Data Tanggal 05 Oktober 2026 , 11:27:38 |
| No |
Unit / Fakultas |
Bulan Belanja |
MAK |
Item RBA |
Tgl. SPP |
No. SPP |
Tgl. SP2D |
No. SP2D |
Jumlah Belanja |
Lama Proses |
Keterangan |
| 1 |
UPA Perpustakaan |
Februari 2026 |
537112 |
Pengadaan kipas angin tempel |
2026-03-12 |
02/UN47.E1/SPP-GUP1/KU/2026 |
2026-04-09 |
0709M |
Rp. 8.000.000 |
28 Hari |
|
| 2 |
UPA Perpustakaan |
Agustus 2026 |
537112 |
Pengadaan Komputer |
2026-08-27 |
022/UN47.E1/SPP-LS5/KU/2026 |
2026-09-10 |
2239M |
Rp. 212.200.000 |
14 Hari |
|
| 3 |
UPA Perpustakaan |
Mei 2026 |
537112 |
Pengadaan AC standing floor |
2026-04-20 |
011/UN47.E1/SPP-LS1/KU/2026 |
2026-05-04 |
0973M |
Rp. 44.436.061 |
14 Hari |
|
| 4 |
UPA Perpustakaan |
September 2026 |
537112 |
Pengadaan AC standing floor |
2026-09-08 |
024/UN47.E1/SPP-LS6/KU/2026 |
2026-09-11 |
2261M |
Rp. 88.799.000 |
3 Hari |
|
| 5 |
UPA Perpustakaan |
Februari 2026 |
525114 |
Pemeliharaan Listrik |
2026-03-12 |
05/UN47.E1/SPP-GUP1/KU/2026 |
2026-04-09 |
0712M |
Rp. 289.000 |
28 Hari |
|
| 6 |
UPA Perpustakaan |
Mei 2026 |
525114 |
Pemeliharaan Listrik |
2026-05-21 |
012/UN47.E1/SPP-GUP3/KU/2026 |
2026-06-30 |
1392M |
Rp. 16.000.000 |
40 Hari |
|
| 7 |
UPA Perpustakaan |
September 2026 |
525114 |
Pemeliharaan Listrik |
2026-09-28 |
031/UN47.E1/SPP-GUP7/KU/2026 |
|
|
Rp. 1.450.000 |
8 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 06 Oktober 2026 (8 Hari) |
| 8 |
UPA Perpustakaan |
April 2026 |
525114 |
Pemeliharaan AC |
2026-04-20 |
09/UN47.E1/SPP-GUP2/KU/2026 |
2026-04-30 |
0941M |
Rp. 29.945.000 |
10 Hari |
|
| 9 |
UPA Perpustakaan |
Juli 2026 |
525114 |
Pemeliharaan Gedung/ Ruangan Perkantoran |
2026-05-22 |
014/UN47.E1/SPP-LS2/KU/2026 |
2026-07-03 |
1471M |
Rp. 125.048.000 |
42 Hari |
|
| 10 |
UPA Perpustakaan |
Agustus 2026 |
525114 |
Pemeliharaan Gedung/ Ruangan Perkantoran |
2026-08-24 |
021/UN47.E1/SPP-LS4/KU/2026 |
|
|
Rp. 48.950.000 |
43 Hari |
Belum ada SP2D terhitung dari 24 Agustus 2026 hingga 06 Oktober 2026 (43 Hari) |
| 11 |
UPA Perpustakaan |
Januari 2026 |
525112 |
Spanduk kegiatan |
2026-03-12 |
03/UN47.E1/SPP-GUP1/KU/2026 |
2026-04-09 |
0710M |
Rp. 52.500 |
28 Hari |
|
| 12 |
UPA Perpustakaan |
Februari 2026 |
525112 |
Spanduk kegiatan |
2026-03-12 |
03/UN47.E1/SPP-GUP1/KU/2026 |
2026-04-09 |
0710M |
Rp. 1.520.000 |
28 Hari |
|
| 13 |
UPA Perpustakaan |
Februari 2026 |
525112 |
Barang Habis Pakai ATM / ATK
|
2026-03-12 |
03/UN47.E1/SPP-GUP1/KU/2026 |
2026-04-09 |
0710M |
Rp. 6.552.295 |
28 Hari |
|
| 14 |
UPA Perpustakaan |
Maret 2026 |
525112 |
Barang Habis Pakai ATM / ATK
|
2026-03-12 |
03/UN47.E1/SPP-GUP1/KU/2026 |
2026-04-09 |
0710M |
Rp. 713.500 |
28 Hari |
|
| 15 |
UPA Perpustakaan |
Juni 2026 |
525112 |
Barang Habis Pakai ATM / ATK
|
2026-08-13 |
015/UN47.E1/SPP-GUP4/KU/2026 |
2026-08-24 |
2069T |
Rp. 1.450.000 |
11 Hari |
|
| 16 |
UPA Perpustakaan |
Juli 2026 |
525112 |
Barang Habis Pakai ATM / ATK
|
2026-08-13 |
015/UN47.E1/SPP-GUP4/KU/2026 |
2026-08-24 |
2069T |
Rp. 7.156.000 |
11 Hari |
|
| 17 |
UPA Perpustakaan |
Oktober 2026 |
525112 |
Barang Habis Pakai ATM / ATK
|
|
|
|
|
Rp. 15.950.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 18 |
UPA Perpustakaan |
Februari 2026 |
525112 |
Insentif Validasi Skripsi/Tesis/Disertasi |
2026-03-12 |
03/UN47.E1/SPP-GUP1/KU/2026 |
2026-04-09 |
0710M |
Rp. 5.000.000 |
28 Hari |
|
| 19 |
UPA Perpustakaan |
Juni 2026 |
525112 |
Insentif Validasi Skripsi/Tesis/Disertasi |
2026-08-13 |
015/UN47.E1/SPP-GUP4/KU/2026 |
2026-08-24 |
2069T |
Rp. 5.000.000 |
11 Hari |
|
| 20 |
UPA Perpustakaan |
Oktober 2026 |
525112 |
Insentif Validasi Skripsi/Tesis/Disertasi |
|
|
|
|
Rp. 5.000.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 21 |
UPA Perpustakaan |
September 2026 |
525119 |
Bantuan Biaya Pencetakan Buku |
2026-09-28 |
030/UN47.E1/SPP-GUP7/KU/2026 |
|
|
Rp. 10.000.000 |
8 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 06 Oktober 2026 (8 Hari) |
| 22 |
UPA Perpustakaan |
Maret 2026 |
525112 |
Konsumsi tamu pimpinan |
2026-03-12 |
03/UN47.E1/SPP-GUP1/KU/2026 |
2026-04-09 |
0710M |
Rp. 1.989.695 |
28 Hari |
|
| 23 |
UPA Perpustakaan |
April 2026 |
525112 |
Konsumsi tamu pimpinan |
2026-04-20 |
07/UN47.E1/SPP-GUP2/KU/2026 |
2026-04-30 |
0939M |
Rp. 2.505.000 |
10 Hari |
|
| 24 |
UPA Perpustakaan |
Juli 2026 |
525112 |
Konsumsi tamu pimpinan |
2026-08-13 |
015/UN47.E1/SPP-GUP4/KU/2026 |
2026-08-24 |
2069T |
Rp. 1.006.920 |
11 Hari |
|
| 25 |
UPA Perpustakaan |
September 2026 |
525112 |
Konsumsi tamu pimpinan |
2026-09-28 |
029/UN47.E1/SPP-GUP7/KU/2026 |
|
|
Rp. 2.700.000 |
8 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 06 Oktober 2026 (8 Hari) |
| 26 |
UPA Perpustakaan |
Februari 2026 |
525112 |
Komsumsi ringan berat
rapat kerja (RAKER) pimpinan dan staf UPA
Perpustakaan |
2026-03-12 |
03/UN47.E1/SPP-GUP1/KU/2026 |
2026-04-09 |
0710M |
Rp. 6.800.000 |
28 Hari |
|
| 27 |
UPA Perpustakaan |
Oktober 2026 |
525112 |
Komsumsi ringan berat
rapat kerja (RAKER) pimpinan dan staf UPA
Perpustakaan |
|
|
|
|
Rp. 8.200.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 28 |
UPA Perpustakaan |
April 2026 |
525119 |
Biaya Media Cetak |
2026-04-20 |
08/UN47.E1/SPP-GUP2/KU/2026 |
2026-04-30 |
0940M |
Rp. 850.000 |
10 Hari |
|
| 29 |
UPA Perpustakaan |
Juni 2026 |
525119 |
Biaya Media Cetak |
2026-08-13 |
017/UN47.E1/SPP-GUP4/KU/2026 |
2026-08-24 |
2071T |
Rp. 1.700.000 |
11 Hari |
|
| 30 |
UPA Perpustakaan |
September 2026 |
525119 |
Biaya Media Cetak |
2026-09-28 |
030/UN47.E1/SPP-GUP7/KU/2026 |
|
|
Rp. 850.000 |
8 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 06 Oktober 2026 (8 Hari) |
| 31 |
UPA Perpustakaan |
Oktober 2026 |
525119 |
Biaya Media Cetak |
|
|
|
|
Rp. 850.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 32 |
UPA Perpustakaan |
Juli 2026 |
525119 |
Pembuatan Leaflet/brosur perpustakaan |
2026-08-13 |
017/UN47.E1/SPP-GUP4/KU/2026 |
2026-08-24 |
2071T |
Rp. 3.600.000 |
11 Hari |
|
| 33 |
UPA Perpustakaan |
Februari 2026 |
525119 |
Pembuatan Kalender |
2026-03-12 |
04/UN47.E1/SPP-GUP1/KU/2026 |
2026-04-09 |
0711M |
Rp. 3.313.010 |
28 Hari |
|
| 34 |
UPA Perpustakaan |
Juli 2026 |
525119 |
Pembuatan tumbler perpustakaan |
2026-08-13 |
017/UN47.E1/SPP-GUP4/KU/2026 |
2026-08-24 |
2071T |
Rp. 3.000.000 |
11 Hari |
|
| 35 |
UPA Perpustakaan |
Agustus 2026 |
525119 |
Pembuatan buku panduan perpustakaan tahun 2026 |
2026-08-31 |
023/UN47.E1/SPP-GUP5/KU/2026 |
2026-09-09 |
2223M |
Rp. 35.000.000 |
9 Hari |
|
| 36 |
UPA Perpustakaan |
Juni 2026 |
525115 |
Transport Dalam dan Luar Daerah Terkait Kegiatan |
2026-08-13 |
016/UN47.E1/SPP-GUP4/KU/2026 |
2026-08-24 |
2070T |
Rp. 150.600 |
11 Hari |
|
| 37 |
UPA Perpustakaan |
Agustus 2026 |
525115 |
Transport Dalam dan Luar Daerah Terkait Kegiatan |
2026-08-20 |
019/UN47.E1/SPP-LS3/KU/2026 |
2026-08-28 |
2095M |
Rp. 7.038.700 |
8 Hari |
|
| 38 |
UPA Perpustakaan |
September 2026 |
525115 |
Transport Dalam dan Luar Daerah Terkait Kegiatan |
2026-09-09 |
025/UN47.E1/SPP-LS7/KU/2026 |
|
|
Rp. 850.000 |
27 Hari |
Belum ada SP2D terhitung dari 09 September 2026 hingga 06 Oktober 2026 (27 Hari) |
| 39 |
UPA Perpustakaan |
September 2026 |
525115 |
Transport Dalam dan Luar Daerah Terkait Kegiatan |
2026-09-29 |
032/UN47.E1/SPP-LS8/KU/2026 |
|
|
Rp. 113.000 |
7 Hari |
Belum ada SP2D terhitung dari 29 September 2026 hingga 06 Oktober 2026 (7 Hari) |
| 40 |
UPA Perpustakaan |
Juni 2026 |
525115 |
Tiket Perjalanan Dinas PP Terkait Kegiatan |
2026-08-13 |
016/UN47.E1/SPP-GUP4/KU/2026 |
2026-08-24 |
2070T |
Rp. 3.210.480 |
11 Hari |
|
| 41 |
UPA Perpustakaan |
Agustus 2026 |
525115 |
Tiket Perjalanan Dinas PP Terkait Kegiatan |
2026-08-20 |
019/UN47.E1/SPP-LS3/KU/2026 |
2026-08-28 |
2095M |
Rp. 89.479.458 |
8 Hari |
|
| 42 |
UPA Perpustakaan |
September 2026 |
525115 |
Tiket Perjalanan Dinas PP Terkait Kegiatan |
2026-09-09 |
025/UN47.E1/SPP-LS7/KU/2026 |
|
|
Rp. 6.525.416 |
27 Hari |
Belum ada SP2D terhitung dari 09 September 2026 hingga 06 Oktober 2026 (27 Hari) |
| 43 |
UPA Perpustakaan |
September 2026 |
525115 |
Tiket Perjalanan Dinas PP Terkait Kegiatan |
2026-09-29 |
032/UN47.E1/SPP-LS8/KU/2026 |
|
|
Rp. 6.277.321 |
7 Hari |
Belum ada SP2D terhitung dari 29 September 2026 hingga 06 Oktober 2026 (7 Hari) |
| 44 |
UPA Perpustakaan |
Juni 2026 |
525115 |
Hotel/Penginapan |
2026-08-13 |
016/UN47.E1/SPP-GUP4/KU/2026 |
2026-08-24 |
2070T |
Rp. 826.000 |
11 Hari |
|
| 45 |
UPA Perpustakaan |
Agustus 2026 |
525115 |
Hotel/Penginapan |
2026-08-20 |
019/UN47.E1/SPP-LS3/KU/2026 |
2026-08-28 |
2095M |
Rp. 16.820.000 |
8 Hari |
|
| 46 |
UPA Perpustakaan |
September 2026 |
525115 |
Hotel/Penginapan |
2026-09-09 |
025/UN47.E1/SPP-LS7/KU/2026 |
|
|
Rp. 2.225.000 |
27 Hari |
Belum ada SP2D terhitung dari 09 September 2026 hingga 06 Oktober 2026 (27 Hari) |
| 47 |
UPA Perpustakaan |
September 2026 |
525115 |
Hotel/Penginapan |
2026-09-29 |
032/UN47.E1/SPP-LS8/KU/2026 |
|
|
Rp. 1.965.600 |
7 Hari |
Belum ada SP2D terhitung dari 29 September 2026 hingga 06 Oktober 2026 (7 Hari) |
| 48 |
UPA Perpustakaan |
Juni 2026 |
525115 |
Uang Harian |
2026-08-13 |
016/UN47.E1/SPP-GUP4/KU/2026 |
2026-08-24 |
2070T |
Rp. 1.200.000 |
11 Hari |
|
| 49 |
UPA Perpustakaan |
Agustus 2026 |
525115 |
Uang Harian |
2026-08-20 |
019/UN47.E1/SPP-LS3/KU/2026 |
2026-08-28 |
2095M |
Rp. 37.600.000 |
8 Hari |
|
| 50 |
UPA Perpustakaan |
September 2026 |
525115 |
Uang Harian |
2026-09-09 |
025/UN47.E1/SPP-LS7/KU/2026 |
|
|
Rp. 2.810.000 |
27 Hari |
Belum ada SP2D terhitung dari 09 September 2026 hingga 06 Oktober 2026 (27 Hari) |
| 51 |
UPA Perpustakaan |
September 2026 |
525115 |
Uang Harian |
2026-09-29 |
032/UN47.E1/SPP-LS8/KU/2026 |
|
|
Rp. 2.650.000 |
7 Hari |
Belum ada SP2D terhitung dari 29 September 2026 hingga 06 Oktober 2026 (7 Hari) |
| 52 |
UPA Perpustakaan |
Juli 2026 |
525119 |
Pemeliharaan E-Skripsi, Opac, Internet,dan Website |
2026-08-13 |
018/UN47.E1/SPP-GUP4/KU/2026 |
2026-08-24 |
2072T |
Rp. 5.000.000 |
11 Hari |
|
| 53 |
UPA Perpustakaan |
Januari 2026 |
525119 |
Pembayaran aplikasi Canva |
2026-03-12 |
06/UN47.E1/SPP-GUP1/KU/2026 |
2026-04-09 |
0713M |
Rp. 770.000 |
28 Hari |
|
| 54 |
UPA Perpustakaan |
April 2026 |
525119 |
Insentif Penguji Tagihan/Verifikator UK
|
2026-04-20 |
010/UN47.E1/SPP-GUP2/KU/2026 |
2026-04-30 |
0942M |
Rp. 480.000 |
10 Hari |
|
| 55 |
UPA Perpustakaan |
Juni 2026 |
525119 |
Insentif Penguji Tagihan/Verifikator UK
|
2026-08-13 |
018/UN47.E1/SPP-GUP4/KU/2026 |
2026-08-24 |
2072T |
Rp. 480.000 |
11 Hari |
|
| 56 |
UPA Perpustakaan |
April 2026 |
525119 |
Insentif PPK/UK |
2026-04-20 |
010/UN47.E1/SPP-GUP2/KU/2026 |
2026-04-30 |
0942M |
Rp. 1.220.000 |
10 Hari |
|
| 57 |
UPA Perpustakaan |
Juni 2026 |
525119 |
Insentif PPK/UK |
2026-08-13 |
018/UN47.E1/SPP-GUP4/KU/2026 |
2026-08-24 |
2072T |
Rp. 1.220.000 |
11 Hari |
|
| 58 |
UPA Perpustakaan |
Agustus 2026 |
525176 |
Insentif Penguji Tagihan/Verifikator UK |
2026-08-20 |
020/UN47.E1/SPP-LS3/KU/2026 |
2026-08-28 |
2094M |
Rp. 480.000 |
8 Hari |
|
| 59 |
UPA Perpustakaan |
September 2026 |
525176 |
Insentif Penguji Tagihan/Verifikator UK |
2026-09-09 |
026/UN47.E1/SPP-LS7/KU/2026 |
|
|
Rp. 480.000 |
27 Hari |
Belum ada SP2D terhitung dari 09 September 2026 hingga 06 Oktober 2026 (27 Hari) |
| 60 |
UPA Perpustakaan |
Agustus 2026 |
525176 |
Insentif PPK/UK |
2026-08-20 |
020/UN47.E1/SPP-LS3/KU/2026 |
2026-08-28 |
2094M |
Rp. 1.220.000 |
8 Hari |
|
| 61 |
UPA Perpustakaan |
September 2026 |
525176 |
Insentif PPK/UK |
2026-09-09 |
026/UN47.E1/SPP-LS7/KU/2026 |
|
|
Rp. 1.220.000 |
27 Hari |
Belum ada SP2D terhitung dari 09 September 2026 hingga 06 Oktober 2026 (27 Hari) |
| 62 |
UPA Perpustakaan |
Oktober 2026 |
525119 |
Bantuan Biaya Terkait Kegiatan Literasi |
|
|
|
|
Rp. 5.000.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 63 |
UPA Perpustakaan |
Mei 2026 |
525119 |
Transformasi Literasi di Era Artificial Intelligent |
2026-05-21 |
013/UN47.E1/SPP-GUP3/KU/2026 |
2026-06-30 |
1393M |
Rp. 7.000.000 |
40 Hari |
|
| 64 |
UPA Perpustakaan |
September 2026 |
525119 |
Bantuan biaya pendaftaran sertifikasi pustakawan |
2026-09-15 |
028/UN47.E1/SPP-GUP6/KU/2026 |
|
|
Rp. 15.000.000 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 65 |
UPA Perpustakaan |
Mei 2026 |
525119 |
Sosialisasi Pencegahan dan Penanggulangan Anti Kekerasan, Anti Narkoba, dan Anti Korupsi |
2026-05-21 |
013/UN47.E1/SPP-GUP3/KU/2026 |
2026-06-30 |
1393M |
Rp. 7.000.000 |
40 Hari |
|
| 66 |
UPA Perpustakaan |
April 2026 |
525119 |
Sosialisasi Penerapan Zona Integritas UPA Perpustakaan |
2026-05-21 |
013/UN47.E1/SPP-GUP3/KU/2026 |
2026-06-30 |
1393M |
Rp. 5.000.000 |
40 Hari |
|
| 67 |
UPA Perpustakaan |
September 2026 |
525119 |
Jurnal Internasional Bereputasi |
2026-09-15 |
027/UN47.E1/SPP-GUP6/KU/2026 |
|
|
Rp. 20.000.000 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 68 |
UPA Perpustakaan |
September 2026 |
525119 |
Jurnal Internasional Bereputasi |
2026-09-28 |
030/UN47.E1/SPP-GUP7/KU/2026 |
|
|
Rp. 20.000.000 |
8 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 06 Oktober 2026 (8 Hari) |
| 69 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
537112 |
Pengadaan Meubelair Pendukung Pembelajaran |
2026-02-25 |
04/SPP-LS-PPBJ/2026 |
2026-03-02 |
0284AE |
Rp. 182.040.000 |
5 Hari |
|
| 70 |
Pengelola Pengadaan Barang dan Jasa |
Mei 2026 |
537112 |
Pengadaan Peralatan Pembelajaran Di Lingkungan UNG |
2026-05-12 |
45/LS-SPP-PPBJ/2026 |
2026-05-21 |
1117AE |
Rp. 218.059.000 |
9 Hari |
|
| 71 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
537112 |
Pengadaan Peralatan Pembelajaran Di Lingkungan UNG |
2026-07-28 |
61/LS-SPP-PPBJ/2026 |
2026-08-03 |
1800AE |
Rp. 83.145.000 |
6 Hari |
|
| 72 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
537112 |
Pengadaan Peralatan Pembelajaran Di Lingkungan UNG |
2026-08-11 |
63/LS-SPP/PPBJ/2026 |
|
|
Rp. 599.841.000 |
56 Hari |
Belum ada SP2D terhitung dari 11 Agustus 2026 hingga 06 Oktober 2026 (56 Hari) |
| 73 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
537112 |
Pengadaan Peralatan Pembelajaran Di Lingkungan UNG |
2026-08-11 |
64/LS-SPP/PPBJ/2026 |
|
|
Rp. 677.044.000 |
56 Hari |
Belum ada SP2D terhitung dari 11 Agustus 2026 hingga 06 Oktober 2026 (56 Hari) |
| 74 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
537112 |
Pengadaan Peralatan Pembelajaran Di Lingkungan UNG |
2026-08-12 |
65/LS-SPP/PPBJ/2026 |
|
|
Rp. 792.559.000 |
55 Hari |
Belum ada SP2D terhitung dari 12 Agustus 2026 hingga 06 Oktober 2026 (55 Hari) |
| 75 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
537112 |
Pengadaan Peralatan Pendukung Perkantoran |
2026-02-25 |
05/SPP-LS-PPBJ/2026 |
2026-03-02 |
0280AE |
Rp. 222.714.000 |
5 Hari |
|
| 76 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
537112 |
Pengadaan Peralatan Pendukung Perkantoran |
2026-02-26 |
19/SPP-LS-PPBJ/2026 |
2026-03-07 |
0293AE |
Rp. 19.097.000 |
9 Hari |
|
| 77 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
537112 |
Pengadaan Peralatan Pendukung Perkantoran |
2026-03-02 |
20/SPP-GU-PPBJ/2026 |
2026-03-05 |
0334AE |
Rp. 16.872.000 |
3 Hari |
|
| 78 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
537112 |
Pengadaan Peralatan Pendukung Perkantoran |
2026-03-12 |
31/LS-SPTB-PPBJ/2026 |
2026-03-17 |
0603AE |
Rp. 149.838.000 |
5 Hari |
|
| 79 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
537112 |
Pengadaan Peralatan Pendukung Perkantoran |
2026-07-06 |
53/LS-SPTB-PPBJ/2026 |
2026-07-22 |
1660AE |
Rp. 69.100.000 |
16 Hari |
|
| 80 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
537112 |
Pengadaan Peralatan Pendukung Perkantoran |
2026-09-21 |
84/LS-SPP-PPBJ/2026 |
|
|
Rp. 49.644.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 81 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
537112 |
Pengadaan Meubelair Pendukung Perkantoran |
2026-02-23 |
14/SPP-LS-PPBJ/2026 |
2026-03-02 |
0275AE |
Rp. 29.788.000 |
7 Hari |
|
| 82 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
537112 |
Pengadaan Meubelair Pendukung Perkantoran |
2026-03-04 |
27/SPP-LS/PPBJ/2026 |
2026-03-13 |
0494AE |
Rp. 53.812.000 |
9 Hari |
|
| 83 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
537112 |
Pengadaan Meubelair Pendukung Perkantoran |
2026-03-04 |
28/SPTB-LS/PPBJ/2026 |
2026-03-13 |
0491AE |
Rp. 248.196.000 |
9 Hari |
|
| 84 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525113 |
Jasa Konsultan Perencanaan dan Bangunan |
2026-02-25 |
16/SPP-LS-PPBJ/2026 |
2026-03-02 |
0283AE |
Rp. 49.783.000 |
5 Hari |
|
| 85 |
Pengelola Pengadaan Barang dan Jasa |
Mei 2026 |
525113 |
Jasa Konsultan Perencanaan dan Bangunan |
2026-05-05 |
41-LS-SPP-PPBJ/2026 |
2026-05-21 |
1111AE |
Rp. 79.365.000 |
16 Hari |
|
| 86 |
Pengelola Pengadaan Barang dan Jasa |
Mei 2026 |
525113 |
Jasa Konsultan Perencanaan dan Bangunan |
2026-05-13 |
46/LS -SPP-PPBJ/2026 |
2026-05-26 |
1161AE |
Rp. 49.839.000 |
13 Hari |
|
| 87 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525113 |
Jasa Konsultan Perencanaan dan Bangunan |
2026-07-08 |
57/LS-SPTB-PPBJ/2026 |
2026-07-29 |
1744AE |
Rp. 640.957.400 |
21 Hari |
|
| 88 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
525113 |
Jasa Konsultan Perencanaan dan Bangunan |
2026-07-08 |
58/LS -SPP-PPBJ/2026 |
2026-08-10 |
1745AE |
Rp. 343.289.200 |
33 Hari |
|
| 89 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
525113 |
Jasa Konsultan Perencanaan dan Bangunan |
2026-08-18 |
66/LS-SPP/PPBJ/2026 |
|
|
Rp. 49.894.000 |
49 Hari |
Belum ada SP2D terhitung dari 18 Agustus 2026 hingga 06 Oktober 2026 (49 Hari) |
| 90 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
525113 |
Jasa Konsultan Perencanaan dan Bangunan |
2026-08-27 |
78-LS-SPPPPBJ/.2026 |
|
|
Rp. 146.936.000 |
40 Hari |
Belum ada SP2D terhitung dari 27 Agustus 2026 hingga 06 Oktober 2026 (40 Hari) |
| 91 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
525113 |
Jasa Konsultan Perencanaan dan Bangunan |
2026-08-27 |
79-LS-SPTBR-PPBJ./2026 |
|
|
Rp. 149.803.000 |
40 Hari |
Belum ada SP2D terhitung dari 27 Agustus 2026 hingga 06 Oktober 2026 (40 Hari) |
| 92 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-02-25 |
06/LS-SPP-PPBJ/2026 |
2026-03-02 |
0270AE |
Rp. 49.461.000 |
5 Hari |
|
| 93 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-03-04 |
23/SPP-LS/PPBJ/2026 |
2026-03-13 |
0493AE |
Rp. 49.875.000 |
9 Hari |
|
| 94 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-03-04 |
24/SPP-LS/PPBJ/2026 |
2026-03-13 |
0492AE |
Rp. 49.407.000 |
9 Hari |
|
| 95 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-03-04 |
26/SPP-LS/PPBJ/2026 |
2026-03-13 |
0489AE |
Rp. 49.736.000 |
9 Hari |
|
| 96 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-03-04 |
25/SPTB-LS/PPBJ/2026 |
2026-03-13 |
0490AE |
Rp. 49.420.000 |
9 Hari |
|
| 97 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-03-09 |
29/SPP-LS/PPBJ/2026 |
2026-03-13 |
0528AE |
Rp. 104.723.000 |
4 Hari |
|
| 98 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-03-12 |
30/SPP-LS/PPBJ/2026 |
2026-03-13 |
0543AE |
Rp. 49.684.000 |
1 Hari |
|
| 99 |
Pengelola Pengadaan Barang dan Jasa |
April 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-03-31 |
33/SPP-LS/PPBJ/2026 |
2026-04-09 |
0703AE |
Rp. 9.967.000 |
9 Hari |
|
| 100 |
Pengelola Pengadaan Barang dan Jasa |
April 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-04-13 |
37/SPP-LS-PPBJ/2026 |
2026-04-20 |
0834AE |
Rp. 49.740.000 |
7 Hari |
|
| 101 |
Pengelola Pengadaan Barang dan Jasa |
Mei 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-05-12 |
44/LS-SPP-LS-PPBJ-2026 |
2026-05-21 |
1112AE |
Rp. 258.433.000 |
9 Hari |
|
| 102 |
Pengelola Pengadaan Barang dan Jasa |
Juni 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-05-04 |
39/LS-SPP-PPBJ/2026 |
2026-06-30 |
1343AE |
Rp. 49.680.000 |
57 Hari |
|
| 103 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-07-09 |
59/LS-SPP-PPBJ/2026 |
2026-07-16 |
1634AE |
Rp. 30.263.000 |
7 Hari |
|
| 104 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-07-28 |
60/LS-SPP-PPBJ/2026 |
2026-08-03 |
1799AE |
Rp. 79.300.000 |
6 Hari |
|
| 105 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-08-24 |
67/SPP-LS/PPBJ/2026 |
|
|
Rp. 49.966.000 |
43 Hari |
Belum ada SP2D terhitung dari 24 Agustus 2026 hingga 06 Oktober 2026 (43 Hari) |
| 106 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-08-24 |
68/SPP-LS/PPBJ/2026 |
|
|
Rp. 49.978.000 |
43 Hari |
Belum ada SP2D terhitung dari 24 Agustus 2026 hingga 06 Oktober 2026 (43 Hari) |
| 107 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-08-24 |
70/SPP-LS/PPBJ/2026 |
|
|
Rp. 49.779.000 |
43 Hari |
Belum ada SP2D terhitung dari 24 Agustus 2026 hingga 06 Oktober 2026 (43 Hari) |
| 108 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-08-11 |
62/LS-SPP/PPBJ/2026 |
2026-09-11 |
2280AE |
Rp. 799.400.000 |
31 Hari |
|
| 109 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-09-22 |
85-LS-SPP/PPBJ-2026 |
|
|
Rp. 49.469.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 110 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-09-22 |
86-LS-SPP-PPBJ/2026 |
|
|
Rp. 49.347.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 111 |
Pengelola Pengadaan Barang dan Jasa |
Oktober 2026 |
525114 |
Pemeliharaan Gedung Kuliah Di Lingkungan UNG |
2026-10-02 |
95/SPP-LS-PPBJ-2026 |
|
|
Rp. 219.229.000 |
4 Hari |
Belum ada SP2D terhitung dari 02 Oktober 2026 hingga 06 Oktober 2026 (4 Hari) |
| 112 |
Pengelola Pengadaan Barang dan Jasa |
April 2026 |
537111 |
Belanja Modal Tanah |
2026-03-16 |
32/SPP-LS/PPBJ/2026 |
2026-04-06 |
0636AE |
Rp. 1.284.978.450 |
21 Hari |
|
| 113 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525114 |
Pemeliharaan Alat Pemadam Kebakaran APAR |
2026-02-25 |
07/SPP-LS-PPBJ/2026 |
2026-03-02 |
0278AE |
Rp. 34.032.000 |
5 Hari |
|
| 114 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525114 |
Pemeliharaan Alat Pemadam Kebakaran APAR |
2026-02-25 |
08/SPP-LS-PPBJ/2026 |
2026-03-02 |
0279AE |
Rp. 62.581.000 |
5 Hari |
|
| 115 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525114 |
Pemeliharaan AC |
2026-09-24 |
91-GU-SPP-PPBJ-2026 |
|
|
Rp. 9.657.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 116 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525114 |
Pemeliharaan Printer |
2026-09-24 |
91-GU-SPP-PPBJ-2026 |
|
|
Rp. 9.595.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 117 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525114 |
Pemeliharaan Halaman Gedung Dan Bangunan Perkantoran Di Lingkungan UNG |
2026-02-25 |
10/SPP-LS-PPBJ/2026 |
2026-03-02 |
0276AE |
Rp. 49.763.000 |
5 Hari |
|
| 118 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525114 |
Pemeliharaan Halaman Gedung Dan Bangunan Perkantoran Di Lingkungan UNG |
2026-02-25 |
11/SPP-LS-PPBJ/2026 |
2026-03-02 |
0274AE |
Rp. 49.420.000 |
5 Hari |
|
| 119 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525114 |
Pemeliharaan Halaman Gedung Dan Bangunan Perkantoran Di Lingkungan UNG |
2026-02-25 |
12/SPP-LS-PPBJ/2026 |
2026-03-02 |
0277AE |
Rp. 49.713.000 |
5 Hari |
|
| 120 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525114 |
Pemeliharaan Halaman Gedung Dan Bangunan Perkantoran Di Lingkungan UNG |
2026-02-25 |
09/SPP-LS-PPBJ/2026 |
2026-03-02 |
0281AE |
Rp. 49.242.000 |
5 Hari |
|
| 121 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525114 |
Pemeliharaan Halaman Gedung Dan Bangunan Perkantoran Di Lingkungan UNG |
2026-03-02 |
18/SPP LS/PPBJ/2026 |
2026-03-04 |
0318AE |
Rp. 199.195.000 |
2 Hari |
|
| 122 |
Pengelola Pengadaan Barang dan Jasa |
Juni 2026 |
525114 |
Pemeliharaan Halaman Gedung Dan Bangunan Perkantoran Di Lingkungan UNG |
2026-05-11 |
42/LS-SPP-PPBJ/2026 |
2026-06-30 |
1368AE |
Rp. 49.580.000 |
50 Hari |
|
| 123 |
Pengelola Pengadaan Barang dan Jasa |
Juni 2026 |
525114 |
Pemeliharaan Halaman Gedung Dan Bangunan Perkantoran Di Lingkungan UNG |
2026-05-11 |
43/LS-SPP-PPBJ/2026 |
2026-06-30 |
1344AE |
Rp. 49.370.000 |
50 Hari |
|
| 124 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525114 |
Pemeliharaan Halaman Gedung Dan Bangunan Perkantoran Di Lingkungan UNG |
2026-06-09 |
50/SPP-LS-PPBJ/2026 |
2026-07-06 |
1513E |
Rp. 49.966.000 |
27 Hari |
|
| 125 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525114 |
Pemeliharaan Halaman Gedung Dan Bangunan Perkantoran Di Lingkungan UNG |
2026-06-09 |
51/SPP-LS-PPBJ/2026 |
2026-07-06 |
1514E |
Rp. 49.862.000 |
27 Hari |
|
| 126 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
525114 |
Pemeliharaan Halaman Gedung Dan Bangunan Perkantoran Di Lingkungan UNG |
2026-08-24 |
69/SPP-LS/PPBJ/20256 |
|
|
Rp. 49.734.000 |
43 Hari |
Belum ada SP2D terhitung dari 24 Agustus 2026 hingga 06 Oktober 2026 (43 Hari) |
| 127 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
525114 |
Pemeliharaan Halaman Gedung Dan Bangunan Perkantoran Di Lingkungan UNG |
2026-08-26 |
75/LS-SPP-PPBJ/2026 |
|
|
Rp. 249.147.000 |
41 Hari |
Belum ada SP2D terhitung dari 26 Agustus 2026 hingga 06 Oktober 2026 (41 Hari) |
| 128 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
525114 |
Pemeliharaan Halaman Gedung Dan Bangunan Perkantoran Di Lingkungan UNG |
2026-08-26 |
77/LS-SPP-PPBJ/2026 |
|
|
Rp. 49.950.000 |
41 Hari |
Belum ada SP2D terhitung dari 26 Agustus 2026 hingga 06 Oktober 2026 (41 Hari) |
| 129 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525114 |
Pemeliharaan Halaman Gedung Dan Bangunan Perkantoran Di Lingkungan UNG |
2026-09-21 |
83/LS-SPP-PPBJ-2026 |
|
|
Rp. 92.570.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 130 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525114 |
Pemeliharaan Halaman Gedung Dan Bangunan Perkantoran Di Lingkungan UNG |
2026-09-23 |
87-LS-SPP-PPBJ-2026 |
|
|
Rp. 49.250.000 |
13 Hari |
Belum ada SP2D terhitung dari 23 September 2026 hingga 06 Oktober 2026 (13 Hari) |
| 131 |
Pengelola Pengadaan Barang dan Jasa |
Januari 2026 |
525112 |
Belanja Konsumsi Ringan dan Konsumsi Berat (34 X 9) Kegiatan) |
2026-03-02 |
21/SPP-GU-PPBJ/2026 |
2026-03-05 |
0335AE |
Rp. 137.000 |
3 Hari |
|
| 132 |
Pengelola Pengadaan Barang dan Jasa |
Mei 2026 |
525112 |
Belanja Konsumsi Ringan dan Konsumsi Berat (34 X 9) Kegiatan) |
2026-05-25 |
47/GU-SPP-PPBJ-2026 |
2026-06-25 |
1340AE |
Rp. 2.500.000 |
31 Hari |
|
| 133 |
Pengelola Pengadaan Barang dan Jasa |
Juni 2026 |
525112 |
Belanja Konsumsi Ringan dan Konsumsi Berat (34 X 9) Kegiatan) |
2026-07-07 |
54/GU-SPP-PPBJ/2026 |
2026-07-09 |
1590AE |
Rp. 192.000 |
2 Hari |
|
| 134 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525112 |
Belanja Konsumsi Ringan dan Konsumsi Berat (34 X 9) Kegiatan) |
2026-08-26 |
72-GU-SPP-PPBJ/2026 |
2026-09-03 |
2211AE |
Rp. 3.866.050 |
8 Hari |
|
| 135 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525112 |
Belanja Konsumsi Ringan dan Konsumsi Berat (34 X 9) Kegiatan) |
2026-09-24 |
88-GU-SPP-PPBJ-2026 |
|
|
Rp. 931.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 136 |
Pengelola Pengadaan Barang dan Jasa |
Januari 2026 |
525112 |
Belanja Kebutuhan Dasar Perkantoran |
2026-03-02 |
21/SPP-GU-PPBJ/2026 |
2026-03-05 |
0335AE |
Rp. 3.515.700 |
3 Hari |
|
| 137 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525112 |
Belanja Kebutuhan Dasar Perkantoran |
2026-04-02 |
34/SPP-GU- PPBJ/2026 |
2026-04-07 |
0661AE |
Rp. 925.400 |
5 Hari |
|
| 138 |
Pengelola Pengadaan Barang dan Jasa |
April 2026 |
525112 |
Belanja Kebutuhan Dasar Perkantoran |
2026-05-25 |
47/GU-SPP-PPBJ-2026 |
2026-06-25 |
1340AE |
Rp. 4.871.906 |
31 Hari |
|
| 139 |
Pengelola Pengadaan Barang dan Jasa |
Juni 2026 |
525112 |
Belanja Kebutuhan Dasar Perkantoran |
2026-07-07 |
54/GU-SPP-PPBJ/2026 |
2026-07-09 |
1590AE |
Rp. 4.186.734 |
2 Hari |
|
| 140 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525112 |
Belanja Kebutuhan Dasar Perkantoran |
2026-08-26 |
72-GU-SPP-PPBJ/2026 |
2026-09-03 |
2211AE |
Rp. 10.452.071 |
8 Hari |
|
| 141 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525112 |
Belanja Kebutuhan Dasar Perkantoran |
2026-09-24 |
88-GU-SPP-PPBJ-2026 |
|
|
Rp. 1.020.050 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 142 |
Pengelola Pengadaan Barang dan Jasa |
Januari 2026 |
525115 |
Tiket PP |
2026-03-02 |
22/SPP-GU-PPBJ/2026 |
2026-03-05 |
0336AE |
Rp. 6.461.780 |
3 Hari |
|
| 143 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525115 |
Tiket PP |
2026-04-02 |
35/SPP-GU- PPBJ/2026 |
2026-04-07 |
0662AE |
Rp. 19.028.800 |
5 Hari |
|
| 144 |
Pengelola Pengadaan Barang dan Jasa |
April 2026 |
525115 |
Tiket PP |
2026-05-25 |
48/GU-SPP-PPBJ-2026 |
2026-06-25 |
1341AE |
Rp. 5.677.860 |
31 Hari |
|
| 145 |
Pengelola Pengadaan Barang dan Jasa |
Mei 2026 |
525115 |
Tiket PP |
2026-05-25 |
48/GU-SPP-PPBJ-2026 |
2026-06-25 |
1341AE |
Rp. 12.603.560 |
31 Hari |
|
| 146 |
Pengelola Pengadaan Barang dan Jasa |
Juni 2026 |
525115 |
Tiket PP |
2026-07-07 |
55/GU-SPP-PPBJ/2026 |
2026-07-09 |
1591AE |
Rp. 18.905.340 |
2 Hari |
|
| 147 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525115 |
Tiket PP |
2026-06-22 |
52/GU-SPP-PPBJ/2026 |
2026-07-03 |
1486AE |
Rp. 50.864.960 |
11 Hari |
|
| 148 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525115 |
Tiket PP |
2026-07-07 |
55/GU-SPP-PPBJ/2026 |
2026-07-09 |
1591AE |
Rp. 5.783.880 |
2 Hari |
|
| 149 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525115 |
Tiket PP |
2026-08-26 |
73-GU-SPP-PPBJ/2026 |
2026-09-03 |
2210AE |
Rp. 8.414.880 |
8 Hari |
|
| 150 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525115 |
Tiket PP |
2026-09-16 |
81/TUP-Nihil-SPP-PPBJ/2026 |
|
|
Rp. 10.950.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 151 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525115 |
Tiket PP |
2026-09-24 |
89-GU-SPP-PPBJ-2026 |
|
|
Rp. 12.746.412 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 152 |
Pengelola Pengadaan Barang dan Jasa |
Januari 2026 |
525115 |
Biaya Hotel Penginapan |
2026-03-02 |
22/SPP-GU-PPBJ/2026 |
2026-03-05 |
0336AE |
Rp. 6.227.142 |
3 Hari |
|
| 153 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525115 |
Biaya Hotel Penginapan |
2026-04-02 |
35/SPP-GU- PPBJ/2026 |
2026-04-07 |
0662AE |
Rp. 10.520.908 |
5 Hari |
|
| 154 |
Pengelola Pengadaan Barang dan Jasa |
April 2026 |
525115 |
Biaya Hotel Penginapan |
2026-05-25 |
48/GU-SPP-PPBJ-2026 |
2026-06-25 |
1341AE |
Rp. 3.695.124 |
31 Hari |
|
| 155 |
Pengelola Pengadaan Barang dan Jasa |
Mei 2026 |
525115 |
Biaya Hotel Penginapan |
2026-05-25 |
48/GU-SPP-PPBJ-2026 |
2026-06-25 |
1341AE |
Rp. 6.746.050 |
31 Hari |
|
| 156 |
Pengelola Pengadaan Barang dan Jasa |
Juni 2026 |
525115 |
Biaya Hotel Penginapan |
2026-07-07 |
55/GU-SPP-PPBJ/2026 |
2026-07-09 |
1591AE |
Rp. 9.488.792 |
2 Hari |
|
| 157 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525115 |
Biaya Hotel Penginapan |
2026-06-22 |
52/GU-SPP-PPBJ/2026 |
2026-07-03 |
1486AE |
Rp. 22.653.529 |
11 Hari |
|
| 158 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525115 |
Biaya Hotel Penginapan |
2026-07-07 |
55/GU-SPP-PPBJ/2026 |
2026-07-09 |
1591AE |
Rp. 1.916.254 |
2 Hari |
|
| 159 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525115 |
Biaya Hotel Penginapan |
2026-08-26 |
73-GU-SPP-PPBJ/2026 |
2026-09-03 |
2210AE |
Rp. 6.269.499 |
8 Hari |
|
| 160 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525115 |
Biaya Hotel Penginapan |
2026-09-16 |
81/TUP-Nihil-SPP-PPBJ/2026 |
|
|
Rp. 22.000.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 161 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525115 |
Biaya Hotel Penginapan |
2026-09-24 |
89-GU-SPP-PPBJ-2026 |
|
|
Rp. 3.339.434 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 162 |
Pengelola Pengadaan Barang dan Jasa |
Januari 2026 |
525115 |
Transport Lokal Bandara Hotel |
2026-03-02 |
22/SPP-GU-PPBJ/2026 |
2026-03-05 |
0336AE |
Rp. 346.000 |
3 Hari |
|
| 163 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525115 |
Transport Lokal Bandara Hotel |
2026-04-02 |
35/SPP-GU- PPBJ/2026 |
2026-04-07 |
0662AE |
Rp. 3.730.000 |
5 Hari |
|
| 164 |
Pengelola Pengadaan Barang dan Jasa |
April 2026 |
525115 |
Transport Lokal Bandara Hotel |
2026-05-25 |
48/GU-SPP-PPBJ-2026 |
2026-06-25 |
1341AE |
Rp. 500.500 |
31 Hari |
|
| 165 |
Pengelola Pengadaan Barang dan Jasa |
Mei 2026 |
525115 |
Transport Lokal Bandara Hotel |
2026-05-25 |
48/GU-SPP-PPBJ-2026 |
2026-06-25 |
1341AE |
Rp. 1.915.000 |
31 Hari |
|
| 166 |
Pengelola Pengadaan Barang dan Jasa |
Juni 2026 |
525115 |
Transport Lokal Bandara Hotel |
2026-07-07 |
55/GU-SPP-PPBJ/2026 |
2026-07-09 |
1591AE |
Rp. 2.128.000 |
2 Hari |
|
| 167 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525115 |
Transport Lokal Bandara Hotel |
2026-06-22 |
52/GU-SPP-PPBJ/2026 |
2026-07-03 |
1486AE |
Rp. 5.662.000 |
11 Hari |
|
| 168 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525115 |
Transport Lokal Bandara Hotel |
2026-07-07 |
55/GU-SPP-PPBJ/2026 |
2026-07-09 |
1591AE |
Rp. 329.000 |
2 Hari |
|
| 169 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525115 |
Transport Lokal Bandara Hotel |
2026-08-26 |
73-GU-SPP-PPBJ/2026 |
2026-09-03 |
2210AE |
Rp. 297.500 |
8 Hari |
|
| 170 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525115 |
Transport Lokal Bandara Hotel |
2026-09-16 |
81/TUP-Nihil-SPP-PPBJ/2026 |
|
|
Rp. 3.390.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 171 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525115 |
Transport Lokal Bandara Hotel |
2026-09-24 |
89-GU-SPP-PPBJ-2026 |
|
|
Rp. 1.614.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 172 |
Pengelola Pengadaan Barang dan Jasa |
Januari 2026 |
525115 |
Uang Harian |
2026-03-02 |
22/SPP-GU-PPBJ/2026 |
2026-03-05 |
0336AE |
Rp. 5.080.000 |
3 Hari |
|
| 173 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525115 |
Uang Harian |
2026-04-02 |
35/SPP-GU- PPBJ/2026 |
2026-04-07 |
0662AE |
Rp. 10.600.000 |
5 Hari |
|
| 174 |
Pengelola Pengadaan Barang dan Jasa |
April 2026 |
525115 |
Uang Harian |
2026-05-25 |
48/GU-SPP-PPBJ-2026 |
2026-06-25 |
1341AE |
Rp. 3.180.000 |
31 Hari |
|
| 175 |
Pengelola Pengadaan Barang dan Jasa |
Mei 2026 |
525115 |
Uang Harian |
2026-05-25 |
48/GU-SPP-PPBJ-2026 |
2026-06-25 |
1341AE |
Rp. 6.360.000 |
31 Hari |
|
| 176 |
Pengelola Pengadaan Barang dan Jasa |
Juni 2026 |
525115 |
Uang Harian |
2026-07-07 |
55/GU-SPP-PPBJ/2026 |
2026-07-09 |
1591AE |
Rp. 9.540.000 |
2 Hari |
|
| 177 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525115 |
Uang Harian |
2026-06-22 |
52/GU-SPP-PPBJ/2026 |
2026-07-03 |
1486AE |
Rp. 24.430.000 |
11 Hari |
|
| 178 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525115 |
Uang Harian |
2026-07-07 |
55/GU-SPP-PPBJ/2026 |
2026-07-09 |
1591AE |
Rp. 2.120.000 |
2 Hari |
|
| 179 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525115 |
Uang Harian |
2026-08-26 |
73-GU-SPP-PPBJ/2026 |
2026-09-03 |
2210AE |
Rp. 3.160.000 |
8 Hari |
|
| 180 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
525115 |
Uang Harian |
2026-08-26 |
73-GU-SPP-PPBJ/2026 |
2026-09-03 |
2210AE |
Rp. 1.040.000 |
8 Hari |
|
| 181 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525115 |
Uang Harian |
2026-09-16 |
81/TUP-Nihil-SPP-PPBJ/2026 |
|
|
Rp. 15.470.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 182 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525115 |
Uang Harian |
2026-09-24 |
89-GU-SPP-PPBJ-2026 |
|
|
Rp. 2.120.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 183 |
Pengelola Pengadaan Barang dan Jasa |
Februari 2026 |
525119 |
Kegiatan Pelaksanaan Barang/Jasa Lainnya |
2026-02-20 |
03/TUP-NIHIL/PPBJ/2026 |
2026-02-26 |
0246AE |
Rp. 145.500.960 |
6 Hari |
|
| 184 |
Pengelola Pengadaan Barang dan Jasa |
Mei 2026 |
525119 |
Kegiatan Pelaksanaan Barang/Jasa Lainnya |
2026-05-25 |
49/GU-SPP-PPBJ-2026 |
2026-06-25 |
1342AE |
Rp. 7.950.000 |
31 Hari |
|
| 185 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525119 |
Kegiatan Pelaksanaan Barang/Jasa Lainnya |
2026-09-16 |
82/TUP-Nihil-SPP-PPBJ/2026 |
|
|
Rp. 8.070.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 186 |
Pengelola Pengadaan Barang dan Jasa |
April 2026 |
525119 |
Pengadaan Seragam Dinas Kantor (Karawo) |
2026-04-13 |
38/SPP/LS-PPBJ/2026 |
2026-04-20 |
0833AE |
Rp. 29.137.000 |
7 Hari |
|
| 187 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525119 |
Bantuan Kegiatan Perlengkapan Olaharga |
2026-02-23 |
15/SPP-LS-PPBJ/2026 |
2026-03-03 |
0299AE |
Rp. 19.147.000 |
8 Hari |
|
| 188 |
Pengelola Pengadaan Barang dan Jasa |
Maret 2026 |
525121 |
Pengadaan Persediaan ATM/ATK dan Bahan Habis Pakai |
2026-02-25 |
13/SPP-LS-PPBJ/2026 |
2026-03-02 |
0282AE |
Rp. 49.407.000 |
5 Hari |
|
| 189 |
Pengelola Pengadaan Barang dan Jasa |
Mei 2026 |
525121 |
Pengadaan Persediaan ATM/ATK dan Bahan Habis Pakai |
2026-05-04 |
40/LS-SPP-PBJ/2026 |
2026-05-26 |
1167AE |
Rp. 59.928.000 |
22 Hari |
|
| 190 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
525121 |
Pengadaan Persediaan ATM/ATK dan Bahan Habis Pakai |
2026-08-26 |
76/LS-SPTB-PPBJ/2026 |
|
|
Rp. 49.147.000 |
41 Hari |
Belum ada SP2D terhitung dari 26 Agustus 2026 hingga 06 Oktober 2026 (41 Hari) |
| 191 |
Pengelola Pengadaan Barang dan Jasa |
Januari 2026 |
525119 |
Belanja Barang dan Jasa Sewa Iklan Perkantoran |
2026-03-02 |
21/SPP/GU-PPBJ/2026 |
2026-03-05 |
0337AE |
Rp. 8.500.000 |
3 Hari |
|
| 192 |
Pengelola Pengadaan Barang dan Jasa |
Agustus 2026 |
525119 |
Belanja Barang dan Jasa Sewa Iklan Perkantoran |
2026-08-26 |
74-GU-SPP-PPBJ/2026 |
2026-09-03 |
2209AE |
Rp. 8.500.000 |
8 Hari |
|
| 193 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525119 |
Sewa Kenderaan pada Kegiatan |
2026-09-24 |
90-GU-SPP-PPBJ-2026 |
|
|
Rp. 5.324.457 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 194 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525119 |
Biaya Sewa Cloud Server |
2026-09-24 |
92-GU-SPP-PPBJ-2026 |
|
|
Rp. 5.827.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 195 |
Pengelola Pengadaan Barang dan Jasa |
April 2026 |
525111 |
Insentif Verifikator/Penguji Tagihan UK |
2026-04-02 |
36/SPP-GU- PPBJ/2026 |
2026-04-07 |
0663AE |
Rp. 1.410.000 |
5 Hari |
|
| 196 |
Pengelola Pengadaan Barang dan Jasa |
Juli 2026 |
525111 |
Insentif Verifikator/Penguji Tagihan UK |
2026-07-07 |
56/GU-SPP-PPBJ/2026 |
2026-07-09 |
1592AE |
Rp. 1.410.000 |
2 Hari |
|
| 197 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525119 |
Biaya Foto Copy dan Jilid Laporan Kegiatan Terkait Pengadaan Barang dan Jasa |
2026-09-24 |
92-GU-SPP-PPBJ-2026 |
|
|
Rp. 2.415.647 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 198 |
Pengelola Pengadaan Barang dan Jasa |
September 2026 |
525176 |
Insentif verifikator/Penguji Tagihan UK |
2026-09-24 |
93-GU-SPP-PPBJ-2026 |
|
|
Rp. 1.410.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 199 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-01-28 |
0060/UN47.A2/KU/LS-BKKU/2026 |
2026-02-04 |
0129P |
Rp. 40.292.808 |
7 Hari |
|
| 200 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-02-04 |
0068/UN47.A2/KU/LS-BKKU/2026 |
2026-02-09 |
0143P |
Rp. 49.700.000 |
5 Hari |
|
| 201 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
|
|
|
|
Rp. 15.430.000 |
219 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Maret 2026 hingga 06 Oktober 2026 (219 Hari) |
| 202 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-03-05 |
0158/UN47.A2/KU/LS-BKKU/2026 |
2026-03-06 |
0351P |
Rp. 47.600.000 |
1 Hari |
|
| 203 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-03-09 |
0174/UN47.A2/KU/LS-BKKU/2026 |
2026-03-11 |
0424P |
Rp. 29.737.000 |
2 Hari |
|
| 204 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-03-09 |
0176/UN47.A2/KU/LS-BKKU/2026 |
2026-03-11 |
0456P |
Rp. 31.515.000 |
2 Hari |
|
| 205 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-03-09 |
0175/UN47.A2/KU/LS-BKKU/2026 |
2026-03-11 |
0467P |
Rp. 47.500.000 |
2 Hari |
|
| 206 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-03-11 |
0205/UN47.A2/KU/LS-BKKU/2026 |
2026-03-11 |
0468P |
Rp. 15.430.000 |
0 Hari |
|
| 207 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-03-11 |
0209/UN47.A2/KU/LS-BKKU/2026 |
2026-03-12 |
0495P |
Rp. 26.150.000 |
1 Hari |
|
| 208 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-03-16 |
0229/UN47.A2/KU/LS-BKKU/2026 |
2026-03-17 |
0596P |
Rp. 47.758.000 |
1 Hari |
|
| 209 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-04-08 |
0273/UN47.A2/KU/GU.6-BKKU/2026 |
2026-04-09 |
0693P |
Rp. 29.616.000 |
1 Hari |
|
| 210 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-04-06 |
0259/UN47.A2/KU/LS-BKKU/2026 |
2026-04-07 |
0656P |
Rp. 27.700.000 |
1 Hari |
|
| 211 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-04-10 |
0278a/UN47.A2/KU/LS-BKKU/2026 |
2026-04-14 |
0742P |
Rp. 28.662.347 |
4 Hari |
|
| 212 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-04-13 |
0281/UN47.A2/KU/LS-BKKU/2026 |
2026-04-14 |
0783P |
Rp. 9.175.812 |
1 Hari |
|
| 213 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-04-28 |
0318/UN47.A2/KU/LS-BKKU/2026 |
2026-04-23 |
0885P |
Rp. 63.030.000 |
-5 Hari |
|
| 214 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-05-04 |
0343/UN47.A2/KU/LS-BKKU/2026 |
2026-05-05 |
0983P |
Rp. 49.250.000 |
1 Hari |
|
| 215 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-05-04 |
0344/UN47.A2/KU/LS-BKKU/2026 |
2026-05-04 |
0984P |
Rp. 45.600.000 |
0 Hari |
|
| 216 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-05-06 |
0361/UN47.A2/KU/LS-BKKU/2026 |
2026-05-07 |
1033P |
Rp. 19.486.459 |
1 Hari |
|
| 217 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-05-11 |
0377/UN47.A2/KU/GU.8-BKKU/2026 |
2026-05-11 |
1037P |
Rp. 7.700.000 |
