP/GUP-05/2026 |
2026-07-06 |
1517A |
Rp. 2.418.675 |
11 Hari |
|
| 1455 |
Fakultas Ilmu Pendidikan |
Juli 2026 |
525119 |
Operasional Kenderaan Dinas Pimpinan BBM Pertamax |
2026-08-07 |
048/UN47.B1/SPP/GUP-06/2026 |
2026-08-18 |
1997A |
Rp. 850.000 |
11 Hari |
|
| 1456 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525119 |
Operasional Kenderaan Dinas Pimpinan BBM Pertamax |
2026-08-07 |
048/UN47.B1/SPP/GUP-06/2026 |
2026-08-18 |
1997A |
Rp. 250.000 |
11 Hari |
|
| Total |
Rp. 46.536.649.105 |
|
|