0 Hari |
|
| 218 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-05-13 |
0394/UN47.A2/KU/LS-BKKU/2026 |
2026-05-21 |
1113P |
Rp. 48.500.000 |
8 Hari |
|
| 219 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-05-26 |
0427/UN47.A2/KU/LS-BKKU/2026 |
2026-06-02 |
1193P |
Rp. 34.500.000 |
7 Hari |
|
| 220 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-05-26 |
0426/UN47.A2/KU/LS-BKKU/2026 |
2026-06-04 |
1194P |
Rp. 32.230.000 |
9 Hari |
|
| 221 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-06-05 |
0457/UN47.A2/KU/LS-BKKU/2026 |
2026-06-05 |
1252P |
Rp. 49.692.000 |
0 Hari |
|
| 222 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-06-15 |
0484/UN47.A2/KU/LS-BKKU/2026 |
2026-06-26 |
1346P |
Rp. 24.100.000 |
11 Hari |
|
| 223 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-06-17 |
0489/UN47.A2/KU/LS-BKKU/2026 |
2026-06-30 |
1397P |
Rp. 29.737.000 |
13 Hari |
|
| 224 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-06-18 |
0495/UN47.A2/KU/GU.10-BKKU/2026 |
2026-06-24 |
1328P |
Rp. 5.500.000 |
6 Hari |
|
| 225 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-06-29 |
0512/UN47.A2/KU/LS-BKKU/2026 |
2026-07-03 |
1469P |
Rp. 31.732.870 |
4 Hari |
|
| 226 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-07-14 |
0585/UN47.A2/KU/LS-BKKU/2026 |
2026-07-16 |
1637P |
Rp. 29.393.000 |
2 Hari |
|
| 227 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-07-24 |
0630/UN47.A2/KU/LS-BKKU/2026 |
2026-07-28 |
1721P |
Rp. 25.500.000 |
4 Hari |
|
| 228 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
|
|
|
|
Rp. 20.000.000 |
66 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Agustus 2026 hingga 06 Oktober 2026 (66 Hari) |
| 229 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-08-13 |
0706/UN47.A2/KU/LS-BKKU/2026 |
2026-08-19 |
2011P |
Rp. 11.000.000 |
6 Hari |
|
| 230 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-08-18 |
0721/UN47.A2/KU/LS-BKKU/2026 |
2026-08-20 |
2042P |
Rp. 25.000.000 |
2 Hari |
|
| 231 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-08-20 |
0741/UN47.A2/KU/LS-BKKU/2026 |
2026-08-27 |
2087P |
Rp. 22.000.000 |
7 Hari |
|
| 232 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-08-28 |
0755/UN47.A2/KU/LS-BKKU/2026 |
2026-09-01 |
2155P |
Rp. 32.637.000 |
4 Hari |
|
| 233 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-09-15 |
0831/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 31.912.500 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 234 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-09-15 |
0837/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 49.603.000 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 235 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
537112 |
Belanja Pengadaan Peralatan dan Mesin Perkantoran |
2026-09-15 |
0825/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 22.246.875 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 236 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-02-11 |
0092/UN47.A2/KU/LS-BKKU/2026 |
2026-02-13 |
0185P |
Rp. 16.383.600 |
2 Hari |
|
| 237 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-03-04 |
0139/UN47.A2/KU/LS-BKKU/2026 |
2026-03-06 |
0347P |
Rp. 49.784.000 |
2 Hari |
|
| 238 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-03-04 |
0146/UN47.A2/KU/LS-BKKU/2026 |
2026-03-06 |
0350P |
Rp. 48.618.000 |
2 Hari |
|
| 239 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-03-04 |
0147/UN.A2/KU/LS-BKKU/2026 |
2026-03-06 |
0349P |
Rp. 48.701.000 |
2 Hari |
|
| 240 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-04-13 |
0287/UN47.A2/KU/LS-BKKU/2026 |
2026-04-15 |
0798N |
Rp. 49.603.000 |
2 Hari |
|
| 241 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-05-04 |
0342/UN47.A2/KU/LS-BKKU/2026 |
2026-05-05 |
0982P |
Rp. 34.136.000 |
1 Hari |
|
| 242 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-05-13 |
0399/UN47.A2/KU/LS-BKU/2026 |
2026-05-19 |
1093P |
Rp. 20.150.000 |
6 Hari |
|
| 243 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-05-25 |
0420/UN47.A2/KU/LS-BKKU/2026 |
2026-05-26 |
1168P |
Rp. 49.372.800 |
1 Hari |
|
| 244 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-05-25 |
0419/UN47.A2/KU/LS-BKKU/2026 |
2026-05-26 |
1169P |
Rp. 48.706.800 |
1 Hari |
|
| 245 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-05-25 |
0407/UN47.A2/KU/LS-BKKU/2026 |
2026-05-26 |
1153P |
Rp. 13.425.000 |
1 Hari |
|
| 246 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-06-03 |
0442/UN47.A2/KU/LS-BKKU/2026 |
2026-06-08 |
1253P |
Rp. 47.619.000 |
5 Hari |
|
| 247 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-06-04 |
0456/UN47.A2/KU/LS-BKKU/2026 |
2026-07-02 |
1426P |
Rp. 48.150.000 |
28 Hari |
|
| 248 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-07-24 |
0626/UN47.A2/KU/LS-BKKU/2026 |
2026-07-29 |
1756P |
Rp. 48.773.400 |
5 Hari |
|
| 249 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-07-24 |
0627/UN47.A2/KU/LS-BKKU/2026 |
2026-07-29 |
1740P |
Rp. 48.909.000 |
5 Hari |
|
| 250 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-07-27 |
0633/UN47.A2/KU/LS-BKKU/2026 |
2026-07-29 |
1742P |
Rp. 49.500.000 |
2 Hari |
|
| 251 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-07-27 |
0632/UN47.A2/KU/LS-BKKU/2026 |
2026-07-30 |
1769P |
Rp. 33.433.200 |
3 Hari |
|
| 252 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-08-13 |
0707/UN47.A2/KU/LS-BKKU/2026 |
2026-08-19 |
2012P |
Rp. 9.997.000 |
6 Hari |
|
| 253 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-08-13 |
0705/UN47.A2/KU/LS-BKKU/2026 |
2026-08-19 |
2002P |
Rp. 49.145.000 |
6 Hari |
|
| 254 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-09-01 |
0781/UN47.A2/KU/LS-BKKU/2026 |
2026-09-10 |
2252P |
Rp. 37.582.350 |
9 Hari |
|
| 255 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Pemeliharaan Peralatan dan Mesin Perkantoran |
2026-03-04 |
0145/UN47.A2/KU/LS-BKKU/2026 |
2026-03-06 |
0348P |
Rp. 46.620.000 |
2 Hari |
|
| 256 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Pemeliharaan Peralatan dan Mesin Perkantoran |
2026-03-10 |
0190/UN47.A2/KU/GU.4-BKKU/2026 |
2026-03-11 |
0438P |
Rp. 34.532.000 |
1 Hari |
|
| 257 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Pemeliharaan Peralatan dan Mesin Perkantoran |
2026-03-31 |
0243/UN47.A2/KU/GU.5-BKKU/2026 |
2026-03-31 |
0620P |
Rp. 15.000.000 |
0 Hari |
|
| 258 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Pemeliharaan Peralatan dan Mesin Perkantoran |
2026-04-08 |
0277/UN47.A2/KU/GU.6-BKKU/2026 |
2026-04-09 |
0697P |
Rp. 23.802.000 |
1 Hari |
|
| 259 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Pemeliharaan Peralatan dan Mesin Perkantoran |
2026-05-11 |
0381/UN47.A2/KU/GU.8-BKKU/2026 |
2026-05-11 |
1041P |
Rp. 33.980.000 |
0 Hari |
|
| 260 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Pemeliharaan Peralatan dan Mesin Perkantoran |
2026-05-30 |
0431/UN47.A2/KU/GU.9-BKKU/2026 |
2026-06-03 |
1216P |
Rp. 15.040.000 |
4 Hari |
|
| 261 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Pemeliharaan Peralatan dan Mesin Perkantoran |
2026-06-18 |
0499/UN47.A2/KU/GU.10-BKKU/2026 |
2026-06-24 |
1332P |
Rp. 10.650.000 |
6 Hari |
|
| 262 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Pemeliharaan Peralatan dan Mesin Perkantoran |
2026-07-10 |
0575/UN47.A2/KU/GU.11-BKKU/2026 |
2026-07-13 |
1608P |
Rp. 40.256.600 |
3 Hari |
|
| 263 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Pemeliharaan Peralatan dan Mesin Perkantoran |
2026-06-11 |
0472/UN47.A2/KU/LS-BKKU/2026 |
2026-07-06 |
1499P |
Rp. 36.335.000 |
25 Hari |
|
| 264 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Pemeliharaan Peralatan dan Mesin Perkantoran |
2026-09-15 |
0844/UN47.A2/KU-GU.15-BKKU/2026 |
2026-09-17 |
2351P |
Rp. 72.156.000 |
2 Hari |
|
| 265 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-02-09 |
0081/UN47.A2/KU/GU.2-BKKU/2026 |
2026-02-11 |
0155P |
Rp. 3.060.000 |
2 Hari |
|
| 266 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-02-26 |
0129/UN47.A2/KU/SPP-GU.3-BKKU |
2026-02-27 |
0255P |
Rp. 57.719.000 |
1 Hari |
|
| 267 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-03-10 |
0190/UN47.A2/KU/GU.4-BKKU/2026 |
2026-03-11 |
0438P |
Rp. 150.000 |
1 Hari |
|
| 268 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-03-31 |
0243/UN47.A2/KU/GU.5-BKKU/2026 |
2026-03-31 |
0620P |
Rp. 20.830.000 |
0 Hari |
|
| 269 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-04-27 |
0327/UN47.A2/KU/GU.7-BKKU/2026 |
2026-04-28 |
0904P |
Rp. 18.000.000 |
1 Hari |
|
| 270 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-05-11 |
0381/UN47.A2/KU/GU.8-BKKU/2026 |
2026-05-11 |
1041P |
Rp. 22.230.000 |
0 Hari |
|
| 271 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-05-13 |
0397/UN47.A2/KU/LS-BKKU/2026 |
2026-05-19 |
1094P |
Rp. 48.300.000 |
6 Hari |
|
| 272 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-05-21 |
0415/UN47.A2/KU/LS-BKKU/2026 |
2026-05-25 |
1135P |
Rp. 37.500.000 |
4 Hari |
|
| 273 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-05-21 |
0416/UN47.A2/KU/LS-BKKU/2026 |
2026-05-25 |
1136P |
Rp. 39.280.000 |
4 Hari |
|
| 274 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-05-30 |
0431/UN47.A2/KU/GU.9-BKKU/2026 |
2026-06-03 |
1216P |
Rp. 785.000 |
4 Hari |
|
| 275 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
|
|
|
|
Rp. 72.000.000 |
127 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Juni 2026 hingga 06 Oktober 2026 (127 Hari) |
| 276 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-06-18 |
0499/UN47.A2/KU/GU.10-BKKU/2026 |
2026-06-24 |
1332P |
Rp. 28.407.000 |
6 Hari |
|
| 277 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-06-23 |
0507/UN47.A2/KU/LS-BKKU/2026 |
2026-06-29 |
1365P |
Rp. 10.800.000 |
6 Hari |
|
| 278 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-07-10 |
0575/UN47.A2/KU/GU.11-BKKU/2026 |
2026-07-13 |
1608P |
Rp. 300.000 |
3 Hari |
|
| 279 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-08-03 |
0654/UN47.A2/KU/LS-BKKU/2026 |
2026-08-03 |
1833P |
Rp. 27.000.000 |
0 Hari |
|
| 280 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-08-13 |
0703/UN47.A2/KU/LS-BKKU/2026 |
2026-08-19 |
2010P |
Rp. 24.102.000 |
6 Hari |
|
| 281 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-08-28 |
0759/UN47.A2/KU/GU.14-BKKU/2026 |
2026-09-01 |
2135P |
Rp. 25.000.000 |
4 Hari |
|
| 282 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-08-28 |
0754/UN47.A2/KU/LS-BKKU/2026 |
2026-09-02 |
2191P |
Rp. 30.545.000 |
5 Hari |
|
| 283 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-09-15 |
0844/UN47.A2/KU-GU.15-BKKU/2026 |
2026-09-17 |
2351P |
Rp. 37.939.000 |
2 Hari |
|
| 284 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Komputer/Laptop/Printer dan Alat Sound System |
2026-09-28 |
0888/UN47.A2/KU/GU.16-BKKU/2026 |
|
|
Rp. 3.150.000 |
8 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 06 Oktober 2026 (8 Hari) |
| 285 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-01-09 |
0030/UN47.A2/KU/LS-BKKU/2026 |
2026-01-19 |
0055P |
Rp. 48.823.500 |
10 Hari |
|
| 286 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-01-21 |
0036/UN47.A2/KU/LS-BKKU/2026 |
2026-01-22 |
0081P |
Rp. 41.385.550 |
1 Hari |
|
| 287 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-01-21 |
0037/UN47.A2/KU/LS-BKKU/2026 |
2026-01-22 |
0083P |
Rp. 49.874.850 |
1 Hari |
|
| 288 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-01-23 |
0044/UN47.A2/KU/LS-BKKU/2026 |
2026-01-26 |
0098P |
Rp. 38.940.000 |
3 Hari |
|
| 289 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-01-28 |
0056/UN47.A2/KU/LS-BKKU/2026 |
2026-01-29 |
0121P |
Rp. 49.635.400 |
1 Hari |
|
| 290 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-01-28 |
0057/UN47.A2/KU/LS-BKKU/2026 |
2026-01-29 |
0120P |
Rp. 47.304.200 |
1 Hari |
|
| 291 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-02-09 |
0081/UN47.A2/KU/GU.2-BKKU/2026 |
2026-02-11 |
0155P |
Rp. 45.107.050 |
2 Hari |
|
| 292 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-02-05 |
0073/UN47.A2/KU/LS-BKKU/2026 |
2026-02-09 |
0142P |
Rp. 34.405.560 |
4 Hari |
|
| 293 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-02-06 |
0075/UN47.A2/KU/SPP-LS-BKKU/2026 |
2026-02-09 |
0149P |
Rp. 42.283.500 |
3 Hari |
|
| 294 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-02-11 |
0086/UN47.A2/KU/LS-BKKU/2026 |
2026-02-12 |
0161P |
Rp. 48.705.500 |
1 Hari |
|
| 295 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-02-11 |
0085/UN47.A2/KU/LS-BKKU/2026 |
2026-02-12 |
0160P |
Rp. 46.443.000 |
1 Hari |
|
| 296 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-02-11 |
0088/UN47.A2/KU/LS-BKKU/2026 |
2026-02-12 |
0159P |
Rp. 32.027.350 |
1 Hari |
|
| 297 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-02-13 |
0099/UN47.A2/KU/LS-BKKU/2026 |
2026-02-18 |
0189P |
Rp. 27.571.000 |
5 Hari |
|
| 298 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-02-26 |
0119/UN47.A2/KU/LS-BKKU/2026 |
2026-02-27 |
0268P |
Rp. 47.690.025 |
1 Hari |
|
| 299 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-02-26 |
0121/UN47.A2/KU/LS-BKKU/2026 |
2026-02-27 |
0259P |
Rp. 47.000.000 |
1 Hari |
|
| 300 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-02-26 |
0123/UN47.A2/KU/LS-BKKU/2026 |
2026-02-27 |
0269P |
Rp. 43.896.050 |
1 Hari |
|
| 301 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-02-26 |
0122/UN47.A2/KU/LS-BKKU/2026 |
2026-02-27 |
0260P |
Rp. 48.507.025 |
1 Hari |
|
| 302 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-03-04 |
0141/UN47.A2/KU/LS-BKKU/2026 |
2026-03-05 |
0326P |
Rp. 41.169.500 |
1 Hari |
|
| 303 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-03-04 |
0140/UN47.A2/KU/LS-BKKU/2026 |
2026-03-05 |
0325P |
Rp. 23.725.000 |
1 Hari |
|
| 304 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-03-09 |
0172/UN47.A2/KU/LS-BKKU/2026 |
2026-03-11 |
0457P |
Rp. 27.775.750 |
2 Hari |
|
| 305 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-03-09 |
0173/UN47.A2/KU/LS-BKKU/2026 |
2026-03-11 |
0458P |
Rp. 24.912.700 |
2 Hari |
|
| 306 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-03-10 |
0185/UN47.A2/KU/LS-BKKU/2026 |
2026-03-12 |
0459P |
Rp. 47.562.500 |
2 Hari |
|
| 307 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-03-10 |
0186/UN47.A2/KU/LS-BKKU/2026 |
2026-03-11 |
0472N |
Rp. 47.458.800 |
1 Hari |
|
| 308 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-03-10 |
0190/UN47.A2/KU/GU.4-BKKU/2026 |
2026-03-11 |
0438P |
Rp. 29.588.400 |
1 Hari |
|
| 309 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-03-11 |
0197/UN47.A2/KU/LS-BKKU/2026 |
2026-03-11 |
0470P |
Rp. 42.339.000 |
0 Hari |
|
| 310 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-03-13 |
0220/UN47.A2/KU-LS-BKKU/2026 |
2026-03-16 |
0559P |
Rp. 45.770.000 |
3 Hari |
|
| 311 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-03-13 |
0221/UN47.A2/KU/LS-BKKU/2026 |
2026-03-16 |
0560P |
Rp. 33.560.600 |
3 Hari |
|
| 312 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-03-31 |
0243/UN47.A2/KU/GU.5-BKKU/2026 |
2026-03-31 |
0620P |
Rp. 25.047.500 |
0 Hari |
|
| 313 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-04-06 |
0264/UN47.A2/KU/LS-BKKU/2026 |
2026-04-07 |
0668P |
Rp. 42.087.200 |
1 Hari |
|
| 314 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-04-07 |
0265/UN47.A2/KU/LS-BKKU/2026 |
2026-04-07 |
0669P |
Rp. 41.870.800 |
0 Hari |
|
| 315 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-04-08 |
0277/UN47.A2/KU/GU.6-BKKU/2026 |
2026-04-09 |
0697P |
Rp. 23.680.900 |
1 Hari |
|
| 316 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-04-08 |
0270/UN47.A2/KU/LS-BKKU/2026 |
2026-04-09 |
0701P |
Rp. 44.966.500 |
1 Hari |
|
| 317 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-04-08 |
0271/UN47.A2/KU/LS-BKKU/2026 |
2026-04-09 |
0702P |
Rp. 33.205.000 |
1 Hari |
|
| 318 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-04-15 |
0295/UN47.A2/KU/LS-BKKU/2026 |
2026-04-16 |
0818P |
Rp. 29.953.000 |
1 Hari |
|
| 319 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-04-15 |
0296/UN47.A2/KU/LS-BKKU/2026 |
2026-04-16 |
0819P |
Rp. 30.864.000 |
1 Hari |
|
| 320 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-04-23 |
0320/UN47.A2/KU/LS-BKKU/2026 |
2026-04-28 |
0891P |
Rp. 48.591.625 |
5 Hari |
|
| 321 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-04-23 |
0322/UN47.A2/KU/LS-BKKU/2026 |
2026-04-28 |
0890P |
Rp. 47.817.150 |
5 Hari |
|
| 322 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-04-23 |
0321/UN47.A2/KU/LS-BKKU/2026 |
2026-04-28 |
0889P |
Rp. 45.287.500 |
5 Hari |
|
| 323 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-04-27 |
0327/UN47.A2/KU/GU.7-BKKU/2026 |
2026-04-28 |
0904P |
Rp. 108.386.000 |
1 Hari |
|
| 324 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-04-30 |
0338/UN47.A2/KU/LS-BKKU/2026 |
2026-04-30 |
0967P |
Rp. 32.500.000 |
0 Hari |
|
| 325 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-05-05 |
0350/UN47.A2/KU/LS-BKKU/2026 |
2026-05-07 |
1032P |
Rp. 27.123.000 |
2 Hari |
|
| 326 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-05-11 |
0381/UN47.A2/KU/GU.8-BKKU/2026 |
2026-05-11 |
1041P |
Rp. 39.329.000 |
0 Hari |
|
| 327 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-05-13 |
0400/UN47.A2/KU/LS-BKKU/2026 |
2026-05-19 |
1087P |
Rp. 47.850.000 |
6 Hari |
|
| 328 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-05-13 |
0401/UN47.A2/KU/LS-BKKU/2026 |
2026-05-19 |
1086P |
Rp. 37.130.000 |
6 Hari |
|
| 329 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-05-21 |
0417/UN47.A2/KU/LS-BKKU/2026 |
2026-05-25 |
1137P |
Rp. 38.550.000 |
4 Hari |
|
| 330 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
|
|
|
|
Rp. 56.100.000 |
127 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Juni 2026 hingga 06 Oktober 2026 (127 Hari) |
| 331 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-06-03 |
0443/UN47.A2/KU/LS-BKKU/2026 |
2026-06-17 |
1303P |
Rp. 38.764.300 |
14 Hari |
|
| 332 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-06-03 |
0444/UN47.A2/KU/LS-BKKU/2026 |
2026-06-17 |
1304P |
Rp. 43.503.500 |
14 Hari |
|
| 333 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-06-03 |
0448/UN47.A2/KU/LS-BKKU/2026 |
2026-06-29 |
1361P |
Rp. 24.258.000 |
26 Hari |
|
| 334 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-06-18 |
0499/UN47.A2/KU/GU.10-BKKU/2026 |
2026-06-24 |
1332P |
Rp. 10.904.500 |
6 Hari |
|
| 335 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-06-23 |
0504/UN47.A2/KU/LS-BKKU/2026 |
2026-06-26 |
1347P |
Rp. 37.601.500 |
3 Hari |
|
| 336 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-06-29 |
0510/UN47.A2/KU/LS-BKKU/2026 |
2026-07-03 |
1468P |
Rp. 46.935.500 |
4 Hari |
|
| 337 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-07-10 |
0567/UN47.A2/KU/LS-BKKU/2026 |
2026-07-15 |
1630P |
Rp. 37.500.000 |
5 Hari |
|
| 338 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-07-10 |
0568/UN47.A2/KU/LS-BKKU/2026 |
2026-07-15 |
1627P |
Rp. 32.028.250 |
5 Hari |
|
| 339 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-07-10 |
0570/UN47.A2/KU/LS-BKKU/2026 |
2026-07-14 |
1625P |
Rp. 47.580.600 |
4 Hari |
|
| 340 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-07-10 |
0571/UN47.A2/KU/LS-BKKU/2026 |
2026-07-14 |
1626P |
Rp. 46.323.000 |
4 Hari |
|
| 341 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-07-22 |
0620/UN47.A2/KU/LS-BKKU/2026 |
2026-07-29 |
1741P |
Rp. 41.919.500 |
7 Hari |
|
| 342 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-07-28 |
0638/UN47.A2/KU/GU.12-BKKU/2026 |
2026-07-29 |
1764P |
Rp. 112.105.600 |
1 Hari |
|
| 343 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-08-13 |
0712/UN47.A2/KU/GU.13-BLU/2026 |
2026-08-18 |
2007P |
Rp. 67.450.000 |
5 Hari |
|
| 344 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-07-29 |
0643/UN47.A2/KU/LS-BKKU/2026 |
2026-08-03 |
1832P |
Rp. 39.048.900 |
5 Hari |
|
| 345 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-08-03 |
0642/UN47.A2/KU/LS-BKKU/2026 |
2026-08-03 |
1831P |
Rp. 38.050.000 |
0 Hari |
|
| 346 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-08-03 |
0657/UN47.A2/KU/LS-BKKU/2026 |
2026-08-04 |
1838P |
Rp. 35.509.000 |
1 Hari |
|
| 347 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-08-19 |
0724/UN47.A2/KU/LS-BKKU/2026 |
2026-08-20 |
2041P |
Rp. 47.600.475 |
1 Hari |
|
| 348 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-08-19 |
0725/UN47.A2/KU/LS-BKKU/2026 |
2026-08-21 |
2054P |
Rp. 7.076.000 |
2 Hari |
|
| 349 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-08-28 |
0759/UN47.A2/KU/GU.14-BKKU/2026 |
2026-09-01 |
2135P |
Rp. 44.163.350 |
4 Hari |
|
| 350 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-09-15 |
0827a/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 29.153.200 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 351 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-09-15 |
0838/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 48.916.500 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 352 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-09-15 |
0839/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 44.243.400 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 353 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-09-15 |
0828/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 36.171.000 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 354 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-09-15 |
0840/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 43.632.400 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 355 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-09-15 |
0826/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 35.895.000 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 356 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-09-16 |
0852/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 14.388.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 357 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-09-16 |
0851/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 44.600.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 358 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-09-25 |
0881/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 12.131.050 |
11 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 06 Oktober 2026 (11 Hari) |
| 359 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-09-28 |
0888/UN47.A2/KU/GU.16-BKKU/2026 |
|
|
Rp. 100.595.000 |
8 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 06 Oktober 2026 (8 Hari) |
| 360 |
Biro Keuangan, Kerja Sama dan Umum |
Oktober 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
|
|
|
|
Rp. 31.799.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 361 |
Biro Keuangan, Kerja Sama dan Umum |
Oktober 2026 |
525114 |
Belanja Pemeliharaan Listrik/Air dan Internet |
2026-10-02 |
0897/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 49.231.500 |
4 Hari |
Belum ada SP2D terhitung dari 02 Oktober 2026 hingga 06 Oktober 2026 (4 Hari) |
| 362 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Pemeliharaan Lift |
2026-02-23 |
0114/UN47.A2/KU/LS-BKKU/2026 |
2026-02-25 |
0226P |
Rp. 30.000.000 |
2 Hari |
|
| 363 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Pemeliharaan Lift |
2026-04-16 |
0299/UN47.A2/KU/LS-BKKU/2026 |
2026-04-20 |
0829P |
Rp. 30.000.000 |
4 Hari |
|
| 364 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Pemeliharaan Lift |
2026-06-17 |
0491/UN47.A2/KU/LS-BKKU/2026 |
2026-06-30 |
1398P |
Rp. 30.000.000 |
13 Hari |
|
| 365 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Pemeliharaan Lift |
2026-09-25 |
0872/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 36.100.000 |
11 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 06 Oktober 2026 (11 Hari) |
| 366 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525114 |
Pemeliharaan AC |
2026-01-19 |
0029/UN47.A2/KU/LS-BKKU/2026 |
2026-01-19 |
0056P |
Rp. 48.432.000 |
0 Hari |
|
| 367 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Pemeliharaan AC |
2026-02-26 |
0129/UN47.A2/KU/SPP-GU.3-BKKU |
2026-02-27 |
0255P |
Rp. 6.125.000 |
1 Hari |
|
| 368 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Pemeliharaan AC |
2026-03-11 |
0210/UN47.A2/KU/LS-BKKU/2026 |
2026-03-13 |
0517P |
Rp. 20.000.000 |
2 Hari |
|
| 369 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Pemeliharaan AC |
2026-03-31 |
0243/UN47.A2/KU/GU.5-BKKU/2026 |
2026-03-31 |
0620P |
Rp. 20.592.500 |
0 Hari |
|
| 370 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Pemeliharaan AC |
2026-04-29 |
0332/UN7.A2/KU/LS-BKKU/2026 |
2026-04-30 |
0938P |
Rp. 35.629.500 |
1 Hari |
|
| 371 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Pemeliharaan AC |
2026-04-30 |
0337/UN47.A2/KU/LS-BKKU/2026 |
2026-05-04 |
0968P |
Rp. 8.637.195 |
4 Hari |
|
| 372 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Pemeliharaan AC |
2026-05-30 |
0431/UN47.A2/KU/GU.9-BKKU/2026 |
2026-06-03 |
1216P |
Rp. 29.950.000 |
4 Hari |
|
| 373 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Pemeliharaan AC |
2026-06-18 |
0499/UN47.A2/KU/GU.10-BKKU/2026 |
2026-06-24 |
1332P |
Rp. 26.679.000 |
6 Hari |
|
| 374 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Pemeliharaan AC |
2026-07-09 |
0558/UN47.A2/KU/LS-BKKU/2026 |
2026-07-13 |
1603P |
Rp. 27.800.000 |
4 Hari |
|
| 375 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Pemeliharaan AC |
|
|
|
|
Rp. 46.000.000 |
66 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Agustus 2026 hingga 06 Oktober 2026 (66 Hari) |
| 376 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Pemeliharaan AC |
2026-07-14 |
0584/UN47.A2/KU/LS-BKKU/2026 |
2026-08-10 |
1863P |
Rp. 35.400.000 |
27 Hari |
|
| 377 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Pemeliharaan AC |
2026-08-13 |
0704/UN47.A2/KU/LS-BKKU/2026 |
2026-08-18 |
2001P |
Rp. 12.425.000 |
5 Hari |
|
| 378 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Pemeliharaan AC |
2026-08-28 |
0759/UN47.A2/KU/GU.14-BKKU/2026 |
2026-09-01 |
2135P |
Rp. 4.582.714 |
4 Hari |
|
| 379 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Pemeliharaan AC |
2026-08-31 |
0756/UN47.A2/KU/LS-BKKU/2026 |
2026-09-02 |
2192P |
Rp. 15.300.000 |
2 Hari |
|
| 380 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Pemeliharaan AC |
2026-09-15 |
0844/UN47.A2/KU-GU.15-BKKU/2026 |
2026-09-17 |
2351P |
Rp. 34.879.000 |
2 Hari |
|
| 381 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Pemeliharaan AC |
2026-09-28 |
0888/UN47.A2/KU/GU.16-BKKU/2026 |
|
|
Rp. 61.501.000 |
8 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 06 Oktober 2026 (8 Hari) |
| 382 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Pemeliharaan AC |
2026-09-29 |
0891/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 23.000.000 |
7 Hari |
Belum ada SP2D terhitung dari 29 September 2026 hingga 06 Oktober 2026 (7 Hari) |
| 383 |
Biro Keuangan, Kerja Sama dan Umum |
Oktober 2026 |
525114 |
Pemeliharaan AC |
|
|
|
|
Rp. 17.785.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 384 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-01-26 |
0049/UN47.A2/KU/GU.1-BKKU/2026 |
2026-01-28 |
0112P |
Rp. 14.406.041 |
2 Hari |
|
| 385 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-02-09 |
0081/UN47.A2/KU/GU.2-BKKU/2026 |
2026-02-11 |
0155P |
Rp. 7.080.000 |
2 Hari |
|
| 386 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-02-26 |
0129/UN47.A2/KU/SPP-GU.3-BKKU |
2026-02-27 |
0255P |
Rp. 143.000 |
1 Hari |
|
| 387 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-03-02 |
0134/UN47.A2/KU/LS-BKKU/2026 |
2026-03-02 |
0289P |
Rp. 31.679.550 |
0 Hari |
|
| 388 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-03-10 |
0190/UN47.A2/KU/GU.4-BKKU/2026 |
2026-03-11 |
0438P |
Rp. 3.585.000 |
1 Hari |
|
| 389 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-03-11 |
0206/UN47.A2/KU/LS-BKKU/2026 |
2026-03-30 |
0610P |
Rp. 40.745.500 |
19 Hari |
|
| 390 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-03-11 |
0207/UN47.A2/KU/LS-BKKU/2026 |
2026-03-30 |
0611P |
Rp. 40.758.500 |
19 Hari |
|
| 391 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-03-31 |
0243/UN47.A2/KU/GU.5-BKKU/2026 |
2026-03-31 |
0620P |
Rp. 1.800.000 |
0 Hari |
|
| 392 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-04-08 |
0277/UN47.A2/KU/GU.6-BKKU/2026 |
2026-04-09 |
0697P |
Rp. 3.397.960 |
1 Hari |
|
| 393 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-04-27 |
0327/UN47.A2/KU/GU.7-BKKU/2026 |
2026-04-28 |
0904P |
Rp. 12.679.500 |
1 Hari |
|
| 394 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-05-11 |
0381/UN47.A2/KU/GU.8-BKKU/2026 |
2026-05-11 |
1041P |
Rp. 3.500.000 |
0 Hari |
|
| 395 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-06-18 |
0499/UN47.A2/KU/GU.10-BKKU/2026 |
2026-06-24 |
1332P |
Rp. 3.750.000 |
6 Hari |
|
| 396 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-07-10 |
0575/UN47.A2/KU/GU.11-BKKU/2026 |
2026-07-13 |
1608P |
Rp. 3.050.232 |
3 Hari |
|
| 397 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-07-10 |
0575/UN47.A2/KU/GU.11-BKKU/2026 |
2026-07-13 |
1608P |
Rp. 4.250.000 |
3 Hari |
|
| 398 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-07-28 |
0638/UN47.A2/KU/GU.12-BKKU/2026 |
2026-07-29 |
1764P |
Rp. 16.902.000 |
1 Hari |
|
| 399 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-08-28 |
0759/UN47.A2/KU/GU.14-BKKU/2026 |
2026-09-01 |
2135P |
Rp. 6.337.000 |
4 Hari |
|
| 400 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
|
|
|
|
Rp. 100.000.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 401 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-09-08 |
0796/UN47.A2/KU/LS-BKKU/2026 |
2026-09-10 |
2244P |
Rp. 49.779.500 |
2 Hari |
|
| 402 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-09-15 |
0824/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 26.500.000 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 403 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-09-17 |
0860/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 31.194.373 |
19 Hari |
Belum ada SP2D terhitung dari 17 September 2026 hingga 06 Oktober 2026 (19 Hari) |
| 404 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-09-28 |
0884/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 48.526.000 |
8 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 06 Oktober 2026 (8 Hari) |
| 405 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-09-28 |
0888/UN47.A2/KU/GU.16-BKKU/2026 |
|
|
Rp. 14.776.500 |
8 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 06 Oktober 2026 (8 Hari) |
| 406 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Pemeliharaan Kendaraan Dinas Perkantoran |
2026-09-28 |
0890/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 45.527.500 |
8 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 06 Oktober 2026 (8 Hari) |
| 407 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-01-20 |
0032/UN47.A2/KU/LS-BKKU/2026 |
2026-01-22 |
0080P |
Rp. 30.600.000 |
2 Hari |
|
| 408 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-01-20 |
0033/UN47.A2/KU/LS-BKKU/2026 |
2026-01-22 |
0082P |
Rp. 35.959.500 |
2 Hari |
|
| 409 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-01-28 |
0058a/UN47.A2/KU/LS-BKKU/2026 |
2026-02-04 |
0134P |
Rp. 45.380.000 |
7 Hari |
|
| 410 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-02-11 |
0089/UN47.A2/KU/LS-BKKU/2026 |
2026-02-13 |
0175P |
Rp. 30.567.075 |
2 Hari |
|
| 411 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-02-11 |
0091/UN47.A2/KU/LS-BKKU/2026 |
2026-02-12 |
0174P |
Rp. 31.228.339 |
1 Hari |
|
| 412 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-02-11 |
0087/UN47.A2/KU/LS-BKKU/2026 |
2026-02-13 |
0173P |
Rp. 25.962.287 |
2 Hari |
|
| 413 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-02-11 |
0090/UN47.A2/KU/LS-BKKU/2026 |
2026-02-13 |
0176P |
Rp. 31.340.945 |
2 Hari |
|
| 414 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-02-13 |
0095/UN47.A2/KU/LS-BKKU/2026 |
2026-02-18 |
0187P |
Rp. 25.197.000 |
5 Hari |
|
| 415 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-02-13 |
0096/UN47.A2/KU/LS-BKKU/2026 |
2026-02-18 |
0188P |
Rp. 24.920.000 |
5 Hari |
|
| 416 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-02-26 |
0129/UN47.A2/KU/SPP-GU.3-BKKU |
2026-02-27 |
0255P |
Rp. 15.000.000 |
1 Hari |
|
| 417 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-03-04 |
0137/UN47.A2/KU/LS-BKKU/2026 |
2026-03-05 |
0327P |
Rp. 47.744.090 |
1 Hari |
|
| 418 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-03-04 |
0142/UN47.A2/KU/LS-BKKU/2026 |
2026-03-05 |
0341 |
Rp. 29.880.000 |
1 Hari |
|
| 419 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-03-05 |
0153/UN47.A2/KU/LS-BKKU/2026 |
2026-03-05 |
0339P |
Rp. 25.962.287 |
0 Hari |
|
| 420 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-03-05 |
0152/UN47.A2/KU/LS-BKKU/2026 |
2026-03-05 |
0338P |
Rp. 35.150.000 |
0 Hari |
|
| 421 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-03-05 |
0151/UN47.A2/KU/LS-BKKU/2026 |
2026-03-05 |
0340P |
Rp. 37.380.982 |
0 Hari |
|
| 422 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-03-10 |
0190/UN47.A2/KU/GU.4-BKKU/2026 |
2026-03-11 |
0438P |
Rp. 60.026.361 |
1 Hari |
|
| 423 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-03-11 |
0208/UN47.A2/KU/LS-BKKU/2026 |
2026-03-13 |
0518P |
Rp. 47.380.713 |
2 Hari |
|
| 424 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-03-16 |
0227/UN47.A2/KU/LS-BKKU/2026 |
2026-03-16 |
0595P |
Rp. 33.730.000 |
0 Hari |
|
| 425 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-03-31 |
0243/UN47.A2/KU/GU.5-BKKU/2026 |
2026-03-31 |
0620P |
Rp. 46.638.187 |
0 Hari |
|
| 426 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-04-08 |
0277/UN47.A2/KU/GU.6-BKKU/2026 |
2026-04-09 |
0697P |
Rp. 15.000.000 |
1 Hari |
|
| 427 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-04-20 |
0302/UN47.A2/KU/LS-BKKU/2026 |
2026-04-21 |
0842P |
Rp. 49.145.000 |
1 Hari |
|
| 428 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-04-20 |
0303/UN47.A2/KU/LS-BKKU/2026 |
2026-04-21 |
0843P |
Rp. 49.018.000 |
1 Hari |
|
| 429 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-04-20 |
0304/UN47.A2/KU/LS-BKKU/2026 |
2026-04-21 |
0844P |
Rp. 49.469.000 |
1 Hari |
|
| 430 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-04-21 |
0306/UN47.A2/KU/LS-BKKU/2026 |
2026-04-23 |
0866P |
Rp. 41.750.907 |
2 Hari |
|
| 431 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-04-21 |
0308/UN47.A2/KU/LS-BKKU/2026 |
2026-04-22 |
0855P |
Rp. 38.672.755 |
1 Hari |
|
| 432 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-04-21 |
0309/UN47.A2/KU/LS-BKKU/2026 |
2026-04-22 |
0854P |
Rp. 34.624.152 |
1 Hari |
|
| 433 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-04-21 |
0311/UN47.A2/KU/LS-BKKU/2026 |
2026-04-23 |
0867P |
Rp. 29.651.300 |
2 Hari |
|
| 434 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-04-21 |
0310/UN47.A2/KU/LS-BKKU/2026 |
2026-04-22 |
0856P |
Rp. 29.710.904 |
1 Hari |
|
| 435 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-04-23 |
0307/UN47.A2/KU/LS-BKKU/2026 |
2026-04-27 |
0887P |
Rp. 38.400.000 |
4 Hari |
|
| 436 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-05-05 |
0351/UN47.A2/KU/LS-BKKU/2026 |
2026-05-07 |
1031P |
Rp. 38.500.000 |
2 Hari |
|
| 437 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-05-05 |
0357/UN47.A2/KU/LS-BKKU/2026 |
2026-05-07 |
1022P |
Rp. 39.319.133 |
2 Hari |
|
| 438 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-05-05 |
0358/UN47.A2/KU/LS-BKKU/2026 |
2026-05-07 |
1020P |
Rp. 41.008.100 |
2 Hari |
|
| 439 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-05-05 |
0359/UN47.A2/KU/LS-BKKU/2026 |
2026-05-07 |
1021P |
Rp. 37.250.754 |
2 Hari |
|
| 440 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-05-30 |
0431/UN47.A2/KU/GU.9-BKKU/2026 |
2026-06-03 |
1216P |
Rp. 23.100.000 |
4 Hari |
|
| 441 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-07-10 |
0575/UN47.A2/KU/GU.11-BKKU/2026 |
2026-07-13 |
1608P |
Rp. 15.000.000 |
3 Hari |
|
| 442 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
|
|
|
|
Rp. 37.000.000 |
97 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Juli 2026 hingga 06 Oktober 2026 (97 Hari) |
| 443 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-07-10 |
0569/UN47.A2/KU/LS-BKKU/2026 |
2026-07-14 |
1624P |
Rp. 28.700.000 |
4 Hari |
|
| 444 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-07-28 |
0638/UN47.A2/KU/GU.12-BKKU/2026 |
2026-07-29 |
1764P |
Rp. 15.000.000 |
1 Hari |
|
| 445 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-08-13 |
0712/UN47.A2/KU/GU.13-BLU/2026 |
2026-08-18 |
2007P |
Rp. 15.000.000 |
5 Hari |
|
| 446 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-08-03 |
0658/Un47.A2/KU/LS-BKKU/2026 |
2026-08-04 |
1837P |
Rp. 28.700.000 |
1 Hari |
|
| 447 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-08-04 |
0671/UN47.A2/KU/LS-BKKU/2026 |
2026-08-11 |
1888P |
Rp. 33.064.532 |
7 Hari |
|
| 448 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-08-11 |
0689/UN47.A2/KU/LS-BKKU/2026 |
2026-08-18 |
1984P |
Rp. 48.379.308 |
7 Hari |
|
| 449 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-08-19 |
0728/UN47.A2/KU/LS-BKKU/2026 |
2026-08-20 |
2052P |
Rp. 34.613.000 |
1 Hari |
|
| 450 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-08-19 |
0730/UN47.A2/KU/LS-BKKU/2026 |
2026-08-20 |
2053P |
Rp. 48.173.400 |
1 Hari |
|
| 451 |
Biro Keuangan, Kerja Sama dan Umum |
Agustus 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-08-24 |
0742/UN47.A2/KU/LS-BKKU/2026 |
2026-08-27 |
2091P |
Rp. 37.732.450 |
3 Hari |
|
| 452 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
|
|
|
|
Rp. 40.500.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 453 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-08-31 |
0761/UN47.A2/KU/LS-BKKU/2026 |
2026-09-02 |
2170P |
Rp. 31.500.000 |
2 Hari |
|
| 454 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-08-31 |
0766/UN47.A2/KU/LS-BKKU/2026 |
2026-09-01 |
2151P |
Rp. 39.518.004 |
1 Hari |
|
| 455 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-09-01 |
0778/UN47.A2/KU/LS-BKKU/2026 |
2026-09-02 |
2180P |
Rp. 32.195.000 |
1 Hari |
|
| 456 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-09-15 |
0827/UN4.A2/KU/LS-BKKU/2026 |
|
|
Rp. 37.898.245 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 457 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-09-25 |
0875/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 49.952.902 |
11 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 06 Oktober 2026 (11 Hari) |
| 458 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-09-25 |
0882/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 10.750.000 |
11 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 06 Oktober 2026 (11 Hari) |
| 459 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-09-25 |
0878/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 49.476.000 |
11 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 06 Oktober 2026 (11 Hari) |
| 460 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-09-25 |
0879/UN47.A2/KU/LS-BKK/2026 |
|
|
Rp. 34.382.000 |
11 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 06 Oktober 2026 (11 Hari) |
| 461 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-09-25 |
0880/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 24.420.000 |
11 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 06 Oktober 2026 (11 Hari) |
| 462 |
Biro Keuangan, Kerja Sama dan Umum |
September 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-09-28 |
0888/UN47.A2/KU/GU.16-BKKU/2026 |
|
|
Rp. 19.374.306 |
8 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 06 Oktober 2026 (8 Hari) |
| 463 |
Biro Keuangan, Kerja Sama dan Umum |
Oktober 2026 |
525114 |
Belanja Pemeliharaan Gedung dan Bangunan Perkantoran |
2026-10-05 |
0904/UN47.A2/KU/LS-BKKU/2026 |
|
|
Rp. 35.401.264 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 464 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-03-04 |
0149/UN47.A2/KU/LS-BKKU/2026 |
2026-03-05 |
0328P |
Rp. 26.200.000 |
1 Hari |
|
| 465 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-03-05 |
0154/UN47.A2/KU-LS/BKKU-2026 |
2026-03-06 |
0346P |
Rp. 30.000.000 |
1 Hari |
|
| 466 |
Biro Keuangan, Kerja Sama dan Umum |
Maret 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-03-31 |
0239/UN47.A2/KU/GU.5-BKKU/2026 |
2026-03-31 |
0616P |
Rp. 1.800.000 |
0 Hari |
|
| 467 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-03-13 |
0218/UN47.A2/KU/LS-BKKU/2026 |
2026-03-13 |
0520P |
Rp. 43.800.000 |
0 Hari |
|
| 468 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-04-13 |
0285/UN47.A2/KU/LS-BKKU/2026 |
2026-04-15 |
0799P |
Rp. 214.900.000 |
2 Hari |
|
| 469 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-04-20 |
0305/UN47.A2/KU/LS-BKKU/2026 |
2026-04-21 |
0845P |
Rp. 24.750.000 |
1 Hari |
|
| 470 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-04-21 |
0312/UN47.A2/KU/LS-BKKU/2026 |
2026-04-22 |
0861P |
Rp. 6.400.000 |
1 Hari |
|
| 471 |
Biro Keuangan, Kerja Sama dan Umum |
April 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-04-21 |
0313/UN47.A2/KU/LS-BKKU/2026 |
2026-04-22 |
0862P |
Rp. 17.400.000 |
1 Hari |
|
| 472 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-04-29 |
0333/UN47.A2/KU/LS-BKKU/2026 |
2026-04-30 |
0966P |
Rp. 26.200.000 |
1 Hari |
|
| 473 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-05-11 |
0378/UN47.A2/KU/GU.8-BKKU/2026 |
2026-05-11 |
1038P |
Rp. 2.500.000 |
0 Hari |
|
| 474 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-05-13 |
0392/UN47.A2/KU/LS-BKKU/2026 |
2026-05-19 |
1092P |
Rp. 5.150.000 |
6 Hari |
|
| 475 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-05-13 |
0366/UN47.A2/KU/LS-BKKU/2026 |
2026-05-20 |
1099P |
Rp. 17.500.000 |
7 Hari |
|
| 476 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-05-21 |
0413/UN47.A2/KU/LS-BKKU/2026 |
2026-05-25 |
1147P |
Rp. 8.800.000 |
4 Hari |
|
| 477 |
Biro Keuangan, Kerja Sama dan Umum |
Mei 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-05-21 |
0414/UN47.A2/KU/LS-BKKU/2026 |
2026-05-25 |
1148P |
Rp. 30.200.000 |
4 Hari |
|
| 478 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-06-30 |
0514/UN47.A2/KU/LS-BKKU/2026 |
2026-07-07 |
1526P |
Rp. 26.200.000 |
7 Hari |
|
| 479 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-06-30 |
0513/UN47.A2/KU/LS-BKKU/2026 |
2026-07-07 |
1525P |
Rp. 63.000.000 |
7 Hari |
|
| 480 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-07-10 |
0565/UN47.A2/KU/LS-BKKU/2026 |
2026-07-14 |
1613P |
Rp. 4.850.000 |
4 Hari |
|
| 481 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-07-10 |
0564/UN47.A2/KU/LS-BKKU/2026 |
2026-07-14 |
1612P |
Rp. 47.100.000 |
4 Hari |
|
| 482 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-07-13 |
0581/UN47.A2/KU/LS-BKKU/2026 |
2026-07-16 |
1636P |
Rp. 41.250.000 |
3 Hari |
|
| 483 |
Biro Keuangan, Kerja Sama dan Umum |
Juli 2026 |
525111 |
Insentif Tim Pembinaan Apratur (BINAP), Insentif Tim Asesor BKD dan
Insentif Tim Penilai dan Panitia Angka Kredit JAFUNG, Komite Integritas
Akademik, Tim Penyusun Kode Etik Tendik UNG, Tim Penyusun Kode
Etik Dosen UNG |
2026-07-15 |
0595/UN47.A2/KU/LS-BKKU/2026 |
2026-07-28 |
1720P |
Rp. 69.600.000 |
13 Hari |
|
| 484 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525111 |
Honorarium Sidang Senat |
2026-02-27 |
0117/UN47.A2/KU/LS-BKKU/2026 |
2026-02-27 |
0263P |
Rp. 66.000.000 |
0 Hari |
|
| 485 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525111 |
Honorarium Sidang Senat |
2026-06-09 |
0462/UN47.A2/KU/LS-BKKU/2026 |
2026-06-29 |
1362P |
Rp. 112.500.000 |
20 Hari |
|
| 486 |
Biro Keuangan, Kerja Sama dan Umum |
Juni 2026 |
525111 |
Honorarium Sidang Senat |
2026-06-09 |
0463/UN47.A2/KU/LS-BKKU/2026 |
2026-06-11 |
1287P |
Rp. 20.000.000 |
2 Hari |
|
| 487 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525112 |
Belanja Kebutuhan Dasar Perkantoran |
2026-01-26 |
0050/UN47.A2/KU/GU.1-BKKU/2026 |
2026-01-28 |
0113P |
Rp. 13.236.500 |
2 Hari |
|
| 488 |
Biro Keuangan, Kerja Sama dan Umum |
Januari 2026 |
525112 |
Belanja Kebutuhan Dasar Perkantoran |
2026-02-09 |
0078/UN47.A2/KU/GU.2-BKKU/2026 |
2026-02-11 |
0153P |
Rp. 28.308.900 |
2 Hari |
|
| 489 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525112 |
Belanja Kebutuhan Dasar Perkantoran |
2026-02-09 |
0078/UN47.A2/KU/GU.2-BKKU/2026 |
2026-02-11 |
0153P |
Rp. 14.491.116 |
2 Hari |
|
| 490 |
Biro Keuangan, Kerja Sama dan Umum |
Februari 2026 |
525112 |
Belanja Kebutuhan Dasar Perkantoran |
2026-02-26 |
0126/UN47.A2/KU/SPP-GU.3-BKKU |
2026-02-27 |
0252P |
Rp. 787.000 |
1 Hari |
|
| 491 |
Fakultas Sastra dan Budaya |
Maret 2026 |
537112 |
Pembelian barang/peralatan Invetaris kantor dan penunjang lainnya berupa laptop dan printer |
2026-03-12 |
16/SPP-LS-5/2026 |
2026-03-30 |
0612D |
Rp. 59.916.690 |
18 Hari |
|
| 492 |
Fakultas Sastra dan Budaya |
April 2026 |
525114 |
Pemeliharaan AC Perkantoran |
2026-04-02 |
24/SPP-GU-1/2026 |
2026-04-09 |
0716D |
Rp. 5.946.429 |
7 Hari |
|
| 493 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525114 |
Pemeliharaan AC Perkantoran |
2026-08-06 |
071/SPP-GU-3/2026 |
2026-08-28 |
2098D |
Rp. 600.000 |
22 Hari |
|
| 494 |
Fakultas Sastra dan Budaya |
September 2026 |
525114 |
Pemeliharaan AC Perkantoran |
2026-09-18 |
0080/SPP-LS-19/2026 |
|
|
Rp. 43.661.963 |
18 Hari |
Belum ada SP2D terhitung dari 18 September 2026 hingga 06 Oktober 2026 (18 Hari) |
| 495 |
Fakultas Sastra dan Budaya |
Oktober 2026 |
525114 |
Pemeliharaan AC Perkantoran |
2026-10-06 |
0090/SPP-LS-24/2026 |
|
|
Rp. 36.003.869 |
0 Hari |
Belum ada SP2D terhitung dari 06 Oktober 2026 hingga 06 Oktober 2026 (0 Hari) |
| 496 |
Fakultas Sastra dan Budaya |
April 2026 |
525114 |
Pemeliharaan Komputer dan Printer Perkantoran |
2026-04-02 |
24/SPP-GU-1/2026 |
2026-04-09 |
0716D |
Rp. 200.000 |
7 Hari |
|
| 497 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525114 |
Pemeliharaan Komputer dan Printer Perkantoran |
2026-08-06 |
071/SPP-GU-3/2026 |
2026-08-28 |
2098D |
Rp. 665.000 |
22 Hari |
|
| 498 |
Fakultas Sastra dan Budaya |
Agustus 2026 |
525114 |
Pemeliharaan Komputer dan Printer Perkantoran |
2026-09-30 |
0086/SPP-GU-NIHIL/2026 |
|
|
Rp. 1.537.500 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 499 |
Fakultas Sastra dan Budaya |
September 2026 |
525114 |
Pemeliharaan Komputer dan Printer Perkantoran |
2026-09-30 |
0086/SPP-GU-NIHIL/2026 |
|
|
Rp. 2.180.000 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 500 |
Fakultas Sastra dan Budaya |
April 2026 |
525114 |
Pemeliharaan Jaringan Internet, Listrik dan Instalasi Air |
2026-04-02 |
24/SPP-GU-1/2026 |
2026-04-09 |
0716D |
Rp. 1.084.000 |
7 Hari |
|
| 501 |
Fakultas Sastra dan Budaya |
Mei 2026 |
525114 |
Pemeliharaan Jaringan Internet, Listrik dan Instalasi Air |
2026-04-27 |
36/SPP-GU-2/2026 |
2026-05-12 |
1054D |
Rp. 1.200.000 |
15 Hari |
|
| 502 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525114 |
Pemeliharaan Jaringan Internet, Listrik dan Instalasi Air |
2026-08-06 |
071/SPP-GU-3/2026 |
2026-08-28 |
2098D |
Rp. 2.159.680 |
22 Hari |
|
| 503 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525114 |
Pemeliharaan Jaringan Internet, Listrik dan Instalasi Air |
2026-09-30 |
0086/SPP-GU-NIHIL/2026 |
|
|
Rp. 2.000.000 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 504 |
Fakultas Sastra dan Budaya |
September 2026 |
525114 |
Pemeliharaan Jaringan Internet, Listrik dan Instalasi Air |
2026-09-14 |
0076/SPP-GU-4/2026 |
|
|
Rp. 3.000.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 505 |
Fakultas Sastra dan Budaya |
September 2026 |
525114 |
Pemeliharaan Jaringan Internet, Listrik dan Instalasi Air |
2026-09-30 |
0086/SPP-GU-NIHIL/2026 |
|
|
Rp. 500.000 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 506 |
Fakultas Sastra dan Budaya |
Agustus 2026 |
525114 |
Bantuan Biaya Pemeliharaan Halaman Gedung dan Bangunan |
2026-09-30 |
0086/SPP-GU-NIHIL/2026 |
|
|
Rp. 3.500.000 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 507 |
Fakultas Sastra dan Budaya |
September 2026 |
525114 |
Bantuan Biaya Pemeliharaan Halaman Gedung dan Bangunan |
2026-09-30 |
0086/SPP-GU-NIHIL/2026 |
|
|
Rp. 1.500.000 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 508 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525119 |
Penguatan Implementasi Kurikulum Berbasis OBE |
2026-08-06 |
073/SPP-GU-3/2026 |
2026-08-28 |
2100D |
Rp. 8.400.000 |
22 Hari |
|
| 509 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Penguatan Implementasi Kurikulum Berbasis OBE |
2026-09-30 |
0088/SPP-GU-NIHIL/2026 |
|
|
Rp. 1.600.000 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 510 |
Fakultas Sastra dan Budaya |
April 2026 |
525119 |
Bantuan Kegiatan Seleksi dan Pelatihan/Pendampingan PPK Ormawa |
2026-04-02 |
26/SPP-GU-1/2026 |
2026-04-09 |
0717D |
Rp. 2.000.000 |
7 Hari |
|
| 511 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525119 |
Bantuan Kegiatan Seleksi dan Pelatihan/Pendampingan PPK Ormawa |
2026-08-06 |
073/SPP-GU-3/2026 |
2026-08-28 |
2100D |
Rp. 1.000.000 |
22 Hari |
|
| 512 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan Kegiatan Seleksi dan Pelatihan/Pendampingan PPK Ormawa |
2026-09-30 |
0088/SPP-GU-NIHIL/2026 |
|
|
Rp. 1.000.000 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 513 |
Fakultas Sastra dan Budaya |
Mei 2026 |
525119 |
Bantuan Kegiatan Tata Kelola Ormawa (Mubes,Sekretariat Ormawa) |
2026-04-27 |
40/SPP-GU-2/2026 |
2026-05-12 |
1056D |
Rp. 4.000.000 |
15 Hari |
|
| 514 |
Fakultas Sastra dan Budaya |
Mei 2026 |
525119 |
Bantuan Kegiatan Pembinaan Prestasi Nasional |
2026-04-27 |
40/SPP-GU-2/2026 |
2026-05-12 |
1056D |
Rp. 2.500.000 |
15 Hari |
|
| 515 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525119 |
Bantuan Kegiatan Pembinaan Prestasi Nasional |
2026-08-06 |
073/SPP-GU-3/2026 |
2026-08-28 |
2100D |
Rp. 2.500.000 |
22 Hari |
|
| 516 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan Kegiatan Pembinaan Prestasi Nasional |
|
|
|
|
Rp. 5.000.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 517 |
Fakultas Sastra dan Budaya |
April 2026 |
525119 |
Bantuan Kegiatan Pembinaan PEKSIMINAS |
2026-04-02 |
26/SPP-GU-1/2026 |
2026-04-09 |
0717D |
Rp. 3.500.000 |
7 Hari |
|
| 518 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525119 |
Bantuan Kegiatan Pembinaan PEKSIMINAS |
2026-08-06 |
073/SPP-GU-3/2026 |
2026-08-28 |
2100D |
Rp. 4.000.000 |
22 Hari |
|
| 519 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan Kegiatan Pembinaan PEKSIMINAS |
2026-09-30 |
0088/SPP-GU-NIHIL/2026 |
|
|
Rp. 2.500.000 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 520 |
Fakultas Sastra dan Budaya |
April 2026 |
525119 |
Bantuan Kegiatan Seleksi dan Pelatihan/Pendampingan P2MW |
2026-04-02 |
26/SPP-GU-1/2026 |
2026-04-09 |
0717D |
Rp. 1.000.000 |
7 Hari |
|
| 521 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan Kegiatan Seleksi dan Pelatihan/Pendampingan P2MW |
2026-09-14 |
0078/SPP-GU-4/2026 |
|
|
Rp. 1.000.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 522 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525119 |
Bantuan Kegiatan PILMAPRES |
2026-08-06 |
073/SPP-GU-3/2026 |
2026-08-28 |
2100D |
Rp. 5.000.000 |
22 Hari |
|
| 523 |
Fakultas Sastra dan Budaya |
Oktober 2026 |
525119 |
Bantuan Presenter Seminar Internasional |
2026-10-06 |
0094/SPP-LS-27/2026 |
|
|
Rp. 4.800.000 |
0 Hari |
Belum ada SP2D terhitung dari 06 Oktober 2026 hingga 06 Oktober 2026 (0 Hari) |
| 524 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan Kegiatan Penerimaan Mahasiswa Baru |
2026-09-14 |
0078/SPP-GU-4/2026 |
|
|
Rp. 20.000.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 525 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525119 |
Bantuan Kegiatan Pekan Ilmiah Mahasiswa Nasional (PIMNAS) |
2026-08-06 |
073/SPP-GU-3/2026 |
2026-08-28 |
2100D |
Rp. 350.000 |
22 Hari |
|
| 526 |
Fakultas Sastra dan Budaya |
Agustus 2026 |
525119 |
Bantuan Kegiatan Pekan Ilmiah Mahasiswa Nasional (PIMNAS) |
2026-09-14 |
0078/SPP-GU-4/2026 |
|
|
Rp. 350.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 527 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan Kegiatan Pekan Ilmiah Mahasiswa Nasional (PIMNAS) |
2026-09-14 |
0078/SPP-GU-4/2026 |
|
|
Rp. 350.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 528 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan Kegiatan Pembinaan Prestasi Internasional |
|
|
|
|
Rp. 15.000.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 529 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan Biaya Yudisium (120 Org x 5 Kegiatan) |
2026-09-14 |
0078/SPP-GU-4/2026 |
|
|
Rp. 2.000.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 530 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan Biaya Semester Antara |
2026-10-06 |
0094/SPP-LS-27/2026 |
|
|
Rp. 6.300.000 |
0 Hari |
Belum ada SP2D terhitung dari 06 Oktober 2026 hingga 06 Oktober 2026 (0 Hari) |
| 531 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan Biaya Kegiatan Laboratorium |
2026-09-30 |
0088/SPP-GU-NIHIL/2026 |
|
|
Rp. 1.500.000 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 532 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan Biaya Kegiatan Penjaminan Mutu Fakultas |
2026-09-30 |
0088/SPP-GU-NIHIL/2026 |
|
|
Rp. 5.000.000 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 533 |
Fakultas Sastra dan Budaya |
April 2026 |
525112 |
Belanja Barang Kebutuhan Sehari-hari dan BelanjaATM/ATK |
2026-04-02 |
20/SPP-GU-1/2026 |
2026-04-09 |
0714D |
Rp. 7.207.300 |
7 Hari |
|
| 534 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525112 |
Belanja Barang Kebutuhan Sehari-hari dan BelanjaATM/ATK |
2026-08-06 |
069/SPP-GU-3/2026 |
2026-08-28 |
2096D |
Rp. 8.303.900 |
22 Hari |
|
| 535 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525112 |
Belanja Barang Kebutuhan Sehari-hari dan BelanjaATM/ATK |
2026-09-30 |
0084/SPP-GU-NIHIL/2026 |
|
|
Rp. 1.922.500 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 536 |
Fakultas Sastra dan Budaya |
Agustus 2026 |
525112 |
Belanja Barang Kebutuhan Sehari-hari dan BelanjaATM/ATK |
2026-08-06 |
069/SPP-GU-3/2026 |
2026-08-28 |
2096D |
Rp. 1.428.000 |
22 Hari |
|
| 537 |
Fakultas Sastra dan Budaya |
Agustus 2026 |
525112 |
Belanja Barang Kebutuhan Sehari-hari dan BelanjaATM/ATK |
2026-09-14 |
0074/SPTB-GU-4/2026 |
|
|
Rp. 500.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 538 |
Fakultas Sastra dan Budaya |
Agustus 2026 |
525112 |
Belanja Barang Kebutuhan Sehari-hari dan BelanjaATM/ATK |
2026-09-30 |
0084/SPP-GU-NIHIL/2026 |
|
|
Rp. 1.815.000 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 539 |
Fakultas Sastra dan Budaya |
September 2026 |
525112 |
Belanja Barang Kebutuhan Sehari-hari dan BelanjaATM/ATK |
2026-09-14 |
0074/SPTB-GU-4/2026 |
|
|
Rp. 993.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 540 |
Fakultas Sastra dan Budaya |
September 2026 |
525112 |
Belanja Barang Kebutuhan Sehari-hari dan BelanjaATM/ATK |
2026-09-30 |
0084/SPP-GU-NIHIL/2026 |
|
|
Rp. 5.750.000 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 541 |
Fakultas Sastra dan Budaya |
April 2026 |
525119 |
Bantuan Biaya Kegiatan Pendukung Tri Dharma Fakultas Sastra dan Budaya |
2026-04-02 |
22/SPP-GU-1/2026 |
2026-04-09 |
0715D |
Rp. 48.579.271 |
7 Hari |
|
| 542 |
Fakultas Sastra dan Budaya |
Mei 2026 |
525119 |
Bantuan Biaya Kegiatan Pendukung Tri Dharma Fakultas Sastra dan Budaya |
2026-04-27 |
34/SPP-GU-2/2026 |
2026-05-12 |
1053D |
Rp. 9.868.100 |
15 Hari |
|
| 543 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525119 |
Bantuan Biaya Kegiatan Pendukung Tri Dharma Fakultas Sastra dan Budaya |
2026-08-06 |
070/SPP-GU-3/2026 |
2026-08-28 |
2097D |
Rp. 15.000.000 |
22 Hari |
|
| 544 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan Biaya Kegiatan Pendukung Tri Dharma Fakultas Sastra dan Budaya |
2026-09-14 |
075/SPP-GU-4/2026 |
|
|
Rp. 22.178.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 545 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan Biaya Kegiatan Pendukung Tri Dharma Fakultas Sastra dan Budaya |
2026-09-30 |
0085/SPP-GU-NIHIL/2026 |
|
|
Rp. 5.000.000 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 546 |
Fakultas Sastra dan Budaya |
April 2026 |
525112 |
Pelaksanaan Rapat Kerja dan Konsumsi Tamu Pimpinan |
2026-04-02 |
20/SPP-GU-1/2026 |
2026-04-09 |
0714D |
Rp. 483.000 |
7 Hari |
|
| 547 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525112 |
Pelaksanaan Rapat Kerja dan Konsumsi Tamu Pimpinan |
2026-08-06 |
069/SPP-GU-3/2026 |
2026-08-28 |
2096D |
Rp. 4.916.500 |
22 Hari |
|
| 548 |
Fakultas Sastra dan Budaya |
Agustus 2026 |
525112 |
Pelaksanaan Rapat Kerja dan Konsumsi Tamu Pimpinan |
2026-08-06 |
069/SPP-GU-3/2026 |
2026-08-28 |
2096D |
Rp. 980.000 |
22 Hari |
|
| 549 |
Fakultas Sastra dan Budaya |
Agustus 2026 |
525112 |
Pelaksanaan Rapat Kerja dan Konsumsi Tamu Pimpinan |
2026-09-14 |
0074/SPTB-GU-4/2026 |
|
|
Rp. 6.320.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 550 |
Fakultas Sastra dan Budaya |
Agustus 2026 |
525112 |
Pelaksanaan Rapat Kerja dan Konsumsi Tamu Pimpinan |
2026-09-30 |
0084/SPP-GU-NIHIL/2026 |
|
|
Rp. 3.100.000 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 551 |
Fakultas Sastra dan Budaya |
September 2026 |
525112 |
Pelaksanaan Rapat Kerja dan Konsumsi Tamu Pimpinan |
2026-09-14 |
0074/SPTB-GU-4/2026 |
|
|
Rp. 1.449.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 552 |
Fakultas Sastra dan Budaya |
September 2026 |
525112 |
Pelaksanaan Rapat Kerja dan Konsumsi Tamu Pimpinan |
2026-09-30 |
0084/SPP-GU-NIHIL/2026 |
|
|
Rp. 5.112.500 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 553 |
Fakultas Sastra dan Budaya |
Mei 2026 |
525112 |
Konsumsi Berat dan Ringan Rapat Rutin Fakultas dan Jurusan |
2026-04-27 |
30/SPP-GU-2/2026 |
2026-05-12 |
1051D |
Rp. 1.697.500 |
15 Hari |
|
| 554 |
Fakultas Sastra dan Budaya |
Agustus 2026 |
525112 |
Konsumsi Berat dan Ringan Rapat Rutin Fakultas dan Jurusan |
2026-09-30 |
0084/SPP-GU-NIHIL/2026 |
|
|
Rp. 3.747.500 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 555 |
Fakultas Sastra dan Budaya |
September 2026 |
525112 |
Konsumsi Berat dan Ringan Rapat Rutin Fakultas dan Jurusan |
2026-09-30 |
0084/SPP-GU-NIHIL/2026 |
|
|
Rp. 16.985.000 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 556 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525119 |
Bantuan Biaya Kegiatan Sekretariat dan Kehumasan |
2026-08-06 |
070/SPP-GU-3/2026 |
2026-08-28 |
2097D |
Rp. 6.500.000 |
22 Hari |
|
| 557 |
Fakultas Sastra dan Budaya |
Mei 2026 |
525115 |
Tiket Perjalanan PP Pimpinan dalam Rangka Forum Dekanat FSB (4 org x 1 keg) |
2026-04-27 |
32/SPP-GU-2/2026 |
2026-05-12 |
1052D |
Rp. 19.007.172 |
15 Hari |
|
| 558 |
Fakultas Sastra dan Budaya |
Mei 2026 |
525115 |
Biaya Akomodasi Pimpinan Dalam Rangka Forum Dekanat FSB (4 org x 4 hari x 1 kegiatan) |
2026-04-27 |
32/SPP-GU-2/2026 |
2026-05-12 |
1052D |
Rp. 11.625.436 |
15 Hari |
|
| 559 |
Fakultas Sastra dan Budaya |
Mei 2026 |
525115 |
Biaya Uang Harian Pimpinan dalam Rangka Forum Dekanat FSB (4 Orang x 5 Hari x 1 Kegiatan) |
2026-04-27 |
32/SPP-GU-2/2026 |
2026-05-12 |
1052D |
Rp. 8.101.436 |
15 Hari |
|
| 560 |
Fakultas Sastra dan Budaya |
Mei 2026 |
525119 |
Operasional Kendaraan Dinas Pimpinan |
2026-04-27 |
34/SPP-GU-2/2026 |
2026-05-12 |
1053D |
Rp. 2.000.000 |
15 Hari |
|
| 561 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525119 |
Operasional Kendaraan Dinas Pimpinan |
2026-08-06 |
070/SPP-GU-3/2026 |
2026-08-28 |
2097D |
Rp. 1.900.000 |
22 Hari |
|
| 562 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Operasional Kendaraan Dinas Pimpinan |
2026-09-30 |
0085/SPP-GU-NIHIL/2026 |
|
|
Rp. 2.750.000 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 563 |
Fakultas Sastra dan Budaya |
Februari 2026 |
525111 |
Remunerasi Insentif Kelola (19 Org x12 Bulan) |
2026-01-13 |
06/SPP-LS-1/2026 |
2026-02-04 |
0131D |
Rp. 45.300.000 |
22 Hari |
|
| 564 |
Fakultas Sastra dan Budaya |
Maret 2026 |
525111 |
Remunerasi Insentif Kelola (19 Org x12 Bulan) |
2026-03-03 |
08/SPP-LS-2/2026 |
2026-03-11 |
0474D |
Rp. 80.200.000 |
8 Hari |
|
| 565 |
Fakultas Sastra dan Budaya |
April 2026 |
525111 |
Remunerasi Insentif Kelola (19 Org x12 Bulan) |
2026-04-06 |
28/SPP-LS-6/2026 |
2026-04-09 |
0718D |
Rp. 40.100.000 |
3 Hari |
|
| 566 |
Fakultas Sastra dan Budaya |
Mei 2026 |
525111 |
Remunerasi Insentif Kelola (19 Org x12 Bulan) |
2026-05-04 |
42/SPP-LS-7/2026 |
2026-05-07 |
1023D |
Rp. 40.100.000 |
3 Hari |
|
| 567 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525111 |
Remunerasi Insentif Kelola (19 Org x12 Bulan) |
2026-06-02 |
48/SPP-LS-9/2026 |
2026-07-01 |
1429D |
Rp. 40.100.000 |
29 Hari |
|
| 568 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525111 |
Remunerasi Insentif Kelola (19 Org x12 Bulan) |
2026-07-07 |
066/SPP-LS-11/2026 |
2026-08-05 |
1848D |
Rp. 40.100.000 |
29 Hari |
|
| 569 |
Fakultas Sastra dan Budaya |
Agustus 2026 |
525111 |
Remunerasi Insentif Kelola (19 Org x12 Bulan) |
2026-08-31 |
075/SPP-LS-15/2026 |
|
|
Rp. 46.600.000 |
36 Hari |
Belum ada SP2D terhitung dari 31 Agustus 2026 hingga 06 Oktober 2026 (36 Hari) |
| 570 |
Fakultas Sastra dan Budaya |
September 2026 |
525111 |
Remunerasi Insentif Kelola (19 Org x12 Bulan) |
2026-08-10 |
074/SPP-LS-14/2026 |
2026-08-20 |
2037D |
Rp. 46.600.000 |
10 Hari |
|
| 571 |
Fakultas Sastra dan Budaya |
Oktober 2026 |
525111 |
Remunerasi Insentif Kelola (19 Org x12 Bulan) |
2026-10-06 |
0094/SPP-LS-28/2026 |
|
|
Rp. 46.600.000 |
0 Hari |
Belum ada SP2D terhitung dari 06 Oktober 2026 hingga 06 Oktober 2026 (0 Hari) |
| 572 |
Fakultas Sastra dan Budaya |
Januari 2026 |
525111 |
Remunerasi Tugas Tambahan Tenaga Pendidik (5 Dosen x 12 Bulan) |
2026-01-13 |
04/SPP-LS-1/2026 |
2026-01-21 |
0077D |
Rp. 141.120.000 |
8 Hari |
|
| 573 |
Fakultas Sastra dan Budaya |
Maret 2026 |
525111 |
Remunerasi Tugas Tambahan Tenaga Pendidik (5 Dosen x 12 Bulan) |
2026-03-09 |
14/SPP-LS-4/2026 |
2026-03-16 |
0561D |
Rp. 60.480.000 |
7 Hari |
|
| 574 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525111 |
Remunerasi Tugas Tambahan Tenaga Pendidik (5 Dosen x 12 Bulan) |
2026-07-07 |
067/SPP-LS-12/2026 |
2026-07-30 |
1773D |
Rp. 141.120.000 |
23 Hari |
|
| 575 |
Fakultas Sastra dan Budaya |
September 2026 |
525111 |
Remunerasi Tugas Tambahan Tenaga Pendidik (5 Dosen x 12 Bulan) |
2026-09-08 |
0077/SPP-LS-17/2026 |
|
|
Rp. 60.480.000 |
28 Hari |
Belum ada SP2D terhitung dari 08 September 2026 hingga 06 Oktober 2026 (28 Hari) |
| 576 |
Fakultas Sastra dan Budaya |
Januari 2026 |
525111 |
Remunerasi Fungsional Tenaga Pendidik (77 Dosen x 12 Bulan) |
2026-01-13 |
02/SPP-LS-1/2026 |
2026-01-19 |
0046D |
Rp. 930.360.000 |
6 Hari |
|
| 577 |
Fakultas Sastra dan Budaya |
Maret 2026 |
525111 |
Remunerasi Fungsional Tenaga Pendidik (77 Dosen x 12 Bulan) |
2026-03-09 |
12/SPP-LS-4/2026 |
2026-03-13 |
0533D |
Rp. 392.880.000 |
4 Hari |
|
| 578 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525111 |
Remunerasi Fungsional Tenaga Pendidik (77 Dosen x 12 Bulan) |
2026-07-07 |
068/SPP-LS-13/2026 |
2026-07-20 |
1649D |
Rp. 924.180.000 |
13 Hari |
|
| 579 |
Fakultas Sastra dan Budaya |
September 2026 |
525111 |
Remunerasi Fungsional Tenaga Pendidik (77 Dosen x 12 Bulan) |
2026-09-18 |
0078/SPP/LS-18/2026 |
|
|
Rp. 404.106.000 |
18 Hari |
Belum ada SP2D terhitung dari 18 September 2026 hingga 06 Oktober 2026 (18 Hari) |
| 580 |
Fakultas Sastra dan Budaya |
Mei 2026 |
525119 |
Bantuan Biaya SIDAPRO dan SIKPRODI |
2026-04-27 |
38/SPP-GU-2/2026 |
2026-05-12 |
1055D |
Rp. 10.000.000 |
15 Hari |
|
| 581 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525119 |
Bantuan Biaya SIDAPRO dan SIKPRODI |
2026-08-06 |
072/SPP-GU-3/2026 |
2026-08-28 |
2099D |
Rp. 5.000.000 |
22 Hari |
|
| 582 |
Fakultas Sastra dan Budaya |
Maret 2026 |
525111 |
Insentif PPK UK |
2026-03-03 |
10/SPP-LS-3/2026 |
2026-03-06 |
0343D |
Rp. 3.630.000 |
3 Hari |
|
| 583 |
Fakultas Sastra dan Budaya |
Juni 2026 |
525111 |
Insentif PPK UK |
2026-06-02 |
48/SPP-LS-10/2026 |
2026-06-30 |
1400D |
Rp. 3.450.000 |
28 Hari |
|
| 584 |
Fakultas Sastra dan Budaya |
Maret 2026 |
525111 |
Insentif Penguji Tagihan/Verifikator UK |
2026-03-03 |
10/SPP-LS-3/2026 |
2026-03-06 |
0343D |
Rp. 1.470.000 |
3 Hari |
|
| 585 |
Fakultas Sastra dan Budaya |
Juni 2026 |
525111 |
Insentif Penguji Tagihan/Verifikator UK |
2026-06-02 |
48/SPP-LS-10/2026 |
2026-06-30 |
1400D |
Rp. 1.410.000 |
28 Hari |
|
| 586 |
Fakultas Sastra dan Budaya |
Agustus 2026 |
525115 |
Biaya Perjalanan Dinas PP Petugas Keuangan Kegiatan Perencanaan dan Keuangan (2 Orang x 1 Kegiatan ) |
2026-09-14 |
0077/SPP-GU-4/2026 |
|
|
Rp. 2.800.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 587 |
Fakultas Sastra dan Budaya |
September 2026 |
525115 |
Biaya Perjalanan Dinas PP Petugas Keuangan Kegiatan Perencanaan dan Keuangan (2 Orang x 1 Kegiatan ) |
2026-09-14 |
0077/SPP-GU-4/2026 |
|
|
Rp. 3.600.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 588 |
Fakultas Sastra dan Budaya |
Agustus 2026 |
525115 |
Biaya Uang Harian Kegiatan Perencanaan dan Pegelolaan Keuangan (2 Orang x 4 hari) |
2026-09-14 |
0077/SPP-GU-4/2026 |
|
|
Rp. 1.000.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 589 |
Fakultas Sastra dan Budaya |
September 2026 |
525115 |
Biaya Uang Harian Kegiatan Perencanaan dan Pegelolaan Keuangan (2 Orang x 4 hari) |
2026-09-14 |
0077/SPP-GU-4/2026 |
|
|
Rp. 2.260.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 590 |
Fakultas Sastra dan Budaya |
September 2026 |
525115 |
Bantuan Biaya Akomodasi Kegiatan Perencanaan dan Pegelolaan Keuangan (2Orang x 4 hari) |
2026-09-14 |
0077/SPP-GU-4/2026 |
|
|
Rp. 2.200.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 591 |
Fakultas Sastra dan Budaya |
Oktober 2026 |
525176 |
Insentif PPK UK |
2026-10-05 |
0092/SPP-LS-26/2026 |
|
|
Rp. 4.480.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 592 |
Fakultas Sastra dan Budaya |
Oktober 2026 |
525176 |
Insentif Penguji Tagihan/Verifikator UK |
2026-10-05 |
0092/SPP-LS-26/2026 |
|
|
Rp. 1.840.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 593 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan Kegiatan Workshop Analisis Manajemen Resiko |
2026-09-30 |
0087/SPP-GU-NIHIL/2026 |
|
|
Rp. 1.000.000 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 594 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525119 |
Kolaborasi Riset dan Publikasi Berbasis Research and Development |
2026-06-02 |
44/SPP-LS-8/2026 |
2026-07-06 |
1509D |
Rp. 14.000.000 |
34 Hari |
|
| 595 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Kolaborasi Riset dan Publikasi Berbasis Research and Development |
2026-09-18 |
0081/SPP-LS-20/2026 |
|
|
Rp. 6.000.000 |
18 Hari |
Belum ada SP2D terhitung dari 18 September 2026 hingga 06 Oktober 2026 (18 Hari) |
| 596 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Bantuan biaya Artikel Ilmiah diterbitkan di Jurnal Internasional Bereputasi (Scopus) |
2026-10-06 |
0089/SPP-LS-23/2026 |
|
|
Rp. 10.000.000 |
0 Hari |
Belum ada SP2D terhitung dari 06 Oktober 2026 hingga 06 Oktober 2026 (0 Hari) |
| 597 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525119 |
Penelitian berbasis Pengembangan kawasan dan SDGs |
2026-06-02 |
44/SPP-LS-8/2026 |
2026-07-06 |
1509D |
Rp. 42.000.000 |
34 Hari |
|
| 598 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Penelitian berbasis Pengembangan kawasan dan SDGs |
2026-09-18 |
0082/SPP-LS-21/2026 |
|
|
Rp. 18.000.000 |
18 Hari |
Belum ada SP2D terhitung dari 18 September 2026 hingga 06 Oktober 2026 (18 Hari) |
| 599 |
Fakultas Sastra dan Budaya |
Juli 2026 |
525119 |
Pengabdian kepada masyarakat berbasis Pengembangan Kawasan dan SDGs |
2026-06-02 |
46/SPP-LS-8/2026 |
2026-07-07 |
1508D |
Rp. 42.000.000 |
35 Hari |
|
| 600 |
Fakultas Sastra dan Budaya |
September 2026 |
525119 |
Pengabdian kepada masyarakat berbasis Pengembangan Kawasan dan SDGs |
2026-09-18 |
0083/SPP-LS-22/2026 |
|
|
Rp. 18.000.000 |
18 Hari |
Belum ada SP2D terhitung dari 18 September 2026 hingga 06 Oktober 2026 (18 Hari) |
| 601 |
Badan Pengelola Usaha |
Maret 2026 |
537112 |
Pengadaan Peralatan Perkantoran |
2026-03-09 |
12/UN47.H/LS5-SPP/BPU/2026 |
2026-03-12 |
0484U |
Rp. 49.839.000 |
3 Hari |
|
| 602 |
Badan Pengelola Usaha |
Maret 2026 |
537112 |
Pengadaan Peralatan Perkantoran |
2026-03-09 |
13/UN47.H/LS5-SPP/BPU/2026 |
2026-03-12 |
0485U |
Rp. 49.950.000 |
3 Hari |
|
| 603 |
Badan Pengelola Usaha |
Maret 2026 |
537112 |
Pengadaan Peralatan Perkantoran |
2026-03-09 |
14/UN47.H/LS5-SPP/BPU/2026 |
2026-03-12 |
0496U |
Rp. 49.772.400 |
3 Hari |
|
| 604 |
Badan Pengelola Usaha |
April 2026 |
537112 |
Pengadaan Peralatan Perkantoran |
2026-03-30 |
19/UN47.H/LS7-SPP/BPU/2026 |
2026-04-01 |
0626U |
Rp. 49.977.750 |
2 Hari |
|
| 605 |
Badan Pengelola Usaha |
April 2026 |
537112 |
Pengadaan Peralatan Perkantoran |
2026-03-30 |
20/UN47.H/LS7-SPP/BPU/2026 |
2026-04-01 |
0627U |
Rp. 30.591.600 |
2 Hari |
|
| 606 |
Badan Pengelola Usaha |
Mei 2026 |
537112 |
Pengadaan Peralatan Perkantoran |
2026-04-28 |
34/UN47.H/LS10-SPP/BPU/2026 |
2026-05-06 |
1000U |
Rp. 37.022.000 |
8 Hari |
|
| 607 |
Badan Pengelola Usaha |
Agustus 2026 |
537112 |
Pengadaan Peralatan Perkantoran |
2026-08-27 |
61/UN47.H/LS18-SPP/BPU/2026 |
2026-09-09 |
2232U |
Rp. 20.434.000 |
13 Hari |
|
| 608 |
Badan Pengelola Usaha |
Agustus 2026 |
537112 |
Pengadaan Peralatan Perkantoran |
2026-09-22 |
71/UN47.H/GUP5-SPP/BPU/2026 |
|
|
Rp. 19.862.406 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 609 |
Badan Pengelola Usaha |
September 2026 |
537112 |
Pengadaan Peralatan Perkantoran |
2026-09-22 |
71/UN47.H/GUP5-SPP/BPU/2026 |
|
|
Rp. 6.925.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 610 |
Badan Pengelola Usaha |
Juli 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-08-07 |
50/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1987U |
Rp. 17.749.000 |
12 Hari |
|
| 611 |
Badan Pengelola Usaha |
Agustus 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-09-22 |
71/UN47.H/GUP5-SPP/BPU/2026 |
|
|
Rp. 19.428.100 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 612 |
Badan Pengelola Usaha |
Maret 2026 |
525114 |
Pemeliharaan AC Split |
2026-04-13 |
26/UN47.H/GUP2-SPP/BPU/2026 |
2026-04-15 |
0804U |
Rp. 1.500.000 |
2 Hari |
|
| 613 |
Badan Pengelola Usaha |
April 2026 |
525114 |
Pemeliharaan AC Split |
2026-05-29 |
40/UN47.H/GUP3-SPP/BPU/2026 |
2026-06-29 |
1372U |
Rp. 800.000 |
31 Hari |
|
| 614 |
Badan Pengelola Usaha |
Juni 2026 |
525114 |
Pemeliharaan AC Split |
2026-08-07 |
56/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1993U |
Rp. 1.120.000 |
12 Hari |
|
| 615 |
Badan Pengelola Usaha |
Agustus 2026 |
525114 |
Pemeliharaan AC Split |
2026-09-22 |
75/UN47.H/GUP5-SPP/BPU/2026 |
|
|
Rp. 1.260.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 616 |
Badan Pengelola Usaha |
September 2026 |
525114 |
Pemeliharaan Komputer / Laptop |
|
|
|
|
Rp. 350.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 617 |
Badan Pengelola Usaha |
Januari 2026 |
525114 |
Pemeilharaan Gedung Kantor dan Unit Usaha |
2026-03-04 |
10/UN47.H/GUP1-SPP/BPU/2026 |
2026-03-11 |
0426U |
Rp. 165.000 |
7 Hari |
|
| 618 |
Badan Pengelola Usaha |
Maret 2026 |
525114 |
Pemeilharaan Gedung Kantor dan Unit Usaha |
2026-04-13 |
26/UN47.H/GUP2-SPP/BPU/2026 |
2026-04-15 |
0804U |
Rp. 27.872.000 |
2 Hari |
|
| 619 |
Badan Pengelola Usaha |
April 2026 |
525114 |
Pemeilharaan Gedung Kantor dan Unit Usaha |
2026-04-14 |
30/UN47.H/LS9-SPP/BPU/2026 |
2026-04-22 |
0853U |
Rp. 48.852.000 |
8 Hari |
|
| 620 |
Badan Pengelola Usaha |
April 2026 |
525114 |
Pemeilharaan Gedung Kantor dan Unit Usaha |
2026-05-29 |
40/UN47.H/GUP3-SPP/BPU/2026 |
2026-06-29 |
1372U |
Rp. 292.000 |
31 Hari |
|
| 621 |
Badan Pengelola Usaha |
Mei 2026 |
525114 |
Pemeilharaan Gedung Kantor dan Unit Usaha |
2026-05-07 |
31/UN47.H/LS11-SPP/BPU/2026 |
2026-05-21 |
1098U |
Rp. 47.123.500 |
14 Hari |
|
| 622 |
Badan Pengelola Usaha |
Juli 2026 |
525114 |
Pemeilharaan Gedung Kantor dan Unit Usaha |
2026-08-07 |
56/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1993U |
Rp. 292.000 |
12 Hari |
|
| 623 |
Badan Pengelola Usaha |
Agustus 2026 |
525114 |
Pemeilharaan Gedung Kantor dan Unit Usaha |
2026-08-12 |
59/UN47.H/LS17-SPP/BPU/2026 |
2026-08-24 |
2083U |
Rp. 24.373.000 |
12 Hari |
|
| 624 |
Badan Pengelola Usaha |
Agustus 2026 |
525114 |
Pemeilharaan Gedung Kantor dan Unit Usaha |
2026-09-22 |
75/UN47.H/GUP5-SPP/BPU/2026 |
|
|
Rp. 1.400.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 625 |
Badan Pengelola Usaha |
September 2026 |
525114 |
Pemeilharaan Gedung Kantor dan Unit Usaha |
2026-09-28 |
79/UN47.H/LS21-SPP/BPU/2026 |
|
|
Rp. 28.717.245 |
8 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 06 Oktober 2026 (8 Hari) |
| 626 |
Badan Pengelola Usaha |
Maret 2026 |
525112 |
Biaya Kebutuhan Dasar Perkantoran |
2026-04-13 |
24/UN47.H/GUP2-SPP/BPU/2026 |
2026-04-15 |
0802U |
Rp. 8.061.324 |
2 Hari |
|
| 627 |
Badan Pengelola Usaha |
April 2026 |
525112 |
Biaya Kebutuhan Dasar Perkantoran |
2026-05-29 |
37/UN47.H/GUP3-SPP/BPU/2026 |
2026-06-29 |
1369U |
Rp. 20.276.930 |
31 Hari |
|
| 628 |
Badan Pengelola Usaha |
Juni 2026 |
525112 |
Biaya Kebutuhan Dasar Perkantoran |
2026-08-07 |
51/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1988U |
Rp. 1.944.870 |
12 Hari |
|
| 629 |
Badan Pengelola Usaha |
Juli 2026 |
525112 |
Biaya Kebutuhan Dasar Perkantoran |
2026-08-07 |
51/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1988U |
Rp. 14.342.210 |
12 Hari |
|
| 630 |
Badan Pengelola Usaha |
Agustus 2026 |
525112 |
Biaya Kebutuhan Dasar Perkantoran |
|
|
|
|
Rp. 66.500 |
66 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Agustus 2026 hingga 06 Oktober 2026 (66 Hari) |
| 631 |
Badan Pengelola Usaha |
Agustus 2026 |
525112 |
Biaya Kebutuhan Dasar Perkantoran |
2026-08-12 |
57/UN47.H/LS17-SPP/BPU/2026 |
2026-08-26 |
2081U |
Rp. 13.189.000 |
14 Hari |
|
| 632 |
Badan Pengelola Usaha |
Agustus 2026 |
525112 |
Biaya Kebutuhan Dasar Perkantoran |
2026-09-22 |
72/UN47.H/GUP5-SPP/BPU/2026 |
|
|
Rp. 7.164.310 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 633 |
Badan Pengelola Usaha |
Oktober 2026 |
525112 |
Biaya Kebutuhan Dasar Perkantoran |
|
|
|
|
Rp. 7.797.300 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 634 |
Badan Pengelola Usaha |
Januari 2026 |
525112 |
Biaya Rapat Kerja dan Evaluasi Unit Usaha Per Triwulan (9 Org x 3 Keg x 12 Bulan) |
2026-03-04 |
08/UN47.H/GUP1-SPP/BPU/2026 |
2026-03-11 |
0428U |
Rp. 150.500 |
7 Hari |
|
| 635 |
Badan Pengelola Usaha |
Maret 2026 |
525112 |
Biaya Rapat Kerja dan Evaluasi Unit Usaha Per Triwulan (9 Org x 3 Keg x 12 Bulan) |
2026-04-13 |
24/UN47.H/GUP2-SPP/BPU/2026 |
2026-04-15 |
0802U |
Rp. 2.880.000 |
2 Hari |
|
| 636 |
Badan Pengelola Usaha |
April 2026 |
525112 |
Biaya Rapat Kerja dan Evaluasi Unit Usaha Per Triwulan (9 Org x 3 Keg x 12 Bulan) |
2026-05-29 |
37/UN47.H/GUP3-SPP/BPU/2026 |
2026-06-29 |
1369U |
Rp. 14.721.000 |
31 Hari |
|
| 637 |
Badan Pengelola Usaha |
Mei 2026 |
525112 |
Biaya Rapat Kerja dan Evaluasi Unit Usaha Per Triwulan (9 Org x 3 Keg x 12 Bulan) |
2026-04-30 |
31/UN47.H/LS10-SPP/BPU/2026 |
2026-05-06 |
0997U |
Rp. 23.400.000 |
6 Hari |
|
| 638 |
Badan Pengelola Usaha |
Juli 2026 |
525112 |
Biaya Rapat Kerja dan Evaluasi Unit Usaha Per Triwulan (9 Org x 3 Keg x 12 Bulan) |
2026-05-25 |
34/UN47.H/LS13-SPP/BPU/2026 |
2026-07-02 |
1438U |
Rp. 13.750.000 |
38 Hari |
|
| 639 |
Badan Pengelola Usaha |
Juli 2026 |
525112 |
Biaya Rapat Kerja dan Evaluasi Unit Usaha Per Triwulan (9 Org x 3 Keg x 12 Bulan) |
2026-08-07 |
51/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1988U |
Rp. 3.187.700 |
12 Hari |
|
| 640 |
Badan Pengelola Usaha |
Agustus 2026 |
525112 |
Biaya Rapat Kerja dan Evaluasi Unit Usaha Per Triwulan (9 Org x 3 Keg x 12 Bulan) |
2026-08-27 |
62/UN47.H/LS18-SPP/BPU/2026 |
2026-09-09 |
2233U |
Rp. 9.250.000 |
13 Hari |
|
| 641 |
Badan Pengelola Usaha |
Agustus 2026 |
525112 |
Biaya Rapat Kerja dan Evaluasi Unit Usaha Per Triwulan (9 Org x 3 Keg x 12 Bulan) |
2026-09-22 |
72/UN47.H/GUP5-SPP/BPU/2026 |
|
|
Rp. 867.500 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 642 |
Badan Pengelola Usaha |
April 2026 |
525115 |
Tiket Perjalanan Dinas PP |
2026-04-14 |
28/UN47.H/LS9-SPP/BPU/2026 |
2026-04-22 |
0851U |
Rp. 17.163.166 |
8 Hari |
|
| 643 |
Badan Pengelola Usaha |
Mei 2026 |
525115 |
Tiket Perjalanan Dinas PP |
2026-04-28 |
32/UN47.H/LS10-SPP/BPU/2026 |
2026-05-06 |
0998U |
Rp. 10.063.560 |
8 Hari |
|
| 644 |
Badan Pengelola Usaha |
Juli 2026 |
525115 |
Tiket Perjalanan Dinas PP |
2026-07-09 |
44/UN47.H/LS15-SPP/BPU/2026 |
2026-07-29 |
1748U |
Rp. 29.012.540 |
20 Hari |
|
| 645 |
Badan Pengelola Usaha |
Agustus 2026 |
525115 |
Tiket Perjalanan Dinas PP |
2026-08-27 |
63/UN47.H/LS18-SPP/BPU/2026 |
2026-09-09 |
2234U |
Rp. 7.103.880 |
13 Hari |
|
| 646 |
Badan Pengelola Usaha |
September 2026 |
525115 |
Tiket Perjalanan Dinas PP |
2026-09-11 |
70/UN47.H/LS20-SPP/BPU/2026 |
|
|
Rp. 3.385.508 |
25 Hari |
Belum ada SP2D terhitung dari 11 September 2026 hingga 06 Oktober 2026 (25 Hari) |
| 647 |
Badan Pengelola Usaha |
Oktober 2026 |
525115 |
Tiket Perjalanan Dinas PP |
|
|
|
|
Rp. 5.847.500 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 648 |
Badan Pengelola Usaha |
Januari 2026 |
525115 |
Biaya Hotel / Penginapan |
2026-03-04 |
09/UN47.H/GUP1-SPP/BPU/2026 |
2026-03-11 |
0427U |
Rp. 32.055.000 |
7 Hari |
|
| 649 |
Badan Pengelola Usaha |
April 2026 |
525115 |
Biaya Hotel / Penginapan |
2026-04-14 |
28/UN47.H/LS9-SPP/BPU/2026 |
2026-04-22 |
0851U |
Rp. 13.067.874 |
8 Hari |
|
| 650 |
Badan Pengelola Usaha |
Mei 2026 |
525115 |
Biaya Hotel / Penginapan |
2026-04-28 |
32/UN47.H/LS10-SPP/BPU/2026 |
2026-05-06 |
0998U |
Rp. 4.128.060 |
8 Hari |
|
| 651 |
Badan Pengelola Usaha |
Juli 2026 |
525115 |
Biaya Hotel / Penginapan |
2026-07-09 |
44/UN47.H/LS15-SPP/BPU/2026 |
2026-07-29 |
1748U |
Rp. 6.574.265 |
20 Hari |
|
| 652 |
Badan Pengelola Usaha |
Juli 2026 |
525115 |
Biaya Hotel / Penginapan |
2026-08-07 |
52/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1989U |
Rp. 6.420.000 |
12 Hari |
|
| 653 |
Badan Pengelola Usaha |
Agustus 2026 |
525115 |
Biaya Hotel / Penginapan |
2026-08-27 |
63/UN47.H/LS18-SPP/BPU/2026 |
2026-09-09 |
2234U |
Rp. 5.517.599 |
13 Hari |
|
| 654 |
Badan Pengelola Usaha |
September 2026 |
525115 |
Biaya Hotel / Penginapan |
2026-09-11 |
70/UN47.H/LS20-SPP/BPU/2026 |
|
|
Rp. 3.679.690 |
25 Hari |
Belum ada SP2D terhitung dari 11 September 2026 hingga 06 Oktober 2026 (25 Hari) |
| 655 |
Badan Pengelola Usaha |
Oktober 2026 |
525115 |
Biaya Hotel / Penginapan |
|
|
|
|
Rp. 1.829.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 656 |
Badan Pengelola Usaha |
Januari 2026 |
525115 |
Uang Harian Terkait Perjalanan Dinas |
2026-03-04 |
09/UN47.H/GUP1-SPP/BPU/2026 |
2026-03-11 |
0427U |
Rp. 34.800.000 |
7 Hari |
|
| 657 |
Badan Pengelola Usaha |
April 2026 |
525115 |
Uang Harian Terkait Perjalanan Dinas |
2026-04-14 |
28/UN47.H/LS9-SPP/BPU/2026 |
2026-04-22 |
0851U |
Rp. 10.460.000 |
8 Hari |
|
| 658 |
Badan Pengelola Usaha |
Mei 2026 |
525115 |
Uang Harian Terkait Perjalanan Dinas |
2026-04-28 |
32/UN47.H/LS10-SPP/BPU/2026 |
2026-05-06 |
0998U |
Rp. 2.650.000 |
8 Hari |
|
| 659 |
Badan Pengelola Usaha |
Juli 2026 |
525115 |
Uang Harian Terkait Perjalanan Dinas |
2026-07-09 |
44/UN47.H/LS15-SPP/BPU/2026 |
2026-07-29 |
1748U |
Rp. 6.890.000 |
20 Hari |
|
| 660 |
Badan Pengelola Usaha |
Juli 2026 |
525115 |
Uang Harian Terkait Perjalanan Dinas |
2026-08-07 |
52/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1989U |
Rp. 4.100.000 |
12 Hari |
|
| 661 |
Badan Pengelola Usaha |
Agustus 2026 |
525115 |
Uang Harian Terkait Perjalanan Dinas |
2026-08-27 |
63/UN47.H/LS18-SPP/BPU/2026 |
2026-09-09 |
2234U |
Rp. 8.780.000 |
13 Hari |
|
| 662 |
Badan Pengelola Usaha |
September 2026 |
525115 |
Uang Harian Terkait Perjalanan Dinas |
|
|
|
|
Rp. 39.628.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 663 |
Badan Pengelola Usaha |
September 2026 |
525115 |
Uang Harian Terkait Perjalanan Dinas |
2026-09-11 |
70/UN47.H/LS20-SPP/BPU/2026 |
|
|
Rp. 10.360.000 |
25 Hari |
Belum ada SP2D terhitung dari 11 September 2026 hingga 06 Oktober 2026 (25 Hari) |
| 664 |
Badan Pengelola Usaha |
Oktober 2026 |
525115 |
Uang Harian Terkait Perjalanan Dinas |
|
|
|
|
Rp. 2.460.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 665 |
Badan Pengelola Usaha |
Januari 2026 |
525115 |
Uang Transport |
2026-03-04 |
09/UN47.H/GUP1-SPP/BPU/2026 |
2026-03-11 |
0427U |
Rp. 11.700.000 |
7 Hari |
|
| 666 |
Badan Pengelola Usaha |
April 2026 |
525115 |
Uang Transport |
2026-03-04 |
09/UN47.H/GUP1-SPP/BPU/2026 |
2026-03-11 |
0427U |
Rp. 300.000 |
7 Hari |
|
| 667 |
Badan Pengelola Usaha |
April 2026 |
525115 |
Uang Transport |
2026-04-14 |
28/UN47.H/LS9-SPP/BPU/2026 |
2026-04-22 |
0851U |
Rp. 3.140.000 |
8 Hari |
|
| 668 |
Badan Pengelola Usaha |
April 2026 |
525115 |
Uang Transport |
2026-05-29 |
38/UN47.H/GUP3-SPP/BPU/2026 |
2026-06-29 |
1370U |
Rp. 2.000.000 |
31 Hari |
|
| 669 |
Badan Pengelola Usaha |
Mei 2026 |
525115 |
Uang Transport |
2026-04-28 |
32/UN47.H/LS10-SPP/BPU/2026 |
2026-05-06 |
0998U |
Rp. 500.000 |
8 Hari |
|
| 670 |
Badan Pengelola Usaha |
Mei 2026 |
525115 |
Uang Transport |
2026-05-29 |
38/UN47.H/GUP3-SPP/BPU/2026 |
2026-06-29 |
1370U |
Rp. 2.000.000 |
31 Hari |
|
| 671 |
Badan Pengelola Usaha |
Juli 2026 |
525115 |
Uang Transport |
2026-07-09 |
44/UN47.H/LS15-SPP/BPU/2026 |
2026-07-29 |
1748U |
Rp. 2.800.000 |
20 Hari |
|
| 672 |
Badan Pengelola Usaha |
Juli 2026 |
525115 |
Uang Transport |
2026-08-07 |
52/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1989U |
Rp. 1.900.000 |
12 Hari |
|
| 673 |
Badan Pengelola Usaha |
Agustus 2026 |
525115 |
Uang Transport |
2026-08-27 |
63/UN47.H/LS18-SPP/BPU/2026 |
2026-09-09 |
2234U |
Rp. 4.500.000 |
13 Hari |
|
| 674 |
Badan Pengelola Usaha |
September 2026 |
525115 |
Uang Transport |
|
|
|
|
Rp. 18.900.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 675 |
Badan Pengelola Usaha |
September 2026 |
525115 |
Uang Transport |
2026-09-11 |
70/UN47.H/LS20-SPP/BPU/2026 |
|
|
Rp. 5.100.000 |
25 Hari |
Belum ada SP2D terhitung dari 11 September 2026 hingga 06 Oktober 2026 (25 Hari) |
| 676 |
Badan Pengelola Usaha |
Oktober 2026 |
525115 |
Uang Transport |
|
|
|
|
Rp. 1.150.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 677 |
Badan Pengelola Usaha |
Maret 2026 |
525119 |
Biaya Operasional Kenderaan Dinas (4 Minggu x 15 Liter x 12 Bulan) |
2026-04-13 |
25/UN47.H/GUP2-SPP/BPU/2026 |
2026-04-15 |
0803U |
Rp. 900.000 |
2 Hari |
|
| 678 |
Badan Pengelola Usaha |
April 2026 |
525119 |
Biaya Operasional Kenderaan Dinas (4 Minggu x 15 Liter x 12 Bulan) |
2026-05-29 |
39/UN47.H/GUP3-SPP/BPU/2026 |
2026-06-29 |
1371U |
Rp. 1.850.000 |
31 Hari |
|
| 679 |
Badan Pengelola Usaha |
Mei 2026 |
525119 |
Biaya Operasional Kenderaan Dinas (4 Minggu x 15 Liter x 12 Bulan) |
2026-05-29 |
39/UN47.H/GUP3-SPP/BPU/2026 |
2026-06-29 |
1371U |
Rp. 650.000 |
31 Hari |
|
| 680 |
Badan Pengelola Usaha |
Juni 2026 |
525119 |
Biaya Operasional Kenderaan Dinas (4 Minggu x 15 Liter x 12 Bulan) |
2026-08-07 |
53/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1990U |
Rp. 778.000 |
12 Hari |
|
| 681 |
Badan Pengelola Usaha |
Agustus 2026 |
525119 |
Biaya Operasional Kenderaan Dinas (4 Minggu x 15 Liter x 12 Bulan) |
2026-09-22 |
73/UN47.H/GUP5-SPP/BPU/2026 |
|
|
Rp. 2.673.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 682 |
Badan Pengelola Usaha |
Januari 2026 |
525119 |
Biaya Sewa Kenderaan Operasional Fakultas/Unit Kerja (16 Unit x 12 Bln) |
2026-01-19 |
02/UN47.H/LS1-SPP/BPU/2026 |
2026-01-27 |
0103U |
Rp. 118.880.000 |
8 Hari |
|
| 683 |
Badan Pengelola Usaha |
Februari 2026 |
525119 |
Biaya Sewa Kenderaan Operasional Fakultas/Unit Kerja (16 Unit x 12 Bln) |
2026-02-23 |
04/UN47.H/LS3-SPP/BPU/2026 |
2026-02-25 |
0230U |
Rp. 118.880.000 |
2 Hari |
|
| 684 |
Badan Pengelola Usaha |
Maret 2026 |
525119 |
Biaya Sewa Kenderaan Operasional Fakultas/Unit Kerja (16 Unit x 12 Bln) |
2026-03-09 |
15/UN47.H/LS5-SPP/BPU/2026 |
2026-03-12 |
0486U |
Rp. 118.880.000 |
3 Hari |
|
| 685 |
Badan Pengelola Usaha |
April 2026 |
525119 |
Biaya Sewa Kenderaan Operasional Fakultas/Unit Kerja (16 Unit x 12 Bln) |
2026-04-08 |
21/UN47.H/LS8-SPP/BPU/2026 |
2026-04-10 |
0764U |
Rp. 118.880.000 |
2 Hari |
|
| 686 |
Badan Pengelola Usaha |
Mei 2026 |
525119 |
Biaya Sewa Kenderaan Operasional Fakultas/Unit Kerja (16 Unit x 12 Bln) |
2026-05-07 |
33/UN47.H/LS11-SPP/BPU/2026 |
2026-05-13 |
1067U |
Rp. 118.880.000 |
6 Hari |
|
| 687 |
Badan Pengelola Usaha |
Juni 2026 |
525119 |
Biaya Sewa Kenderaan Operasional Fakultas/Unit Kerja (16 Unit x 12 Bln) |
2026-06-05 |
42/UN47.H/LS14-SPP/BPU/2026 |
2026-06-26 |
1345U |
Rp. 118.880.000 |
21 Hari |
|
| 688 |
Badan Pengelola Usaha |
Juli 2026 |
525119 |
Biaya Sewa Kenderaan Operasional Fakultas/Unit Kerja (16 Unit x 12 Bln) |
2026-07-09 |
47/UN47.H/LS15-SPP/BPU/2026 |
2026-07-22 |
1681U |
Rp. 118.880.000 |
13 Hari |
|
| 689 |
Badan Pengelola Usaha |
Agustus 2026 |
525119 |
Biaya Sewa Kenderaan Operasional Fakultas/Unit Kerja (16 Unit x 12 Bln) |
2026-08-12 |
58/UN47.H/LS17-SPP/BPU/2026 |
2026-08-24 |
2080U |
Rp. 118.880.000 |
12 Hari |
|
| 690 |
Badan Pengelola Usaha |
September 2026 |
525119 |
Biaya Sewa Kenderaan Operasional Fakultas/Unit Kerja (16 Unit x 12 Bln) |
2026-09-11 |
67/UN47.H/LS20-SPP/BPU/2026 |
|
|
Rp. 118.880.000 |
25 Hari |
Belum ada SP2D terhitung dari 11 September 2026 hingga 06 Oktober 2026 (25 Hari) |
| 691 |
Badan Pengelola Usaha |
September 2026 |
525119 |
Biaya Sewa Kenderaan Operasional Fakultas/Unit Kerja (16 Unit x 12 Bln) |
2026-09-28 |
77/UN47.H/LS21-SPP/BPU/2026 |
|
|
Rp. 118.880.000 |
8 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 06 Oktober 2026 (8 Hari) |
| 692 |
Badan Pengelola Usaha |
Januari 2026 |
525119 |
Biaya Sewa Kenderaan Operasional BPU (1 Unit x 12 Bln) |
2026-01-19 |
02/UN47.H/LS1-SPP/BPU/2026 |
2026-01-27 |
0103U |
Rp. 7.430.000 |
8 Hari |
|
| 693 |
Badan Pengelola Usaha |
Februari 2026 |
525119 |
Biaya Sewa Kenderaan Operasional BPU (1 Unit x 12 Bln) |
2026-02-23 |
04/UN47.H/LS3-SPP/BPU/2026 |
2026-02-25 |
0230U |
Rp. 7.430.000 |
2 Hari |
|
| 694 |
Badan Pengelola Usaha |
Maret 2026 |
525119 |
Biaya Sewa Kenderaan Operasional BPU (1 Unit x 12 Bln) |
2026-03-09 |
15/UN47.H/LS5-SPP/BPU/2026 |
2026-03-12 |
0486U |
Rp. 7.430.000 |
3 Hari |
|
| 695 |
Badan Pengelola Usaha |
April 2026 |
525119 |
Biaya Sewa Kenderaan Operasional BPU (1 Unit x 12 Bln) |
2026-04-08 |
21/UN47.H/LS8-SPP/BPU/2026 |
2026-04-10 |
0764U |
Rp. 7.430.000 |
2 Hari |
|
| 696 |
Badan Pengelola Usaha |
Mei 2026 |
525119 |
Biaya Sewa Kenderaan Operasional BPU (1 Unit x 12 Bln) |
2026-05-07 |
33/UN47.H/LS11-SPP/BPU/2026 |
2026-05-13 |
1067U |
Rp. 7.430.000 |
6 Hari |
|
| 697 |
Badan Pengelola Usaha |
Juni 2026 |
525119 |
Biaya Sewa Kenderaan Operasional BPU (1 Unit x 12 Bln) |
2026-06-05 |
42/UN47.H/LS14-SPP/BPU/2026 |
2026-06-26 |
1345U |
Rp. 7.430.000 |
21 Hari |
|
| 698 |
Badan Pengelola Usaha |
Juli 2026 |
525119 |
Biaya Sewa Kenderaan Operasional BPU (1 Unit x 12 Bln) |
2026-07-09 |
47/UN47.H/LS15-SPP/BPU/2026 |
2026-07-22 |
1681U |
Rp. 7.430.000 |
13 Hari |
|
| 699 |
Badan Pengelola Usaha |
Agustus 2026 |
525119 |
Biaya Sewa Kenderaan Operasional BPU (1 Unit x 12 Bln) |
2026-08-12 |
58/UN47.H/LS17-SPP/BPU/2026 |
2026-08-24 |
2080U |
Rp. 7.430.000 |
12 Hari |
|
| 700 |
Badan Pengelola Usaha |
September 2026 |
525119 |
Biaya Sewa Kenderaan Operasional BPU (1 Unit x 12 Bln) |
2026-09-11 |
67/UN47.H/LS20-SPP/BPU/2026 |
|
|
Rp. 7.430.000 |
25 Hari |
Belum ada SP2D terhitung dari 11 September 2026 hingga 06 Oktober 2026 (25 Hari) |
| 701 |
Badan Pengelola Usaha |
September 2026 |
525119 |
Biaya Sewa Kenderaan Operasional BPU (1 Unit x 12 Bln) |
2026-09-28 |
77/UN47.H/LS21-SPP/BPU/2026 |
|
|
Rp. 7.430.000 |
8 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 06 Oktober 2026 (8 Hari) |
| 702 |
Badan Pengelola Usaha |
Februari 2026 |
525111 |
Remunerasi Insentif Kelola |
2026-01-29 |
03/UN47.H/LS2-SPP/BPU/2026 |
2026-02-09 |
0132U |
Rp. 37.200.000 |
11 Hari |
|
| 703 |
Badan Pengelola Usaha |
Maret 2026 |
525111 |
Remunerasi Insentif Kelola |
2026-03-09 |
18/UN47.H/LS6-SPP/BPU/2026 |
2026-03-13 |
0542U |
Rp. 42.200.000 |
4 Hari |
|
| 704 |
Badan Pengelola Usaha |
Juni 2026 |
525111 |
Remunerasi Insentif Kelola |
2026-05-07 |
35/UN47.H/LS12-SPP/BPU/2026 |
2026-06-02 |
1198U |
Rp. 42.200.000 |
26 Hari |
|
| 705 |
Badan Pengelola Usaha |
Juli 2026 |
525111 |
Remunerasi Insentif Kelola |
2026-07-13 |
49/UN47.H/LS17-SPP/BPU/2026 |
2026-08-05 |
1852U |
Rp. 42.200.000 |
23 Hari |
|
| 706 |
Badan Pengelola Usaha |
Agustus 2026 |
525111 |
Remunerasi Insentif Kelola |
2026-09-01 |
66/UN47.H/LS18-SPP/BPU/2026 |
|
|
Rp. 42.200.000 |
35 Hari |
Belum ada SP2D terhitung dari 01 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 707 |
Badan Pengelola Usaha |
Maret 2026 |
525119 |
Operasional Kegiatan Usaha / unit Usaha BPU (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
2026-02-24 |
06/UN47.H/LS4-SPP/BPU/2026 |
2026-03-03 |
0291U |
Rp. 49.950.000 |
7 Hari |
|
| 708 |
Badan Pengelola Usaha |
Maret 2026 |
525119 |
Operasional Kegiatan Usaha / unit Usaha BPU (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
2026-02-26 |
05/UN47.H/LS4-SPP/BPU/2026 |
2026-03-03 |
0290U |
Rp. 50.970.300 |
5 Hari |
|
| 709 |
Badan Pengelola Usaha |
Maret 2026 |
525119 |
Operasional Kegiatan Usaha / unit Usaha BPU (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
2026-02-26 |
07/UN47.H/LS4-SPP/BPU/2026 |
2026-03-03 |
0292U |
Rp. 49.783.500 |
5 Hari |
|
| 710 |
Badan Pengelola Usaha |
Maret 2026 |
525119 |
Operasional Kegiatan Usaha / unit Usaha BPU (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
2026-03-09 |
17/UN47.H/LS5-SPP/BPU/2026 |
2026-03-12 |
0487U |
Rp. 23.684.000 |
3 Hari |
|
| 711 |
Badan Pengelola Usaha |
Maret 2026 |
525119 |
Operasional Kegiatan Usaha / unit Usaha BPU (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
2026-04-13 |
25/UN47.H/GUP2-SPP/BPU/2026 |
2026-04-15 |
0803U |
Rp. 95.494.180 |
2 Hari |
|
| 712 |
Badan Pengelola Usaha |
April 2026 |
525119 |
Operasional Kegiatan Usaha / unit Usaha BPU (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
2026-04-08 |
23/UN47.H/LS8-SPP/BPU/2026 |
2026-04-10 |
0766U |
Rp. 42.475.000 |
2 Hari |
|
| 713 |
Badan Pengelola Usaha |
April 2026 |
525119 |
Operasional Kegiatan Usaha / unit Usaha BPU (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
2026-05-29 |
39/UN47.H/GUP3-SPP/BPU/2026 |
2026-06-29 |
1371U |
Rp. 94.169.462 |
31 Hari |
|
| 714 |
Badan Pengelola Usaha |
Juni 2026 |
525119 |
Operasional Kegiatan Usaha / unit Usaha BPU (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
2026-08-07 |
53/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1990U |
Rp. 15.900.000 |
12 Hari |
|
| 715 |
Badan Pengelola Usaha |
Juli 2026 |
525119 |
Operasional Kegiatan Usaha / unit Usaha BPU (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
2026-08-07 |
53/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1990U |
Rp. 28.219.069 |
12 Hari |
|
| 716 |
Badan Pengelola Usaha |
Agustus 2026 |
525119 |
Operasional Kegiatan Usaha / unit Usaha BPU (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
|
|
|
|
Rp. 5.400.000 |
66 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Agustus 2026 hingga 06 Oktober 2026 (66 Hari) |
| 717 |
Badan Pengelola Usaha |
Agustus 2026 |
525119 |
Operasional Kegiatan Usaha / unit Usaha BPU (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
2026-08-27 |
64/UN47.H/LS18-SPP/BPU/2026 |
2026-09-09 |
2235U |
Rp. 22.580.000 |
13 Hari |
|
| 718 |
Badan Pengelola Usaha |
Agustus 2026 |
525119 |
Operasional Kegiatan Usaha / unit Usaha BPU (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
2026-09-22 |
73/UN47.H/GUP5-SPP/BPU/2026 |
|
|
Rp. 27.900.210 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 719 |
Badan Pengelola Usaha |
September 2026 |
525119 |
Operasional Kegiatan Usaha / unit Usaha BPU (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
|
|
|
|
Rp. 38.085.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 720 |
Badan Pengelola Usaha |
Oktober 2026 |
525119 |
Operasional Kegiatan Usaha / unit Usaha BPU (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
|
|
|
|
Rp. 16.009.070 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 721 |
Badan Pengelola Usaha |
Juli 2026 |
525119 |
Biaya Persiapan, Penyelenggaraan dan Evaluasi KSO/KSM (Apotek Damhil, UNG Mart & Food Service, UNG Lingua, UNG Tours & Travel, UNG Training, UNG TV, UNG Press & Percetakan, UTC Damhil, UNG Tech) |
2026-05-25 |
35/UN47.H/LS13-SPP/BPU/2026 |
2026-07-02 |
1439U |
Rp. 17.242.000 |
38 Hari |
|
| 722 |
Badan Pengelola Usaha |
September 2026 |
525119 |
Biaya Penyusunan SOP dan Regulasi Usaha |
2026-09-28 |
78/UN47.H/LS21-SPP/BPU/2026 |
|
|
Rp. 13.000.000 |
8 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 06 Oktober 2026 (8 Hari) |
| 723 |
Badan Pengelola Usaha |
Juni 2026 |
525174 |
Honor Tenaga Kontrak |
2026-08-07 |
54/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1991U |
Rp. 17.400.000 |
12 Hari |
|
| 724 |
Badan Pengelola Usaha |
Juli 2026 |
525174 |
Honor Tenaga Kontrak |
2026-08-07 |
54/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1991U |
Rp. 6.800.000 |
12 Hari |
|
| 725 |
Badan Pengelola Usaha |
Juli 2026 |
525176 |
Honorarium Kepala Divisi |
2026-08-07 |
55/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1992U |
Rp. 5.000.000 |
12 Hari |
|
| 726 |
Badan Pengelola Usaha |
Agustus 2026 |
525176 |
Honorarium Kepala Divisi |
2026-09-22 |
74/UN47.H/GUP5-SPP/BPU/2026 |
|
|
Rp. 7.000.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 727 |
Badan Pengelola Usaha |
Juni 2026 |
525176 |
Tunjangan Manajer Unit Usaha |
2026-08-07 |
55/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1992U |
Rp. 11.304.049 |
12 Hari |
|
| 728 |
Badan Pengelola Usaha |
Juli 2026 |
525176 |
Tunjangan Manajer Unit Usaha |
2026-08-07 |
55/UN47.H/GUP4-SPP/BPU/2026 |
2026-08-19 |
1992U |
Rp. 3.519.615 |
12 Hari |
|
| 729 |
Badan Pengelola Usaha |
Agustus 2026 |
525176 |
Tunjangan Manajer Unit Usaha |
2026-09-22 |
74/UN47.H/GUP5-SPP/BPU/2026 |
|
|
Rp. 40.160.627 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 730 |
Badan Pengelola Usaha |
Januari 2026 |
525119 |
Biaya Pengembangan Sistem Informasi dan Pengelolaan Usaha Universitas |
2026-03-04 |
11/UN47.H/GUP1-SPP/BPU/2026 |
2026-03-11 |
0425U |
Rp. 35.000.000 |
7 Hari |
|
| 731 |
Badan Pengelola Usaha |
Mei 2026 |
525119 |
Biaya Pengembangan Sistem Informasi dan Pengelolaan Usaha Universitas |
2026-05-07 |
34/UN47.H/LS11-SPP/BPU/2026 |
2026-05-19 |
1088U |
Rp. 88.700.000 |
12 Hari |
|
| 732 |
Badan Pengelola Usaha |
Maret 2026 |
525119 |
Biaya Maintenance dan Pengembangan Sistem Administrasi BPU/Universitas |
2026-03-09 |
16/UN47.H/LS5-SPP/BPU/2026 |
2026-03-12 |
0488U |
Rp. 60.000.000 |
3 Hari |
|
| 733 |
Badan Pengelola Usaha |
April 2026 |
525119 |
Biaya Maintenance dan Pengembangan Sistem Administrasi BPU/Universitas |
2026-04-08 |
22/UN47.H/LS8-SPP/BPU/2026 |
2026-04-10 |
0765U |
Rp. 15.000.000 |
2 Hari |
|
| 734 |
Badan Pengelola Usaha |
April 2026 |
525119 |
Biaya Maintenance dan Pengembangan Sistem Administrasi BPU/Universitas |
2026-04-14 |
29/UN47.H/LS9-SPP/BPU/2026 |
2026-04-22 |
0852U |
Rp. 15.000.000 |
8 Hari |
|
| 735 |
Badan Pengelola Usaha |
Juli 2026 |
525119 |
Biaya Maintenance dan Pengembangan Sistem Administrasi BPU/Universitas |
2026-05-25 |
36/UN47.H/LS13-SPP/BPU/2026 |
2026-07-02 |
1440U |
Rp. 25.000.000 |
38 Hari |
|
| 736 |
Badan Pengelola Usaha |
Juli 2026 |
525119 |
Biaya Maintenance dan Pengembangan Sistem Administrasi BPU/Universitas |
2026-06-05 |
43/UN47.H/LS14-SPP/BPU/2026 |
2026-07-06 |
1512U |
Rp. 25.000.000 |
31 Hari |
|
| 737 |
Badan Pengelola Usaha |
Juli 2026 |
525119 |
Biaya Maintenance dan Pengembangan Sistem Administrasi BPU/Universitas |
2026-07-09 |
46/UN47.H/LS15-SPP/BPU/2026 |
2026-07-29 |
1747U |
Rp. 30.000.000 |
20 Hari |
|
| 738 |
Badan Pengelola Usaha |
Agustus 2026 |
525119 |
Biaya Maintenance dan Pengembangan Sistem Administrasi BPU/Universitas |
2026-08-12 |
60/UN47.H/LS17-SPP/BPU/2026 |
2026-08-24 |
2082U |
Rp. 25.000.000 |
12 Hari |
|
| 739 |
Badan Pengelola Usaha |
September 2026 |
525119 |
Biaya Maintenance dan Pengembangan Sistem Administrasi BPU/Universitas |
2026-09-11 |
68/UN47.H/LS20-SPP/BPU/2026 |
|
|
Rp. 35.000.000 |
25 Hari |
Belum ada SP2D terhitung dari 11 September 2026 hingga 06 Oktober 2026 (25 Hari) |
| 740 |
Badan Pengelola Usaha |
September 2026 |
525119 |
Biaya Maintenance dan Pengembangan Sistem Administrasi BPU/Universitas |
2026-09-28 |
80/UN47.H/LS21-SPP/BPU/2026 |
|
|
Rp. 35.000.000 |
8 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 06 Oktober 2026 (8 Hari) |
| 741 |
Badan Pengelola Usaha |
April 2026 |
525119 |
Biaya Maintenance dan Pengembangan Website |
2026-04-08 |
22/UN47.H/LS8-SPP/BPU/2026 |
2026-04-10 |
0765U |
Rp. 45.000.000 |
2 Hari |
|
| 742 |
Badan Pengelola Usaha |
April 2026 |
525119 |
Biaya Maintenance dan Pengembangan Website |
2026-04-14 |
29/UN47.H/LS9-SPP/BPU/2026 |
2026-04-22 |
0852U |
Rp. 25.000.000 |
8 Hari |
|
| 743 |
Badan Pengelola Usaha |
Juli 2026 |
525119 |
Biaya Maintenance dan Pengembangan Website |
2026-05-25 |
36/UN47.H/LS13-SPP/BPU/2026 |
2026-07-02 |
1440U |
Rp. 15.000.000 |
38 Hari |
|
| 744 |
Badan Pengelola Usaha |
Juli 2026 |
525119 |
Biaya Maintenance dan Pengembangan Website |
2026-06-05 |
43/UN47.H/LS14-SPP/BPU/2026 |
2026-07-06 |
1512U |
Rp. 15.000.000 |
31 Hari |
|
| 745 |
Badan Pengelola Usaha |
Juli 2026 |
525119 |
Biaya Maintenance dan Pengembangan Website |
2026-07-09 |
46/UN47.H/LS15-SPP/BPU/2026 |
2026-07-29 |
1747U |
Rp. 10.000.000 |
20 Hari |
|
| 746 |
Badan Pengelola Usaha |
Agustus 2026 |
525119 |
Biaya Maintenance dan Pengembangan Website |
2026-08-12 |
60/UN47.H/LS17-SPP/BPU/2026 |
2026-08-24 |
2082U |
Rp. 10.000.000 |
12 Hari |
|
| 747 |
Badan Pengelola Usaha |
Maret 2026 |
525119 |
Biaya Cloud Server dan Lisensi cPanel |
2026-03-09 |
16/UN47.H/LS5-SPP/BPU/2026 |
2026-03-12 |
0488U |
Rp. 21.700.000 |
3 Hari |
|
| 748 |
Badan Pengelola Usaha |
April 2026 |
525119 |
Biaya Cloud Server dan Lisensi cPanel |
2026-04-08 |
22/UN47.H/LS8-SPP/BPU/2026 |
2026-04-10 |
0765U |
Rp. 8.000.000 |
2 Hari |
|
| 749 |
Badan Pengelola Usaha |
April 2026 |
525119 |
Biaya Cloud Server dan Lisensi cPanel |
2026-04-14 |
29/UN47.H/LS9-SPP/BPU/2026 |
2026-04-22 |
0852U |
Rp. 13.700.000 |
8 Hari |
|
| 750 |
Badan Pengelola Usaha |
Juli 2026 |
525119 |
Biaya Cloud Server dan Lisensi cPanel |
2026-05-25 |
36/UN47.H/LS13-SPP/BPU/2026 |
2026-07-02 |
1440U |
Rp. 8.000.000 |
38 Hari |
|
| 751 |
Badan Pengelola Usaha |
Juli 2026 |
525119 |
Biaya Cloud Server dan Lisensi cPanel |
2026-06-05 |
43/UN47.H/LS14-SPP/BPU/2026 |
2026-07-06 |
1512U |
Rp. 13.700.000 |
31 Hari |
|
| 752 |
Badan Pengelola Usaha |
Juli 2026 |
525119 |
Biaya Cloud Server dan Lisensi cPanel |
2026-07-09 |
46/UN47.H/LS15-SPP/BPU/2026 |
2026-07-29 |
1747U |
Rp. 10.000.000 |
20 Hari |
|
| 753 |
Badan Pengelola Usaha |
Agustus 2026 |
525119 |
Biaya Cloud Server dan Lisensi cPanel |
2026-08-12 |
60/UN47.H/LS17-SPP/BPU/2026 |
2026-08-24 |
2082U |
Rp. 15.700.000 |
12 Hari |
|
| 754 |
Badan Pengelola Usaha |
September 2026 |
525119 |
Biaya Cloud Server dan Lisensi cPanel |
2026-09-11 |
68/UN47.H/LS20-SPP/BPU/2026 |
|
|
Rp. 10.000.000 |
25 Hari |
Belum ada SP2D terhitung dari 11 September 2026 hingga 06 Oktober 2026 (25 Hari) |
| 755 |
Badan Pengelola Usaha |
September 2026 |
525119 |
Biaya Cloud Server dan Lisensi cPanel |
2026-09-28 |
80/UN47.H/LS21-SPP/BPU/2026 |
|
|
Rp. 15.700.000 |
8 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 06 Oktober 2026 (8 Hari) |
| 756 |
Badan Pengelola Usaha |
Maret 2026 |
525111 |
Honorarium PPK Unit Kerja |
2026-04-13 |
27/UN47.H/GUP2-SPP/BPU/2026 |
2026-04-15 |
0805U |
Rp. 2.300.000 |
2 Hari |
|
| 757 |
Badan Pengelola Usaha |
April 2026 |
525111 |
Honorarium PPK Unit Kerja |
2026-05-29 |
41/UN47.H/GUP3-SPP/BPU/2026 |
2026-06-29 |
1373U |
Rp. 2.300.000 |
31 Hari |
|
| 758 |
Badan Pengelola Usaha |
Maret 2026 |
525111 |
Honorarium Penguji Tagihan / Verifikator |
2026-04-13 |
27/UN47.H/GUP2-SPP/BPU/2026 |
2026-04-15 |
0805U |
Rp. 940.000 |
2 Hari |
|
| 759 |
Badan Pengelola Usaha |
April 2026 |
525111 |
Honorarium Penguji Tagihan / Verifikator |
2026-05-29 |
41/UN47.H/GUP3-SPP/BPU/2026 |
2026-06-29 |
1373U |
Rp. 940.000 |
31 Hari |
|
| 760 |
Badan Pengelola Usaha |
Agustus 2026 |
525176 |
Honorarium PPK Unit Kerja |
2026-09-22 |
76/UN47.H/GUP5-SPP/BPU/2026 |
|
|
Rp. 5.330.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 761 |
Badan Pengelola Usaha |
Januari 2026 |
525119 |
Biaya Pengembangan Karakter dan Team Work |
2026-03-04 |
11/UN47.H/GUP1-SPP/BPU/2026 |
2026-03-11 |
0425U |
Rp. 25.681.100 |
7 Hari |
|
| 762 |
Badan Pengelola Usaha |
Mei 2026 |
525119 |
Biaya Pengembangan Karakter dan Team Work |
2026-04-28 |
33/UN47.H/LS10-SPP/BPU/2026 |
2026-05-06 |
0999U |
Rp. 53.725.000 |
8 Hari |
|
| 763 |
Badan Pengelola Usaha |
September 2026 |
525119 |
Workshop Pengembangan Unit Usaha |
2026-09-11 |
69/UN47.H/LS20-SPP/BPU/2026 |
|
|
Rp. 49.520.000 |
25 Hari |
Belum ada SP2D terhitung dari 11 September 2026 hingga 06 Oktober 2026 (25 Hari) |
| 764 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Januari 2026 |
537112 |
Pengadaan Ac |
2026-02-20 |
2/UN47.D2/KU.01.00/SPP-GUP1/2026 |
2026-02-24 |
0212L |
Rp. 23.950.000 |
4 Hari |
|
| 765 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
537112 |
Pengadaan Laptop |
2026-06-17 |
47/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1352L |
Rp. 44.987.000 |
12 Hari |
|
| 766 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
537112 |
Pengadaan Laptop |
2026-08-31 |
78/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2265L |
Rp. 14.428.900 |
11 Hari |
|
| 767 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
537112 |
Pengadaan PC All In One |
2026-04-14 |
21/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0773L |
Rp. 36.630.000 |
0 Hari |
|
| 768 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
537112 |
Pengadaan Printer |
2026-02-23 |
10/UN47.D2/KU.01.00/SPP-LS1/2026 |
2026-02-25 |
0233L |
Rp. 12.000.000 |
2 Hari |
|
| 769 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
537112 |
Pengadaan Printer |
2026-08-03 |
61/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1938L |
Rp. 3.885.000 |
9 Hari |
|
| 770 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
537112 |
Pengadaan Meubelair Pendukung Perkantoran |
2026-04-27 |
31/UN47.D2/KU.01.00/SPP-GUP3/2026 |
2026-04-29 |
0933L |
Rp. 17.237.125 |
2 Hari |
|
| 771 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
537112 |
Pengadaan Meubelair Pendukung Perkantoran |
2026-07-06 |
58/UN47.D2/KU.01.00/SPP-LS6/2026 |
2026-07-15 |
1628L |
Rp. 31.976.880 |
9 Hari |
|
| 772 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525114 |
Pemeliharaan Komputer/Laptop Pendukung Perkantoran |
2026-04-10 |
24/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0776L |
Rp. 1.400.000 |
4 Hari |
|
| 773 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525114 |
Pemeliharaan Komputer/Laptop Pendukung Perkantoran |
2026-08-03 |
65/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1942L |
Rp. 500.000 |
9 Hari |
|
| 774 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Januari 2026 |
525114 |
Pemeliharaan AC Pendukung Perkantoran |
2026-02-20 |
5/UN47.D2/KU.01.00/SPP-GUP1/2026 |
2026-02-24 |
0215L |
Rp. 1.950.000 |
4 Hari |
|
| 775 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Mei 2026 |
525114 |
Pemeliharaan AC Pendukung Perkantoran |
2026-05-25 |
42/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1182L |
Rp. 1.880.000 |
8 Hari |
|
| 776 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525114 |
Pemeliharaan AC Pendukung Perkantoran |
2026-06-17 |
50/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1355L |
Rp. 1.720.000 |
12 Hari |
|
| 777 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525114 |
Pemeliharaan AC Pendukung Perkantoran |
2026-08-31 |
82/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2269L |
Rp. 1.250.000 |
11 Hari |
|
| 778 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525114 |
Pemeliharaan AC Pendukung Perkantoran |
2026-09-22 |
91/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 1.175.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 779 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525114 |
Pemeliharaan Printer Pendukung Perkantoran |
2026-04-10 |
24/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0776L |
Rp. 525.000 |
4 Hari |
|
| 780 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525114 |
Pemeliharaan Jaringan LIstrik/Internet Pendukung Perkantoran |
2026-04-10 |
24/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0776L |
Rp. 586.500 |
4 Hari |
|
| 781 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525114 |
Pemeliharaan Peralatan Micro Teaching LPMPP |
2026-08-03 |
65/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1942L |
Rp. 5.750.000 |
9 Hari |
|
| 782 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525114 |
Pemeliharaan Gedung dan Bangunan Pendukung Perkantoran di Lingkungan LPMPP |
2026-04-10 |
24/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0776L |
Rp. 645.200 |
4 Hari |
|
| 783 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Maret 2026 |
525114 |
Pemeliharaan Gedung dan Bangunan Pendukung Perkantoran di Lingkungan LPMPP |
2026-03-30 |
13/UN47.D2/KU.01.00/SPP-LS2/2026 |
2026-03-31 |
0615L |
Rp. 38.067.772 |
1 Hari |
|
| 784 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525114 |
Pemeliharaan Gedung dan Bangunan Pendukung Perkantoran di Lingkungan LPMPP |
2026-04-27 |
33/UN47.D2/KU.01.00/SPP-GUP3/2026 |
2026-04-29 |
0935L |
Rp. 36.821.948 |
2 Hari |
|
| 785 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525114 |
Pemeliharaan Gedung dan Bangunan Pendukung Perkantoran di Lingkungan LPMPP |
2026-05-25 |
42/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1182L |
Rp. 39.360.515 |
8 Hari |
|
| 786 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Mei 2026 |
525114 |
Pemeliharaan Gedung dan Bangunan Pendukung Perkantoran di Lingkungan LPMPP |
2026-05-25 |
42/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1182L |
Rp. 388.200 |
8 Hari |
|
| 787 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525114 |
Pemeliharaan Gedung dan Bangunan Pendukung Perkantoran di Lingkungan LPMPP |
2026-09-22 |
91/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 19.916.784 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 788 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525114 |
Pemeliharaan Halaman Perkantoran di Lingkungan LPMPP |
2026-08-03 |
65/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1942L |
Rp. 8.087.004 |
9 Hari |
|
| 789 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525115 |
Tiket perjalanan dinas dalam rangka konsultasi dan pelaporan program RPL (2 Org) |
2026-06-17 |
54/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1359L |
Rp. 5.850.000 |
12 Hari |
|
| 790 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525119 |
Bantuan kegiatan Sosialisasi Rekognisi Pembelajaran Lampau (RPL) |
2026-04-10 |
30/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0782L |
Rp. 15.000.000 |
4 Hari |
|
| 791 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525119 |
Bantuan kegiatan Sosialisasi Rekognisi Pembelajaran Lampau (RPL) |
2026-05-25 |
45/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1185L |
Rp. 20.000.000 |
8 Hari |
|
| 792 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525119 |
Bantuan kegiatan Sosialisasi Rekognisi Pembelajaran Lampau (RPL) |
2026-08-03 |
68/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1935L |
Rp. 5.000.000 |
9 Hari |
|
| 793 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525112 |
Konsumsi Panitia, peserta pada pelaksanaan Pelatihan Guru pamong UNG Mengajar (Bacth 9 & 10) di Kota Gorontalo, Kab. Gorontalo dan. Bone Bolango |
2026-04-01 |
15/UN47.D2/KU.01.00/SPP-TUPN/2026 |
2026-04-08 |
0681L |
Rp. 38.500.000 |
7 Hari |
|
| 794 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525112 |
Konsumsi Panitia, peserta pada pelaksanaan Pelatihan Guru pamong UNG Mengajar (Bacth 9 & 10) di Kota Gorontalo, Kab. Gorontalo dan. Bone Bolango |
2026-08-27 |
71/UN47.D2/KU.01.00/SPP-TUPN4/2026 |
2026-09-01 |
2157L |
Rp. 19.135.000 |
5 Hari |
|
| 795 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525112 |
ATK, fotocopy, spanduk pada pelatihan Guru Pamong UNG Mengajar (Bacth 9 & 10) di (Kab. Gorontalo, Kab. Bone Bolango) |
2026-09-22 |
95/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 900.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 796 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525112 |
Konsumsi Panitia, Narasumber, dan peserta pada kegiatan coaching umum dan pelepasan mahasiswa peserta UNG Mengajar (Bacth 9 & 10) |
2026-04-01 |
15/UN47.D2/KU.01.00/SPP-TUPN/2026 |
2026-04-08 |
0681L |
Rp. 33.159.150 |
7 Hari |
|
| 797 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525112 |
Konsumsi Panitia, Narasumber, dan peserta pada kegiatan coaching umum dan pelepasan mahasiswa peserta UNG Mengajar (Bacth 9 & 10) |
2026-08-27 |
71/UN47.D2/KU.01.00/SPP-TUPN4/2026 |
2026-09-01 |
2157L |
Rp. 15.015.000 |
5 Hari |
|
| 798 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525112 |
Konsumsi Panitia, Narasumber, dan peserta pada kegiatan coaching umum dan pelepasan mahasiswa peserta UNG Mengajar (Bacth 9 & 10) |
2026-08-31 |
84/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2271L |
Rp. 4.250.000 |
11 Hari |
|
| 799 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Januari 2026 |
525112 |
ATK, fotocopy, spanduk pada Coaching umum dan pelepasan UNG Mengajar (Bacth 9 & 10) |
2026-02-20 |
7/UN47.D2/KU.01.00/SPP-GUP1/2026 |
2026-02-24 |
0217L |
Rp. 1.226.500 |
4 Hari |
|
| 800 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525112 |
Sertifikat (Peserta, Guru Pamong, dan Kepala Sekolah) UNG Mengajar (Bacth 9 & 10) |
2026-04-01 |
15/UN47.D2/KU.01.00/SPP-TUPN/2026 |
2026-04-08 |
0681L |
Rp. 10.000.000 |
7 Hari |
|
| 801 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525112 |
Sertifikat (Peserta, Guru Pamong, dan Kepala Sekolah) UNG Mengajar (Bacth 9 & 10) |
2026-08-28 |
75/UN47.D2/KU.01.00/SPP-LS7/2026 |
2026-09-01 |
2165L |
Rp. 10.000.000 |
4 Hari |
|
| 802 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525112 |
Sertifikat (Peserta, Guru Pamong, dan Kepala Sekolah) UNG Mengajar (Bacth 9 & 10) |
2026-08-31 |
84/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2271L |
Rp. 7.000.000 |
11 Hari |
|
| 803 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525112 |
Konsumsi Peserta (dosen Pembimbing lapangan) dalam rangka workshop Penyamaan Presepsi Kegiatan UNG Mengajar (Bacth 9 & 10) |
2026-04-02 |
20/UN47.D2/KU.01.00/SPP-LS3/2026 |
2026-04-07 |
0660J |
Rp. 10.000.000 |
5 Hari |
|
| 804 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525112 |
Konsumsi Peserta (dosen Pembimbing lapangan) dalam rangka workshop Penyamaan Presepsi Kegiatan UNG Mengajar (Bacth 9 & 10) |
2026-08-27 |
71/UN47.D2/KU.01.00/SPP-TUPN4/2026 |
2026-09-01 |
2157L |
Rp. 13.050.000 |
5 Hari |
|
| 805 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525112 |
Konsumsi pada kegiatan FGD Mekanisme dan Teknis Pelaksanaan Pembelajaran di Luar Program Studi (Magang, Kewirausahaan, Riset, Membangun Desa, Pertukaran Pelajar)Bersama Pelaksana Teknis (LPPM, UPA PKK, UPA Bahasa dan Unit/Bagian Kerjasama) |
2026-08-31 |
84/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2271L |
Rp. 1.850.000 |
11 Hari |
|
| 806 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Januari 2026 |
525115 |
transportasi pada kegiatan Survey sekolah dan rekruitmen calon guru pamong UNG Mengajar (Bacth 9 & 10) Wilayah Kota Gorontalo |
2026-02-20 |
8/UN47.D2/KU.01.00/SPP-GUP1/2026 |
2026-02-24 |
0218L |
Rp. 2.250.000 |
4 Hari |
|
| 807 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
transportasi pada kegiatan Survey sekolah dan rekruitmen calon guru pamong UNG Mengajar (Bacth 9 & 10) Wilayah Kota Gorontalo |
2026-08-27 |
72/UN47.D2/KU.01.00/SPP-TUPN4/2026 |
2026-09-01 |
2158L |
Rp. 2.000.000 |
5 Hari |
|
| 808 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525115 |
transportasi pada kegiatan Survey sekolah dan rekruitmen calon guru pamong UNG Mengajar (Bacth 9 & 10) Wilayah Kota Gorontalo |
|
|
|
|
Rp. 250.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 809 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525115 |
trnsportasi pada kegiatan Survey sekolah dan rekruitmen calon guru pamong UNG Mengajar (Bacth 9 & 10) Wilayah Kabupaten Gorontalo & Bone Bolango |
2026-02-20 |
8/UN47.D2/KU.01.00/SPP-GUP1/2026 |
2026-02-24 |
0218L |
Rp. 19.500.000 |
4 Hari |
|
| 810 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
trnsportasi pada kegiatan Survey sekolah dan rekruitmen calon guru pamong UNG Mengajar (Bacth 9 & 10) Wilayah Kabupaten Gorontalo & Bone Bolango |
2026-08-27 |
72/UN47.D2/KU.01.00/SPP-TUPN4/2026 |
2026-09-01 |
2158L |
Rp. 20.400.000 |
5 Hari |
|
| 811 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525115 |
Transportasi lokal peserta/guru pada pelatihan Guru Pamong UNG Mengajar (Bacth 9 & 10) di Kota Gorontalo, Kab. Gorontalo, Kab. Bone Bolango |
2026-04-01 |
16/UN47.D2/KU.01.00/SPP-TUPN/2026 |
2026-04-08 |
0682L |
Rp. 32.130.000 |
7 Hari |
|
| 812 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
Transportasi lokal peserta/guru pada pelatihan Guru Pamong UNG Mengajar (Bacth 9 & 10) di Kota Gorontalo, Kab. Gorontalo, Kab. Bone Bolango |
2026-08-27 |
72/UN47.D2/KU.01.00/SPP-TUPN4/2026 |
2026-09-01 |
2158L |
Rp. 64.400.000 |
5 Hari |
|
| 813 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525115 |
Transportasi lokal peserta/guru pada pelatihan Guru Pamong UNG Mengajar (Bacth 9 & 10) di Kota Gorontalo, Kab. Gorontalo, Kab. Bone Bolango |
2026-09-22 |
96/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 750.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 814 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525115 |
Transportasi narasumber Eksternal (Dinas Pendidikan Provinsi dan Kabupaten/kota, dan Depag) pada pelatihan Guru Pamong UNG Mengajar (Bacth 9 & 10). |
2026-04-01 |
16/UN47.D2/KU.01.00/SPP-TUPN/2026 |
2026-04-08 |
0682L |
Rp. 500.000 |
7 Hari |
|
| 815 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525115 |
Transportasi narasumber Eksternal (Dinas Pendidikan Provinsi dan Kabupaten/kota, dan Depag) pada pelatihan Guru Pamong UNG Mengajar (Bacth 9 & 10). |
2026-09-22 |
96/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 2.500.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 816 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525115 |
Transportasi Panitia dan narausmber internal pada pelatihan Guru Pamong UNG Mengajar (Bacth 9 & 10) di Kab. Gorontalo, Bone Bolango, dan Kota Gorontalo |
2026-04-01 |
16/UN47.D2/KU.01.00/SPP-TUPN/2026 |
2026-04-08 |
0682L |
Rp. 4.300.000 |
7 Hari |
|
| 817 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
Transportasi Panitia dan narausmber internal pada pelatihan Guru Pamong UNG Mengajar (Bacth 9 & 10) di Kab. Gorontalo, Bone Bolango, dan Kota Gorontalo |
2026-08-27 |
72/UN47.D2/KU.01.00/SPP-TUPN4/2026 |
2026-09-01 |
2158L |
Rp. 9.500.000 |
5 Hari |
|
| 818 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525115 |
Transportasi koordninasi Panitia Pelaksana pada penyerahan Mahasiswa/peserta UNG Mengajar (Bacth 9 & 10) Ke Dinas (Dinas Pendidikan Kota Gorontalo, Kab. Gorontalo, Kab. Bone Bolango, Dinas Pendidikan Prov. Gorontalo, Kanwil Depag Prov. Gorontalo) |
2026-04-01 |
16/UN47.D2/KU.01.00/SPP-TUPN/2026 |
2026-04-08 |
0682L |
Rp. 1.250.000 |
7 Hari |
|
| 819 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525115 |
Transportasi koordninasi Panitia Pelaksana pada penyerahan Mahasiswa/peserta UNG Mengajar (Bacth 9 & 10) Ke Dinas (Dinas Pendidikan Kota Gorontalo, Kab. Gorontalo, Kab. Bone Bolango, Dinas Pendidikan Prov. Gorontalo, Kanwil Depag Prov. Gorontalo) |
2026-09-22 |
96/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 1.400.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 820 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Maret 2026 |
525115 |
Transportasi dosen pembimbing lapangan UNG Mengajar (Bacth 9 & 10) di Kota Gorontalo (50 orang x 2 kali) |
2026-04-10 |
29/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0781L |
Rp. 4.050.000 |
4 Hari |
|
| 821 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525115 |
Transportasi dosen pembimbing lapangan UNG Mengajar (Bacth 9 & 10) di Kota Gorontalo (50 orang x 2 kali) |
2026-05-25 |
44/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1184L |
Rp. 250.000 |
8 Hari |
|
| 822 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525115 |
Transportasi dosen pembimbing lapangan UNG Mengajar (Bacth 9 & 10) di Kota Gorontalo (50 orang x 2 kali) |
2026-05-25 |
46/UN47.D2/KU.01.00/SPP-LS4/2026 |
2026-05-26 |
1160L |
Rp. 4.650.000 |
1 Hari |
|
| 823 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525115 |
Transportasi dosen pembimbing lapangan UNG Mengajar (Bacth 9 & 10) di Kota Gorontalo (50 orang x 2 kali) |
|
|
|
|
Rp. 250.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 824 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Maret 2026 |
525115 |
Transportasi dosen pembimbing lapangan UNG Mengajar (Bacth 9 & 10) di Kabupaten Gorontalo dan Bone Bolango (517 orang x 2 kali) |
2026-04-10 |
29/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0781L |
Rp. 30.250.000 |
4 Hari |
|
| 825 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525115 |
Transportasi dosen pembimbing lapangan UNG Mengajar (Bacth 9 & 10) di Kabupaten Gorontalo dan Bone Bolango (517 orang x 2 kali) |
2026-05-25 |
44/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1184L |
Rp. 22.500.000 |
8 Hari |
|
| 826 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525115 |
Transportasi dosen pembimbing lapangan UNG Mengajar (Bacth 9 & 10) di Kabupaten Gorontalo dan Bone Bolango (517 orang x 2 kali) |
2026-05-25 |
46/UN47.D2/KU.01.00/SPP-LS4/2026 |
2026-05-26 |
1160L |
Rp. 6.500.000 |
1 Hari |
|
| 827 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525115 |
Transportasi dosen pembimbing lapangan UNG Mengajar (Bacth 9 & 10) di Kabupaten Gorontalo dan Bone Bolango (517 orang x 2 kali) |
|
|
|
|
Rp. 73.200.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 828 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525115 |
Transportasi monitoring dan evaluasi pelaksanaan UNG Mengajar (Bacth 9 & 10) tahap pertama di Kota Gorontalo (Pimpinan Universitas dan panitia) |
2026-05-25 |
44/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1184L |
Rp. 1.800.000 |
8 Hari |
|
| 829 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525115 |
Transportasi monitoring dan evaluasi pelaksanaan UNG Mengajar (Bacth 9 & 10) tahap pertama di Kabupaten Gorontalo dan Bone Bolango (Pimpinan Universitas dan panitia). |
2026-05-25 |
44/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1184L |
Rp. 9.000.000 |
8 Hari |
|
| 830 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525115 |
Transportasi monitoring dan evaluasi pelaksanaan UNG Mengajar (Bacth 9 & 10) tahap pertama di Kabupaten Gorontalo dan Bone Bolango (Pimpinan Universitas dan panitia). |
2026-08-03 |
67/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1936L |
Rp. 600.000 |
9 Hari |
|
| 831 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525115 |
Transportasi monitoring dan evaluasi pelaksanaan UNG Mengajar (Bacth 9 & 10) tahap Kedua/ Pameran Produk di Kota Gorontalo (Pimpinan Universitas dan panitia) |
2026-07-30 |
59/UN47.D2/KU.01.00/SPP-TUPN3/2026 |
2026-08-12 |
1932L |
Rp. 250.000 |
13 Hari |
|
| 832 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525115 |
Transportasi monitoring dan evaluasi pelaksanaan UNG Mengajar (Bacth 9 & 10) tahap Kedua/ pameran produk di Kabupaten Gorontalo dan Bone Bolango (Pimpinan Universitas dan panitia) |
2026-07-30 |
59/UN47.D2/KU.01.00/SPP-TUPN3/2026 |
2026-08-12 |
1932L |
Rp. 19.850.000 |
13 Hari |
|
| 833 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
Transportasi monitoring dan evaluasi pelaksanaan UNG Mengajar (Bacth 9 & 10) tahap Kedua/ pameran produk di Kabupaten Gorontalo dan Bone Bolango (Pimpinan Universitas dan panitia) |
2026-08-27 |
72/UN47.D2/KU.01.00/SPP-TUPN4/2026 |
2026-09-01 |
2158L |
Rp. 6.600.000 |
5 Hari |
|
| 834 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525115 |
Transportasi yang mewakili pimpinan pada penyerahan Mahasiswa/peserta UNG Mengajar (Bacth 9 & 10) di Kota Gorontalo |
2026-04-01 |
16/UN47.D2/KU.01.00/SPP-TUPN/2026 |
2026-04-08 |
0682L |
Rp. 600.000 |
7 Hari |
|
| 835 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
Transportasi yang mewakili pimpinan pada penyerahan Mahasiswa/peserta UNG Mengajar (Bacth 9 & 10) di Kota Gorontalo |
2026-08-27 |
72/UN47.D2/KU.01.00/SPP-TUPN4/2026 |
2026-09-01 |
2158L |
Rp. 750.000 |
5 Hari |
|
| 836 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525115 |
Transportasi yang mewakili pimpinan pada penyerahan Mahasiswa/peserta UNG Mengajar (Bacth 9 & 10) di Kota Gorontalo |
2026-09-22 |
96/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 2.750.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 837 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525115 |
Transportasi yang mewakili pimpinan pada penyerahan Mahasiswa/peserta UNG Mengajar (Bacth 9 & 10) di Kab. Gorontalo dan Bone Bolango |
2026-04-01 |
16/UN47.D2/KU.01.00/SPP-TUPN/2026 |
2026-04-08 |
0682L |
Rp. 9.500.000 |
7 Hari |
|
| 838 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Maret 2026 |
525115 |
Transportasi yang mewakili pimpinan pada penyerahan Mahasiswa/peserta UNG Mengajar (Bacth 9 & 10) di Kab. Gorontalo dan Bone Bolango |
2026-04-01 |
16/UN47.D2/KU.01.00/SPP-TUPN/2026 |
2026-04-08 |
0682L |
Rp. 500.000 |
7 Hari |
|
| 839 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
Transportasi yang mewakili pimpinan pada penyerahan Mahasiswa/peserta UNG Mengajar (Bacth 9 & 10) di Kab. Gorontalo dan Bone Bolango |
2026-08-27 |
72/UN47.D2/KU.01.00/SPP-TUPN4/2026 |
2026-09-01 |
2158L |
Rp. 8.000.000 |
5 Hari |
|
| 840 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525115 |
Transportasi yang mewakili pimpinan pada penyerahan Mahasiswa/peserta UNG Mengajar (Bacth 9 & 10) di Kab. Gorontalo dan Bone Bolango |
2026-09-22 |
96/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 2.850.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 841 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525115 |
Transportasi yang mewakili pimpinan pada penarikan Mahasiswa/peserta UNG Mengajar (Bacth 9 & 10) di Kota Gorontalo |
2026-08-03 |
67/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1936L |
Rp. 750.000 |
9 Hari |
|
| 842 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525115 |
Transportasi yang mewakili pimpinan pada penarikan Mahasiswa/peserta UNG Mengajar (Bacth 9 & 10) di Kab. Gorontalo dan Bone Bolango |
2026-08-03 |
67/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1936L |
Rp. 10.500.000 |
9 Hari |
|
| 843 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525115 |
Tiket Perjalanan Dinas Pendampingan dan Koordinasi Program SAPA KAMPUS MBKB (Merdeka Belajar Kampus Berdampak) Badan POM RI dengan UPT Balai Provinsi Mitra Magang dalam Aktivitas Mahasiswa Mendampingi UMKM Pangan Olahan (1 Org x 2 Keg) |
2026-06-17 |
54/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1359L |
Rp. 900.000 |
12 Hari |
|
| 844 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525115 |
Tiket Perjalanan Dinas Pendampingan dan Koordinasi Program SAPA KAMPUS MBKB (Merdeka Belajar Kampus Berdampak) Badan POM RI dengan UPT Balai Provinsi Mitra Magang dalam Aktivitas Mahasiswa Mendampingi UMKM Pangan Olahan (1 Org x 2 Keg) |
2026-08-03 |
67/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1936L |
Rp. 11.841.720 |
9 Hari |
|
| 845 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525115 |
Uang harian dalam rangka Perjalanan Dinas Pendampingan dan Koordinasi Program SAPA KAMPUS MBKB Badan POM RI dengan UPT Balai Provinsi Mitra Magang dalam Aktivitas Mahasiswa Mendampingi UMKM Pangan Olahan (1 Org x 5 hari x 2 Keg) |
2026-08-03 |
67/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1936L |
Rp. 5.250.000 |
9 Hari |
|
| 846 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
Pnginapan dalam rangka Perjalanan Dinas Pendampingan dan Koordinasi Program SAPA KAMPUS MBKB Badan POM RI dengan UPT Balai Provinsi Mitra Magang dalam Aktivitas Mahasiswa Mendampingi UMKM Pangan Olahan (1 Org x 4 hari x 2 Keg) |
2026-08-31 |
85/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2272L |
Rp. 3.541.156 |
11 Hari |
|
| 847 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525119 |
Sewa gedung pada pelathan guru Pamong UNG Mengajar (Bacth 9 & 10) di Kab. Gorontalo, Bone Bolango, dan Kota Gorontalo (2 x 2 lokasi) |
2026-04-01 |
17/UN47.D2/KU.01.00/SPP-TUPN/2026 |
2026-04-08 |
0683L |
Rp. 15.000.000 |
7 Hari |
|
| 848 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525119 |
Sewa gedung pada pelathan guru Pamong UNG Mengajar (Bacth 9 & 10) di Kab. Gorontalo, Bone Bolango, dan Kota Gorontalo (2 x 2 lokasi) |
2026-09-22 |
97/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 5.000.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 849 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525119 |
Insentif Guru pamong pada pelaksana kegiatan UNG Mengajar (Bacth 9 & 10) di tempat praktek |
2026-08-03 |
68/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1935L |
Rp. 36.800.000 |
9 Hari |
|
| 850 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525119 |
Insentif Guru pamong pada pelaksana kegiatan UNG Mengajar (Bacth 9 & 10) di tempat praktek |
2026-08-03 |
69/UN47.D2/KU.01.00/SPP-LS6/2026 |
2026-08-12 |
1943L |
Rp. 34.400.000 |
9 Hari |
|
| 851 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525119 |
Asuransi Keselamatan Peserta |
2026-04-01 |
17/UN47.D2/KU.01.00/SPP-TUPN/2026 |
2026-04-08 |
0683L |
Rp. 10.220.000 |
7 Hari |
|
| 852 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525119 |
Asuransi Keselamatan Peserta |
2026-08-31 |
86/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2273L |
Rp. 22.400.000 |
11 Hari |
|
| 853 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525119 |
Bantuan Pelaksanaan Pelatihan PEKERTI bagi Dosen |
2026-04-27 |
35/UN47.D2/KU.01.00/SPP-GUP3/2026 |
2026-04-29 |
0937L |
Rp. 25.000.000 |
2 Hari |
|
| 854 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525119 |
Bantuan Pelaksanaan Pelatihan PEKERTI Batch 2 bagi Dosen |
2026-06-17 |
55/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1360L |
Rp. 20.000.000 |
12 Hari |
|
| 855 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525119 |
Bantuan Pelaksanaan Pelatihan PEKERTI Batch 2 bagi Dosen |
2026-07-30 |
60/UN47.D2/KU.01.00/SPP-TUPN3/2026 |
2026-08-12 |
1933L |
Rp. 5.000.000 |
13 Hari |
|
| 856 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525112 |
Konsumsi pada Kegiatan Pendampingan Akreditasi Nasional (50 org x 2 hari x 2 keg) |
2026-09-22 |
95/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 10.000.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 857 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525112 |
Konsumsi pada Kegiatan Pendampingan Akreditasi Internasional (50 org x 2 hari x 2 keg) |
2026-09-22 |
95/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 10.000.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 858 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Mei 2026 |
525112 |
Konsumsi pada kegiatan workshop penyusunan standar mutu dan formulir mutu (50 Org x 5 Hari) |
2026-05-13 |
37/UN47.D2/KU.01.00/SPP-TUPN2/2026 |
2026-05-25 |
1149L |
Rp. 1.300.000 |
12 Hari |
|
| 859 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525112 |
Konsumsi kegiatan persiapan dan penetapan prodi terakreditasi unggul mengikuti akreditasi internasional (100 Org x 2 Keg) |
2026-09-22 |
95/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 5.000.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 860 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
Tiket Perjalanan dinas dalam rangka perangkat SPMI (10 Org) |
2026-08-27 |
72/UN47.D2/KU.01.00/SPP-TUPN4/2026 |
2026-09-01 |
2158L |
Rp. 56.150.000 |
5 Hari |
|
| 861 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
Tiket Perjalanan dinas dalam rangka perangkat SPMI (10 Org) |
2026-08-31 |
85/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2272L |
Rp. 8.500.000 |
11 Hari |
|
| 862 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525119 |
Bantuan kegiatan Pelaksanaan Audit Mutu Internal (AMI) |
2026-04-27 |
35/UN47.D2/KU.01.00/SPP-GUP3/2026 |
2026-04-29 |
0937L |
Rp. 15.000.000 |
2 Hari |
|
| 863 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Mei 2026 |
525119 |
Bantuan kegiatan Pelaksanaan Audit Mutu Internal (AMI) |
2026-05-13 |
38/UN47.D2/KU.01.00/SPP-TUPN2/2026 |
2026-05-25 |
1150L |
Rp. 20.000.000 |
12 Hari |
|
| 864 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525119 |
Bantuan kegiatan Pelaksanaan Audit Mutu Internal (AMI) |
2026-07-30 |
60/UN47.D2/KU.01.00/SPP-TUPN3/2026 |
2026-08-12 |
1933L |
Rp. 20.000.000 |
13 Hari |
|
| 865 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525119 |
Bantuan kegiatan Pelaksanaan Audit Mutu Internal (AMI) |
2026-08-27 |
73/UN47.D2/KU.01.00/SPP-TUPN4/2026 |
2026-09-01 |
2159L |
Rp. 15.000.000 |
5 Hari |
|
| 866 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525119 |
Bantuan Kegiatan pada pusat MKWK, MK Penciri, Disabilitas, Kajian Pancasila dan Pendidikan Karakter |
2026-05-25 |
45/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1185L |
Rp. 15.000.000 |
8 Hari |
|
| 867 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Mei 2026 |
525119 |
Honorarium Narasumber pada kegiatan pusat pengembangan standar, AMI dan Manajemen Resiko (3 Org x 6 jam) |
2026-05-13 |
38/UN47.D2/KU.01.00/SPP-TUPN2/2026 |
2026-05-25 |
1150L |
Rp. 16.200.000 |
12 Hari |
|
| 868 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Mei 2026 |
525119 |
Bantuan kegiatan pelatihan calon Auditor AMI |
2026-05-13 |
38/UN47.D2/KU.01.00/SPP-TUPN2/2026 |
2026-05-25 |
1150L |
Rp. 47.500.000 |
12 Hari |
|
| 869 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Mei 2026 |
525119 |
Paket Meeting Room pada Kegiatan
SPMI UNG (64 x 4) |
2026-05-13 |
38/UN47.D2/KU.01.00/SPP-TUPN2/2026 |
2026-05-25 |
1150L |
Rp. 15.000.000 |
12 Hari |
|
| 870 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525119 |
Paket Meeting Room pada Kegiatan
SPMI UNG (64 x 4) |
2026-08-27 |
73/UN47.D2/KU.01.00/SPP-TUPN4/2026 |
2026-09-01 |
2159L |
Rp. 20.000.000 |
5 Hari |
|
| 871 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525119 |
Paket Meeting Room pada Kegiatan
SPMI UNG (64 x 4) |
2026-08-31 |
86/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2273L |
Rp. 20.000.000 |
11 Hari |
|
| 872 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525119 |
Paket Meeting Room pada Kegiatan
SPMI UNG (64 x 4) |
2026-09-22 |
97/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 15.000.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 873 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525119 |
Bantuan kegiatan pendampingan penyusunan dokumen akreditasi |
2026-04-10 |
30/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0782L |
Rp. 9.000.000 |
4 Hari |
|
| 874 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525119 |
Bantuan kegiatan pendampingan penyusunan dokumen akreditasi |
2026-05-25 |
45/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1185L |
Rp. 6.000.000 |
8 Hari |
|
| 875 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525119 |
Bantuan kegiatan pendampingan penyusunan dokumen akreditasi |
2026-08-03 |
68/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1935L |
Rp. 18.500.000 |
9 Hari |
|
| 876 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525119 |
Bantuan kegiatan pendampingan penyusunan dokumen akreditasi |
2026-09-22 |
97/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 6.000.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 877 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525119 |
Bantuan kegiatan Klinik dan Simulasi Akreditasi serta Pendampingan |
2026-04-10 |
30/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0782L |
Rp. 7.500.000 |
4 Hari |
|
| 878 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525119 |
Bantuan kegiatan Klinik dan Simulasi Akreditasi serta Pendampingan |
2026-08-03 |
68/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1935L |
Rp. 11.250.000 |
9 Hari |
|
| 879 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525119 |
Bantuan kegiatan Klinik dan Simulasi Akreditasi serta Pendampingan |
2026-09-22 |
97/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 5.000.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 880 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525119 |
Bantuan kegiatan penguatan pengelolaan sistem akreditasi |
2026-09-22 |
97/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 10.000.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 881 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525119 |
Honorarium Narasumber pada kegiatan
pendampingan Akreditasi (2 Org x 7 jam x 2 Keg) |
2026-08-03 |
68/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1935L |
Rp. 5.400.000 |
9 Hari |
|
| 882 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525112 |
Konsumsi pada kegiatan Workshop
Penguatan Sistem Digital Penjaminan Mutu Internal UNG |
2026-09-22 |
95/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 5.000.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 883 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525112 |
Konsumsi Berat dan Ringan, pada Kegiatan pendampingan penyusunan kurikulum prodi (40 org x 2 Keg) |
2026-04-10 |
28/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0780L |
Rp. 1.950.000 |
4 Hari |
|
| 884 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Maret 2026 |
525112 |
Konsumsi Berat dan Ringan, pada Kegiatan pendampingan penyusunan kurikulum prodi (40 org x 2 Keg) |
2026-04-10 |
28/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0780L |
Rp. 1.600.000 |
4 Hari |
|
| 885 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525112 |
Konsumsi pada kegiaatan Evaluasi Implementasi Kurikulum Prodi (50 Org x 2 Keg) |
2026-09-22 |
95/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 5.000.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 886 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525115 |
Tiket Perjalanan dinas narasumber pada kegiatan Penguatan Kurikulum OBE Bermuatan Inovasi Berbasis Kawasan (2 Org) |
2026-07-30 |
61/UN47.D2/KU.01.00/SPP-TUPN3/2026 |
2026-08-12 |
1934L |
Rp. 11.041.000 |
13 Hari |
|
| 887 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525115 |
Penginapan dalam rangka Perjalanan dinas narasumber pada kegiatan Penguatan Kurikulum OBE Bermuatan Inovasi Berbasis Kawasan (3 Org 4 Hari)) |
2026-07-30 |
61/UN47.D2/KU.01.00/SPP-TUPN3/2026 |
2026-08-12 |
1934L |
Rp. 7.920.000 |
13 Hari |
|
| 888 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525119 |
Bantuan kegiatan penyusunan kurikulum inovatif berbasis model pembelajaran baru |
2026-06-17 |
55/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1360L |
Rp. 22.000.000 |
12 Hari |
|
| 889 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Januari 2026 |
525119 |
Bantuan kegiatan strategi implementasi pedoman kurikulum Universitas Negeri Gorontalo |
2026-02-20 |
9/UN47.D2/KU.01.00/SPP-GUP1/2026 |
2026-02-24 |
0219L |
Rp. 42.000.000 |
4 Hari |
|
| 890 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525119 |
Insentif narasumber pada kegiatan Penguatan Kurikulum OBE Bermuatan Inovasi Berbasis Kawasan (2 Org x 8 Jam ) |
2026-07-30 |
60/UN47.D2/KU.01.00/SPP-TUPN3/2026 |
2026-08-12 |
1933L |
Rp. 14.400.000 |
13 Hari |
|
| 891 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525119 |
Bantuan kegiatan Evaluasi Kurikulum Penyusunan Dokumen Kurikulum OBE, Penyusunan Kurikulum OBE Tahap 2, Penyusunan Rancangan Assesment tiap mata kuliah |
2026-06-30 |
57/UN47.D2/KU.01.00/SPP-LS5/2026 |
2026-07-09 |
1584L |
Rp. 192.000.000 |
9 Hari |
|
| 892 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525119 |
Bantuan kegiatan Evaluasi Kurikulum Penyusunan Dokumen Kurikulum OBE, Penyusunan Kurikulum OBE Tahap 2, Penyusunan Rancangan Assesment tiap mata kuliah |
2026-08-28 |
77/UN47.D2/KU.01.00/SPP-LS9/2026 |
2026-09-02 |
2177L |
Rp. 128.000.000 |
5 Hari |
|
| 893 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525119 |
Bantuan kegiatan pendampingan penyusunan, Penilaian Akreditasi Nasional dan Internasional serta Bantuan kegiatan review dan validasi kurikulum dengan narasumber intenal dan eksternal |
2026-07-30 |
60/UN47.D2/KU.01.00/SPP-TUPN3/2026 |
2026-08-12 |
1933L |
Rp. 50.000.000 |
13 Hari |
|
| 894 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525119 |
Bantuan kegiatan pendampingan penyusunan, Penilaian Akreditasi Nasional dan Internasional serta Bantuan kegiatan review dan validasi kurikulum dengan narasumber intenal dan eksternal |
2026-08-31 |
86/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2273L |
Rp. 30.000.000 |
11 Hari |
|
| 895 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525119 |
Zoom Meeting |
2026-09-21 |
88/UN47.D2/KU.01.00/SPP-LS10/2026 |
|
|
Rp. 5.000.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 896 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Januari 2026 |
525112 |
ATK Perkantoran LPMPP |
2026-02-20 |
3/UN47.D2/KU.01.00/SPP-GUP1/2026 |
2026-02-24 |
0213L |
Rp. 3.773.690 |
4 Hari |
|
| 897 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525112 |
ATK Perkantoran LPMPP |
2026-02-23 |
11/UN47.D2/KU.01.00/SPP-LS1/2026 |
2026-02-26 |
0234L |
Rp. 19.945.000 |
3 Hari |
|
| 898 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525112 |
ATK Perkantoran LPMPP |
2026-04-10 |
22/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0774L |
Rp. 3.939.790 |
4 Hari |
|
| 899 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525112 |
ATK Perkantoran LPMPP |
2026-05-25 |
39/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1179L |
Rp. 2.603.000 |
8 Hari |
|
| 900 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525112 |
ATK Perkantoran LPMPP |
2026-06-17 |
48/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1353L |
Rp. 14.035.170 |
12 Hari |
|
| 901 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525112 |
ATK Perkantoran LPMPP |
2026-08-31 |
79/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2266L |
Rp. 1.489.500 |
11 Hari |
|
| 902 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Januari 2026 |
525112 |
Spanduk Kegiatan LPMPP |
2026-02-20 |
3/UN47.D2/KU.01.00/SPP-GUP1/2026 |
2026-02-24 |
0213L |
Rp. 1.258.000 |
4 Hari |
|
| 903 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525112 |
Spanduk Kegiatan LPMPP |
2026-04-01 |
14/UN47.D2/KU.01.00/SPP-TUPN/2026 |
2026-04-08 |
0680L |
Rp. 1.750.000 |
7 Hari |
|
| 904 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525112 |
Spanduk Kegiatan LPMPP |
2026-04-10 |
22/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0774L |
Rp. 633.400 |
4 Hari |
|
| 905 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525112 |
Spanduk Kegiatan LPMPP |
2026-05-25 |
39/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1179L |
Rp. 350.000 |
8 Hari |
|
| 906 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525112 |
Spanduk Kegiatan LPMPP |
2026-06-17 |
48/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1353L |
Rp. 660.900 |
12 Hari |
|
| 907 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525112 |
Spanduk Kegiatan LPMPP |
2026-08-03 |
62/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1939L |
Rp. 898.000 |
9 Hari |
|
| 908 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525112 |
Spanduk Kegiatan LPMPP |
2026-08-31 |
79/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2266L |
Rp. 600.000 |
11 Hari |
|
| 909 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525112 |
Spanduk Kegiatan LPMPP |
|
|
|
|
Rp. 1.710.200 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 910 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525112 |
Operasional Perkantoran sehari hari |
2026-06-17 |
48/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1353L |
Rp. 2.543.000 |
12 Hari |
|
| 911 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525112 |
Operasional Perkantoran sehari hari |
2026-08-03 |
62/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1939L |
Rp. 4.018.150 |
9 Hari |
|
| 912 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525112 |
Operasional Perkantoran sehari hari |
2026-08-31 |
79/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2266L |
Rp. 2.186.100 |
11 Hari |
|
| 913 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Januari 2026 |
525112 |
Konsumsi Berat dan Ringan, Rapat Tamu Pimpinan (20 Org x 40 Keg) |
2026-02-20 |
3/UN47.D2/KU.01.00/SPP-GUP1/2026 |
2026-02-24 |
0213L |
Rp. 3.691.500 |
4 Hari |
|
| 914 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Maret 2026 |
525112 |
Konsumsi Berat dan Ringan, Rapat Tamu Pimpinan (20 Org x 40 Keg) |
2026-04-10 |
22/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0774L |
Rp. 1.000.000 |
4 Hari |
|
| 915 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525112 |
Konsumsi Berat dan Ringan, Rapat Tamu Pimpinan (20 Org x 40 Keg) |
2026-06-17 |
48/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1353L |
Rp. 1.537.500 |
12 Hari |
|
| 916 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525112 |
Konsumsi Berat dan Ringan, Rapat Tamu Pimpinan (20 Org x 40 Keg) |
2026-08-03 |
62/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1939L |
Rp. 1.875.000 |
9 Hari |
|
| 917 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525112 |
Konsumsi Berat dan Ringan, Rapat Tamu Pimpinan (20 Org x 40 Keg) |
2026-08-28 |
74/UN47.D2/KU.01.00/SPP-LS7/2026 |
2026-09-01 |
2166L |
Rp. 15.000.000 |
4 Hari |
|
| 918 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525112 |
Konsumsi Berat dan Ringan, Rapat Tamu Pimpinan (20 Org x 40 Keg) |
2026-08-31 |
79/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2266L |
Rp. 7.425.000 |
11 Hari |
|
| 919 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525112 |
Konsumsi Berat dan Ringan, Rapat Tamu Pimpinan (20 Org x 40 Keg) |
2026-09-22 |
89/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 6.400.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 920 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525115 |
Tiket PP Perjalanan Dinas dalam rangka
pengembangan SDM Tenaga Kependidikan (6 Org) |
2026-04-10 |
23/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0775L |
Rp. 700.000 |
4 Hari |
|
| 921 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525115 |
Tiket PP Perjalanan Dinas dalam rangka
pengembangan SDM Tenaga Kependidikan (6 Org) |
2026-04-02 |
18/UN47.D2/KU.01.00/SPP-LS3/2026 |
2026-04-07 |
0658L |
Rp. 5.988.280 |
5 Hari |
|
| 922 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Mei 2026 |
525115 |
Tiket PP Perjalanan Dinas dalam rangka
pengembangan SDM Tenaga Kependidikan (6 Org) |
2026-05-25 |
40/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1180L |
Rp. 15.727.760 |
8 Hari |
|
| 923 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525115 |
Tiket PP Perjalanan Dinas dalam rangka
pengembangan SDM Tenaga Kependidikan (6 Org) |
2026-06-17 |
49/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1354L |
Rp. 2.747.460 |
12 Hari |
|
| 924 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525115 |
Tiket PP Perjalanan Dinas dalam rangka
pengembangan SDM Tenaga Kependidikan (6 Org) |
2026-08-03 |
63/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1940L |
Rp. 3.682.560 |
9 Hari |
|
| 925 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
Tiket PP Perjalanan Dinas dalam rangka
pengembangan SDM Tenaga Kependidikan (6 Org) |
2026-08-31 |
80/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2267L |
Rp. 1.700.000 |
11 Hari |
|
| 926 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525115 |
Uang Harian Perjalanan Dinas dalam Rangka pengembangan SDM Tenaga Kependidikan (6 Org x 5 hari) |
2026-04-10 |
23/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0775L |
Rp. 3.330.000 |
4 Hari |
|
| 927 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525115 |
Uang Harian Perjalanan Dinas dalam Rangka pengembangan SDM Tenaga Kependidikan (6 Org x 5 hari) |
2026-04-02 |
18/UN47.D2/KU.01.00/SPP-LS3/2026 |
2026-04-07 |
0658L |
Rp. 3.600.000 |
5 Hari |
|
| 928 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525115 |
Uang Harian Perjalanan Dinas dalam Rangka pengembangan SDM Tenaga Kependidikan (6 Org x 5 hari) |
2026-04-27 |
32/UN47.D2/KU.01.00/SPP-GUP3/2026 |
2026-04-29 |
0934L |
Rp. 4.440.000 |
2 Hari |
|
| 929 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525115 |
Uang Harian Perjalanan Dinas dalam Rangka pengembangan SDM Tenaga Kependidikan (6 Org x 5 hari) |
2026-05-25 |
40/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1180L |
Rp. 1.110.000 |
8 Hari |
|
| 930 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525115 |
Uang Harian Perjalanan Dinas dalam Rangka pengembangan SDM Tenaga Kependidikan (6 Org x 5 hari) |
2026-08-03 |
63/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1940L |
Rp. 2.330.000 |
9 Hari |
|
| 931 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
Uang Harian Perjalanan Dinas dalam Rangka pengembangan SDM Tenaga Kependidikan (6 Org x 5 hari) |
2026-08-31 |
80/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2267L |
Rp. 1.000.000 |
11 Hari |
|
| 932 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525115 |
Penginapan Peerjalanan Dinas dalam rangka pengembangan SDM Tenaga Kependidikan (5 Org x 4 hari) |
2026-04-10 |
23/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0775L |
Rp. 2.400.000 |
4 Hari |
|
| 933 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525115 |
Penginapan Peerjalanan Dinas dalam rangka pengembangan SDM Tenaga Kependidikan (5 Org x 4 hari) |
2026-04-02 |
18/UN47.D2/KU.01.00/SPP-LS3/2026 |
2026-04-07 |
0658L |
Rp. 1.606.636 |
5 Hari |
|
| 934 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525115 |
Penginapan Peerjalanan Dinas dalam rangka pengembangan SDM Tenaga Kependidikan (5 Org x 4 hari) |
2026-04-27 |
32/UN47.D2/KU.01.00/SPP-GUP3/2026 |
2026-04-29 |
0934L |
Rp. 1.480.000 |
2 Hari |
|
| 935 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Mei 2026 |
525115 |
Penginapan Peerjalanan Dinas dalam rangka pengembangan SDM Tenaga Kependidikan (5 Org x 4 hari) |
2026-05-25 |
40/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1180L |
Rp. 2.086.645 |
8 Hari |
|
| 936 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525115 |
Penginapan Peerjalanan Dinas dalam rangka pengembangan SDM Tenaga Kependidikan (5 Org x 4 hari) |
2026-06-17 |
49/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1354L |
Rp. 2.796.504 |
12 Hari |
|
| 937 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
Penginapan Peerjalanan Dinas dalam rangka pengembangan SDM Tenaga Kependidikan (5 Org x 4 hari) |
2026-08-31 |
80/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2267L |
Rp. 1.440.000 |
11 Hari |
|
| 938 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525115 |
Biaya Transport Bandara PP |
2026-04-02 |
18/UN47.D2/KU.01.00/SPP-LS3/2026 |
2026-04-07 |
0658L |
Rp. 1.000.000 |
5 Hari |
|
| 939 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Mei 2026 |
525115 |
Biaya Transport Bandara PP |
2026-05-25 |
40/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1180L |
Rp. 500.000 |
8 Hari |
|
| 940 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525119 |
Bantuan biaya registrasi kegiatan dalam rangka
pengembangan SDM Tenaga Kependidikan |
2026-09-22 |
90/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 5.252.500 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 941 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Januari 2026 |
525119 |
Biaya Operasional Mobil KDO Pimpinan |
2026-02-20 |
4/UN47.D2/KU.01.00/SPP-GUP1/2026 |
2026-02-24 |
0214L |
Rp. 400.000 |
4 Hari |
|
| 942 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Mei 2026 |
525119 |
Biaya Operasional Mobil KDO Pimpinan |
2026-05-25 |
41/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1181L |
Rp. 200.000 |
8 Hari |
|
| 943 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525119 |
Biaya Operasional Mobil KDO Pimpinan |
2026-08-03 |
64/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1941L |
Rp. 1.000.000 |
9 Hari |
|
| 944 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525119 |
Biaya Operasional Mobil KDO Pimpinan |
2026-08-31 |
81/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2268L |
Rp. 850.000 |
11 Hari |
|
| 945 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525115 |
Tiket PP (Perjalanan Dinas Pimpinan dalam rangka pengembangan kelembagaan dan kerjasama (10 Org x 1 Keg) |
2026-04-10 |
26/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0778L |
Rp. 1.000.000 |
4 Hari |
|
| 946 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525115 |
Tiket PP (Perjalanan Dinas Pimpinan dalam rangka pengembangan kelembagaan dan kerjasama (10 Org x 1 Keg) |
2026-04-02 |
19/UN47.D2/KU.01.00/SPP-LS3/2026 |
2026-04-07 |
0659L |
Rp. 5.721.412 |
5 Hari |
|
| 947 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525115 |
Tiket PP (Perjalanan Dinas Pimpinan dalam rangka pengembangan kelembagaan dan kerjasama (10 Org x 1 Keg) |
2026-06-17 |
52/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1357L |
Rp. 3.902.300 |
12 Hari |
|
| 948 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
Tiket PP (Perjalanan Dinas Pimpinan dalam rangka pengembangan kelembagaan dan kerjasama (10 Org x 1 Keg) |
2026-08-28 |
76/UN47.D2/KU.01.00/SPP-LS8/2026 |
2026-09-01 |
2167L |
Rp. 26.660.935 |
4 Hari |
|
| 949 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
Tiket PP (Perjalanan Dinas Pimpinan dalam rangka pengembangan kelembagaan dan kerjasama (10 Org x 1 Keg) |
2026-08-31 |
83/UN47.D2/KU.01.00/SPP-GU7/2026 |
2026-09-11 |
2270L |
Rp. 10.085.396 |
11 Hari |
|
| 950 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Oktober 2026 |
525115 |
Tiket PP (Perjalanan Dinas Pimpinan dalam rangka pengembangan kelembagaan dan kerjasama (10 Org x 1 Keg) |
|
|
|
|
Rp. 17.252.722 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 951 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525115 |
Uang Harian Jakarta (Perjalanan Dinas Pimpinan dalam rangka pengembangan
kelembagaan dan kerjasama (10 Org x 5 hari x 1 Keg) |
2026-04-10 |
26/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0778L |
Rp. 2.220.000 |
4 Hari |
|
| 952 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525115 |
Uang Harian Jakarta (Perjalanan Dinas Pimpinan dalam rangka pengembangan
kelembagaan dan kerjasama (10 Org x 5 hari x 1 Keg) |
2026-04-02 |
19/UN47.D2/KU.01.00/SPP-LS3/2026 |
2026-04-07 |
0659L |
Rp. 2.980.000 |
5 Hari |
|
| 953 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Mei 2026 |
525115 |
Uang Harian Jakarta (Perjalanan Dinas Pimpinan dalam rangka pengembangan
kelembagaan dan kerjasama (10 Org x 5 hari x 1 Keg) |
2026-05-25 |
43/UN47.D2/KU.01.00/SPP-GUP4/2026 |
2026-06-02 |
1183L |
Rp. 1.060.000 |
8 Hari |
|
| 954 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525115 |
Uang Harian Jakarta (Perjalanan Dinas Pimpinan dalam rangka pengembangan
kelembagaan dan kerjasama (10 Org x 5 hari x 1 Keg) |
2026-08-03 |
66/UN47.D2/KU.01.00/SPP-GUP6/2026 |
2026-08-12 |
1937L |
Rp. 2.070.000 |
9 Hari |
|
| 955 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Oktober 2026 |
525115 |
Uang Harian Jakarta (Perjalanan Dinas Pimpinan dalam rangka pengembangan
kelembagaan dan kerjasama (10 Org x 5 hari x 1 Keg) |
|
|
|
|
Rp. 9.300.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 956 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525115 |
Penginapan (Perjalanan Dinas Pimpinan dalam rangka pengembangan kelembagaan dan kerjasama) (10 Org x 4) |
2026-04-10 |
26/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0778L |
Rp. 2.400.000 |
4 Hari |
|
| 957 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525115 |
Penginapan (Perjalanan Dinas Pimpinan dalam rangka pengembangan kelembagaan dan kerjasama) (10 Org x 4) |
2026-04-02 |
19/UN47.D2/KU.01.00/SPP-LS3/2026 |
2026-04-07 |
0659L |
Rp. 2.784.736 |
5 Hari |
|
| 958 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525115 |
Penginapan (Perjalanan Dinas Pimpinan dalam rangka pengembangan kelembagaan dan kerjasama) (10 Org x 4) |
2026-06-17 |
52/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1357L |
Rp. 990.000 |
12 Hari |
|
| 959 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Oktober 2026 |
525115 |
Penginapan (Perjalanan Dinas Pimpinan dalam rangka pengembangan kelembagaan dan kerjasama) (10 Org x 4) |
|
|
|
|
Rp. 2.190.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 960 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Januari 2026 |
525119 |
Upgrade Hosting Web LPMPP, |
2026-02-20 |
6/UN47.D2/KU.01.00/SPP-GUP1/2026 |
2026-02-24 |
0216L |
Rp. 15.000.000 |
4 Hari |
|
| 961 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525119 |
Pengembangan Sistem Kampus Merdeka UNG (Upgrade Modul Kampus Berdampak) |
2026-04-27 |
34/UN47.D2/KU.01.00/SPP-GUP3/2026 |
2026-04-29 |
0936L |
Rp. 10.000.000 |
2 Hari |
|
| 962 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525119 |
Pengembangan sistem monitoring dokumen kurikulum program studi |
2026-09-21 |
87/UN47.D2/KU.01.00/SPP-LS10/2026 |
|
|
Rp. 10.000.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 963 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525119 |
Pengembangan Sistem Survei Mitra Kerjasama |
2026-04-27 |
34/UN47.D2/KU.01.00/SPP-GUP3/2026 |
2026-04-29 |
0936L |
Rp. 10.000.000 |
2 Hari |
|
| 964 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525119 |
Pengembangan Sistem Digital Rencana Tindak Lanjut (RTL) |
2026-04-10 |
27/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0779L |
Rp. 10.000.000 |
4 Hari |
|
| 965 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525119 |
Pengembangan Sistem Digital Audit Mutu Internal (Upgrade Modul Penilaian dan Perangkingan) |
2026-04-27 |
34/UN47.D2/KU.01.00/SPP-GUP3/2026 |
2026-04-29 |
0936L |
Rp. 10.000.000 |
2 Hari |
|
| 966 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
April 2026 |
525119 |
Pengembangan Sistem Integrasi Survei Kepuasan SPMI |
2026-04-27 |
34/UN47.D2/KU.01.00/SPP-GUP3/2026 |
2026-04-29 |
0936L |
Rp. 10.000.000 |
2 Hari |
|
| 967 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525119 |
Pelaksanaan Survei Kepuasan SPMI (Dosen, Tendik, Dan Mahasiswa) Tahun 2026 |
2026-06-17 |
53/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1358L |
Rp. 10.000.000 |
12 Hari |
|
| 968 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525119 |
Pengembangan sitem digital dasboard terformat kinerja dosen |
2026-09-21 |
87/UN47.D2/KU.01.00/SPP-LS10/2026 |
|
|
Rp. 10.000.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 969 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525111 |
Honorarium PPK UK LPMPP |
2026-04-10 |
25/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0777L |
Rp. 2.300.000 |
4 Hari |
|
| 970 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525111 |
Honorarium PPK UK LPMPP |
2026-06-17 |
51/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1356L |
Rp. 3.450.000 |
12 Hari |
|
| 971 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Februari 2026 |
525111 |
Honorarium Verifikator UK (penguji tagihan) LPMPP |
2026-04-10 |
25/UN47.D2/KU.01.00/SPP-GUP2/2026 |
2026-04-14 |
0777L |
Rp. 940.000 |
4 Hari |
|
| 972 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juni 2026 |
525111 |
Honorarium Verifikator UK (penguji tagihan) LPMPP |
2026-06-17 |
51/UN47.D2/KU.01.00/SPP-GU5/2026 |
2026-06-29 |
1356L |
Rp. 1.880.000 |
12 Hari |
|
| 973 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Agustus 2026 |
525115 |
Tiket PP Perjalanan Dinas dalam rangka kegiatan perencanaan dan pengelolaan keuangan (3 Org) |
2026-08-28 |
76/UN47.D2/KU.01.00/SPP-LS8/2026 |
2026-09-01 |
2167L |
Rp. 9.630.000 |
4 Hari |
|
| 974 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525115 |
Tiket PP Perjalanan Dinas dalam rangka kegiatan perencanaan dan pengelolaan keuangan (3 Org) |
2026-09-22 |
92/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 6.512.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 975 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Oktober 2026 |
525115 |
Tiket PP Perjalanan Dinas dalam rangka kegiatan perencanaan dan pengelolaan keuangan (3 Org) |
|
|
|
|
Rp. 3.925.397 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 976 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Oktober 2026 |
525115 |
Uang Harian dalam rangka Perjalanan Dinas dalam rangka kegiatan perencanaan dan pengelolaan keuangan (3 Org x 5 hari) |
|
|
|
|
Rp. 6.639.862 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 977 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Oktober 2026 |
525115 |
Uang penginapan dalam rangka Perjalanan Dinas dalam rangka kegiatan perencanaan dan pengelolaan keuangan (3 Org x 4 hari) |
|
|
|
|
Rp. 7.324.680 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 978 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Januari 2026 |
525119 |
Bantuan kegiatan penyusunan/Rapat/Evaluasi kinerja LPMPP |
2026-02-20 |
6/UN47.D2/KU.01.00/SPP-GUP1/2026 |
2026-02-24 |
0216L |
Rp. 25.000.000 |
4 Hari |
|
| 979 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525119 |
Bantuan kegiatan penyusunan/Rapat/Evaluasi kinerja LPMPP |
2026-09-22 |
93/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 7.500.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 980 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525176 |
Honorarium PPK UK LPMPP |
2026-09-22 |
94/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 4.600.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 981 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
September 2026 |
525176 |
Honorarium Verifikator UK (penguji tagihan) LPMPP |
2026-09-22 |
94/UN47.D2/KU.01.00/SPP-GU8/2026 |
|
|
Rp. 1.410.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 982 |
Lembaga Penjaminan Mutu dan Pengembangan Pembelajaran |
Juli 2026 |
525119 |
Bantuan Peresmian dan Pameran Produk Mahasiswa UNG Mengajar |
2026-07-30 |
58/UN47.D2/KU.01.00/SPP-TUPN3/2026 |
2026-08-12 |
1931L |
Rp. 40.000.000 |
13 Hari |
|
| 983 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
537112 |
Pengadaan SmartTV |
2026-04-20 |
032/SPP-LS/FEB/2026 |
2026-05-13 |
1068H |
Rp. 39.960.000 |
23 Hari |
|
| 984 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
537112 |
Pengadaan SmartTV |
2026-07-14 |
064/SPP-LS/FEB/2026 |
2026-08-13 |
1945H |
Rp. 19.980.000 |
30 Hari |
|
| 985 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
537112 |
Pengadaan AC |
2026-02-20 |
008/SPP-LS/FEB/2026 |
2026-03-03 |
0300H |
Rp. 48.951.000 |
11 Hari |
|
| 986 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
537112 |
Pengadaan AC |
2026-09-21 |
095/SPP-LS/FEB/2026 |
|
|
Rp. 6.700.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 987 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
537112 |
Pengadaan VideoTron |
2026-03-04 |
014/SPP-LS/FEB/2026 |
2026-03-16 |
0576H |
Rp. 49.944.500 |
12 Hari |
|
| 988 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
537112 |
Pengadaan Meja/Kursi Kuliah |
2026-03-04 |
015/SPP-LS/FEB/2026 |
2026-03-17 |
0598H |
Rp. 10.000.000 |
13 Hari |
|
| 989 |
Fakultas Ekonomi dan Bisnis |
Juni 2026 |
537112 |
Pengadaan Komputer |
2026-05-21 |
042/SPP-LS/FEB/2026 |
2026-06-30 |
1401H |
Rp. 15.722.650 |
40 Hari |
|
| 990 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
537112 |
Pengadaan Scanner |
2026-05-21 |
044/SPP-LS/FEB/2026 |
2026-07-03 |
1484H |
Rp. 7.199.900 |
43 Hari |
|
| 991 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
537112 |
Pengadaan Sound System Ruang Rapat |
2026-03-04 |
012/SPP-LS/FEB/2026 |
2026-03-10 |
0400H |
Rp. 30.000.000 |
6 Hari |
|
| 992 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525114 |
Pemeliharaan Gedung Perkuliahan, Ruangan Laboratorium, Ruangan Kuliah |
2026-04-20 |
031/SPP-LS/FEB/2026 |
2026-04-30 |
0945H |
Rp. 49.450.000 |
10 Hari |
|
| 993 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525114 |
Pemeliharaan Gedung Perkuliahan, Ruangan Laboratorium, Ruangan Kuliah |
2026-04-20 |
030/SPP-LS/FEB/2026 |
2026-04-30 |
0965H |
Rp. 49.589.000 |
10 Hari |
|
| 994 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525114 |
Pemeliharaan Gedung Perkuliahan, Ruangan Laboratorium, Ruangan Kuliah |
2026-08-07 |
072/SPP-LS/FEB/2026 |
2026-09-01 |
2156H |
Rp. 44.961.000 |
25 Hari |
|
| 995 |
Fakultas Ekonomi dan Bisnis |
Januari 2026 |
525114 |
Pemeliharaan AC |
2026-02-13 |
006/SPP-GU.1/FEB/2026 |
2026-02-26 |
0249H |
Rp. 330.000 |
13 Hari |
|
| 996 |
Fakultas Ekonomi dan Bisnis |
Februari 2026 |
525114 |
Pemeliharaan AC |
2026-02-13 |
006/SPP-GU.1/FEB/2026 |
2026-02-26 |
0249H |
Rp. 20.000.000 |
13 Hari |
|
| 997 |
Fakultas Ekonomi dan Bisnis |
Februari 2026 |
525114 |
Pemeliharaan AC |
2026-03-10 |
024/SPP-GU.2/FEB/2026 |
2026-03-17 |
0548H |
Rp. 1.000.000 |
7 Hari |
|
| 998 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525114 |
Pemeliharaan AC |
2026-04-20 |
035/SPP-GU.3/FEB/2026 |
2026-04-28 |
0898H |
Rp. 100.000 |
8 Hari |
|
| 999 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525114 |
Pemeliharaan AC |
2026-04-20 |
035/SPP-GU.3/FEB/2026 |
2026-04-28 |
0898H |
Rp. 5.550.000 |
8 Hari |
|
| 1000 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
525114 |
Pemeliharaan AC |
2026-05-21 |
047/SPP-GU.4/FEB/2026 |
2026-06-04 |
1249H |
Rp. 1.350.000 |
14 Hari |
|
| 1001 |
Fakultas Ekonomi dan Bisnis |
Juni 2026 |
525114 |
Pemeliharaan AC |
2026-06-15 |
054/SPP-GU.5/FEB/2026 |
2026-07-07 |
1540H |
Rp. 2.000.000 |
22 Hari |
|
| 1002 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525114 |
Pemeliharaan AC |
2026-07-31 |
068/SPP-GU.6/FEB/2026 |
2026-08-12 |
1928H |
Rp. 850.000 |
12 Hari |
|
| 1003 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525114 |
Pemeliharaan AC |
|
|
|
|
Rp. 1.000.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 1004 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525114 |
Pemeliharaan AC |
2026-09-21 |
089/SPP-GU.8/FEB/2026 |
|
|
Rp. 1.750.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1005 |
Fakultas Ekonomi dan Bisnis |
Februari 2026 |
525114 |
Pemeliharaan Jaringan Listrik |
2026-03-10 |
024/SPP-GU.2/FEB/2026 |
2026-03-17 |
0548H |
Rp. 23.725.000 |
7 Hari |
|
| 1006 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525114 |
Pemeliharaan Jaringan Listrik |
2026-08-07 |
073/SPP-LS/FEB/2026 |
2026-08-28 |
2118E |
Rp. 14.950.000 |
21 Hari |
|
| 1007 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525114 |
Pemeliharaan Gedung Fakultas, Ruangan Dosen |
2026-03-04 |
013/SPP-LS/FEB/2026 |
2026-03-16 |
0544H |
Rp. 49.473.700 |
12 Hari |
|
| 1008 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525114 |
Pemeliharaan Gedung Fakultas, Ruangan Dosen |
2026-04-20 |
038/SPP-LS/FEB/2026 |
2026-04-30 |
0944H |
Rp. 49.620.600 |
10 Hari |
|
| 1009 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525112 |
Konsumsi terkait kegiatan Workshop/Pelatihan/Lokakarya/Seminar/Diskusi/Temu Ilmiah Keilmuan Program Studi |
2026-07-06 |
058/SPP-LS/FEB/2026 |
2026-07-31 |
1789H |
Rp. 26.500.000 |
25 Hari |
|
| 1010 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525112 |
Konsumsi terkait kegiatan Workshop penyusunan Rencana PerkuliahanSemester (RPS) Mata Kuliah Berbasis Outcome Based Education (OBE) |
2026-09-21 |
091/SPP-GU.8/FEB/2026 |
|
|
Rp. 4.485.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1011 |
Fakultas Ekonomi dan Bisnis |
Februari 2026 |
525119 |
Bantuan Biaya terkait Kegiatan Lokakarya/Workshop/Pelatihan/Seminar/Diskusi/Temu Ilmiah/Sosialisasi Keilmuan Program Studi |
2026-03-10 |
027/SPP-GU.2/FEB/2026 |
2026-03-17 |
0551H |
Rp. 2.200.000 |
7 Hari |
|
| 1012 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525119 |
Bantuan Biaya terkait Kegiatan Lokakarya/Workshop/Pelatihan/Seminar/Diskusi/Temu Ilmiah/Sosialisasi Keilmuan Program Studi |
2026-04-20 |
037/SPP-GU.3/FEB/2026 |
2026-04-28 |
0900H |
Rp. 4.500.000 |
8 Hari |
|
| 1013 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525119 |
Bantuan Biaya terkait Kegiatan Lokakarya/Workshop/Pelatihan/Seminar/Diskusi/Temu Ilmiah/Sosialisasi Keilmuan Program Studi |
2026-04-20 |
037/SPP-GU.3/FEB/2026 |
2026-04-28 |
0900H |
Rp. 26.098.000 |
8 Hari |
|
| 1014 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525119 |
Bantuan Biaya terkait Kegiatan Lokakarya/Workshop/Pelatihan/Seminar/Diskusi/Temu Ilmiah/Sosialisasi Keilmuan Program Studi |
2026-07-31 |
070/SPP-GU.6/FEB/2026 |
2026-08-12 |
1930H |
Rp. 2.350.000 |
12 Hari |
|
| 1015 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525119 |
Bantuan Biaya terkait Kegiatan Lokakarya/Workshop/Pelatihan/Seminar/Diskusi/Temu Ilmiah/Sosialisasi Keilmuan Program Studi |
2026-08-20 |
079/SPP-GU.7/FEB/2026 |
2026-09-01 |
2143H |
Rp. 4.800.000 |
12 Hari |
|
| 1016 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525119 |
Bantuan Biaya terkait Kegiatan Lokakarya/Workshop/Pelatihan/Seminar/Diskusi/Temu Ilmiah/Sosialisasi Keilmuan Program Studi |
2026-09-07 |
081/SPP-LS/FEB/2026 |
|
|
Rp. 25.000.000 |
29 Hari |
Belum ada SP2D terhitung dari 07 September 2026 hingga 06 Oktober 2026 (29 Hari) |
| 1017 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525119 |
Bantuan Biaya terkait Kegiatan Lokakarya/Workshop/Pelatihan/Seminar/Diskusi/Temu Ilmiah/Sosialisasi Keilmuan Program Studi |
2026-09-21 |
093/SPP-LS/FEB/2026 |
|
|
Rp. 25.000.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1018 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525119 |
Honor Narasumber Kegiatan Workshop/Seminar/Lokakarya/Pelatihan(4 Org x 2 Jam x 4 Keg) |
2026-05-21 |
050/SPP-GU.4/FEB/2026 |
2026-06-04 |
1248H |
Rp. 10.800.000 |
14 Hari |
|
| 1019 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525112 |
Konsumsi Kegiatan Coacing Magang/PKL/MBKM |
2026-03-10 |
026/SPP-GU.2/FEB/2026 |
2026-03-17 |
0550H |
Rp. 1.515.000 |
7 Hari |
|
| 1020 |
Fakultas Ekonomi dan Bisnis |
Februari 2026 |
525119 |
Bantuan Biaya Kegiatan Kemahasiswaan dan Ormawa |
2026-03-10 |
027/SPP-GU.2/FEB/2026 |
2026-03-17 |
0551H |
Rp. 2.000.000 |
7 Hari |
|
| 1021 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525119 |
Bantuan Biaya Kegiatan Kemahasiswaan dan Ormawa |
2026-03-10 |
027/SPP-GU.2/FEB/2026 |
2026-03-17 |
0551H |
Rp. 5.000.000 |
7 Hari |
|
| 1022 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525119 |
Bantuan Biaya Kegiatan Kemahasiswaan dan Ormawa |
2026-04-20 |
037/SPP-GU.3/FEB/2026 |
2026-04-28 |
0900H |
Rp. 4.286.400 |
8 Hari |
|
| 1023 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525119 |
Bantuan Biaya Kegiatan Kemahasiswaan dan Ormawa |
2026-04-20 |
037/SPP-GU.3/FEB/2026 |
2026-04-28 |
0900H |
Rp. 3.000.000 |
8 Hari |
|
| 1024 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525119 |
Bantuan Biaya Kegiatan Kemahasiswaan dan Ormawa |
2026-05-21 |
050/SPP-GU.4/FEB/2026 |
2026-06-04 |
1248H |
Rp. 10.000.000 |
14 Hari |
|
| 1025 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
525119 |
Bantuan Biaya Kegiatan Kemahasiswaan dan Ormawa |
2026-05-21 |
050/SPP-GU.4/FEB/2026 |
2026-06-04 |
1248H |
Rp. 7.000.000 |
14 Hari |
|
| 1026 |
Fakultas Ekonomi dan Bisnis |
Juni 2026 |
525119 |
Bantuan Biaya Kegiatan Kemahasiswaan dan Ormawa |
2026-06-15 |
056/SPP-GU.5/FEB/2026 |
2026-07-07 |
1542H |
Rp. 13.442.500 |
22 Hari |
|
| 1027 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525119 |
Bantuan Biaya Kegiatan Kemahasiswaan dan Ormawa |
2026-08-20 |
079/SPP-GU.7/FEB/2026 |
2026-09-01 |
2143H |
Rp. 3.686.400 |
12 Hari |
|
| 1028 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525119 |
Bantuan Biaya Kegiatan Kemahasiswaan dan Ormawa |
2026-09-21 |
092/SPP-GU.8/FEB/2026 |
|
|
Rp. 30.500.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1029 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525119 |
Bantuan Kegiatan Kemahasiswaan Internasional |
2026-08-20 |
079/SPP-GU.7/FEB/2026 |
2026-09-01 |
2143H |
Rp. 1.650.000 |
12 Hari |
|
| 1030 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525119 |
Bantuan Publikasi Artikel/Jurnal terindex |
2026-04-20 |
037/SPP-GU.3/FEB/2026 |
2026-04-28 |
0900H |
Rp. 2.500.000 |
8 Hari |
|
| 1031 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
525119 |
Bantuan Publikasi Artikel/Jurnal terindex |
2026-05-21 |
050/SPP-GU.4/FEB/2026 |
2026-06-04 |
1248H |
Rp. 2.500.000 |
14 Hari |
|
| 1032 |
Fakultas Ekonomi dan Bisnis |
Juni 2026 |
525119 |
Biaya terkait kegiatan Sertifikasi Kompetensi |
2026-06-15 |
056/SPP-GU.5/FEB/2026 |
2026-07-07 |
1542H |
Rp. 2.000.000 |
22 Hari |
|
| 1033 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525119 |
Iuran Asosiasi Fakultas dan Program Studi |
2026-09-21 |
092/SPP-GU.8/FEB/2026 |
|
|
Rp. 15.000.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1034 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525119 |
Biaya Terkait Kegiatan Semester Antara |
2026-09-14 |
085/SPP-LS.ANTARA/FEB/2026 |
|
|
Rp. 25.620.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1035 |
Fakultas Ekonomi dan Bisnis |
Februari 2026 |
525112 |
ATM/ATK Operasional Perkantoran dan Kebutuhan dasar perkantoran di dalam negeri |
2026-03-10 |
021/SPP-GU.2/FEB/2026 |
2026-03-17 |
0545H |
Rp. 2.095.000 |
7 Hari |
|
| 1036 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525112 |
ATM/ATK Operasional Perkantoran dan Kebutuhan dasar perkantoran di dalam negeri |
2026-03-10 |
021/SPP-GU.2/FEB/2026 |
2026-03-17 |
0545H |
Rp. 24.132.200 |
7 Hari |
|
| 1037 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525112 |
ATM/ATK Operasional Perkantoran dan Kebutuhan dasar perkantoran di dalam negeri |
2026-04-20 |
033/SPP-GU.3/FEB/2026 |
2026-04-28 |
0896H |
Rp. 1.652.100 |
8 Hari |
|
| 1038 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525112 |
ATM/ATK Operasional Perkantoran dan Kebutuhan dasar perkantoran di dalam negeri |
2026-05-21 |
045/SPP-GU.4/FEB/2026 |
2026-06-04 |
1245H |
Rp. 735.000 |
14 Hari |
|
| 1039 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
525112 |
ATM/ATK Operasional Perkantoran dan Kebutuhan dasar perkantoran di dalam negeri |
2026-05-21 |
045/SPP-GU.4/FEB/2026 |
2026-06-04 |
1245H |
Rp. 2.629.500 |
14 Hari |
|
| 1040 |
Fakultas Ekonomi dan Bisnis |
Juni 2026 |
525112 |
ATM/ATK Operasional Perkantoran dan Kebutuhan dasar perkantoran di dalam negeri |
2026-06-15 |
052/SPP-GU.5/FEB/2026 |
2026-07-07 |
1538H |
Rp. 1.620.000 |
22 Hari |
|
| 1041 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525112 |
ATM/ATK Operasional Perkantoran dan Kebutuhan dasar perkantoran di dalam negeri |
2026-05-21 |
043/SPP-LS/FEB/2026 |
2026-07-02 |
1432H |
Rp. 28.184.300 |
42 Hari |
|
| 1042 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525112 |
ATM/ATK Operasional Perkantoran dan Kebutuhan dasar perkantoran di dalam negeri |
2026-07-31 |
065/SPP-GU.6/FEB/2026 |
2026-08-12 |
1925H |
Rp. 4.676.600 |
12 Hari |
|
| 1043 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525112 |
ATM/ATK Operasional Perkantoran dan Kebutuhan dasar perkantoran di dalam negeri |
2026-08-20 |
075/SPP-GU.7/FEB/2026 |
2026-09-01 |
2139H |
Rp. 2.520.900 |
12 Hari |
|
| 1044 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525112 |
ATM/ATK Operasional Perkantoran dan Kebutuhan dasar perkantoran di dalam negeri |
|
|
|
|
Rp. 4.716.800 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 1045 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525112 |
ATM/ATK Operasional Perkantoran dan Kebutuhan dasar perkantoran di dalam negeri |
2026-09-21 |
087/SPP-GU.8/FEB/2026 |
|
|
Rp. 1.919.600 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1046 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525112 |
Pengandaan Dokumen |
2026-03-10 |
021/SPP-GU.2/FEB/2026 |
2026-03-17 |
0545H |
Rp. 836.300 |
7 Hari |
|
| 1047 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525112 |
Pengandaan Dokumen |
2026-04-20 |
033/SPP-GU.3/FEB/2026 |
2026-04-28 |
0896H |
Rp. 311.600 |
8 Hari |
|
| 1048 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
525112 |
Pengandaan Dokumen |
2026-05-21 |
045/SPP-GU.4/FEB/2026 |
2026-06-04 |
1245H |
Rp. 1.585.800 |
14 Hari |
|
| 1049 |
Fakultas Ekonomi dan Bisnis |
Juni 2026 |
525112 |
Pengandaan Dokumen |
2026-06-15 |
052/SPP-GU.5/FEB/2026 |
2026-07-07 |
1538H |
Rp. 1.766.200 |
22 Hari |
|
| 1050 |
Fakultas Ekonomi dan Bisnis |
Februari 2026 |
525112 |
Brosur,Leaflet, Spanduk, Banner |
2026-03-10 |
021/SPP-GU.2/FEB/2026 |
2026-03-17 |
0545H |
Rp. 1.650.000 |
7 Hari |
|
| 1051 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525112 |
Brosur,Leaflet, Spanduk, Banner |
2026-07-31 |
065/SPP-GU.6/FEB/2026 |
2026-08-12 |
1925H |
Rp. 224.700 |
12 Hari |
|
| 1052 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525112 |
Brosur,Leaflet, Spanduk, Banner |
|
|
|
|
Rp. 593.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 1053 |
Fakultas Ekonomi dan Bisnis |
Oktober 2026 |
525112 |
Brosur,Leaflet, Spanduk, Banner |
|
|
|
|
Rp. 3.300.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1054 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525112 |
Papan Informasi Akrilik |
2026-09-25 |
096/SPP-LS/FEB/2026 |
|
|
Rp. 29.960.000 |
11 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 06 Oktober 2026 (11 Hari) |
| 1055 |
Fakultas Ekonomi dan Bisnis |
Januari 2026 |
525112 |
Konsumsi Berat Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg) |
2026-02-20 |
004/SPP-GU.1/FEB/2026 |
2026-02-26 |
0247H |
Rp. 306.000 |
6 Hari |
|
| 1056 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525112 |
Konsumsi Berat Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg) |
2026-03-10 |
021/SPP-GU.2/FEB/2026 |
2026-03-17 |
0545H |
Rp. 2.100.000 |
7 Hari |
|
| 1057 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
525112 |
Konsumsi Berat Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg) |
2026-05-21 |
045/SPP-GU.4/FEB/2026 |
2026-06-04 |
1245H |
Rp. 1.330.000 |
14 Hari |
|
| 1058 |
Fakultas Ekonomi dan Bisnis |
Juni 2026 |
525112 |
Konsumsi Berat Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg) |
2026-06-15 |
052/SPP-GU.5/FEB/2026 |
2026-07-07 |
1538H |
Rp. 2.502.500 |
22 Hari |
|
| 1059 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525112 |
Konsumsi Berat Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg) |
2026-07-31 |
065/SPP-GU.6/FEB/2026 |
2026-08-12 |
1925H |
Rp. 962.500 |
12 Hari |
|
| 1060 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525112 |
Konsumsi Berat Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg) |
2026-08-20 |
075/SPP-GU.7/FEB/2026 |
2026-09-01 |
2139H |
Rp. 3.400.000 |
12 Hari |
|
| 1061 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525112 |
Konsumsi Berat Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg) |
|
|
|
|
Rp. 2.625.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 1062 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525112 |
Konsumsi Berat Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg) |
2026-09-21 |
087/SPP-GU.8/FEB/2026 |
|
|
Rp. 770.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1063 |
Fakultas Ekonomi dan Bisnis |
Januari 2026 |
525112 |
Konsumsi Ringan Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg |
2026-02-20 |
004/SPP-GU.1/FEB/2026 |
2026-02-26 |
0247H |
Rp. 847.000 |
6 Hari |
|
| 1064 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525112 |
Konsumsi Ringan Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg |
2026-03-10 |
021/SPP-GU.2/FEB/2026 |
2026-03-17 |
0545H |
Rp. 990.000 |
7 Hari |
|
| 1065 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
525112 |
Konsumsi Ringan Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg |
2026-05-21 |
045/SPP-GU.4/FEB/2026 |
2026-06-04 |
1245H |
Rp. 1.017.500 |
14 Hari |
|
| 1066 |
Fakultas Ekonomi dan Bisnis |
Juni 2026 |
525112 |
Konsumsi Ringan Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg |
2026-06-15 |
052/SPP-GU.5/FEB/2026 |
2026-07-07 |
1538H |
Rp. 815.000 |
22 Hari |
|
| 1067 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525112 |
Konsumsi Ringan Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg |
2026-07-31 |
065/SPP-GU.6/FEB/2026 |
2026-08-12 |
1925H |
Rp. 375.000 |
12 Hari |
|
| 1068 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525112 |
Konsumsi Ringan Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg |
2026-08-20 |
075/SPP-GU.7/FEB/2026 |
2026-09-01 |
2139H |
Rp. 2.525.000 |
12 Hari |
|
| 1069 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525112 |
Konsumsi Ringan Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg |
|
|
|
|
Rp. 1.050.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 1070 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525112 |
Konsumsi Ringan Rapat Pimpinan/Rapat Senat/Tamu Pimpinan/RapatJurusan (100 Org x 20 Keg |
2026-09-21 |
087/SPP-GU.8/FEB/2026 |
|
|
Rp. 2.172.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1071 |
Fakultas Ekonomi dan Bisnis |
Februari 2026 |
525119 |
Pelaksanaan Musyawarah Kerja/Rapat Kerja |
2026-02-20 |
005/SPP-GU.1/FEB/2026 |
2026-02-26 |
0248H |
Rp. 32.400.000 |
6 Hari |
|
| 1072 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525119 |
Pelaksanaan Musyawarah Kerja/Rapat Kerja |
2026-02-20 |
009/SPP-LS/FEB/2026 |
2026-03-04 |
0317H |
Rp. 37.500.000 |
12 Hari |
|
| 1073 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525115 |
Akomodasi Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan (9 Org x 3 Hari x 2 Keg) |
2026-03-10 |
022/SPP-GU.2/FEB/2026 |
2026-03-17 |
0546H |
Rp. 3.636.000 |
7 Hari |
|
| 1074 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
525115 |
Akomodasi Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan (9 Org x 3 Hari x 2 Keg) |
2026-05-21 |
046/SPP-GU.4/FEB/2026 |
2026-06-04 |
1250H |
Rp. 6.125.500 |
14 Hari |
|
| 1075 |
Fakultas Ekonomi dan Bisnis |
Juni 2026 |
525115 |
Akomodasi Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan (9 Org x 3 Hari x 2 Keg) |
2026-06-15 |
057/SPP-GU.5/FEB/2026 |
2026-07-07 |
1543H |
Rp. 450.000 |
22 Hari |
|
| 1076 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525115 |
Akomodasi Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan (9 Org x 3 Hari x 2 Keg) |
2026-07-31 |
066/SPP-GU.6/FEB/2026 |
2026-08-12 |
1926H |
Rp. 10.495.500 |
12 Hari |
|
| 1077 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525115 |
Akomodasi Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan (9 Org x 3 Hari x 2 Keg) |
2026-08-20 |
076/SPP-GU.7/FEB/2026 |
2026-09-01 |
2140H |
Rp. 17.221.500 |
12 Hari |
|
| 1078 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525115 |
Akomodasi Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan (9 Org x 3 Hari x 2 Keg) |
2026-09-21 |
088/SPP-GU.8/FEB/2026 |
|
|
Rp. 11.167.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1079 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525115 |
Uang Harian Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan(9 Org x 4 Hari x 2 Keg) |
2026-03-10 |
022/SPP-GU.2/FEB/2026 |
2026-03-17 |
0546H |
Rp. 2.080.000 |
7 Hari |
|
| 1080 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
525115 |
Uang Harian Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan(9 Org x 4 Hari x 2 Keg) |
2026-05-21 |
046/SPP-GU.4/FEB/2026 |
2026-06-04 |
1250H |
Rp. 4.390.000 |
14 Hari |
|
| 1081 |
Fakultas Ekonomi dan Bisnis |
Juni 2026 |
525115 |
Uang Harian Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan(9 Org x 4 Hari x 2 Keg) |
2026-06-15 |
057/SPP-GU.5/FEB/2026 |
2026-07-07 |
1543H |
Rp. 2.120.000 |
22 Hari |
|
| 1082 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525115 |
Uang Harian Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan(9 Org x 4 Hari x 2 Keg) |
2026-07-31 |
066/SPP-GU.6/FEB/2026 |
2026-08-12 |
1926H |
Rp. 9.430.000 |
12 Hari |
|
| 1083 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525115 |
Uang Harian Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan(9 Org x 4 Hari x 2 Keg) |
2026-08-20 |
076/SPP-GU.7/FEB/2026 |
2026-09-01 |
2140H |
Rp. 14.560.000 |
12 Hari |
|
| 1084 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525115 |
Uang Harian Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan(9 Org x 4 Hari x 2 Keg) |
2026-09-21 |
088/SPP-GU.8/FEB/2026 |
|
|
Rp. 7.180.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1085 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525115 |
Transport Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan (9 Org x 2 Keg) |
2026-03-10 |
022/SPP-GU.2/FEB/2026 |
2026-03-17 |
0546H |
Rp. 1.100.000 |
7 Hari |
|
| 1086 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
525115 |
Transport Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan (9 Org x 2 Keg) |
2026-05-21 |
046/SPP-GU.4/FEB/2026 |
2026-06-04 |
1250H |
Rp. 11.411.500 |
14 Hari |
|
| 1087 |
Fakultas Ekonomi dan Bisnis |
Juni 2026 |
525115 |
Transport Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan (9 Org x 2 Keg) |
2026-06-15 |
057/SPP-GU.5/FEB/2026 |
2026-07-07 |
1543H |
Rp. 5.429.600 |
22 Hari |
|
| 1088 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525115 |
Transport Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan (9 Org x 2 Keg) |
2026-07-31 |
066/SPP-GU.6/FEB/2026 |
2026-08-12 |
1926H |
Rp. 34.123.600 |
12 Hari |
|
| 1089 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525115 |
Transport Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan (9 Org x 2 Keg) |
2026-08-20 |
076/SPP-GU.7/FEB/2026 |
2026-09-01 |
2140H |
Rp. 18.759.100 |
12 Hari |
|
| 1090 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525115 |
Transport Perjalanan Dinas Dalam Rangka Koordinasi Kelembagaan (9 Org x 2 Keg) |
2026-09-21 |
088/SPP-GU.8/FEB/2026 |
|
|
Rp. 7.547.400 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1091 |
Fakultas Ekonomi dan Bisnis |
Februari 2026 |
525119 |
Biaya Operasional Kenderaan Dinas (4 Minggu x 20 Liter x 12 Bulan) |
2026-03-10 |
023/SPP-GU.2/FEB/2026 |
2026-03-17 |
0547H |
Rp. 744.400 |
7 Hari |
|
| 1092 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525119 |
Biaya Operasional Kenderaan Dinas (4 Minggu x 20 Liter x 12 Bulan) |
2026-03-10 |
023/SPP-GU.2/FEB/2026 |
2026-03-17 |
0547H |
Rp. 742.000 |
7 Hari |
|
| 1093 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525119 |
Biaya Operasional Kenderaan Dinas (4 Minggu x 20 Liter x 12 Bulan) |
2026-04-20 |
034/SPP-GU.3/FEB/2026 |
2026-04-28 |
0897H |
Rp. 750.000 |
8 Hari |
|
| 1094 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525119 |
Biaya Operasional Kenderaan Dinas (4 Minggu x 20 Liter x 12 Bulan) |
2026-04-20 |
034/SPP-GU.3/FEB/2026 |
2026-04-28 |
0897H |
Rp. 500.000 |
8 Hari |
|
| 1095 |
Fakultas Ekonomi dan Bisnis |
Juni 2026 |
525119 |
Biaya Operasional Kenderaan Dinas (4 Minggu x 20 Liter x 12 Bulan) |
2026-06-15 |
053/SPP-GU.5/FEB/2026 |
2026-07-07 |
1539H |
Rp. 1.400.000 |
22 Hari |
|
| 1096 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525119 |
Biaya Operasional Kenderaan Dinas (4 Minggu x 20 Liter x 12 Bulan) |
2026-08-20 |
077/SPP-GU.7/FEB/2026 |
2026-09-01 |
2141H |
Rp. 1.850.000 |
12 Hari |
|
| 1097 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525119 |
Biaya Operasional Kenderaan Dinas (4 Minggu x 20 Liter x 12 Bulan) |
|
|
|
|
Rp. 700.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 1098 |
Fakultas Ekonomi dan Bisnis |
Januari 2026 |
525111 |
Remunerasi Tugas Tambahan |
2026-01-14 |
003/SPP-LS REMUN/FEB/2026 |
2026-01-21 |
0067H |
Rp. 166.320.000 |
7 Hari |
|
| 1099 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525111 |
Remunerasi Tugas Tambahan |
2026-03-04 |
017/SPP-LS REMUN/FEB/2026 |
2026-03-17 |
0565H |
Rp. 71.280.000 |
13 Hari |
|
| 1100 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525111 |
Remunerasi Tugas Tambahan |
2026-07-06 |
060/SPP-LS REMUN/FEB/2026 |
2026-07-30 |
1772H |
Rp. 166.320.000 |
24 Hari |
|
| 1101 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525111 |
Remunerasi Tugas Tambahan |
2026-09-07 |
084/SPP-LS.REMUN/FEB/2026 |
|
|
Rp. 71.280.000 |
29 Hari |
Belum ada SP2D terhitung dari 07 September 2026 hingga 06 Oktober 2026 (29 Hari) |
| 1102 |
Fakultas Ekonomi dan Bisnis |
Januari 2026 |
525111 |
Remunerasi Fungsional |
2026-01-14 |
002/SPP-LS REMUN/FEB/2026 |
2026-01-15 |
0041H |
Rp. 1.176.204.000 |
1 Hari |
|
| 1103 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525111 |
Remunerasi Fungsional |
2026-03-04 |
016/SPP-LS.REMUN/FEB/2026 |
2026-03-16 |
0564H |
Rp. 482.130.000 |
12 Hari |
|
| 1104 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525111 |
Remunerasi Fungsional |
2026-07-06 |
059/SPP-LS REMUN/FEB/2026 |
2026-07-16 |
1645H |
Rp. 1.157.436.000 |
10 Hari |
|
| 1105 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525111 |
Remunerasi Fungsional |
2026-07-31 |
071/SPP-LS REMUN/FEB/2026 |
2026-08-19 |
2014H |
Rp. 11.736.000 |
19 Hari |
|
| 1106 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525111 |
Remunerasi Fungsional |
2026-09-07 |
083/SPP-LS.REMUN/FEB/2026 |
|
|
Rp. 510.318.000 |
29 Hari |
Belum ada SP2D terhitung dari 07 September 2026 hingga 06 Oktober 2026 (29 Hari) |
| 1107 |
Fakultas Ekonomi dan Bisnis |
Februari 2026 |
525111 |
Insentif Kelola |
2026-02-24 |
011/SPP-LS.REMUN/FEB/2026 |
2026-02-27 |
0273H |
Rp. 38.000.000 |
3 Hari |
|
| 1108 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525111 |
Insentif Kelola |
2026-03-04 |
018/SPP-LS REMUN/FEB/2026 |
2026-03-11 |
0447H |
Rp. 38.000.000 |
7 Hari |
|
| 1109 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525111 |
Insentif Kelola |
2026-04-08 |
029/SPP-LS/FEB/2026 |
2026-04-10 |
0767H |
Rp. 38.000.000 |
2 Hari |
|
| 1110 |
Fakultas Ekonomi dan Bisnis |
Juni 2026 |
525111 |
Insentif Kelola |
2026-05-04 |
041/SPP-LS/FEB/2026 |
2026-06-02 |
1199H |
Rp. 36.000.000 |
29 Hari |
|
| 1111 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525111 |
Insentif Kelola |
2026-06-03 |
051/SPP-LS INSENTIF KELOLA/FEB/2026 |
2026-07-01 |
1433H |
Rp. 36.000.000 |
28 Hari |
|
| 1112 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525111 |
Insentif Kelola |
2026-07-06 |
061/SPP-LS REMUN/FEB/2026 |
2026-08-03 |
1826H |
Rp. 36.000.000 |
28 Hari |
|
| 1113 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525111 |
Insentif Kelola |
2026-08-07 |
074/SPP-LS REMUN/FEB/2026 |
|
|
Rp. 36.000.000 |
60 Hari |
Belum ada SP2D terhitung dari 07 Agustus 2026 hingga 06 Oktober 2026 (60 Hari) |
| 1114 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525111 |
Insentif Kelola |
2026-09-07 |
082/SPP-LS.REMUN/FEB/2026 |
|
|
Rp. 36.000.000 |
29 Hari |
Belum ada SP2D terhitung dari 07 September 2026 hingga 06 Oktober 2026 (29 Hari) |
| 1115 |
Fakultas Ekonomi dan Bisnis |
Februari 2026 |
525119 |
Biaya Pengelolaan Website, Sistem Informasi Laboratorium/Fakultas/Program Studi |
2026-02-23 |
010/SPP-LS/FEB/2026 |
2026-02-27 |
0272H |
Rp. 14.000.000 |
4 Hari |
|
| 1116 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525119 |
Biaya Pengelolaan Website, Sistem Informasi Laboratorium/Fakultas/Program Studi |
2026-03-09 |
019/SPP-LS/FEB/2026 |
2026-03-13 |
0525H |
Rp. 13.500.000 |
4 Hari |
|
| 1117 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525119 |
Pengembangan SIM Klinik Bumdes |
2026-04-08 |
028/SPP-LS/FEB/2026 |
2026-04-10 |
0763H |
Rp. 35.000.000 |
2 Hari |
|
| 1118 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
525111 |
Honor PPK Fakultas |
2026-05-21 |
048/SPP-GU.4/FEB/2026 |
2026-06-04 |
1246H |
Rp. 4.600.000 |
14 Hari |
|
| 1119 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
525111 |
Honor Penguji Tagihan/Verifikator UK |
2026-05-21 |
048/SPP-GU.4/FEB/2026 |
2026-06-04 |
1246H |
Rp. 1.880.000 |
14 Hari |
|
| 1120 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525176 |
Honor PPK Fakultas |
2026-08-20 |
080/SPP-GU.7/FEB/2026 |
2026-09-01 |
2144H |
Rp. 3.450.000 |
12 Hari |
|
| 1121 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525176 |
Honor PPK Fakultas |
|
|
|
|
Rp. 1.150.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 1122 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525176 |
Honor Penguji Tagihan/Verfikator UK |
2026-08-20 |
080/SPP-GU.7/FEB/2026 |
2026-09-01 |
2144H |
Rp. 1.410.000 |
12 Hari |
|
| 1123 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525176 |
Honor Penguji Tagihan/Verfikator UK |
|
|
|
|
Rp. 470.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 1124 |
Fakultas Ekonomi dan Bisnis |
Februari 2026 |
525119 |
Bantuan Biaya Pembinaan Karakter |
2026-02-20 |
007/SPP-GU.1/FEB/2026 |
2026-02-26 |
0250H |
Rp. 33.500.000 |
6 Hari |
|
| 1125 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525119 |
Bantuan Biaya Kegiatan Pendampingan Asesmen Akreditasi Program Studi |
2026-03-10 |
025/SPP-GU.2/FEB/2026 |
2026-03-17 |
0549H |
Rp. 11.953.000 |
7 Hari |
|
| 1126 |
Fakultas Ekonomi dan Bisnis |
Maret 2026 |
525119 |
Bantuan Biaya Kegiatan Pendampingan Asesmen Akreditasi Program Studi |
2026-04-20 |
036/SPP-GU.3/FEB/2026 |
2026-04-28 |
0899H |
Rp. 31.391.300 |
8 Hari |
|
| 1127 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525119 |
Bantuan Biaya Kegiatan Pendampingan Asesmen Akreditasi Program Studi |
2026-04-20 |
036/SPP-GU.3/FEB/2026 |
2026-04-28 |
0899H |
Rp. 6.860.000 |
8 Hari |
|
| 1128 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525119 |
Bantuan Biaya Kegiatan Pendampingan Asesmen Akreditasi Program Studi |
2026-04-20 |
039/SPP-LS/FEB/2026 |
2026-04-30 |
0946H |
Rp. 42.400.000 |
10 Hari |
|
| 1129 |
Fakultas Ekonomi dan Bisnis |
Mei 2026 |
525119 |
Bantuan Biaya Kegiatan Pendampingan Asesmen Akreditasi Program Studi |
2026-04-29 |
040/SPP-LS/FEB/2026 |
2026-05-05 |
1007H |
Rp. 36.800.000 |
6 Hari |
|
| 1130 |
Fakultas Ekonomi dan Bisnis |
Juni 2026 |
525119 |
Bantuan Biaya Kegiatan Pendampingan Asesmen Akreditasi Program Studi |
2026-06-15 |
055/SPP-GU.5/FEB/2026 |
2026-07-07 |
1541H |
Rp. 44.131.000 |
22 Hari |
|
| 1131 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525119 |
Bantuan Biaya Kegiatan Pendampingan Asesmen Akreditasi Program Studi |
2026-07-14 |
063/SPP-LS/FEB/2026 |
2026-07-29 |
1749H |
Rp. 16.410.000 |
15 Hari |
|
| 1132 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525119 |
Bantuan Biaya Kegiatan Pendampingan Asesmen Akreditasi Program Studi |
2026-07-31 |
069/SPP-GU.6/FEB/2026 |
2026-08-12 |
1929H |
Rp. 18.745.000 |
12 Hari |
|
| 1133 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525119 |
Bantuan Biaya Kegiatan Pendampingan Asesmen Akreditasi Program Studi |
2026-08-20 |
078/SPP-GU.7/FEB/2026 |
2026-09-01 |
2142H |
Rp. 8.780.300 |
12 Hari |
|
| 1134 |
Fakultas Ekonomi dan Bisnis |
April 2026 |
525119 |
Kegiatan kuliah pakar/praktisi internasional |
2026-05-21 |
049/SPP-GU.4/FEB/2026 |
2026-06-04 |
1247H |
Rp. 20.145.000 |
14 Hari |
|
| 1135 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525112 |
Pengandaan Dokumen Laporan |
2026-09-21 |
090/SPP-GU.8/FEB/2026 |
|
|
Rp. 1.998.800 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1136 |
Fakultas Ekonomi dan Bisnis |
Agustus 2026 |
525119 |
Bantuan Biaya Terkait Kegiatan Pencegahan dan Penanganan Anti Kekerasan , Anti Narkoba dan Anti Korupsi |
2026-08-20 |
078/SPP-GU.7/FEB/2026 |
2026-09-01 |
2142H |
Rp. 2.440.000 |
12 Hari |
|
| 1137 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525119 |
Skim Penelitian Kolaboratif Dosen dan Mahasiswa Berbasis Kawasan |
2026-07-06 |
062/SPP-LS PENELITIAN/FEB/2026 |
2026-07-28 |
1718H |
Rp. 84.000.000 |
22 Hari |
|
| 1138 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525119 |
Skim Penelitian Kolaboratif Dosen dan Mahasiswa Berbasis Kawasan |
2026-09-21 |
086/SPP-LS.PENELITIAN/FEB/2026 |
|
|
Rp. 36.000.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1139 |
Fakultas Ekonomi dan Bisnis |
Juli 2026 |
525119 |
Bantuan Publikasi Jurnal Nasional terindex |
2026-07-31 |
067/SPP-GU.6/FEB/2026 |
2026-08-12 |
1927H |
Rp. 5.000.000 |
12 Hari |
|
| 1140 |
Fakultas Ekonomi dan Bisnis |
September 2026 |
525119 |
Pengabdian Kolaboratif Berbasis Kawasan |
2026-09-21 |
094/SPP-LS.PENGABDIAN/FEB/2026 |
|
|
Rp. 6.000.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1141 |
Fakultas Olahraga dan Kesehatan |
Maret 2026 |
537112 |
Pengadaan Leptop, Komputer, AC, Printer, Scenner dan LCD |
2026-04-06 |
18/UN47.B7.2/SPP -GUP.02/2026 |
2026-04-10 |
0740G |
Rp. 9.000.000 |
4 Hari |
|
| 1142 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
537112 |
Pengadaan Leptop, Komputer, AC, Printer, Scenner dan LCD |
2026-04-20 |
29/UN47.B7.2/SPP -GUP.03/2026 |
2026-04-23 |
0878G |
Rp. 22.648.500 |
3 Hari |
|
| 1143 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
537112 |
Pengadaan Leptop, Komputer, AC, Printer, Scenner dan LCD |
2026-05-12 |
36/UN47.B7.2/SPP -GUP.04/2026 |
2026-06-03 |
1228G |
Rp. 13.400.000 |
22 Hari |
|
| 1144 |
Fakultas Olahraga dan Kesehatan |
Juni 2026 |
537112 |
Pengadaan Leptop, Komputer, AC, Printer, Scenner dan LCD |
2026-06-18 |
48/UN47.B7.2/SPP -GUP.5/2026 |
2026-07-03 |
1478G |
Rp. 7.150.000 |
15 Hari |
|
| 1145 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
537112 |
Pengadaan Leptop, Komputer, AC, Printer, Scenner dan LCD |
2026-07-15 |
62/UN47.B7.2/SPP -GUP.6 /2026 |
2026-07-29 |
1727G |
Rp. 7.000.000 |
14 Hari |
|
| 1146 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
537112 |
Pengadaan Leptop, Komputer, AC, Printer, Scenner dan LCD |
2026-08-10 |
68/UN47.B7.2/SPP - GUP.07 /2026 |
2026-08-12 |
1912G |
Rp. 10.000.000 |
2 Hari |
|
| 1147 |
Fakultas Olahraga dan Kesehatan |
Agustus 2026 |
537112 |
Pengadaan Leptop, Komputer, AC, Printer, Scenner dan LCD |
2026-08-19 |
82/UN47.B7.2/SPP - GUP.08 /2026 |
2026-08-28 |
2109G |
Rp. 15.000.000 |
9 Hari |
|
| 1148 |
Fakultas Olahraga dan Kesehatan |
Agustus 2026 |
537112 |
Pengadaan Leptop, Komputer, AC, Printer, Scenner dan LCD |
2026-09-09 |
79/UN47.B7.2/SPP - GUP .09/2026 |
2026-09-11 |
2276G |
Rp. 19.750.000 |
2 Hari |
|
| 1149 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525114 |
Pemeliharaan Alat -alat Laboratorium Jurusan |
2026-04-20 |
31/UN47.B7.2/SPP -GUP.03/2026 |
2026-04-23 |
0880G |
Rp. 16.755.000 |
3 Hari |
|
| 1150 |
Fakultas Olahraga dan Kesehatan |
Maret 2026 |
525114 |
Pemeliharaan Gedung Pendukung Pembelajaran |
2026-04-06 |
20/UN47.B7.2/SPP -GUP.02/2026 |
2026-04-10 |
0738G |
Rp. 15.000.000 |
4 Hari |
|
| 1151 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525114 |
Pemeliharaan Gedung Pendukung Pembelajaran |
2026-08-10 |
70/UN47.B7.2/SPP - GUP.07 /2026 |
2026-08-12 |
1914G |
Rp. 615.000 |
2 Hari |
|
| 1152 |
Fakultas Olahraga dan Kesehatan |
Agustus 2026 |
525114 |
Pemeliharaan Gedung Pendukung Pembelajaran |
2026-08-19 |
84/UN47.B7.2/SPP - GUP.08 /2026 |
2026-08-28 |
2111G |
Rp. 11.810.400 |
9 Hari |
|
| 1153 |
Fakultas Olahraga dan Kesehatan |
September 2026 |
525114 |
Pemeliharaan Gedung Pendukung Pembelajaran |
2026-09-14 |
87/UN47.B7.2/SPP - GUP.10/2026 |
|
|
Rp. 29.950.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1154 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525114 |
Pemeliharaan AC, Jaringan Listrik, Instalasi Air dan Jaringan Internet |
2026-04-20 |
33/UN47.B7.2/SPP -GUP.03/2026 |
2026-04-23 |
0882G |
Rp. 8.205.000 |
3 Hari |
|
| 1155 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525114 |
Pemeliharaan AC, Jaringan Listrik, Instalasi Air dan Jaringan Internet |
2026-05-12 |
40/UN47.B7.2/SPP -GUP.04/2026 |
2026-06-03 |
1223G |
Rp. 8.950.000 |
22 Hari |
|
| 1156 |
Fakultas Olahraga dan Kesehatan |
Juni 2026 |
525114 |
Pemeliharaan AC, Jaringan Listrik, Instalasi Air dan Jaringan Internet |
2026-06-18 |
52/UN47.B7.2/SPP -GUP.5/2026 |
2026-07-03 |
1474G |
Rp. 5.244.500 |
15 Hari |
|
| 1157 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525114 |
Pemeliharaan AC, Jaringan Listrik, Instalasi Air dan Jaringan Internet |
2026-08-10 |
72/UN47.B7.2/SPP - GUP.07 /2026 |
2026-08-12 |
1916G |
Rp. 17.400.000 |
2 Hari |
|
| 1158 |
Fakultas Olahraga dan Kesehatan |
Agustus 2026 |
525114 |
Pemeliharaan AC, Jaringan Listrik, Instalasi Air dan Jaringan Internet |
2026-08-19 |
86/UN47.B7.2/SPP - GUP.08 /2026 |
2026-08-28 |
2113G |
Rp. 9.830.000 |
9 Hari |
|
| 1159 |
Fakultas Olahraga dan Kesehatan |
September 2026 |
525114 |
Pemeliharaan AC, Jaringan Listrik, Instalasi Air dan Jaringan Internet |
2026-09-14 |
89/UN47.B7.2/SPP - GUP.10/2026 |
|
|
Rp. 2.755.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1160 |
Fakultas Olahraga dan Kesehatan |
Maret 2026 |
525114 |
Pemeliharaan Printer dan Komputer |
2026-04-06 |
23/UN47.B7.2/SPP -GUP.02/2026 |
2026-04-10 |
0735G |
Rp. 1.950.000 |
4 Hari |
|
| 1161 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525114 |
Pemeliharaan Printer dan Komputer |
2026-08-10 |
72/UN47.B7.2/SPP - GUP.07 /2026 |
2026-08-12 |
1916G |
Rp. 1.850.000 |
2 Hari |
|
| 1162 |
Fakultas Olahraga dan Kesehatan |
September 2026 |
525114 |
Pemeliharaan Printer dan Komputer |
2026-09-14 |
89/UN47.B7.2/SPP - GUP.10/2026 |
|
|
Rp. 750.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1163 |
Fakultas Olahraga dan Kesehatan |
Agustus 2026 |
525114 |
Pemeliharaan Gedung Perkantoran |
2026-08-19 |
86/UN47.B7.2/SPP - GUP.08 /2026 |
2026-08-28 |
2113G |
Rp. 9.317.550 |
9 Hari |
|
| 1164 |
Fakultas Olahraga dan Kesehatan |
Agustus 2026 |
525114 |
Pemeliharaan Gedung Perkantoran |
2026-09-09 |
80/UN47.B7.2/SPP - GUP .09/2026 |
2026-09-11 |
2275G |
Rp. 1.900.000 |
2 Hari |
|
| 1165 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Bantuan Biaya Kegiatan Sosialisasi Penerimaan Mahasiswa Baru |
2026-06-24 |
58/UN47.B7.2/SPP -LS.12 /2026 |
2026-07-09 |
1585G |
Rp. 10.000.000 |
15 Hari |
|
| 1166 |
Fakultas Olahraga dan Kesehatan |
September 2026 |
525119 |
Bantuan Biaya Kegiatan Sosialisasi Penerimaan Mahasiswa Baru |
2026-09-23 |
97/UN47.B7.2/SPP - LS.20/2026 |
|
|
Rp. 20.000.000 |
13 Hari |
Belum ada SP2D terhitung dari 23 September 2026 hingga 06 Oktober 2026 (13 Hari) |
| 1167 |
Fakultas Olahraga dan Kesehatan |
September 2026 |
525119 |
Bantuan Biaya Kegiatan Kuliah Umum |
2026-09-23 |
97/UN47.B7.2/SPP - LS.20/2026 |
|
|
Rp. 35.000.000 |
13 Hari |
Belum ada SP2D terhitung dari 23 September 2026 hingga 06 Oktober 2026 (13 Hari) |
| 1168 |
Fakultas Olahraga dan Kesehatan |
Mei 2026 |
525119 |
Bantuan Biaya Kegiatan Kuliah Pakar Berbasis Case Method dan Team Based
Project |
2026-05-12 |
43/UN47.B7.2/SPP -GUP.04/2026 |
2026-06-03 |
1221G |
Rp. 20.000.000 |
22 Hari |
|
| 1169 |
Fakultas Olahraga dan Kesehatan |
Mei 2026 |
525119 |
Bantuan Biaya Kegiatan Kuliah Pakar Berbasis Case Method dan Team Based
Project |
2026-05-12 |
44/UN47.B7.2/SPP -LS.10/2026 |
2026-05-26 |
1152G |
Rp. 19.776.000 |
14 Hari |
|
| 1170 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Bantuan Biaya Kegiatan Kuliah Pakar Berbasis Case Method dan Team Based
Project |
2026-06-24 |
58/UN47.B7.2/SPP -LS.12 /2026 |
2026-07-09 |
1585G |
Rp. 20.000.000 |
15 Hari |
|
| 1171 |
Fakultas Olahraga dan Kesehatan |
Agustus 2026 |
525119 |
Bantuan Biaya Kegiatan Kuliah Pakar Berbasis Case Method dan Team Based
Project |
2026-08-19 |
88/UN47.B7.2/SPP - GUP.08 /2026 |
2026-08-28 |
2114G |
Rp. 20.000.000 |
9 Hari |
|
| 1172 |
Fakultas Olahraga dan Kesehatan |
September 2026 |
525119 |
Bantuan Biaya Kegiatan Kuliah Pakar Berbasis Case Method dan Team Based
Project |
2026-09-23 |
97/UN47.B7.2/SPP - LS.20/2026 |
|
|
Rp. 40.000.000 |
13 Hari |
Belum ada SP2D terhitung dari 23 September 2026 hingga 06 Oktober 2026 (13 Hari) |
| 1173 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Biaya Penyusunan Rancangan Pembelajaran Semester (RPS) |
2026-06-24 |
58/UN47.B7.2/SPP -LS.12 /2026 |
2026-07-09 |
1585G |
Rp. 24.000.000 |
15 Hari |
|
| 1174 |
Fakultas Olahraga dan Kesehatan |
Mei 2026 |
525119 |
Biaya Kegiatan Tracer Study dan Temu Alumni |
2026-05-12 |
44/UN47.B7.2/SPP -LS.10/2026 |
2026-05-26 |
1152G |
Rp. 30.000.000 |
14 Hari |
|
| 1175 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Biaya Sewa Kolam Renang Untuk kegiatan Praktek MK Renang Mahasiswa
Jurusan Penjas dan Pendidikan Kepelatihan Olahraga Semester Genap dan
Semester Ganjil (250 Mahasiswa x 10 Pertemuan x 1 Kelas x Pr.20.000) |
2026-06-24 |
58/UN47.B7.2/SPP -LS.12 /2026 |
2026-07-09 |
1585G |
Rp. 11.400.000 |
15 Hari |
|
| 1176 |
Fakultas Olahraga dan Kesehatan |
Mei 2026 |
525119 |
Pelaksanaan PKL/PBL/PPL (100 Mahasiswa x 6 Prodi) |
2026-05-12 |
44/UN47.B7.2/SPP -LS.10/2026 |
2026-05-26 |
1152G |
Rp. 7.500.000 |
14 Hari |
|
| 1177 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Pelaksanaan PKL/PBL/PPL (100 Mahasiswa x 6 Prodi) |
2026-06-24 |
58/UN47.B7.2/SPP -LS.12 /2026 |
2026-07-09 |
1585G |
Rp. 7.500.000 |
15 Hari |
|
| 1178 |
Fakultas Olahraga dan Kesehatan |
September 2026 |
525119 |
Pelaksanaan Magang Industri dan Rumah Sakit Prodi D3 Farmasi |
2026-09-23 |
97/UN47.B7.2/SPP - LS.20/2026 |
|
|
Rp. 25.000.000 |
13 Hari |
Belum ada SP2D terhitung dari 23 September 2026 hingga 06 Oktober 2026 (13 Hari) |
| 1179 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Pengadaan Alat dan Barang Olahraga untuk menunjang praktik olahraga Jurusan Penjas dan PKO |
2026-06-24 |
59/UN47.B7.2/SPP -LS.13 /2026 |
2026-07-09 |
1588G |
Rp. 49.200.000 |
15 Hari |
|
| 1180 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Pengadaan Alat dan Barang Olahraga untuk menunjang praktik olahraga Jurusan Penjas dan PKO |
2026-06-24 |
60/UN47.B7.2/SPP -LS.13 /2026 |
2026-07-09 |
1587G |
Rp. 49.800.000 |
15 Hari |
|
| 1181 |
Fakultas Olahraga dan Kesehatan |
Juni 2026 |
525112 |
Biaya bahan laboratorium, ATM/ATK terkait pembelajaran mahasiswa
keperawatan non reguler angkatan 12 Semester 2 |
2026-06-18 |
53/UN47.B7.2/SPP -GUP.5/2026 |
2026-07-03 |
1473G |
Rp. 525.000 |
15 Hari |
|
| 1182 |
Fakultas Olahraga dan Kesehatan |
Mei 2026 |
525119 |
Kegiatan Pelatihan Ujian Kompetensi Mahasiswa (UKOM) D3 Farmasi |
2026-05-12 |
44/UN47.B7.2/SPP -LS.10/2026 |
2026-05-26 |
1152G |
Rp. 25.000.000 |
14 Hari |
|
| 1183 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525119 |
Biaya Kegiatan Stase Keperawatan Gawat Darurat Profesi Ners Angkatan 22 |
2026-04-20 |
35/UN47.B7.2/SPP -LS.09/2026 |
2026-04-28 |
0911G |
Rp. 123.267.000 |
8 Hari |
|
| 1184 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525119 |
Biaya Kegiatan Stase Keperawatan Gerontik Profesi Ners Angkatan 22 |
2026-04-20 |
35/UN47.B7.2/SPP -LS.09/2026 |
2026-04-28 |
0911G |
Rp. 65.219.800 |
8 Hari |
|
| 1185 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525119 |
Biaya Kegiatan Stase Keperawatan Komunitas Profesi Ners Angkatan 22 |
2026-04-20 |
35/UN47.B7.2/SPP -LS.09/2026 |
2026-04-28 |
0911G |
Rp. 78.185.600 |
8 Hari |
|
| 1186 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525119 |
Biaya Kegiatan Stase Keperawatan Keluarga Profesi Ners Angkatan 22 |
2026-04-20 |
35/UN47.B7.2/SPP -LS.09/2026 |
2026-04-28 |
0911G |
Rp. 61.975.600 |
8 Hari |
|
| 1187 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525119 |
Biaya Kegiatan Stase Keperawatan Peminatan Profesi Ners Angkatan 22 |
2026-04-20 |
35/UN47.B7.2/SPP -LS.09/2026 |
2026-04-28 |
0911G |
Rp. 66.876.900 |
8 Hari |
|
| 1188 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525119 |
Biaya Kegiatan Karya Ilmiah Ners Profesi Ners Angkatan 22 |
2026-04-20 |
35/UN47.B7.2/SPP -LS.09/2026 |
2026-04-28 |
0911G |
Rp. 35.014.000 |
8 Hari |
|
| 1189 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525119 |
Biaya Kegiatan Pelatihan BTCLS Profesi Ners Angkatan 23 |
2026-04-20 |
35/UN47.B7.2/SPP -LS.09/2026 |
2026-04-28 |
0911G |
Rp. 157.455.000 |
8 Hari |
|
| 1190 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525119 |
Biaya Kegiatan Stase Keperawatan Dasar Profesi Ners Angkatan 23 |
2026-04-20 |
35/UN47.B7.2/SPP -LS.09/2026 |
2026-04-28 |
0911G |
Rp. 75.450.000 |
8 Hari |
|
| 1191 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525119 |
Biaya Kegiatan Stase Keperawatan Medikal Bedah Profesi Ners Angkatan 23 |
2026-04-20 |
35/UN47.B7.2/SPP -LS.09/2026 |
2026-04-28 |
0911G |
Rp. 140.350.000 |
8 Hari |
|
| 1192 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525119 |
Biaya Kegiatan PKPA Rumah Sakit Profesi Apoteker Angkatan 1 Semester 2 |
2026-04-15 |
26/UN47.B7.2/SPP -LS.07/2026 |
2026-04-16 |
0827G |
Rp. 210.760.000 |
1 Hari |
|
| 1193 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525119 |
Biaya Kegiatan PKPA Industri Farmasi Profesi Apoteker Angkatan 1 Semester 2 |
2026-04-15 |
26/UN47.B7.2/SPP -LS.07/2026 |
2026-04-16 |
0827G |
Rp. 261.320.000 |
1 Hari |
|
| 1194 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525119 |
Biaya Kegiatan Kepanitraan Umum (PANUM) Profesi Apoteker Angkatan 2 |
2026-04-15 |
26/UN47.B7.2/SPP -LS.07/2026 |
2026-04-16 |
0827G |
Rp. 111.000.000 |
1 Hari |
|
| 1195 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525119 |
Biaya Kegiatan PKPA Apotek Profesi Apoteker Angkatan 2 Semester 1 |
2026-04-15 |
26/UN47.B7.2/SPP -LS.07/2026 |
2026-04-16 |
0827G |
Rp. 85.300.000 |
1 Hari |
|
| 1196 |
Fakultas Olahraga dan Kesehatan |
April 2026 |
525119 |
Biaya Kegiatan PKPA Puskesmas Profesi Apoteker Angkatan 2 Semester 1 |
2026-04-15 |
26/UN47.B7.2/SPP -LS.07/2026 |
2026-04-16 |
0827G |
Rp. 87.800.000 |
1 Hari |
|
| 1197 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Biaya Kegiatan PKPA Distribusi Farmasi Profesi Apoteker Angkatan 2 Semester 1 |
2026-06-19 |
55/UN47.B7.2/SPP -LS.11 Apoteker/2026 |
2026-07-06 |
1505G |
Rp. 129.560.000 |
17 Hari |
|
| 1198 |
Fakultas Olahraga dan Kesehatan |
Juni 2026 |
525119 |
Honorarium Mengajar, honorarium Koordinator, Honorarium penyusunan GBPM,
dan kegiatan lainnya terkait pembelajaran mahasiswa keperawatan non reguler
angkatan 12 Semester 2 |
2026-05-12 |
46/UN47.B7.2/SPP -LS.10 Program Non reguler/2026 |
2026-06-25 |
1338G |
Rp. 145.150.000 |
44 Hari |
|
| 1199 |
Fakultas Olahraga dan Kesehatan |
Mei 2026 |
525119 |
Biaya Kegiatan Pelatihan OSCE Prodi D3 Farmasi |
2026-05-12 |
44/UN47.B7.2/SPP -LS.10/2026 |
2026-05-26 |
1152G |
Rp. 30.000.000 |
14 Hari |
|
| 1200 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Biaya Kegiatan Ujian Kompetensi Mahasiswa (UKOM) Profesi Ners Angkatan 22 |
2026-07-13 |
61/UN47.B7.2/SPP -LS.14 /2026 |
2026-07-22 |
1677G |
Rp. 117.400.000 |
9 Hari |
|
| 1201 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
biaya Kegiatan Pelatihan OSCE Profesi Ners Angkatan 22 |
2026-07-13 |
61/UN47.B7.2/SPP -LS.14 /2026 |
2026-07-22 |
1677G |
Rp. 60.491.000 |
9 Hari |
|
| 1202 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Biaya Kegiatan Stase Keperawatan Maternitas Profesi ners Angkatan 23 |
2026-07-13 |
61/UN47.B7.2/SPP -LS.14 /2026 |
2026-07-22 |
1677G |
Rp. 90.160.000 |
9 Hari |
|
| 1203 |
Fakultas Olahraga dan Kesehatan |
September 2026 |
525119 |
Biaya Kegiatan Stase Keperawatan Maternitas Profesi ners Angkatan 23 |
2026-09-14 |
85//UN47.B7.2/SPP - LS.18 PROFESI NERS/2026 |
|
|
Rp. 3.675.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1204 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Biaya Kegiatan Stase Keperawatan Anak Profesi Ners Angkatan 23 |
2026-07-13 |
61/UN47.B7.2/SPP -LS.14 /2026 |
2026-07-22 |
1677G |
Rp. 90.310.000 |
9 Hari |
|
| 1205 |
Fakultas Olahraga dan Kesehatan |
September 2026 |
525119 |
Biaya Kegiatan Stase Keperawatan Anak Profesi Ners Angkatan 23 |
2026-09-14 |
85//UN47.B7.2/SPP - LS.18 PROFESI NERS/2026 |
|
|
Rp. 3.325.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1206 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Biaya Kegiatan Stase Keperawatan Jiwa Profesi Ners Angkatan 23 |
2026-07-13 |
61/UN47.B7.2/SPP -LS.14 /2026 |
2026-07-22 |
1677G |
Rp. 87.310.000 |
9 Hari |
|
| 1207 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Biaya Kegiatan Stase Keperawatan Manajemen Profesi Ners Angkatan 23 |
2026-07-13 |
61/UN47.B7.2/SPP -LS.14 /2026 |
2026-07-22 |
1677G |
Rp. 74.705.000 |
9 Hari |
|
| 1208 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Biaya Kegiatan Kepanitraan Umum (PANUM) Profesi Ners angkatan 24 |
2026-07-13 |
61/UN47.B7.2/SPP -LS.14 /2026 |
2026-07-22 |
1677G |
Rp. 147.640.000 |
9 Hari |
|
| 1209 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Biaya Kegiatan Pelatihan BTCLS Profesi Ners Angkatan 24 |
2026-07-13 |
61/UN47.B7.2/SPP -LS.14 /2026 |
2026-07-22 |
1677G |
Rp. 94.775.000 |
9 Hari |
|
| 1210 |
Fakultas Olahraga dan Kesehatan |
Juli 2026 |
525119 |
Biaya Kegiatan Stase Keperawatan Dasar Profesi Ners Angkatan 24 |
2026-07-13 |
61/UN47.B7.2/SPP -LS.14 /2026 |
2026-07-22 |
1677G |
Rp. 49.855.000 |
9 Hari |
|
| 1211 |
Fakultas Pertanian |
Januari 2026 |
525114 |
Pemeliharaan Instalasi Listrik dan Air |
2026-03-05 |
06/SPP-GU1/2026 |
2026-03-10 |
0403F |
Rp. 2.385.000 |
5 Hari |
|
| 1212 |
Fakultas Pertanian |
Maret 2026 |
525114 |
Pemeliharaan Instalasi Listrik dan Air |
2026-04-10 |
15/SPP-GU2/2026 |
2026-04-15 |
0807F |
Rp. 1.000.000 |
5 Hari |
|
| 1213 |
Fakultas Pertanian |
April 2026 |
525114 |
Pemeliharaan Instalasi Listrik dan Air |
2026-04-22 |
23/SPP-GU3/2026 |
2026-04-29 |
0918F |
Rp. 1.500.000 |
7 Hari |
|
| 1214 |
Fakultas Pertanian |
Juli 2026 |
525114 |
Pemeliharaan Instalasi Listrik dan Air |
2026-08-18 |
50/SPP-GU6/2026 |
2026-08-28 |
2102F |
Rp. 115.000 |
10 Hari |
|
| 1215 |
Fakultas Pertanian |
Juli 2026 |
525114 |
Biaya Pemeliharaan dan pengembangan Laboratorium Alam/ Miniranch Jurusan Peternakan |
2026-08-18 |
50/SPP-GU6/2026 |
2026-08-28 |
2102F |
Rp. 16.100.000 |
10 Hari |
|
| 1216 |
Fakultas Pertanian |
Agustus 2026 |
525114 |
Biaya Pemeliharaan dan pengembangan Laboratorium Alam/ Miniranch Jurusan Peternakan |
2026-08-31 |
57/SPP-LS12/2026 |
|
|
Rp. 23.899.500 |
36 Hari |
Belum ada SP2D terhitung dari 31 Agustus 2026 hingga 06 Oktober 2026 (36 Hari) |
| 1217 |
Fakultas Pertanian |
September 2026 |
525114 |
Biaya Pemeliharaan dan pengembangan Laboratorium Alam/ Miniranch Jurusan Peternakan |
2026-09-29 |
67/SPP-LS16/2026 |
|
|
Rp. 60.000.000 |
7 Hari |
Belum ada SP2D terhitung dari 29 September 2026 hingga 06 Oktober 2026 (7 Hari) |
| 1218 |
Fakultas Pertanian |
Juli 2026 |
525114 |
Pemeliharaan Personal Computer/ Laptop |
2026-08-18 |
53/SPP-GU6/2026 |
2026-08-28 |
2105F |
Rp. 1.975.000 |
10 Hari |
|
| 1219 |
Fakultas Pertanian |
Agustus 2026 |
525114 |
Pemeliharaan Personal Computer/ Laptop |
2026-08-18 |
53/SPP-GU6/2026 |
2026-08-28 |
2105F |
Rp. 1.750.000 |
10 Hari |
|
| 1220 |
Fakultas Pertanian |
September 2026 |
525114 |
Pemeliharaan Personal Computer/ Laptop |
2026-09-30 |
71/SPP-GUNIHIL/2026 |
|
|
Rp. 5.035.000 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 1221 |
Fakultas Pertanian |
Januari 2026 |
525114 |
Pemeliharaan AC |
2026-03-05 |
08/SPP-GU1/2026 |
2026-03-10 |
0405F |
Rp. 750.000 |
5 Hari |
|
| 1222 |
Fakultas Pertanian |
April 2026 |
525114 |
Pemeliharaan AC |
2026-04-22 |
25/SPP-GU3/2026 |
2026-04-29 |
0919F |
Rp. 2.075.000 |
7 Hari |
|
| 1223 |
Fakultas Pertanian |
April 2026 |
525114 |
Pemeliharaan AC |
2026-05-25 |
31/SPP-GU4/2026 |
2026-06-18 |
1316F |
Rp. 1.900.000 |
24 Hari |
|
| 1224 |
Fakultas Pertanian |
Agustus 2026 |
525114 |
Pemeliharaan AC |
2026-08-18 |
53/SPP-GU6/2026 |
2026-08-28 |
2105F |
Rp. 1.550.000 |
10 Hari |
|
| 1225 |
Fakultas Pertanian |
September 2026 |
525114 |
Pemeliharaan AC |
2026-09-30 |
71/SPP-GUNIHIL/2026 |
|
|
Rp. 3.475.000 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 1226 |
Fakultas Pertanian |
Januari 2026 |
525114 |
Pemeliharaan Mesin Printer |
2026-03-05 |
08/SPP-GU1/2026 |
2026-03-10 |
0405F |
Rp. 2.140.000 |
5 Hari |
|
| 1227 |
Fakultas Pertanian |
Maret 2026 |
525114 |
Pemeliharaan Mesin Printer |
2026-04-10 |
17/SPP-GU2/2026 |
2026-04-15 |
0809F |
Rp. 550.000 |
5 Hari |
|
| 1228 |
Fakultas Pertanian |
Agustus 2026 |
525114 |
Pemeliharaan Mesin Printer |
2026-08-18 |
53/SPP-GU6/2026 |
2026-08-28 |
2105F |
Rp. 1.842.500 |
10 Hari |
|
| 1229 |
Fakultas Pertanian |
September 2026 |
525114 |
Pemeliharaan Mesin Printer |
2026-09-30 |
71/SPP-GUNIHIL/2026 |
|
|
Rp. 3.267.500 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 1230 |
Fakultas Pertanian |
April 2026 |
525114 |
Pemeliharaan Gedung Perkantoran Fakultas Pertanian |
2026-04-22 |
25/SPP-GU3/2026 |
2026-04-29 |
0919F |
Rp. 22.600.000 |
7 Hari |
|
| 1231 |
Fakultas Pertanian |
April 2026 |
525114 |
Pemeliharaan Gedung Perkantoran Fakultas Pertanian |
2026-05-25 |
31/SPP-GU4/2026 |
2026-06-18 |
1316F |
Rp. 756.000 |
24 Hari |
|
| 1232 |
Fakultas Pertanian |
Juni 2026 |
525114 |
Pemeliharaan Gedung Perkantoran Fakultas Pertanian |
2026-07-14 |
41/SPP-GU5/2026 |
2026-07-29 |
1735F |
Rp. 5.077.000 |
15 Hari |
|
| 1233 |
Fakultas Pertanian |
Juli 2026 |
525114 |
Pemeliharaan Gedung Perkantoran Fakultas Pertanian |
2026-07-14 |
41/SPP-GU5/2026 |
2026-07-29 |
1735F |
Rp. 14.167.000 |
15 Hari |
|
| 1234 |
Fakultas Pertanian |
September 2026 |
525114 |
Pemeliharaan Gedung Perkantoran Fakultas Pertanian |
2026-09-30 |
71/SPP-GUNIHIL/2026 |
|
|
Rp. 1.903.000 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 1235 |
Fakultas Pertanian |
Maret 2026 |
525114 |
Pemeliharaan Halaman Perkantoran Fakultas Pertanian |
2026-04-10 |
17/SPP-GU2/2026 |
2026-04-15 |
0809F |
Rp. 1.870.000 |
5 Hari |
|
| 1236 |
Fakultas Pertanian |
April 2026 |
525114 |
Pemeliharaan Halaman Perkantoran Fakultas Pertanian |
2026-04-22 |
25/SPP-GU3/2026 |
2026-04-29 |
0919F |
Rp. 5.019.000 |
7 Hari |
|
| 1237 |
Fakultas Pertanian |
April 2026 |
525114 |
Pemeliharaan Halaman Perkantoran Fakultas Pertanian |
2026-05-25 |
31/SPP-GU4/2026 |
2026-06-18 |
1316F |
Rp. 1.644.000 |
24 Hari |
|
| 1238 |
Fakultas Pertanian |
Mei 2026 |
525114 |
Pemeliharaan Halaman Perkantoran Fakultas Pertanian |
2026-05-25 |
31/SPP-GU4/2026 |
2026-06-18 |
1316F |
Rp. 1.800.000 |
24 Hari |
|
| 1239 |
Fakultas Pertanian |
Agustus 2026 |
525114 |
Pemeliharaan Halaman Perkantoran Fakultas Pertanian |
2026-08-18 |
53/SPP-GU6/2026 |
2026-08-28 |
2105F |
Rp. 2.389.000 |
10 Hari |
|
| 1240 |
Fakultas Pertanian |
Agustus 2026 |
525114 |
Pemeliharaan Halaman Perkantoran Fakultas Pertanian |
2026-09-30 |
71/SPP-GUNIHIL/2026 |
|
|
Rp. 1.681.500 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 1241 |
Fakultas Pertanian |
September 2026 |
525114 |
Biaya pemeliharaan dan pengembangan Green House Fakultas Pertanian |
2026-09-28 |
64/SPP-LS16/2026 |
|
|
Rp. 234.500.000 |
8 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 06 Oktober 2026 (8 Hari) |
| 1242 |
Fakultas Pertanian |
September 2026 |
525114 |
Biaya pemeliharaan dan pengembangan Green House Fakultas Pertanian |
2026-09-30 |
71/SPP-GUNIHIL/2026 |
|
|
Rp. 500.000 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 1243 |
Fakultas Pertanian |
Maret 2026 |
525119 |
Bantuan Biaya Pelaksanaan Sosialisasi Calon Mahasiswa Baru dan Pembuatan Liflet untuk 4 Prodi. |
2026-04-10 |
19/SPP-GU2/2026 |
2026-04-15 |
0811F |
Rp. 20.000.000 |
5 Hari |
|
| 1244 |
Fakultas Pertanian |
Mei 2026 |
525119 |
Bantuan Biaya Pelaksanaan Sosialisasi Calon Mahasiswa Baru dan Pembuatan Liflet untuk 4 Prodi. |
2026-05-25 |
33/SPP-GU4/2026 |
2026-06-18 |
1314F |
Rp. 10.000.000 |
24 Hari |
|
| 1245 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Bantuan Biaya Pelaksanaan Kegiatan Seminar, Workshop Pembelajaran di Jurusan |
2026-07-15 |
47/SPP-LS10/2026 |
2026-07-29 |
1761F |
Rp. 1.500.000 |
14 Hari |
|
| 1246 |
Fakultas Pertanian |
Juni 2026 |
525119 |
Bantuan Biaya Pelaksanaan Kegiatan Mahasiswa yang Melakukan Student On Project Expo Jurusan |
2026-07-14 |
44/SPP-GU5/2026 |
2026-07-29 |
1737F |
Rp. 2.000.000 |
15 Hari |
|
| 1247 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Bantuan Biaya Pelaksanaan Kegiatan Mahasiswa yang Melakukan Student On Project Expo Jurusan |
2026-08-31 |
56/SPP-LS12/2026 |
2026-09-11 |
2262F |
Rp. 2.000.000 |
11 Hari |
|
| 1248 |
Fakultas Pertanian |
April 2026 |
525119 |
Bantuan Biaya Pelaksanaan Lokakarya Kurikulum dilingkungan Fakultas Pertanian Universitas Negeri Gorontalo |
2026-04-22 |
26/SPP-GU3/2026 |
2026-04-29 |
0920F |
Rp. 10.000.000 |
7 Hari |
|
| 1249 |
Fakultas Pertanian |
April 2026 |
525119 |
Bantuan Biaya Pelaksanaan Lokakarya Kurikulum dilingkungan Fakultas Pertanian Universitas Negeri Gorontalo |
2026-05-25 |
33/SPP-GU4/2026 |
2026-06-18 |
1314F |
Rp. 10.000.000 |
24 Hari |
|
| 1250 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Bantuan Biaya Pelaksanaan Lokakarya Kurikulum dilingkungan Fakultas Pertanian Universitas Negeri Gorontalo |
2026-07-15 |
47/SPP-LS10/2026 |
2026-07-29 |
1761F |
Rp. 10.000.000 |
14 Hari |
|
| 1251 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Bantuan Biaya Pelaksanaan Lokakarya Kurikulum dilingkungan Fakultas Pertanian Universitas Negeri Gorontalo |
2026-08-31 |
56/SPP-LS12/2026 |
2026-09-11 |
2262F |
Rp. 10.000.000 |
11 Hari |
|
| 1252 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Bantuan Biaya Kegiatan Terkait Tracer Studi dan Penelusuran Biodata Alumni |
2026-08-31 |
56/SPP-LS12/2026 |
2026-09-11 |
2262F |
Rp. 7.000.000 |
11 Hari |
|
| 1253 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Bantuan Biaya Pelaksanaan Kegiatan Sinkronisasi SIAT dan PDDIKTI |
2026-08-31 |
56/SPP-LS12/2026 |
2026-09-11 |
2262F |
Rp. 6.000.000 |
11 Hari |
|
| 1254 |
Fakultas Pertanian |
Maret 2026 |
525119 |
Bantuan Biaya Kegiatan Musyawarah Besar Ormawa dan Rapat Kerja Ormawa. |
2026-04-10 |
19/SPP-GU2/2026 |
2026-04-15 |
0811F |
Rp. 5.000.000 |
5 Hari |
|
| 1255 |
Fakultas Pertanian |
April 2026 |
525119 |
Bantuan Biaya Kegiatan Musyawarah Besar Ormawa dan Rapat Kerja Ormawa. |
2026-05-25 |
33/SPP-GU4/2026 |
2026-06-18 |
1314F |
Rp. 500.000 |
24 Hari |
|
| 1256 |
Fakultas Ilmu Pendidikan |
Juli 2026 |
537112 |
Pengadaan Kursi Direksi |
2026-08-07 |
045/UN47.B1/SPP/GUP-06/2026 |
2026-08-18 |
1994A |
Rp. 5.193.020 |
11 Hari |
|
| 1257 |
Fakultas Pertanian |
Juli 2026 |
525119 |
Bantuan Biaya Kegiatan Musyawarah Besar Ormawa dan Rapat Kerja Ormawa. |
2026-08-18 |
55/SPP-GU6/2026 |
2026-08-28 |
2107F |
Rp. 500.000 |
10 Hari |
|
| 1258 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Bantuan Biaya Penguatan Kapasitas Mahasiswa Baru (PKKMB) Dilingkungan Fakultas Pertanian. |
2026-03-30 |
012/UN47.B1/SPP/GUP-02/2026 |
2026-04-06 |
0641A |
Rp. 12.000.000 |
7 Hari |
|
| 1259 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Bantuan Biaya Penguatan Kapasitas Mahasiswa Baru (PKKMB) Dilingkungan Fakultas Pertanian. |
2026-08-31 |
56/SPP-LS12/2026 |
2026-09-11 |
2262F |
Rp. 15.000.000 |
11 Hari |
|
| 1260 |
Fakultas Pertanian |
Maret 2026 |
525119 |
Bantuan Biaya Kegiatan Latihan Dasar Kepemimpinan Senat, HMJ Dilingkungan Fakultas Pertanian |
2026-03-30 |
012/UN47.B1/SPP/GUP-02/2026 |
2026-04-06 |
0641A |
Rp. 10.000.000 |
7 Hari |
|
| 1261 |
Fakultas Pertanian |
Juli 2026 |
525119 |
Bantuan Biaya Kegiatan Latihan Dasar Kepemimpinan Senat, HMJ Dilingkungan Fakultas Pertanian |
2026-08-18 |
55/SPP-GU6/2026 |
2026-08-28 |
2107F |
Rp. 1.000.000 |
10 Hari |
|
| 1262 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
537112 |
Pengadaan AC 2 Pk Untuk Ruang Kelas |
2026-07-21 |
043/UN47.B1/SPP/LS-13/2026 |
2026-07-29 |
1743A |
Rp. 39.600.000 |
8 Hari |
|
| 1263 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Bantuan Biaya Kegiatan Latihan Dasar Kepemimpinan Senat, HMJ Dilingkungan Fakultas Pertanian |
2026-08-31 |
56/SPP-LS12/2026 |
2026-09-11 |
2262F |
Rp. 1.000.000 |
11 Hari |
|
| 1264 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
537112 |
Pengadaan Laptop |
2026-08-07 |
045/UN47.B1/SPP/GUP-06/2026 |
2026-08-18 |
1994A |
Rp. 16.734.525 |
11 Hari |
|
| 1265 |
Fakultas Ilmu Pendidikan |
September 2026 |
537112 |
Pengadaan mesin Scanner |
2026-09-29 |
68/SPP-LS16/2026 |
|
|
Rp. 5.000.000 |
7 Hari |
Belum ada SP2D terhitung dari 29 September 2026 hingga 06 Oktober 2026 (7 Hari) |
| 1266 |
Fakultas Ilmu Pendidikan |
Juli 2026 |
537112 |
Pengadaan printer |
2026-08-07 |
045/UN47.B1/SPP/GUP-06/2026 |
2026-08-18 |
1994A |
Rp. 2.817.275 |
11 Hari |
|
| 1267 |
Fakultas Pertanian |
Maret 2026 |
525119 |
Bantuan Biaya Kegiatan Program Kreaktivitas/Kewirausahaan Mahasiswa (PKM) |
2026-04-10 |
19/SPP-GU2/2026 |
2026-04-15 |
0811F |
Rp. 7.000.000 |
5 Hari |
|
| 1268 |
Fakultas Ilmu Pendidikan |
Oktober 2026 |
537112 |
Pengadaan sarana Penunjang Pendidikan untuk Jurusan terakreditasi Unggul |
|
|
|
|
Rp. 56.756.065 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1269 |
Fakultas Pertanian |
Maret 2026 |
525119 |
Bantuan biaya pelaksanaan kegiatan pembinaan kerohanian dilingkungan Fakultas Pertanian Universitas Negeri Gorontalo |
2026-04-10 |
19/SPP-GU2/2026 |
2026-04-15 |
0811F |
Rp. 20.000.000 |
5 Hari |
|
| 1270 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
537112 |
Pengadaan Kipas Angin Standing |
2026-08-31 |
054/UN47.B1/SPP/GUP-07/2026 |
2026-09-14 |
2289A |
Rp. 11.998.000 |
14 Hari |
|
| 1271 |
Fakultas Ilmu Pendidikan |
Oktober 2026 |
537112 |
Pengadaan Kursi Kuliah Dosen |
2026-07-14 |
44/SPP-GU5/2026 |
2026-07-29 |
1737F |
Rp. 2.000.000 |
15 Hari |
|
| 1272 |
Fakultas Ilmu Pendidikan |
Oktober 2026 |
537112 |
Pengadaan Kursi Kuliah Dosen |
|
|
|
|
Rp. 8.777.800 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1273 |
Fakultas Ilmu Pendidikan |
September 2026 |
537112 |
Pengadaan AC 1 Pk |
2026-09-21 |
065/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 6.564.200 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1274 |
Fakultas Pertanian |
Januari 2026 |
525119 |
Bantuan Biaya Kegiatan Pembinaan Mahasiswa Mengikuti Penelusuran Minat dan Bakat |
2026-03-05 |
09/SPP-GU1/2026 |
2026-03-10 |
0406F |
Rp. 4.000.000 |
5 Hari |
|
| 1275 |
Fakultas Pertanian |
Maret 2026 |
525119 |
Bantuan Biaya Kegiatan Pekan Seni Mahasiswa Nasional |
2026-03-30 |
014/UN47.B1/SPP/GUP-02/2026 |
2026-04-06 |
0643A |
Rp. 21.500.000 |
7 Hari |
|
| 1276 |
Fakultas Pertanian |
Mei 2026 |
525119 |
Bantuan Biaya Kegiatan Pekan Seni Mahasiswa Nasional |
2026-05-25 |
33/SPP-GU4/2026 |
2026-06-18 |
1314F |
Rp. 13.000.000 |
24 Hari |
|
| 1277 |
Fakultas Pertanian |
Mei 2026 |
525119 |
Bantuan Biaya Kegiatan Pekan Seni Mahasiswa Nasional |
2026-06-02 |
026/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1267A |
Rp. 8.500.000 |
7 Hari |
|
| 1278 |
Fakultas Pertanian |
Mei 2026 |
525119 |
Bantuan Biaya Kegiatan Pelaksanaan Yudisium. |
2026-05-25 |
33/SPP-GU4/2026 |
2026-06-18 |
1314F |
Rp. 2.000.000 |
24 Hari |
|
| 1279 |
Fakultas Pertanian |
September 2026 |
525119 |
Bantuan Biaya Kegiatan Pekan Seni Mahasiswa Nasional |
2026-09-21 |
069/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 16.426.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1280 |
Fakultas Pertanian |
Juli 2026 |
525119 |
Bantuan Biaya Kegiatan Pelaksanaan Yudisium. |
2026-07-14 |
44/SPP-GU5/2026 |
2026-07-29 |
1737F |
Rp. 2.000.000 |
15 Hari |
|
| 1281 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525114 |
Pemeliharaan AC |
2026-03-30 |
014/UN47.B1/SPP/GUP-02/2026 |
2026-04-06 |
0643A |
Rp. 14.137.800 |
7 Hari |
|
| 1282 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Bantuan Biaya Kegiatan Pelaksanaan Yudisium. |
2026-08-31 |
56/SPP-LS12/2026 |
2026-09-11 |
2262F |
Rp. 1.500.000 |
11 Hari |
|
| 1283 |
Fakultas Ilmu Pendidikan |
Juni 2026 |
525114 |
Pemeliharaan AC |
2026-06-25 |
036/UN47.B1/SPP/GUP-05/2026 |
2026-07-06 |
1518A |
Rp. 16.701.500 |
11 Hari |
|
| 1284 |
Fakultas Ilmu Pendidikan |
Juli 2026 |
525114 |
Pemeliharaan AC |
2026-08-07 |
049/UN47.B1/SPP/GUP-06/2026 |
2026-08-18 |
1998A |
Rp. 5.347.250 |
11 Hari |
|
| 1285 |
Fakultas Pertanian |
Juni 2026 |
525119 |
Bantuan Biaya Penyelenggaraan Praktikum (Ganjil/Genap) |
2026-07-14 |
44/SPP-GU5/2026 |
2026-07-29 |
1737F |
Rp. 2.500.000 |
15 Hari |
|
| 1286 |
Fakultas Ilmu Pendidikan |
September 2026 |
525114 |
Pemeliharaan AC |
2026-09-21 |
069/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 3.855.550 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1287 |
Fakultas Pertanian |
Oktober 2026 |
525112 |
Biaya Konsumsi Pelaksanaan Visitasi Akreditasi Nasional |
2026-06-02 |
026/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1267A |
Rp. 100.000 |
7 Hari |
|
| 1288 |
Fakultas Pertanian |
Oktober 2026 |
525112 |
Biaya Konsumsi Pelaksanaan Visitasi Akreditasi Nasional |
|
|
|
|
Rp. 60.000.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1289 |
Fakultas Pertanian |
Mei 2026 |
525119 |
Bantuan Biaya Penetapan Pelaksanaan Evaluasi Pengendalian dan Peningkatan (PPEPP) |
2026-06-02 |
026/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1267A |
Rp. 35.000.000 |
7 Hari |
|
| 1290 |
Fakultas Pertanian |
April 2026 |
525119 |
Bantuan Biaya Pelaksanaan Akreditasi Program Studi |
2026-04-22 |
26/SPP-GU3/2026 |
2026-04-29 |
0920F |
Rp. 10.000.000 |
7 Hari |
|
| 1291 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525114 |
Pembuatan lapangan Petanque |
2026-03-30 |
014/UN47.B1/SPP/GUP-02/2026 |
2026-04-06 |
0643A |
Rp. 15.000.000 |
7 Hari |
|
| 1292 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Bantuan Biaya Pelaksanaan Akreditasi Program Studi |
2026-07-15 |
47/SPP-LS10/2026 |
2026-07-29 |
1761F |
Rp. 10.000.000 |
14 Hari |
|
| 1293 |
Fakultas Pertanian |
Juli 2026 |
525119 |
Bantuan biaya Pendampingan Akreditasi |
2026-03-09 |
010/UN47.B1/SPP/GUP-01/2026 |
2026-03-13 |
0511A |
Rp. 10.485.000 |
4 Hari |
|
| 1294 |
Fakultas Pertanian |
Juli 2026 |
525119 |
Bantuan biaya Pendampingan Akreditasi |
2026-07-14 |
44/SPP-GU5/2026 |
2026-07-29 |
1737F |
Rp. 24.915.500 |
15 Hari |
|
| 1295 |
Fakultas Pertanian |
April 2026 |
525119 |
Bantuan biaya Pendampingan Akreditasi |
2026-04-29 |
019/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0989A |
Rp. 13.900.000 |
6 Hari |
|
| 1296 |
Fakultas Pertanian |
Januari 2026 |
525112 |
Belanja Barang Kebutuhan Dasar Perkantoran |
2026-03-05 |
10/SPP-GU1/2026 |
2026-03-10 |
0407F |
Rp. 16.276.430 |
5 Hari |
|
| 1297 |
Fakultas Pertanian |
Juni 2026 |
525119 |
Bantuan biaya Pendampingan Akreditasi |
2026-06-25 |
036/UN47.B1/SPP/GUP-05/2026 |
2026-07-06 |
1518A |
Rp. 9.174.500 |
11 Hari |
|
| 1298 |
Fakultas Pertanian |
Maret 2026 |
525112 |
Belanja Barang Kebutuhan Dasar Perkantoran |
2026-04-10 |
14/SPP-GU2/2026 |
2026-04-15 |
0806F |
Rp. 3.000.014 |
5 Hari |
|
| 1299 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Bantuan biaya Pendampingan Akreditasi |
2026-08-31 |
058/UN47.B1/SPP/GUP-07/2026 |
2026-09-14 |
2293A |
Rp. 10.500.000 |
14 Hari |
|
| 1300 |
Fakultas Pertanian |
April 2026 |
525112 |
Belanja Barang Kebutuhan Dasar Perkantoran |
2026-04-22 |
22/SPP-GU3/2026 |
2026-04-29 |
0917F |
Rp. 11.525.700 |
7 Hari |
|
| 1301 |
Fakultas Pertanian |
April 2026 |
525112 |
Belanja Barang Kebutuhan Dasar Perkantoran |
2026-05-25 |
28/SPP-GU4/2026 |
2026-06-18 |
1319F |
Rp. 4.374.100 |
24 Hari |
|
| 1302 |
Fakultas Pertanian |
September 2026 |
525119 |
Bantuan biaya Pendampingan Akreditasi |
2026-09-21 |
069/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 19.570.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1303 |
Fakultas Pertanian |
Mei 2026 |
525112 |
Belanja Barang Kebutuhan Dasar Perkantoran |
2026-05-25 |
28/SPP-GU4/2026 |
2026-06-18 |
1319F |
Rp. 3.784.400 |
24 Hari |
|
| 1304 |
Fakultas Ilmu Pendidikan |
Juni 2026 |
525114 |
Renovasi Aula Fakultas |
2026-04-29 |
019/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0989A |
Rp. 24.990.000 |
6 Hari |
|
| 1305 |
Fakultas Pertanian |
Juni 2026 |
525112 |
Belanja Barang Kebutuhan Dasar Perkantoran |
2026-07-14 |
39/SPP-GU5/2026 |
2026-07-29 |
1734F |
Rp. 1.783.300 |
15 Hari |
|
| 1306 |
Fakultas Pertanian |
September 2026 |
525112 |
Belanja Barang Kebutuhan Dasar Perkantoran |
2026-07-14 |
39/SPP-GU5/2026 |
2026-07-29 |
1734F |
Rp. 2.310.500 |
15 Hari |
|
| 1307 |
Fakultas Ilmu Pendidikan |
September 2026 |
525114 |
Pemeliharaan 7 Lab Prodi |
2026-09-21 |
069/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 918.700 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1308 |
Fakultas Pertanian |
Oktober 2026 |
525112 |
Belanja Barang Kebutuhan Dasar Perkantoran |
2026-08-18 |
49/SPP-GU6/2026 |
2026-08-28 |
2101F |
Rp. 6.463.200 |
10 Hari |
|
| 1309 |
Fakultas Pertanian |
Oktober 2026 |
525112 |
Belanja Barang Kebutuhan Dasar Perkantoran |
2026-10-01 |
70/SPP-GUNIHIL/2026 |
|
|
Rp. 6.027.363 |
5 Hari |
Belum ada SP2D terhitung dari 01 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1310 |
Fakultas Pertanian |
September 2026 |
525112 |
Belanja Barang Kebutuhan Dasar Perkantoran |
2026-10-01 |
70/SPP-GUNIHIL/2026 |
|
|
Rp. 34.937.090 |
5 Hari |
Belum ada SP2D terhitung dari 01 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1311 |
Fakultas Ilmu Pendidikan |
September 2026 |
525119 |
Bantuan Biaya Workshop Kurikulum dan Penyusunan RPS |
2026-09-21 |
073/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 8.000.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1312 |
Fakultas Pertanian |
Januari 2026 |
525112 |
Biaya Konsumsi Rapat Pimpinan |
2026-03-05 |
10/SPP-GU1/2026 |
2026-03-10 |
0407F |
Rp. 5.464.286 |
5 Hari |
|
| 1313 |
Fakultas Ilmu Pendidikan |
Januari 2026 |
525119 |
Bantuan Biaya Workshop Kurikulum dan Penyusunan RPS |
|
|
|
|
Rp. 4.255.050 |
278 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Januari 2026 hingga 06 Oktober 2026 (278 Hari) |
| 1314 |
Fakultas Pertanian |
Maret 2026 |
525112 |
Biaya Konsumsi Rapat Pimpinan |
2026-04-10 |
14/SPP-GU2/2026 |
2026-04-15 |
0806F |
Rp. 5.464.286 |
5 Hari |
|
| 1315 |
Fakultas Pertanian |
Juli 2026 |
525112 |
Biaya Konsumsi Rapat Pimpinan |
2026-04-22 |
22/SPP-GU3/2026 |
2026-04-29 |
0917F |
Rp. 5.205.000 |
7 Hari |
|
| 1316 |
Fakultas Pertanian |
Juli 2026 |
525112 |
Biaya Konsumsi Rapat Pimpinan |
2026-05-25 |
28/SPP-GU4/2026 |
2026-06-18 |
1319F |
Rp. 1.250.000 |
24 Hari |
|
| 1317 |
Fakultas Pertanian |
Mei 2026 |
525112 |
Biaya Konsumsi Rapat Pimpinan |
2026-05-25 |
28/SPP-GU4/2026 |
2026-06-18 |
1319F |
Rp. 6.225.000 |
24 Hari |
|
| 1318 |
Fakultas Ilmu Pendidikan |
Mei 2026 |
525119 |
Bantuan Biaya Kegiatan Kuliah Umum |
2026-06-02 |
030/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1271A |
Rp. 1.825.000 |
7 Hari |
|
| 1319 |
Fakultas Pertanian |
Juli 2026 |
525112 |
Biaya Konsumsi Rapat Pimpinan |
2026-07-14 |
39/SPP-GU5/2026 |
2026-07-29 |
1734F |
Rp. 906.700 |
15 Hari |
|
| 1320 |
Fakultas Pertanian |
Juli 2026 |
525112 |
Biaya Konsumsi Rapat Pimpinan |
2026-08-18 |
49/SPP-GU6/2026 |
2026-08-28 |
2101F |
Rp. 484.000 |
10 Hari |
|
| 1321 |
Fakultas Ilmu Pendidikan |
Juni 2026 |
525119 |
Bantuan Biaya Kegiatan Kuliah Umum |
2026-06-25 |
038/UN47.B1/SPP/GUP-05/2026 |
2026-07-06 |
1520A |
Rp. 2.663.900 |
11 Hari |
|
| 1322 |
Fakultas Pertanian |
Agustus 2026 |
525112 |
Biaya Konsumsi Rapat Pimpinan |
2026-10-01 |
70/SPP-GUNIHIL/2026 |
|
|
Rp. 1.428.800 |
5 Hari |
Belum ada SP2D terhitung dari 01 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1323 |
Fakultas Pertanian |
April 2026 |
525112 |
Biaya Konsumsi Rapat Pimpinan |
2026-10-01 |
70/SPP-GUNIHIL/2026 |
|
|
Rp. 4.200.000 |
5 Hari |
Belum ada SP2D terhitung dari 01 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1324 |
Fakultas Ilmu Pendidikan |
April 2026 |
525119 |
Workshop Penulisan Skripsi, Luaran Skripsi dengan dukungan AI |
2026-04-29 |
022/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0992A |
Rp. 1.500.000 |
6 Hari |
|
| 1325 |
Fakultas Ilmu Pendidikan |
Mei 2026 |
525119 |
Workshop Penulisan Skripsi, Luaran Skripsi dengan dukungan AI |
2026-06-02 |
030/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1271A |
Rp. 1.000.000 |
7 Hari |
|
| 1326 |
Fakultas Pertanian |
Januari 2026 |
525112 |
Biaya Konsumsi Tamu Pimpinan |
2026-03-05 |
10/SPP-GU1/2026 |
2026-03-10 |
0407F |
Rp. 2.034.743 |
5 Hari |
|
| 1327 |
Fakultas Ilmu Pendidikan |
Juni 2026 |
525119 |
Workshop Penulisan Skripsi, Luaran Skripsi dengan dukungan AI |
2026-06-25 |
038/UN47.B1/SPP/GUP-05/2026 |
2026-07-06 |
1520A |
Rp. 4.500.000 |
11 Hari |
|
| 1328 |
Fakultas Pertanian |
Maret 2026 |
525112 |
Biaya Konsumsi Tamu Pimpinan |
2026-04-10 |
14/SPP-GU2/2026 |
2026-04-15 |
0806F |
Rp. 655.700 |
5 Hari |
|
| 1329 |
Fakultas Pertanian |
Mei 2026 |
525112 |
Biaya Konsumsi Tamu Pimpinan |
2026-05-25 |
28/SPP-GU4/2026 |
2026-06-18 |
1319F |
Rp. 2.046.500 |
24 Hari |
|
| 1330 |
Fakultas Pertanian |
Juli 2026 |
525112 |
Biaya Konsumsi Tamu Pimpinan |
2026-07-14 |
39/SPP-GU5/2026 |
2026-07-29 |
1734F |
Rp. 2.850.000 |
15 Hari |
|
| 1331 |
Fakultas Pertanian |
Juli 2026 |
525112 |
Biaya Konsumsi Tamu Pimpinan |
2026-08-18 |
49/SPP-GU6/2026 |
2026-08-28 |
2101F |
Rp. 218.500 |
10 Hari |
|
| 1332 |
Fakultas Ilmu Pendidikan |
Januari 2026 |
525119 |
Pendampingan/Pembinaan dan pengembangan prestasi mahasiswa serta bantuan biaya kegiatan organisasi kemahasiswaan |
2026-03-09 |
011/UN47.B1/SPP/GUP-01/2026 |
2026-03-13 |
0512A |
Rp. 2.045.250 |
4 Hari |
|
| 1333 |
Fakultas Pertanian |
April 2026 |
525112 |
Biaya Konsumsi Tamu Pimpinan |
2026-08-18 |
49/SPP-GU6/2026 |
2026-08-28 |
2101F |
Rp. 1.619.750 |
10 Hari |
|
| 1334 |
Fakultas Pertanian |
April 2026 |
525112 |
Biaya Konsumsi Tamu Pimpinan |
2026-10-01 |
70/SPP-GUNIHIL/2026 |
|
|
Rp. 1.120.247 |
5 Hari |
Belum ada SP2D terhitung dari 01 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1335 |
Fakultas Ilmu Pendidikan |
April 2026 |
525119 |
Pendampingan/Pembinaan dan pengembangan prestasi mahasiswa serta bantuan biaya kegiatan organisasi kemahasiswaan |
2026-04-29 |
022/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0992A |
Rp. 4.100.000 |
6 Hari |
|
| 1336 |
Fakultas Pertanian |
Mei 2026 |
525112 |
Biaya Konsumsi Tamu Pimpinan |
2026-10-01 |
70/SPP-GUNIHIL/2026 |
|
|
Rp. 4.424.500 |
5 Hari |
Belum ada SP2D terhitung dari 01 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1337 |
Fakultas Ilmu Pendidikan |
Mei 2026 |
525119 |
Pendampingan/Pembinaan dan pengembangan prestasi mahasiswa serta bantuan biaya kegiatan organisasi kemahasiswaan |
2026-06-02 |
030/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1271A |
Rp. 300.000 |
7 Hari |
|
| 1338 |
Fakultas Ilmu Pendidikan |
Juni 2026 |
525119 |
Pendampingan/Pembinaan dan pengembangan prestasi mahasiswa serta bantuan biaya kegiatan organisasi kemahasiswaan |
2026-06-25 |
038/UN47.B1/SPP/GUP-05/2026 |
2026-07-06 |
1520A |
Rp. 200.000 |
11 Hari |
|
| 1339 |
Fakultas Pertanian |
Januari 2026 |
525119 |
Bantuan Biaya Pelaksanaan Kegiatan Rapat Kerja dan Penyamaan Persepsi Fakultas Pertanian Universitas Negeri Gorontalo |
2026-03-05 |
07/SPP-GU1/2026 |
2026-03-10 |
0404F |
Rp. 15.000.000 |
5 Hari |
|
| 1340 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525119 |
Pendampingan/Pembinaan dan pengembangan prestasi mahasiswa serta bantuan biaya kegiatan organisasi kemahasiswaan |
2026-08-31 |
062/UN47.B1/SPP/GUP-07/2026 |
2026-09-14 |
2297A |
Rp. 250.000 |
14 Hari |
|
| 1341 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525119 |
Pendampingan/Pembinaan dan pengembangan prestasi mahasiswa serta bantuan biaya kegiatan organisasi kemahasiswaan |
2026-09-21 |
073/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 2.050.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1342 |
Fakultas Pertanian |
Agustus 2026 |
525115 |
Biaya Transport (PP) |
2026-08-18 |
51/SPP-GU6/2026 |
2026-08-28 |
2103F |
Rp. 3.660.000 |
10 Hari |
|
| 1343 |
Fakultas Pertanian |
September 2026 |
525115 |
Biaya Transport (PP) |
2026-09-28 |
69/SPP-LS16/2026 |
|
|
Rp. 8.020.000 |
8 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 06 Oktober 2026 (8 Hari) |
| 1344 |
Fakultas Ilmu Pendidikan |
Oktober 2026 |
525119 |
Bantuan Biaya Pelatihan Kepemimpinan Mahasiswa |
|
|
|
|
Rp. 800.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1345 |
Fakultas Pertanian |
Mei 2026 |
525115 |
Biaya Uang Harian |
2026-05-25 |
29/SPP-GU4/2026 |
2026-06-18 |
1318F |
Rp. 2.000.000 |
24 Hari |
|
| 1346 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525119 |
Bantuan Biaya pelaksanaan PKKMB Fakultas |
2026-08-31 |
062/UN47.B1/SPP/GUP-07/2026 |
2026-09-14 |
2297A |
Rp. 9.925.000 |
14 Hari |
|
| 1347 |
Fakultas Pertanian |
Januari 2026 |
525119 |
Operasional Kenderaan Pimpinan |
2026-03-05 |
07/SPP-GU1/2026 |
2026-03-10 |
0404F |
Rp. 1.200.000 |
5 Hari |
|
| 1348 |
Fakultas Ilmu Pendidikan |
September 2026 |
525119 |
Bantuan Biaya pelaksanaan PKKMB Fakultas |
2026-09-21 |
073/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 1.375.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1349 |
Fakultas Pertanian |
Maret 2026 |
525119 |
Operasional Kenderaan Pimpinan |
2026-04-10 |
16/SPP-GU2/2026 |
2026-04-15 |
0808F |
Rp. 600.000 |
5 Hari |
|
| 1350 |
Fakultas Pertanian |
April 2026 |
525119 |
Operasional Kenderaan Pimpinan |
2026-04-22 |
24/SPP-GU3/2026 |
2026-04-29 |
0921F |
Rp. 450.000 |
7 Hari |
|
| 1351 |
Fakultas Ilmu Pendidikan |
Oktober 2026 |
525119 |
Bantuan Biaya pelaksanaan PKKMB Fakultas |
|
|
|
|
Rp. 875.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1352 |
Fakultas Pertanian |
Mei 2026 |
525119 |
Operasional Kenderaan Pimpinan |
2026-05-25 |
30/SPP-GU4/2026 |
2026-06-18 |
1317F |
Rp. 600.000 |
24 Hari |
|
| 1353 |
Fakultas Pertanian |
Juni 2026 |
525119 |
Operasional Kenderaan Pimpinan |
2026-07-14 |
40/SPP-GU5/2026 |
2026-07-29 |
1739F |
Rp. 750.000 |
15 Hari |
|
| 1354 |
Fakultas Ilmu Pendidikan |
Juni 2026 |
525119 |
Bantuan Pelatihan Penalaran Penulisan karya Ilmiah dan Talenta Prestasi |
2026-04-29 |
022/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0992A |
Rp. 1.500.000 |
6 Hari |
|
| 1355 |
Fakultas Pertanian |
Mei 2026 |
525119 |
Operasional Kenderaan Pimpinan |
2026-08-18 |
52/SPP-GU6/2026 |
2026-08-28 |
2104F |
Rp. 1.200.000 |
10 Hari |
|
| 1356 |
Fakultas Ilmu Pendidikan |
Mei 2026 |
525119 |
Bantuan Pelatihan Penalaran Penulisan karya Ilmiah dan Talenta Prestasi |
2026-06-02 |
030/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1271A |
Rp. 9.300.000 |
7 Hari |
|
| 1357 |
Fakultas Pertanian |
September 2026 |
525111 |
Remunerasi Dosen Fungsional |
2026-01-14 |
02/SPP-LS1/2026 |
2026-01-15 |
0033F |
Rp. 1.002.840.000 |
1 Hari |
|
| 1358 |
Fakultas Ilmu Pendidikan |
September 2026 |
525119 |
Bantuan Pelatihan Penalaran Penulisan karya Ilmiah dan Talenta Prestasi |
2026-09-21 |
073/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 1.000.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1359 |
Fakultas Pertanian |
Maret 2026 |
525111 |
Remunerasi Dosen Fungsional |
2026-03-09 |
12/SPP-LS3/2026 |
2026-03-13 |
0534F |
Rp. 425.580.000 |
4 Hari |
|
| 1360 |
Fakultas Pertanian |
Juli 2026 |
525111 |
Remunerasi Dosen Fungsional |
2026-07-06 |
37/SPP-LS9/2026 |
2026-07-13 |
1604F |
Rp. 991.284.000 |
7 Hari |
|
| 1361 |
Fakultas Ilmu Pendidikan |
Mei 2026 |
525119 |
Bantuan Biaya kegiatan MUBES Senat Mahasiswa Fakultas/Jurusan/Prodi |
2026-06-02 |
030/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1271A |
Rp. 500.000 |
7 Hari |
|
| 1362 |
Fakultas Pertanian |
September 2026 |
525111 |
Remunerasi Dosen Fungsional |
2026-09-18 |
62/SPP-LS14/2026 |
|
|
Rp. 443.004.000 |
18 Hari |
Belum ada SP2D terhitung dari 18 September 2026 hingga 06 Oktober 2026 (18 Hari) |
| 1363 |
Fakultas Ilmu Pendidikan |
Januari 2026 |
525119 |
Bantuan biaya bagi mahasiswa ikut kegiatan pertukaran pelajar/kredit transfer luar negeri. (Erasmus) |
2026-03-09 |
011/UN47.B1/SPP/GUP-01/2026 |
2026-03-13 |
0512A |
Rp. 10.000.000 |
4 Hari |
|
| 1364 |
Fakultas Pertanian |
Februari 2026 |
525111 |
Remunerasi Dosen Insentif Kelola |
2026-01-28 |
04/SPP-LS2/2026 |
2026-01-30 |
0127F |
Rp. 36.500.000 |
2 Hari |
|
| 1365 |
Fakultas Pertanian |
April 2026 |
525111 |
Remunerasi Dosen Insentif Kelola |
2026-03-09 |
11/SPP-LS3/2026 |
2026-03-16 |
0571F |
Rp. 73.000.000 |
7 Hari |
|
| 1366 |
Fakultas Ilmu Pendidikan |
April 2026 |
525119 |
Bantuan Biaya pendampingan/pembinaan dan persiapan bagi mahasiswa ikut kegiatan Lomba Penalaran/Kompetisi Minat Bakat/Teknologi/Sosial Budaya dari Tingkat Prodi/Fakultas/Universitas/Regional/Internasional/KPMI/Kompetisi Pedagog Muda Indonesia |
2026-04-29 |
022/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0992A |
Rp. 500.000 |
6 Hari |
|
| 1367 |
Fakultas Pertanian |
April 2026 |
525111 |
Remunerasi Dosen Insentif Kelola |
2026-04-14 |
21/SPP-LS5/2026 |
2026-04-16 |
0817F |
Rp. 36.500.000 |
2 Hari |
|
| 1368 |
Fakultas Ilmu Pendidikan |
Mei 2026 |
525119 |
Bantuan Biaya pendampingan/pembinaan dan persiapan bagi mahasiswa ikut kegiatan Lomba Penalaran/Kompetisi Minat Bakat/Teknologi/Sosial Budaya dari Tingkat Prodi/Fakultas/Universitas/Regional/Internasional/KPMI/Kompetisi Pedagog Muda Indonesia |
2026-06-02 |
030/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1271A |
Rp. 7.994.000 |
7 Hari |
|
| 1369 |
Fakultas Pertanian |
Juni 2026 |
525111 |
Remunerasi Dosen Insentif Kelola |
2026-05-25 |
35/SPP-LS7/2026 |
2026-06-04 |
1236F |
Rp. 36.500.000 |
10 Hari |
|
| 1370 |
Fakultas Ilmu Pendidikan |
Juni 2026 |
525119 |
Bantuan Biaya pendampingan/pembinaan dan persiapan bagi mahasiswa ikut kegiatan Lomba Penalaran/Kompetisi Minat Bakat/Teknologi/Sosial Budaya dari Tingkat Prodi/Fakultas/Universitas/Regional/Internasional/KPMI/Kompetisi Pedagog Muda Indonesia |
2026-06-25 |
038/UN47.B1/SPP/GUP-05/2026 |
2026-07-06 |
1520A |
Rp. 1.000.000 |
11 Hari |
|
| 1371 |
Fakultas Pertanian |
Agustus 2026 |
525111 |
Remunerasi Dosen Insentif Kelola |
2026-06-23 |
36/SPP-LS8/2026 |
2026-08-06 |
1845F |
Rp. 36.500.000 |
44 Hari |
|
| 1372 |
Fakultas Pertanian |
Agustus 2026 |
525111 |
Remunerasi Dosen Insentif Kelola |
2026-08-03 |
48/SPP-LS11/2026 |
2026-08-13 |
1955F |
Rp. 36.500.000 |
10 Hari |
|
| 1373 |
Fakultas Pertanian |
September 2026 |
525111 |
Remunerasi Dosen Insentif Kelola |
2026-09-25 |
63/SPP-LS15/2026 |
|
|
Rp. 73.000.000 |
11 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 06 Oktober 2026 (11 Hari) |
| 1374 |
Fakultas Ilmu Pendidikan |
Oktober 2026 |
525115 |
Bantuan Biaya Perjalanan bagi Dosen Ikut Kegiatan (Presenter) pada Seminar/workshop/Forum asosiasi/Faklutas/Jurusan |
2026-06-02 |
029/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1270A |
Rp. 5.000.000 |
7 Hari |
|
| 1375 |
Fakultas Pertanian |
Oktober 2026 |
525111 |
Remunerasi Dosen Insentif Kelola |
2026-10-05 |
73/SPP-LS17/2026 |
|
|
Rp. 36.500.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 1376 |
Fakultas Ilmu Pendidikan |
Oktober 2026 |
525115 |
Bantuan Biaya Perjalanan bagi Dosen Ikut Kegiatan (Presenter) pada Seminar/workshop/Forum asosiasi/Faklutas/Jurusan |
|
|
|
|
Rp. 10.000.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1377 |
Fakultas Pertanian |
Januari 2026 |
525111 |
Remunerasi Tugas Tambahan |
2026-01-14 |
03/SPP-LS1/2026 |
2026-01-21 |
0068F |
Rp. 105.000.000 |
7 Hari |
|
| 1378 |
Fakultas Ilmu Pendidikan |
Maret 2026 |
525119 |
Bantuan Biaya Keanggotaan Asosiasi Internasional |
2026-06-02 |
030/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1271A |
Rp. 6.000.000 |
7 Hari |
|
| 1379 |
Fakultas Pertanian |
Maret 2026 |
525111 |
Remunerasi Tugas Tambahan |
2026-03-09 |
13/SPP-LS3/2026 |
2026-03-16 |
0555F |
Rp. 45.000.000 |
7 Hari |
|
| 1380 |
Fakultas Pertanian |
Juli 2026 |
525111 |
Remunerasi Tugas Tambahan |
2026-07-06 |
38/SPP-LS9/2026 |
2026-07-30 |
1795F |
Rp. 105.000.000 |
24 Hari |
|
| 1381 |
Fakultas Ilmu Pendidikan |
April 2026 |
525119 |
Bantuan Registrasi Dosen Ikut Kegiatan Seminar/workshop/Forum asosiasi Jurusan |
2026-04-29 |
022/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0992A |
Rp. 4.088.675 |
6 Hari |
|
| 1382 |
Fakultas Pertanian |
September 2026 |
525111 |
Remunerasi Tugas Tambahan |
2026-09-18 |
61/SPP-LS14/2026 |
|
|
Rp. 45.000.000 |
18 Hari |
Belum ada SP2D terhitung dari 18 September 2026 hingga 06 Oktober 2026 (18 Hari) |
| 1383 |
Fakultas Ilmu Pendidikan |
Mei 2026 |
525119 |
Bantuan Registrasi Dosen Ikut Kegiatan Seminar/workshop/Forum asosiasi Jurusan |
2026-06-02 |
030/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1271A |
Rp. 1.000.000 |
7 Hari |
|
| 1384 |
Fakultas Pertanian |
Maret 2026 |
525111 |
Insentif Pejabat Pembuat Komitmen Unit Kerja (PPK/UK) |
2026-04-10 |
18/SPP-GU2/2026 |
2026-04-15 |
0810F |
Rp. 3.450.000 |
5 Hari |
|
| 1385 |
Fakultas Ilmu Pendidikan |
September 2026 |
525119 |
Bantuan Program Smart Entepreneusship (Penguatan Income Generating Unit) / Pusat Kajian |
2026-09-21 |
073/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 1.250.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1386 |
Fakultas Pertanian |
Mei 2026 |
525111 |
Insentif Pejabat Pembuat Komitmen Unit Kerja (PPK/UK) |
2026-05-25 |
32/SPP-GU4/2026 |
2026-06-18 |
1315F |
Rp. 1.150.000 |
24 Hari |
|
| 1387 |
Fakultas Pertanian |
Juni 2026 |
525111 |
Insentif Pejabat Pembuat Komitmen Unit Kerja (PPK/UK) |
2026-07-14 |
43/SPP-GU5/2026 |
2026-07-29 |
1736F |
Rp. 2.300.000 |
15 Hari |
|
| 1388 |
Fakultas Ilmu Pendidikan |
Juni 2026 |
525119 |
Bantuan Akreditasi MP |
2026-06-25 |
038/UN47.B1/SPP/GUP-05/2026 |
2026-07-06 |
1520A |
Rp. 10.000.000 |
11 Hari |
|
| 1389 |
Fakultas Pertanian |
Maret 2026 |
525111 |
Insentif Penguji Tagihan/ Verifikator UK |
2026-04-10 |
18/SPP-GU2/2026 |
2026-04-15 |
0810F |
Rp. 1.410.000 |
5 Hari |
|
| 1390 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525119 |
Bantuan Akreditasi MP |
2026-08-31 |
062/UN47.B1/SPP/GUP-07/2026 |
2026-09-14 |
2297A |
Rp. 5.000.000 |
14 Hari |
|
| 1391 |
Fakultas Pertanian |
Mei 2026 |
525111 |
Insentif Penguji Tagihan/ Verifikator UK |
2026-05-25 |
32/SPP-GU4/2026 |
2026-06-18 |
1315F |
Rp. 470.000 |
24 Hari |
|
| 1392 |
Fakultas Pertanian |
Juli 2026 |
525111 |
Insentif Penguji Tagihan/ Verifikator UK |
2026-07-14 |
43/SPP-GU5/2026 |
2026-07-29 |
1736F |
Rp. 940.000 |
15 Hari |
|
| 1393 |
Fakultas Ilmu Pendidikan |
April 2026 |
525119 |
Bantuan Akreditasi Psikologi |
2026-04-29 |
022/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0992A |
Rp. 10.000.000 |
6 Hari |
|
| 1394 |
Fakultas Ilmu Pendidikan |
Januari 2026 |
525119 |
Bantuan Kegiatan Akreditasi tingkat Fakultas |
2026-08-18 |
54/SPP-GU6/2026 |
2026-08-28 |
2106F |
Rp. 1.150.000 |
10 Hari |
|
| 1395 |
Fakultas Ilmu Pendidikan |
Januari 2026 |
525119 |
Bantuan Kegiatan Akreditasi tingkat Fakultas |
2026-03-09 |
011/UN47.B1/SPP/GUP-01/2026 |
2026-03-13 |
0512A |
Rp. 1.804.500 |
4 Hari |
|
| 1396 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525119 |
Bantuan Kegiatan Akreditasi tingkat Fakultas |
2026-03-09 |
011/UN47.B1/SPP/GUP-01/2026 |
2026-03-13 |
0512A |
Rp. 13.179.375 |
4 Hari |
|
| 1397 |
Fakultas Pertanian |
Agustus 2026 |
525176 |
Insentif Penguji Tagihan/ Verifikator UK |
2026-08-18 |
54/SPP-GU6/2026 |
2026-08-28 |
2106F |
Rp. 470.000 |
10 Hari |
|
| 1398 |
Fakultas Pertanian |
September 2026 |
525119 |
Bantuan Biaya Penyusunan Laporan Tahunan LAKIN Fakultas Pertanian Universitas Negeri Gorontalo, |
2026-09-21 |
073/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 3.500.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1399 |
Fakultas Pertanian |
Oktober 2026 |
525119 |
Bantuan Biaya Penyusunan Laporan Tahunan LAKIN Fakultas Pertanian Universitas Negeri Gorontalo, |
|
|
|
|
Rp. 4.237.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1400 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Penelitian Dosen Asisten Ahli/P3K |
2026-07-15 |
45/SPP-LS10/2026 |
2026-07-29 |
1750F |
Rp. 8.000.000 |
14 Hari |
|
| 1401 |
Fakultas Ilmu Pendidikan |
September 2026 |
525119 |
Biaya pendampingan Akreditasi Internasional Prodi yang memilki Nilai Tertinggi di Fakultas |
2026-09-21 |
073/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 5.000.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1402 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Penelitian Dosen Lektor |
2026-07-15 |
45/SPP-LS10/2026 |
2026-07-29 |
1750F |
Rp. 10.000.000 |
14 Hari |
|
| 1403 |
Fakultas Pertanian |
Januari 2026 |
525119 |
Penelitian Dosen Lektor Kepala |
2026-03-09 |
008/UN47.B1/SPP/GUP-01/2026 |
2026-03-13 |
0509A |
Rp. 18.690.300 |
4 Hari |
|
| 1404 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Penelitian Dosen Lektor Kepala |
2026-07-15 |
45/SPP-LS10/2026 |
2026-07-29 |
1750F |
Rp. 10.000.000 |
14 Hari |
|
| 1405 |
Fakultas Pertanian |
Maret 2026 |
525119 |
Penelitian Dosen Lektor Kepala |
2026-03-30 |
013/UN47.B1/SPP/GUP-02/2026 |
2026-04-06 |
0642A |
Rp. 3.862.200 |
7 Hari |
|
| 1406 |
Fakultas Pertanian |
September 2026 |
525119 |
Insentif Jurnal Sinta 3/4 |
2026-09-14 |
60/SPP-LS13/2026 |
|
|
Rp. 800.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1407 |
Fakultas Pertanian |
April 2026 |
525119 |
Penelitian Dosen Lektor Kepala |
2026-04-29 |
016/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0986A |
Rp. 6.336.500 |
6 Hari |
|
| 1408 |
Fakultas Pertanian |
Mei 2026 |
525119 |
Penelitian Dosen Lektor Kepala |
2026-06-02 |
024/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1265A |
Rp. 23.558.000 |
7 Hari |
|
| 1409 |
Fakultas Pertanian |
September 2026 |
525119 |
Insentif Jurnal Sinta 1/ Sinta 2 |
2026-09-14 |
60/SPP-LS13/2026 |
|
|
Rp. 3.000.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1410 |
Fakultas Pertanian |
Juni 2026 |
525119 |
Penelitian Dosen Lektor Kepala |
2026-06-25 |
033/UN47.B1/SPP/GUP-05/2026 |
2026-07-06 |
1515A |
Rp. 32.741.425 |
11 Hari |
|
| 1411 |
Fakultas Pertanian |
Juli 2026 |
525119 |
Penelitian Dosen Lektor Kepala |
2026-08-07 |
046/UN47.B1/SPP/GUP-06/2026 |
2026-08-18 |
1995A |
Rp. 37.477.700 |
11 Hari |
|
| 1412 |
Fakultas Pertanian |
September 2026 |
525119 |
Insentif Jurnal Scopus Q1 dan Q2 |
2026-09-14 |
60/SPP-LS13/2026 |
|
|
Rp. 5.000.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1413 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Penelitian Dosen Lektor Kepala |
2026-08-07 |
046/UN47.B1/SPP/GUP-06/2026 |
2026-08-18 |
1995A |
Rp. 9.747.750 |
11 Hari |
|
| 1414 |
Fakultas Pertanian |
Agustus 2026 |
525119 |
Penelitian Dosen Lektor Kepala |
2026-08-31 |
055/UN47.B1/SPP/GUP-07/2026 |
2026-09-14 |
2290A |
Rp. 24.028.000 |
14 Hari |
|
| 1415 |
Fakultas Pertanian |
September 2026 |
525119 |
Insentif Jurnal Scopus Q3 |
2026-09-14 |
60/SPP-LS13/2026 |
|
|
Rp. 21.000.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1416 |
Fakultas Pertanian |
September 2026 |
525119 |
Penelitian Dosen Lektor Kepala |
2026-09-21 |
066/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 7.767.500 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1417 |
Fakultas Pertanian |
Oktober 2026 |
525119 |
Penelitian Dosen Lektor Kepala |
|
|
|
|
Rp. 14.910.950 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1418 |
Fakultas Pertanian |
Oktober 2026 |
525119 |
Bantuan Biaya Pelaksanaan Pengabdian Kolaboratif |
2026-07-14 |
42/SPP-GU5/2026 |
2026-07-29 |
1738F |
Rp. 5.000.000 |
15 Hari |
|
| 1419 |
Fakultas Pertanian |
Januari 2026 |
525119 |
Bantuan Biaya Pelaksanaan Pengabdian Kolaboratif |
2026-07-15 |
46/SPP-LS10/2026 |
2026-07-29 |
1760F |
Rp. 7.500.000 |
14 Hari |
|
| 1420 |
Fakultas Ilmu Pendidikan |
Januari 2026 |
525112 |
Konsumsi Berat/Ringan rapat kerja/Senat/Pimpinan/Raker dan Pelayanan Tamu Pimpinan |
2026-03-09 |
008/UN47.B1/SPP/GUP-01/2026 |
2026-03-13 |
0509A |
Rp. 14.692.500 |
4 Hari |
|
| 1421 |
Fakultas Ilmu Pendidikan |
Maret 2026 |
525112 |
Konsumsi Berat/Ringan rapat kerja/Senat/Pimpinan/Raker dan Pelayanan Tamu Pimpinan |
2026-03-09 |
008/UN47.B1/SPP/GUP-01/2026 |
2026-03-13 |
0509A |
Rp. 1.800.000 |
4 Hari |
|
| 1422 |
Fakultas Pertanian |
Januari 2026 |
537112 |
Belanja Laptop |
2026-03-05 |
05/SPP-GU1/2026 |
2026-03-10 |
0402F |
Rp. 10.339.340 |
5 Hari |
|
| 1423 |
Fakultas Ilmu Pendidikan |
April 2026 |
525112 |
Konsumsi Berat/Ringan rapat kerja/Senat/Pimpinan/Raker dan Pelayanan Tamu Pimpinan |
2026-04-29 |
016/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0986A |
Rp. 14.076.000 |
6 Hari |
|
| 1424 |
Fakultas Pertanian |
Juni 2026 |
537112 |
Belanja LCD |
2026-09-28 |
65/SPP-LS16/2026 |
|
|
Rp. 12.950.000 |
8 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 06 Oktober 2026 (8 Hari) |
| 1425 |
Fakultas Ilmu Pendidikan |
Juni 2026 |
525112 |
Konsumsi Berat/Ringan rapat kerja/Senat/Pimpinan/Raker dan Pelayanan Tamu Pimpinan |
2026-06-25 |
033/UN47.B1/SPP/GUP-05/2026 |
2026-07-06 |
1515A |
Rp. 6.958.900 |
11 Hari |
|
| 1426 |
Fakultas Ilmu Pendidikan |
Juli 2026 |
525112 |
Konsumsi Berat/Ringan rapat kerja/Senat/Pimpinan/Raker dan Pelayanan Tamu Pimpinan |
2026-08-07 |
046/UN47.B1/SPP/GUP-06/2026 |
2026-08-18 |
1995A |
Rp. 4.809.500 |
11 Hari |
|
| 1427 |
Fakultas Pertanian |
April 2026 |
537112 |
Belanja AC |
2026-05-25 |
27/SPP-GU4/2026 |
2026-06-18 |
1320F |
Rp. 6.500.000 |
24 Hari |
|
| 1428 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525112 |
Konsumsi Berat/Ringan rapat kerja/Senat/Pimpinan/Raker dan Pelayanan Tamu Pimpinan |
2026-08-31 |
055/UN47.B1/SPP/GUP-07/2026 |
2026-09-14 |
2290A |
Rp. 19.175.500 |
14 Hari |
|
| 1429 |
Fakultas Pertanian |
September 2026 |
537112 |
Belanja AC |
2026-09-14 |
58/SPP-LS13/2026 |
|
|
Rp. 52.500.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1430 |
Fakultas Pertanian |
September 2026 |
537112 |
Belanja AC |
2026-09-14 |
59/SPP-LS13/2026 |
|
|
Rp. 38.200.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1431 |
Fakultas Pertanian |
September 2026 |
537112 |
Belanja AC |
2026-09-28 |
66/SPP-LS16/2026 |
|
|
Rp. 10.800.000 |
8 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 06 Oktober 2026 (8 Hari) |
| 1432 |
Fakultas Ilmu Pendidikan |
September 2026 |
525112 |
Konsumsi Berat/Ringan rapat kerja/Senat/Pimpinan/Raker dan Pelayanan Tamu Pimpinan |
2026-09-21 |
066/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 9.000.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1433 |
Fakultas Ilmu Pendidikan |
Oktober 2026 |
525112 |
Konsumsi Berat/Ringan rapat kerja/Senat/Pimpinan/Raker dan Pelayanan Tamu Pimpinan |
|
|
|
|
Rp. 11.854.250 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1434 |
Fakultas Ilmu Pendidikan |
Januari 2026 |
525119 |
Bantuan terkait Pelaksanaan Rapat Kerja Tahunan Fakultas |
2026-03-09 |
009/UN47.B1/SPP/GUP-01/2026 |
2026-03-13 |
0510A |
Rp. 31.800.000 |
4 Hari |
|
| 1435 |
Fakultas Ilmu Pendidikan |
April 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Tiket 10 orang ) |
2026-04-29 |
017/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0987A |
Rp. 9.672.850 |
6 Hari |
|
| 1436 |
Fakultas Ilmu Pendidikan |
Juni 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Tiket 10 orang ) |
2026-06-25 |
034/UN47.B1/SPP/GUP-05/2026 |
2026-07-06 |
1516A |
Rp. 6.622.341 |
11 Hari |
|
| 1437 |
Fakultas Ilmu Pendidikan |
Juli 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Tiket 10 orang ) |
2026-08-07 |
047/UN47.B1/SPP/GUP-06/2026 |
2026-08-18 |
1996A |
Rp. 12.634.735 |
11 Hari |
|
| 1438 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Tiket 10 orang ) |
2026-08-31 |
056/UN47.B1/SPP/GUP-07/2026 |
2026-09-14 |
2291A |
Rp. 6.843.257 |
14 Hari |
|
| 1439 |
Fakultas Ilmu Pendidikan |
September 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Tiket 10 orang ) |
2026-09-21 |
067/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 2.000.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1440 |
Fakultas Ilmu Pendidikan |
Oktober 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Tiket 10 orang ) |
|
|
|
|
Rp. 7.262.300 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1441 |
Fakultas Ilmu Pendidikan |
April 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Uang Harian 9 orang x 4 Hari ) |
2026-04-29 |
017/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0987A |
Rp. 520.000 |
6 Hari |
|
| 1442 |
Fakultas Ilmu Pendidikan |
Juni 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Uang Harian 9 orang x 4 Hari ) |
2026-06-25 |
034/UN47.B1/SPP/GUP-05/2026 |
2026-07-06 |
1516A |
Rp. 1.920.000 |
11 Hari |
|
| 1443 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Uang Harian 9 orang x 4 Hari ) |
2026-08-31 |
056/UN47.B1/SPP/GUP-07/2026 |
2026-09-14 |
2291A |
Rp. 2.290.000 |
14 Hari |
|
| 1444 |
Fakultas Ilmu Pendidikan |
September 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Uang Harian 9 orang x 4 Hari ) |
2026-09-21 |
067/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 2.260.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1445 |
Fakultas Ilmu Pendidikan |
Oktober 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Uang Harian 9 orang x 4 Hari ) |
|
|
|
|
Rp. 1.220.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1446 |
Fakultas Ilmu Pendidikan |
April 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Akomodasi 9 orang x 3 Hari) |
2026-04-29 |
017/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0987A |
Rp. 2.805.975 |
6 Hari |
|
| 1447 |
Fakultas Ilmu Pendidikan |
Juni 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Akomodasi 9 orang x 3 Hari) |
2026-06-25 |
034/UN47.B1/SPP/GUP-05/2026 |
2026-07-06 |
1516A |
Rp. 2.999.577 |
11 Hari |
|
| 1448 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Akomodasi 9 orang x 3 Hari) |
2026-08-31 |
056/UN47.B1/SPP/GUP-07/2026 |
2026-09-14 |
2291A |
Rp. 3.530.203 |
14 Hari |
|
| 1449 |
Fakultas Ilmu Pendidikan |
September 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Akomodasi 9 orang x 3 Hari) |
2026-09-21 |
067/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 4.875.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1450 |
Fakultas Ilmu Pendidikan |
Oktober 2026 |
525115 |
Biaya perjalanan Dinas Pimpinan terkait koordinasi kelembagaan dan Kerjasama (Biaya Akomodasi 9 orang x 3 Hari) |
|
|
|
|
Rp. 1.800.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1451 |
Fakultas Ilmu Pendidikan |
Januari 2026 |
525119 |
Operasional Kenderaan Dinas Pimpinan BBM Pertamax |
2026-03-09 |
009/UN47.B1/SPP/GUP-01/2026 |
2026-03-13 |
0510A |
Rp. 450.000 |
4 Hari |
|
| 1452 |
Fakultas Ilmu Pendidikan |
April 2026 |
525119 |
Operasional Kenderaan Dinas Pimpinan BBM Pertamax |
2026-04-29 |
018/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0988A |
Rp. 1.650.000 |
6 Hari |
|
| 1453 |
Fakultas Ilmu Pendidikan |
Mei 2026 |
525119 |
Operasional Kenderaan Dinas Pimpinan BBM Pertamax |
2026-06-02 |
025/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1266A |
Rp. 450.000 |
7 Hari |
|
| 1454 |
Fakultas Ilmu Pendidikan |
Juni 2026 |
525119 |
Operasional Kenderaan Dinas Pimpinan BBM Pertamax |
2026-06-25 |
035/UN47.B1/SPP/GUP-05/2026 |
2026-07-06 |
1517A |
Rp. 2.418.675 |
11 Hari |
|
| 1455 |
Fakultas Ilmu Pendidikan |
Juli 2026 |
525119 |
Operasional Kenderaan Dinas Pimpinan BBM Pertamax |
2026-08-07 |
048/UN47.B1/SPP/GUP-06/2026 |
2026-08-18 |
1997A |
Rp. 850.000 |
11 Hari |
|
| 1456 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525119 |
Operasional Kenderaan Dinas Pimpinan BBM Pertamax |
2026-08-07 |
048/UN47.B1/SPP/GUP-06/2026 |
2026-08-18 |
1997A |
Rp. 250.000 |
11 Hari |
|
| 1457 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525119 |
Operasional Kenderaan Dinas Pimpinan BBM Pertamax |
2026-08-31 |
057/UN47.B1/SPP/GUP-07/2026 |
2026-09-14 |
2292A |
Rp. 600.000 |
14 Hari |
|
| 1458 |
Fakultas Ilmu Pendidikan |
September 2026 |
525119 |
Operasional Kenderaan Dinas Pimpinan BBM Pertamax |
2026-09-21 |
068/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 600.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1459 |
Fakultas Ilmu Pendidikan |
Oktober 2026 |
525119 |
Operasional Kenderaan Dinas Pimpinan BBM Pertamax |
|
|
|
|
Rp. 200.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1460 |
Fakultas Ilmu Pendidikan |
Januari 2026 |
525111 |
Remunerasi Fungsional (98 orang x 12 bulan) |
2026-01-12 |
002/UN47.B1/SPP/LS-01/2026 |
2026-01-15 |
0032A |
Rp. 1.103.580.000 |
3 Hari |
|
| 1461 |
Fakultas Ilmu Pendidikan |
Maret 2026 |
525111 |
Remunerasi Fungsional (98 orang x 12 bulan) |
2026-03-06 |
005/UN47.B1/SPP/LS-04/2026 |
2026-03-16 |
0566A |
Rp. 475.710.000 |
10 Hari |
|
| 1462 |
Fakultas Ilmu Pendidikan |
Juli 2026 |
525111 |
Remunerasi Fungsional (98 orang x 12 bulan) |
2026-07-07 |
040/UN47.B1/SPP/LS-10/2026 |
2026-07-24 |
1692A |
Rp. 1.079.868.000 |
17 Hari |
|
| 1463 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525111 |
Remunerasi Fungsional (98 orang x 12 bulan) |
2026-08-03 |
044/UN47.B1/SPP/LS-14/2026 |
2026-08-12 |
1882A |
Rp. 22.176.000 |
9 Hari |
|
| 1464 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525111 |
Remunerasi Fungsional (98 orang x 12 bulan) |
2026-08-31 |
063/UN47.B1/SPP/LS-16/2026 |
|
|
Rp. 490.560.000 |
36 Hari |
Belum ada SP2D terhitung dari 31 Agustus 2026 hingga 06 Oktober 2026 (36 Hari) |
| 1465 |
Fakultas Ilmu Pendidikan |
September 2026 |
525111 |
Remunerasi Fungsional (98 orang x 12 bulan) |
2026-09-22 |
075/UN47.B1/SPP/LS-18/2026 |
|
|
Rp. 32.760.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 1466 |
Fakultas Ilmu Pendidikan |
Januari 2026 |
525111 |
Remunerasi Tugas Tambahan (4 orang x 12 Bulan) |
2026-01-14 |
003/UN47.B1/SPP/LS-02/2026 |
2026-01-21 |
0074A |
Rp. 105.000.000 |
7 Hari |
|
| 1467 |
Fakultas Ilmu Pendidikan |
Maret 2026 |
525111 |
Remunerasi Tugas Tambahan (4 orang x 12 Bulan) |
2026-03-06 |
006/UN47.B1/SPP/LS-05/2026 |
2026-03-16 |
0567A |
Rp. 45.000.000 |
10 Hari |
|
| 1468 |
Fakultas Ilmu Pendidikan |
Juli 2026 |
525111 |
Remunerasi Tugas Tambahan (4 orang x 12 Bulan) |
2026-07-07 |
041/UN47.B1/SPP/LS-11/2026 |
2026-07-30 |
1793A |
Rp. 105.000.000 |
23 Hari |
|
| 1469 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525111 |
Remunerasi Tugas Tambahan (4 orang x 12 Bulan) |
2026-08-31 |
053/UN47.B1/SPP/LS-15/2026 |
|
|
Rp. 45.000.000 |
36 Hari |
Belum ada SP2D terhitung dari 31 Agustus 2026 hingga 06 Oktober 2026 (36 Hari) |
| 1470 |
Fakultas Ilmu Pendidikan |
Februari 2026 |
525111 |
Insentif Kelola BLU (24 0rang x 12 Bulan ) |
2026-02-03 |
004/UN47.B1/SPP/LS-03/2026 |
2026-02-09 |
0145A |
Rp. 98.400.000 |
6 Hari |
|
| 1471 |
Fakultas Ilmu Pendidikan |
Maret 2026 |
525111 |
Insentif Kelola BLU (24 0rang x 12 Bulan ) |
2026-03-09 |
007/UN47.B1/SPP/LS-06/2026 |
2026-03-16 |
0568A |
Rp. 98.400.000 |
7 Hari |
|
| 1472 |
Fakultas Ilmu Pendidikan |
Juni 2026 |
525111 |
Insentif Kelola BLU (24 0rang x 12 Bulan ) |
2026-05-11 |
023/UN47.B1/SPP/LS-07/2026 |
2026-06-04 |
1229A |
Rp. 104.400.000 |
24 Hari |
|
| 1473 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525111 |
Insentif Kelola BLU (24 0rang x 12 Bulan ) |
2026-07-07 |
042/UN47.B1/SPP/LS-12/2026 |
2026-08-05 |
1846A |
Rp. 106.400.000 |
29 Hari |
|
| 1474 |
Fakultas Ilmu Pendidikan |
September 2026 |
525111 |
Insentif Kelola BLU (24 0rang x 12 Bulan ) |
2026-09-21 |
074/UN47.B1/SPP/LS-17/2026 |
|
|
Rp. 109.400.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1475 |
Fakultas Ilmu Pendidikan |
April 2026 |
525111 |
Insentif PPK Unit Kerja |
2026-04-29 |
020/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0990A |
Rp. 3.450.000 |
6 Hari |
|
| 1476 |
Fakultas Ilmu Pendidikan |
Juni 2026 |
525111 |
Insentif PPK Unit Kerja |
2026-06-25 |
037/UN47.B1/SPP/GUP-05/2026 |
2026-07-06 |
1519A |
Rp. 2.300.000 |
11 Hari |
|
| 1477 |
Fakultas Ilmu Pendidikan |
April 2026 |
525111 |
Insentif Penguji Tagihan / Verifikator unit kerja |
2026-04-29 |
020/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0990A |
Rp. 1.410.000 |
6 Hari |
|
| 1478 |
Fakultas Ilmu Pendidikan |
Juni 2026 |
525111 |
Insentif Penguji Tagihan / Verifikator unit kerja |
2026-06-25 |
037/UN47.B1/SPP/GUP-05/2026 |
2026-07-06 |
1519A |
Rp. 940.000 |
11 Hari |
|
| 1479 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525115 |
Biaya Perjalanan Dinas terkait perencanaan dan tata kelola keuangan (biaya Tiket 2 orang) |
2026-08-31 |
059/UN47.B1/SPP/GUP-07/2026 |
2026-09-14 |
2294A |
Rp. 700.000 |
14 Hari |
|
| 1480 |
Fakultas Ilmu Pendidikan |
September 2026 |
525115 |
Biaya Perjalanan Dinas terkait perencanaan dan tata kelola keuangan (biaya Tiket 2 orang) |
2026-09-21 |
071/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 700.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1481 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525115 |
Biaya Perjalanan Dinas terkait perencanaan dan tata kelola keuangan (biaya uang harian 2 x 4) |
2026-08-31 |
059/UN47.B1/SPP/GUP-07/2026 |
2026-09-14 |
2294A |
Rp. 1.000.000 |
14 Hari |
|
| 1482 |
Fakultas Ilmu Pendidikan |
September 2026 |
525115 |
Biaya Perjalanan Dinas terkait perencanaan dan tata kelola keuangan (biaya uang harian 2 x 4) |
2026-09-21 |
071/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 1.130.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1483 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525115 |
Biaya Perjalanan Dinas terkait perencanaan dan tata kelola keuangan (Biaya Akomodasi 2 orang x 3 hari) |
2026-08-31 |
059/UN47.B1/SPP/GUP-07/2026 |
2026-09-14 |
2294A |
Rp. 1.800.000 |
14 Hari |
|
| 1484 |
Fakultas Ilmu Pendidikan |
September 2026 |
525115 |
Biaya Perjalanan Dinas terkait perencanaan dan tata kelola keuangan (Biaya Akomodasi 2 orang x 3 hari) |
2026-09-21 |
071/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 1.650.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1485 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525176 |
Insnetif PPK Unit kerja |
2026-08-31 |
061/UN47.B1/SPP/GUP-07/2026 |
2026-09-14 |
2296A |
Rp. 3.450.000 |
14 Hari |
|
| 1486 |
Fakultas Ilmu Pendidikan |
Oktober 2026 |
525176 |
Insnetif PPK Unit kerja |
|
|
|
|
Rp. 1.150.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1487 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525176 |
Insentif Penguji / Verifikator unit kerja |
2026-08-31 |
061/UN47.B1/SPP/GUP-07/2026 |
2026-09-14 |
2296A |
Rp. 1.410.000 |
14 Hari |
|
| 1488 |
Fakultas Ilmu Pendidikan |
Oktober 2026 |
525176 |
Insentif Penguji / Verifikator unit kerja |
|
|
|
|
Rp. 470.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1489 |
Fakultas Ilmu Pendidikan |
September 2026 |
525115 |
Biaya transport, Akomodasi dan uang harian perjalanan dinas Tenaga Kependidikan ikuti Kegiatan pengembangan SDM/Diklat/Workshop.Kegiatan Penguatan dan Pengembangan Kompetensi Tenaga Kependidikan / Kompetisi tendik / Bencmarking* |
2026-10-05 |
076/UN47.B1/SPP/TUP-Nihil/2026 |
|
|
Rp. 83.050.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 1490 |
Fakultas Ilmu Pendidikan |
Maret 2026 |
525119 |
Bantuan Pembinaan Mental Spritual Civitas Akademika FIP |
2026-03-30 |
015/UN47.B1/SPP/GUP-02/2026 |
2026-04-06 |
0644A |
Rp. 28.500.000 |
7 Hari |
|
| 1491 |
Fakultas Ilmu Pendidikan |
April 2026 |
525119 |
Bantuan Pembinaan Mental Spritual Civitas Akademika FIP |
2026-04-29 |
021/UN47.B1/SPP/GUP-03/2026 |
2026-05-05 |
0991A |
Rp. 4.500.000 |
6 Hari |
|
| 1492 |
Fakultas Ilmu Pendidikan |
Agustus 2026 |
525119 |
Bantuan Kegiatan Dharma wanita Persatuan FIP |
2026-08-31 |
060/UN47.B1/SPP/GUP-07/2026 |
2026-09-14 |
2295A |
Rp. 2.000.000 |
14 Hari |
|
| 1493 |
Fakultas Ilmu Pendidikan |
Mei 2026 |
525119 |
Persiapan penilaian Pencapaian IKU |
2026-06-02 |
028/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1269A |
Rp. 3.200.000 |
7 Hari |
|
| 1494 |
Fakultas Ilmu Pendidikan |
Juli 2026 |
525119 |
Persiapan penilaian Pencapaian IKU |
2026-08-07 |
050/UN47.B1/SPP/GUP-06/2026 |
2026-08-18 |
1999A |
Rp. 500.000 |
11 Hari |
|
| 1495 |
Fakultas Ilmu Pendidikan |
September 2026 |
525119 |
Bantuan Biaya Meating Room untuk Tenaga Kependidikan ikuti Kegiatan pengembangan SDM/Diklat/Workshop.Kegiatan Penguatan dan Pengembangan Kompetensi Tenaga Kependidikan / Kompetisi tendik / Bencmarking |
2026-10-05 |
077/UN47.B1/SPP/TUP-Nihil/2026 |
|
|
Rp. 12.789.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 1496 |
Fakultas Ilmu Pendidikan |
September 2026 |
525119 |
Bantuan Biaya Pembangnan Zona Integroitas |
2026-09-21 |
072/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 2.000.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1497 |
Fakultas Ilmu Pendidikan |
September 2026 |
525119 |
Survey dan Penyusunan Proposal PSDKU |
2026-09-21 |
072/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 1.500.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1498 |
Fakultas Ilmu Pendidikan |
Oktober 2026 |
525119 |
Pengelolaan website |
|
|
|
|
Rp. 3.400.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1499 |
Fakultas Ilmu Pendidikan |
Juli 2026 |
525119 |
Bantuan Pelaksanaan Kegiatan Internasional Join Research |
2026-06-26 |
039/UN47.B1/SPP/LS-09/2026 |
2026-07-09 |
1583A |
Rp. 15.000.000 |
13 Hari |
|
| 1500 |
Fakultas Ilmu Pendidikan |
Juli 2026 |
525119 |
Bantuan Biaya Penelitian bagi Dosen pemula / Tenaga Pengajar, Asisten Ahli / Hibah unggulan Fakultas (SDGs 1,4,17) |
2026-06-24 |
031/UN47.B1/SPP/LS-08/2026 |
2026-07-06 |
1506A |
Rp. 3.500.000 |
12 Hari |
|
| 1501 |
Fakultas Ilmu Pendidikan |
Juli 2026 |
525119 |
Bantuan Biaya Penelitian bagi Dosen pemula / Tenaga Pengajar, Asisten Ahli / Hibah unggulan Fakultas (SDGs 1,4,17) |
2026-06-26 |
039/UN47.B1/SPP/LS-09/2026 |
2026-07-09 |
1583A |
Rp. 16.500.000 |
13 Hari |
|
| 1502 |
Fakultas Ilmu Pendidikan |
Juli 2026 |
525119 |
Bantuan Biaya Penelitian Guru besar (SDGs 1,4,17) |
2026-06-26 |
039/UN47.B1/SPP/LS-09/2026 |
2026-07-09 |
1583A |
Rp. 54.000.000 |
13 Hari |
|
| 1503 |
Fakultas Ilmu Pendidikan |
Juli 2026 |
525119 |
Bantuan Biaya Penelitian Akselerasi Dosen Lektor Kepala ke Guru Besar (SDGs, 1,4,17) |
2026-06-26 |
039/UN47.B1/SPP/LS-09/2026 |
2026-07-09 |
1583A |
Rp. 17.500.000 |
13 Hari |
|
| 1504 |
Fakultas Ilmu Pendidikan |
Juli 2026 |
525119 |
Bantuan BiayaPelaksanaan kegiatan pengabdian kepada masyarakat (Desa / Sekolah binaan) dalam bentuk karya (SDGs 1,4,17) |
2026-06-24 |
032/UN47.B1/SPP/LS-08/2026 |
2026-07-06 |
1507A |
Rp. 21.000.000 |
12 Hari |
|
| 1505 |
Fakultas Ilmu Pendidikan |
September 2026 |
525119 |
Bantuan Publikasi Jurnal terindeks sinta 2 Mahasiswa melilbatkan Dosen (author Mahasiswa) |
2026-09-21 |
070/UN47.B1/SPP/GUP-08/2026 |
|
|
Rp. 2.000.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1506 |
Fakultas Ilmu Pendidikan |
Mei 2026 |
525119 |
Bantuan Biaya Paket langganan Zoom Meating |
2026-06-02 |
027/UN47.B1/SPP/GUP-04/2026 |
2026-06-09 |
1268A |
Rp. 1.272.050 |
7 Hari |
|
| 1507 |
Fakultas Hukum |
Mei 2026 |
537112 |
Pengadaan AC |
2026-06-15 |
76/UN47.B9/SPP-GUP 5/2026 |
2026-06-30 |
1412W |
Rp. 9.800.000 |
15 Hari |
|
| 1508 |
Fakultas Hukum |
Agustus 2026 |
537112 |
Pengadaan Kursi Simulasi Peradilan Semu |
2026-09-14 |
117/UN47.B9/SPP-GUP 7/2026 |
|
|
Rp. 20.290.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1509 |
Fakultas Hukum |
Maret 2026 |
537112 |
Pengadaan Sarana Pembelajaran |
2026-04-08 |
27/UN47.B9/SPP-GUP 2/2026 |
2026-04-10 |
0755W |
Rp. 350.000 |
2 Hari |
|
| 1510 |
Fakultas Hukum |
April 2026 |
537112 |
Pengadaan Alat Penunjang Kinerja Pimpinan (Samsung Galaxi Tab) |
2026-05-19 |
59/UN47.B9/SPP-GUP 4/2026 |
2026-05-20 |
1103W |
Rp. 14.396.193 |
1 Hari |
|
| 1511 |
Fakultas Hukum |
September 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-09-14 |
117/UN47.B9/SPP-GUP 7/2026 |
|
|
Rp. 23.434.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1512 |
Fakultas Hukum |
April 2026 |
525114 |
Pemeliharaan Printer |
2026-05-19 |
65/UN47.B9/SPP-GUP 4/2026 |
2026-05-20 |
1106W |
Rp. 300.000 |
1 Hari |
|
| 1513 |
Fakultas Hukum |
Januari 2026 |
525114 |
Pemeliharaan Jaringan Listrik |
2026-03-04 |
13/UN47.B9/SPP-GUP 1/2026 |
2026-03-09 |
0374W |
Rp. 600.500 |
5 Hari |
|
| 1514 |
Fakultas Hukum |
Maret 2026 |
525114 |
Pemeliharaan Jaringan Listrik |
2026-04-08 |
31/UN47.B9/SPP-GUP 2/2026 |
2026-04-10 |
0753W |
Rp. 195.000 |
2 Hari |
|
| 1515 |
Fakultas Hukum |
April 2026 |
525114 |
Pemeliharaan Jaringan Listrik |
2026-04-22 |
53/UN47.B9/SPP-GUP 3/2026 |
2026-04-30 |
0962W |
Rp. 750.000 |
8 Hari |
|
| 1516 |
Fakultas Hukum |
Juni 2026 |
525114 |
Pemeliharaan Jaringan Listrik |
2026-08-12 |
100/UN47.B9/SPP-GUP 6/2026 |
2026-08-20 |
2047W |
Rp. 1.080.000 |
8 Hari |
|
| 1517 |
Fakultas Hukum |
April 2026 |
525114 |
Pemeliharaan Jaringan Air |
2026-04-22 |
53/UN47.B9/SPP-GUP 3/2026 |
2026-04-30 |
0962W |
Rp. 195.000 |
8 Hari |
|
| 1518 |
Fakultas Hukum |
Juni 2026 |
525114 |
Pemeliharaan Jaringan Air |
2026-08-12 |
100/UN47.B9/SPP-GUP 6/2026 |
2026-08-20 |
2047W |
Rp. 450.000 |
8 Hari |
|
| 1519 |
Fakultas Hukum |
Januari 2026 |
525114 |
Pemeliharaan AC |
2026-03-04 |
13/UN47.B9/SPP-GUP 1/2026 |
2026-03-09 |
0374W |
Rp. 75.000 |
5 Hari |
|
| 1520 |
Fakultas Hukum |
April 2026 |
525114 |
Pemeliharaan AC |
2026-05-19 |
65/UN47.B9/SPP-GUP 4/2026 |
2026-05-20 |
1106W |
Rp. 5.238.521 |
1 Hari |
|
| 1521 |
Fakultas Hukum |
September 2026 |
525114 |
Pemeliharaan AC |
2026-09-14 |
123/UN47.B9/SPP-GUP 7/2026 |
|
|
Rp. 7.084.745 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1522 |
Fakultas Hukum |
Juni 2026 |
525114 |
Pemeliharaan Komputer/Laptop |
2026-08-12 |
100/UN47.B9/SPP-GUP 6/2026 |
2026-08-20 |
2047W |
Rp. 750.000 |
8 Hari |
|
| 1523 |
Fakultas Hukum |
September 2026 |
525114 |
Pemeliharaan Meubelair Perkantoran |
2026-09-14 |
130/UN47.B9/SPP-LS21/2026 |
|
|
Rp. 14.679.750 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1524 |
Fakultas Hukum |
September 2026 |
525114 |
Pemeliharaan Gedung dan Bangunan Pendukung Perkantoran |
2026-10-28 |
145/UN47.B9/SPP-LS24/2026 |
|
|
Rp. 40.500.000 |
-22 Hari |
Belum ada SP2D terhitung dari 28 Oktober 2026 hingga 06 Oktober 2026 (-22 Hari) |
| 1525 |
Fakultas Hukum |
April 2026 |
525119 |
Sosialisasi Penerimaan Mahasiswa Baru (Dalam Negri dan Luar Negeri) |
2026-04-22 |
55/UN47.B9/SPP-GUP 3/2026 |
2026-04-30 |
0964W |
Rp. 334.000 |
8 Hari |
|
| 1526 |
Fakultas Hukum |
Mei 2026 |
525119 |
Pelaksanaan Seminar Internasional |
2026-06-15 |
84/UN47.B9/SPP-GUP 5/2026 |
2026-06-30 |
1416W |
Rp. 2.400.000 |
15 Hari |
|
| 1527 |
Fakultas Hukum |
Maret 2026 |
525119 |
Pelaksanaan Pembinaan dan Penyelenggaraan Kegiatan Kemahasiswaan |
2026-03-09 |
25/UN47.B9/SPP-LS4/2026 |
2026-03-17 |
0602W |
Rp. 14.829.000 |
8 Hari |
|
| 1528 |
Fakultas Hukum |
Maret 2026 |
525119 |
Pelaksanaan Pembinaan dan Penyelenggaraan Kegiatan Kemahasiswaan |
2026-04-08 |
37/UN47.B9/SPP-GUP 2/2026 |
2026-04-10 |
0750W |
Rp. 10.000.000 |
2 Hari |
|
| 1529 |
Fakultas Hukum |
April 2026 |
525119 |
Pelaksanaan Pembinaan dan Penyelenggaraan Kegiatan Kemahasiswaan |
2026-04-22 |
55/UN47.B9/SPP-GUP 3/2026 |
2026-04-30 |
0964W |
Rp. 17.900.000 |
8 Hari |
|
| 1530 |
Fakultas Hukum |
April 2026 |
525119 |
Pelaksanaan Pembinaan dan Penyelenggaraan Kegiatan Kemahasiswaan |
2026-05-18 |
71/UN47.B9/SPP-GUP 4/2026 |
2026-05-20 |
1109W |
Rp. 16.780.000 |
2 Hari |
|
| 1531 |
Fakultas Hukum |
Mei 2026 |
525119 |
Pelaksanaan Pembinaan dan Penyelenggaraan Kegiatan Kemahasiswaan |
2026-06-15 |
84/UN47.B9/SPP-GUP 5/2026 |
2026-06-30 |
1416W |
Rp. 29.196.569 |
15 Hari |
|
| 1532 |
Fakultas Hukum |
Juni 2026 |
525119 |
Pelaksanaan Pembinaan dan Penyelenggaraan Kegiatan Kemahasiswaan |
2026-08-12 |
108/UN47.B9/SPP-GUP 6/2026 |
2026-08-20 |
2050W |
Rp. 17.500.000 |
8 Hari |
|
| 1533 |
Fakultas Hukum |
September 2026 |
525119 |
Pelaksanaan Pembinaan dan Penyelenggaraan Kegiatan Kemahasiswaan |
2026-09-28 |
142/UN47.B9/SPP-GUP 8/2026 |
|
|
Rp. 20.000.000 |
8 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 06 Oktober 2026 (8 Hari) |
| 1534 |
Fakultas Hukum |
Oktober 2026 |
525119 |
Pelaksanaan Pembinaan dan Penyelenggaraan Kegiatan Kemahasiswaan |
2026-10-05 |
GU NIHIL 4 |
|
|
Rp. 34.424.500 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 1535 |
Fakultas Hukum |
April 2026 |
525119 |
Pelaksanaan kegiatan Yudisium |
2026-05-18 |
71/UN47.B9/SPP-GUP 4/2026 |
2026-05-20 |
1109W |
Rp. 156.200 |
2 Hari |
|
| 1536 |
Fakultas Hukum |
April 2026 |
525119 |
Bantuan biaya Pendamping bagi mahasiswa pada kegiatan Pekan Ilmiah Nasional dan Pekan Seni Mahasiswa Nasional |
2026-04-22 |
55/UN47.B9/SPP-GUP 3/2026 |
2026-04-30 |
0964W |
Rp. 12.500.000 |
8 Hari |
|
| 1537 |
Fakultas Hukum |
Mei 2026 |
525119 |
Bantuan biaya Pendamping bagi mahasiswa pada kegiatan Pekan Ilmiah Nasional dan Pekan Seni Mahasiswa Nasional |
2026-06-15 |
84/UN47.B9/SPP-GUP 5/2026 |
2026-06-30 |
1416W |
Rp. 5.000.000 |
15 Hari |
|
| 1538 |
Fakultas Hukum |
April 2026 |
525119 |
Bantuan biaya Pelaksanaan Monitoring dan Evaluasi Perkuliahan |
2026-04-22 |
49/UN47.B9/SPP-GUP 3/2026 |
2026-04-30 |
0960W |
Rp. 3.800.000 |
8 Hari |
|
| 1539 |
Fakultas Hukum |
April 2026 |
525119 |
Bantuan biaya Pelaksanaan Monitoring dan Evaluasi Perkuliahan |
2026-04-22 |
55/UN47.B9/SPP-GUP 3/2026 |
2026-04-30 |
0964W |
Rp. 1.425.000 |
8 Hari |
|
| 1540 |
Fakultas Hukum |
Juni 2026 |
525119 |
Bantuan biaya Pelaksanaan Monitoring dan Evaluasi Perkuliahan |
2026-08-12 |
108/UN47.B9/SPP-GUP 6/2026 |
2026-08-20 |
2050W |
Rp. 8.770.000 |
8 Hari |
|
| 1541 |
Fakultas Hukum |
September 2026 |
525119 |
Biaya Terkait Kegiatan Semester Antara |
2026-08-31 |
113/UN47.B9/SPP-LS 17/2026 |
2026-09-02 |
2190W |
Rp. 21.400.000 |
2 Hari |
|
| 1542 |
Fakultas Hukum |
Maret 2026 |
525119 |
Workshop Penyusunan LKPS dan LED Akreditasi |
2026-04-08 |
37/UN47.B9/SPP-GUP 2/2026 |
2026-04-10 |
0750W |
Rp. 6.950.000 |
2 Hari |
|
| 1543 |
Fakultas Hukum |
Mei 2026 |
525119 |
Bantuan biaya kegiatan Pengumpulan Data Dokumen LKPS dan LED |
2026-06-15 |
84/UN47.B9/SPP-GUP 5/2026 |
2026-06-30 |
1416W |
Rp. 9.999.000 |
15 Hari |
|
| 1544 |
Fakultas Hukum |
Mei 2026 |
525119 |
Bantuan biaya Penyusunan LKPS dan LED |
2026-06-15 |
84/UN47.B9/SPP-GUP 5/2026 |
2026-06-30 |
1416W |
Rp. 880.000 |
15 Hari |
|
| 1545 |
Fakultas Hukum |
Januari 2026 |
525112 |
Biaya kebutuhan dasar perkantoran dalam negeri |
2026-03-04 |
07/UN47.B9/SPP-GUP 1/2026 |
2026-03-09 |
0371W |
Rp. 25.999.100 |
5 Hari |
|
| 1546 |
Fakultas Hukum |
Maret 2026 |
525112 |
Biaya kebutuhan dasar perkantoran dalam negeri |
2026-04-08 |
29/UN47.B9/SPP-GUP 2/2026 |
2026-04-10 |
0754W |
Rp. 751.000 |
2 Hari |
|
| 1547 |
Fakultas Hukum |
April 2026 |
525112 |
Biaya kebutuhan dasar perkantoran dalam negeri |
2026-04-22 |
57/UN47.B9/SPP-GUP 3/2026 |
2026-04-30 |
0963W |
Rp. 3.179.000 |
8 Hari |
|
| 1548 |
Fakultas Hukum |
April 2026 |
525112 |
Biaya kebutuhan dasar perkantoran dalam negeri |
2026-05-19 |
61/UN47.B9/SPP-GUP 4/2026 |
2026-05-20 |
1104W |
Rp. 1.967.500 |
1 Hari |
|
| 1549 |
Fakultas Hukum |
Mei 2026 |
525112 |
Biaya kebutuhan dasar perkantoran dalam negeri |
2026-06-15 |
78/UN47.B9/SPP-GUP 5/2026 |
2026-06-30 |
1413W |
Rp. 2.488.000 |
15 Hari |
|
| 1550 |
Fakultas Hukum |
Juni 2026 |
525112 |
Biaya kebutuhan dasar perkantoran dalam negeri |
2026-08-12 |
94/UN47.B9/SPP-GUP 6/2026 |
2026-08-20 |
2044W |
Rp. 200.000 |
8 Hari |
|
| 1551 |
Fakultas Hukum |
Agustus 2026 |
525112 |
Biaya kebutuhan dasar perkantoran dalam negeri |
2026-09-14 |
119/UN47.B9/SPP-GUP 7/2026 |
|
|
Rp. 1.021.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1552 |
Fakultas Hukum |
September 2026 |
525112 |
Biaya kebutuhan dasar perkantoran dalam negeri |
2026-09-14 |
119/UN47.B9/SPP-GUP 7/2026 |
|
|
Rp. 5.123.046 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1553 |
Fakultas Hukum |
September 2026 |
525112 |
Biaya kebutuhan dasar perkantoran dalam negeri |
2026-09-28 |
136/UN47.B9/SPP-GUP 8/2026 |
|
|
Rp. 4.619.500 |
8 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 06 Oktober 2026 (8 Hari) |
| 1554 |
Fakultas Hukum |
Oktober 2026 |
525112 |
Biaya kebutuhan dasar perkantoran dalam negeri |
2026-10-05 |
GU NIHIL 1 |
|
|
Rp. 11.088.088 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 1555 |
Fakultas Hukum |
Januari 2026 |
525112 |
Biaya konsumsi kegiatan Fakultas, Jumat bersih dan Spiritua |
2026-03-04 |
07/UN47.B9/SPP-GUP 1/2026 |
2026-03-09 |
0371W |
Rp. 1.982.928 |
5 Hari |
|
| 1556 |
Fakultas Hukum |
Maret 2026 |
525112 |
Biaya konsumsi kegiatan Fakultas, Jumat bersih dan Spiritua |
2026-03-09 |
23/UN47.B9/SPP-LS4/2026 |
2026-03-17 |
0601W |
Rp. 8.000.000 |
8 Hari |
|
| 1557 |
Fakultas Hukum |
Maret 2026 |
525112 |
Biaya konsumsi kegiatan Fakultas, Jumat bersih dan Spiritua |
2026-04-08 |
29/UN47.B9/SPP-GUP 2/2026 |
2026-04-10 |
0754W |
Rp. 9.521.380 |
2 Hari |
|
| 1558 |
Fakultas Hukum |
April 2026 |
525112 |
Biaya konsumsi kegiatan Fakultas, Jumat bersih dan Spiritua |
2026-04-22 |
57/UN47.B9/SPP-GUP 3/2026 |
2026-04-30 |
0963W |
Rp. 5.150.000 |
8 Hari |
|
| 1559 |
Fakultas Hukum |
April 2026 |
525112 |
Biaya konsumsi kegiatan Fakultas, Jumat bersih dan Spiritua |
2026-05-19 |
61/UN47.B9/SPP-GUP 4/2026 |
2026-05-20 |
1104W |
Rp. 1.425.000 |
1 Hari |
|
| 1560 |
Fakultas Hukum |
Mei 2026 |
525112 |
Biaya konsumsi kegiatan Fakultas, Jumat bersih dan Spiritua |
2026-06-15 |
78/UN47.B9/SPP-GUP 5/2026 |
2026-06-30 |
1413W |
Rp. 360.000 |
15 Hari |
|
| 1561 |
Fakultas Hukum |
Juni 2026 |
525112 |
Biaya konsumsi kegiatan Fakultas, Jumat bersih dan Spiritua |
2026-08-12 |
94/UN47.B9/SPP-GUP 6/2026 |
2026-08-20 |
2044W |
Rp. 955.000 |
8 Hari |
|
| 1562 |
Fakultas Hukum |
September 2026 |
525112 |
Biaya konsumsi kegiatan Fakultas, Jumat bersih dan Spiritua |
2026-09-28 |
136/UN47.B9/SPP-GUP 8/2026 |
|
|
Rp. 21.445.000 |
8 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 06 Oktober 2026 (8 Hari) |
| 1563 |
Fakultas Hukum |
Oktober 2026 |
525112 |
Biaya konsumsi kegiatan Fakultas, Jumat bersih dan Spiritua |
2026-10-05 |
GU NIHIL 1 |
|
|
Rp. 5.265.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 1564 |
Fakultas Hukum |
Januari 2026 |
525112 |
Pelaksannan Rapat Rutin dan Konsumsi Tamu Pimpinan |
2026-03-04 |
07/UN47.B9/SPP-GUP 1/2026 |
2026-03-09 |
0371W |
Rp. 14.075.640 |
5 Hari |
|
| 1565 |
Fakultas Hukum |
April 2026 |
525112 |
Pelaksannan Rapat Rutin dan Konsumsi Tamu Pimpinan |
2026-04-22 |
57/UN47.B9/SPP-GUP 3/2026 |
2026-04-30 |
0963W |
Rp. 1.785.895 |
8 Hari |
|
| 1566 |
Fakultas Hukum |
April 2026 |
525112 |
Pelaksannan Rapat Rutin dan Konsumsi Tamu Pimpinan |
2026-05-19 |
61/UN47.B9/SPP-GUP 4/2026 |
2026-05-20 |
1104W |
Rp. 2.373.723 |
1 Hari |
|
| 1567 |
Fakultas Hukum |
Mei 2026 |
525112 |
Pelaksannan Rapat Rutin dan Konsumsi Tamu Pimpinan |
2026-06-15 |
78/UN47.B9/SPP-GUP 5/2026 |
2026-06-30 |
1413W |
Rp. 250.000 |
15 Hari |
|
| 1568 |
Fakultas Hukum |
Juni 2026 |
525112 |
Pelaksannan Rapat Rutin dan Konsumsi Tamu Pimpinan |
2026-08-12 |
94/UN47.B9/SPP-GUP 6/2026 |
2026-08-20 |
2044W |
Rp. 1.306.000 |
8 Hari |
|
| 1569 |
Fakultas Hukum |
Agustus 2026 |
525112 |
Pelaksannan Rapat Rutin dan Konsumsi Tamu Pimpinan |
2026-09-14 |
119/UN47.B9/SPP-GUP 7/2026 |
|
|
Rp. 4.329.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1570 |
Fakultas Hukum |
September 2026 |
525112 |
Pelaksannan Rapat Rutin dan Konsumsi Tamu Pimpinan |
2026-09-14 |
119/UN47.B9/SPP-GUP 7/2026 |
|
|
Rp. 1.017.600 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1571 |
Fakultas Hukum |
September 2026 |
525112 |
Pelaksannan Rapat Rutin dan Konsumsi Tamu Pimpinan |
2026-09-28 |
136/UN47.B9/SPP-GUP 8/2026 |
|
|
Rp. 3.375.000 |
8 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 06 Oktober 2026 (8 Hari) |
| 1572 |
Fakultas Hukum |
Oktober 2026 |
525112 |
Pelaksannan Rapat Rutin dan Konsumsi Tamu Pimpinan |
2026-10-05 |
GU NIHIL 1 |
|
|
Rp. 300.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 1573 |
Fakultas Hukum |
Januari 2026 |
525112 |
Rapat Kerja Fakultas Tahun 2026 |
2026-03-04 |
07/UN47.B9/SPP-GUP 1/2026 |
2026-03-09 |
0371W |
Rp. 12.400.000 |
5 Hari |
|
| 1574 |
Fakultas Hukum |
Januari 2026 |
525115 |
Tiket Perjalanan (PP) |
2026-03-04 |
09/UN47.B9/SPP-GUP 1/2026 |
2026-03-09 |
0372W |
Rp. 2.500.000 |
5 Hari |
|
| 1575 |
Fakultas Hukum |
Maret 2026 |
525115 |
Tiket Perjalanan (PP) |
2026-03-06 |
15/UN47.B9/SPTB-LS4/2026 |
2026-03-17 |
0600W |
Rp. 6.356.160 |
11 Hari |
|
| 1576 |
Fakultas Hukum |
April 2026 |
525115 |
Tiket Perjalanan (PP) |
2026-04-22 |
51/UN47.B9/SPP-GUP 3/2026 |
2026-04-30 |
0961W |
Rp. 6.166.320 |
8 Hari |
|
| 1577 |
Fakultas Hukum |
September 2026 |
525115 |
Tiket Perjalanan (PP) |
2026-09-14 |
TUP NIHIL 1 |
|
|
Rp. 700.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1578 |
Fakultas Hukum |
Januari 2026 |
525115 |
Uang Harian |
2026-03-04 |
09/UN47.B9/SPP-GUP 1/2026 |
2026-03-09 |
0372W |
Rp. 2.500.000 |
5 Hari |
|
| 1579 |
Fakultas Hukum |
Maret 2026 |
525115 |
Uang Harian |
2026-03-06 |
15/UN47.B9/SPTB-LS4/2026 |
2026-03-17 |
0600W |
Rp. 2.100.000 |
11 Hari |
|
| 1580 |
Fakultas Hukum |
April 2026 |
525115 |
Uang Harian |
2026-04-22 |
51/UN47.B9/SPP-GUP 3/2026 |
2026-04-30 |
0961W |
Rp. 1.590.000 |
8 Hari |
|
| 1581 |
Fakultas Hukum |
Juni 2026 |
525115 |
Uang Harian |
2026-08-12 |
96/UN47.B9/SPP-GUP 6/2026 |
2026-08-20 |
2045W |
Rp. 2.050.000 |
8 Hari |
|
| 1582 |
Fakultas Hukum |
September 2026 |
525115 |
Uang Harian |
2026-09-14 |
TUP NIHIL 1 |
|
|
Rp. 1.130.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1583 |
Fakultas Hukum |
Januari 2026 |
525115 |
Akomodasi |
2026-03-04 |
09/UN47.B9/SPP-GUP 1/2026 |
2026-03-09 |
0372W |
Rp. 1.650.000 |
5 Hari |
|
| 1584 |
Fakultas Hukum |
Maret 2026 |
525115 |
Akomodasi |
2026-03-06 |
15/UN47.B9/SPTB-LS4/2026 |
2026-03-17 |
0600W |
Rp. 2.244.001 |
11 Hari |
|
| 1585 |
Fakultas Hukum |
April 2026 |
525115 |
Akomodasi |
2026-04-22 |
51/UN47.B9/SPP-GUP 3/2026 |
2026-04-30 |
0961W |
Rp. 1.722.000 |
8 Hari |
|
| 1586 |
Fakultas Hukum |
Juni 2026 |
525115 |
Akomodasi |
2026-08-12 |
96/UN47.B9/SPP-GUP 6/2026 |
2026-08-20 |
2045W |
Rp. 3.288.000 |
8 Hari |
|
| 1587 |
Fakultas Hukum |
September 2026 |
525115 |
Akomodasi |
2026-09-14 |
TUP NIHIL 1 |
|
|
Rp. 2.200.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1588 |
Fakultas Hukum |
Maret 2026 |
525115 |
Transport Lokal (PP) |
2026-03-06 |
15/UN47.B9/SPTB-LS4/2026 |
2026-03-17 |
0600W |
Rp. 405.000 |
11 Hari |
|
| 1589 |
Fakultas Hukum |
Juni 2026 |
525115 |
Transport Lokal (PP) |
2026-08-12 |
96/UN47.B9/SPP-GUP 6/2026 |
2026-08-20 |
2045W |
Rp. 1.200.000 |
8 Hari |
|
| 1590 |
Fakultas Hukum |
Januari 2026 |
525119 |
Operasional Kenderaan Dinas Pimpinan |
2026-03-04 |
11/UN47.B9/SPP-GUP 1/2026 |
2026-03-09 |
0373W |
Rp. 1.093.938 |
5 Hari |
|
| 1591 |
Fakultas Hukum |
Maret 2026 |
525119 |
Operasional Kenderaan Dinas Pimpinan |
2026-04-08 |
39/UN47.B9/SPP-GUP 2/2026 |
2026-04-10 |
0749W |
Rp. 840.000 |
2 Hari |
|
| 1592 |
Fakultas Hukum |
April 2026 |
525119 |
Operasional Kenderaan Dinas Pimpinan |
2026-04-22 |
47/UN47.B9/SPP-GUP 3/2026 |
2026-04-30 |
0959W |
Rp. 765.900 |
8 Hari |
|
| 1593 |
Fakultas Hukum |
April 2026 |
525119 |
Operasional Kenderaan Dinas Pimpinan |
2026-05-18 |
63/UN47.B9/SPP-GUP 4/2026 |
2026-05-20 |
1105W |
Rp. 800.000 |
2 Hari |
|
| 1594 |
Fakultas Hukum |
Mei 2026 |
525119 |
Operasional Kenderaan Dinas Pimpinan |
2026-06-15 |
80/UN47.B9/SPP-GUP 5/2026 |
2026-06-30 |
1414W |
Rp. 836.000 |
15 Hari |
|
| 1595 |
Fakultas Hukum |
Juni 2026 |
525119 |
Operasional Kenderaan Dinas Pimpinan |
2026-08-12 |
98/UN47.B9/SPP-GUP 6/2026 |
2026-08-20 |
2046W |
Rp. 750.000 |
8 Hari |
|
| 1596 |
Fakultas Hukum |
Agustus 2026 |
525119 |
Operasional Kenderaan Dinas Pimpinan |
2026-09-14 |
121/UN47.B9/SPP-GUP 7/2026 |
|
|
Rp. 700.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1597 |
Fakultas Hukum |
September 2026 |
525119 |
Operasional Kenderaan Dinas Pimpinan |
2026-09-28 |
138/UN47.B9/SPP-GUP 8/2026 |
|
|
Rp. 840.000 |
8 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 06 Oktober 2026 (8 Hari) |
| 1598 |
Fakultas Hukum |
Oktober 2026 |
525119 |
Operasional Kenderaan Dinas Pimpinan |
2026-10-05 |
GU NIHIL 2 |
|
|
Rp. 713.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 1599 |
Fakultas Hukum |
Januari 2026 |
525111 |
Pembayaran Remunerasi Fungsional Dosen/Tenaga Pendidik |
2026-01-14 |
01/UN47.B9/PNBP-BLU/SPP-LS.Remun Ins.Kinerja/2026 |
2026-01-15 |
0028W |
Rp. 449.772.000 |
1 Hari |
|
| 1600 |
Fakultas Hukum |
Januari 2026 |
525111 |
Pembayaran Remunerasi Fungsional Dosen/Tenaga Pendidik |
2026-01-19 |
04/UN47.B9/PNBP-BLU/SPP-LS.Remun Ins.Kinerja/2026 |
2026-01-21 |
0070W |
Rp. 1.296.000 |
2 Hari |
|
| 1601 |
Fakultas Hukum |
Maret 2026 |
525111 |
Pembayaran Remunerasi Fungsional Dosen/Tenaga Pendidik |
2026-03-09 |
19/UN47.B9/PNBP-BLU/SPP-LS 6.Remun Ins. Kinerja/2026 |
2026-03-13 |
0516W |
Rp. 201.870.000 |
4 Hari |
|
| 1602 |
Fakultas Hukum |
Juli 2026 |
525111 |
Pembayaran Remunerasi Fungsional Dosen/Tenaga Pendidik |
2026-07-08 |
90/UN47.B9/SPP-LS 14 Remun Ins. Kinerja/2026 |
2026-07-09 |
1589W |
Rp. 475.140.000 |
1 Hari |
|
| 1603 |
Fakultas Hukum |
September 2026 |
525111 |
Pembayaran Remunerasi Fungsional Dosen/Tenaga Pendidik |
2026-09-17 |
132/UN47.B9/SPP-LS 22 Remun Ins. Kinerja/2026 |
|
|
Rp. 229.380.000 |
19 Hari |
Belum ada SP2D terhitung dari 17 September 2026 hingga 06 Oktober 2026 (19 Hari) |
| 1604 |
Fakultas Hukum |
Januari 2026 |
525111 |
Pembayaran Remunerasi Tugas Tambahan (Jabatan) Dosen/Tenaga Pendidik |
2026-01-19 |
06/UN47.B9/PNBP-BLU/SPP-LS.Remun TT/2026 |
2026-01-21 |
0069W |
Rp. 105.000.000 |
2 Hari |
|
| 1605 |
Fakultas Hukum |
Maret 2026 |
525111 |
Pembayaran Remunerasi Tugas Tambahan (Jabatan) Dosen/Tenaga Pendidik |
2026-03-09 |
21/UN47.B9/PNBP-BLU/SPP-LS 7.Remun TT/2026 |
2026-03-13 |
0515W |
Rp. 45.000.000 |
4 Hari |
|
| 1606 |
Fakultas Hukum |
Juli 2026 |
525111 |
Pembayaran Remunerasi Tugas Tambahan (Jabatan) Dosen/Tenaga Pendidik |
2026-07-08 |
88/UN47.B9/SPP-LS 13 Remun TT/2026 |
2026-07-30 |
1774W |
Rp. 105.000.000 |
22 Hari |
|
| 1607 |
Fakultas Hukum |
September 2026 |
525111 |
Pembayaran Remunerasi Tugas Tambahan (Jabatan) Dosen/Tenaga Pendidik |
2026-09-17 |
134/UN47.B9/SPP-LS 23 Remun Tamb/2026 |
|
|
Rp. 45.000.000 |
19 Hari |
Belum ada SP2D terhitung dari 17 September 2026 hingga 06 Oktober 2026 (19 Hari) |
| 1608 |
Fakultas Hukum |
Maret 2026 |
525111 |
Insentif Kelola BLU |
2026-03-09 |
17/UN47.B9/PNBP-BLU/SPP-LS 5.Remun Ins. Kelola/2026 |
2026-03-16 |
0578W |
Rp. 18.000.000 |
7 Hari |
|
| 1609 |
Fakultas Hukum |
April 2026 |
525111 |
Insentif Kelola BLU |
2026-04-21 |
43/UN47.B9/SPP-LS9/2026 |
2026-04-29 |
0932W |
Rp. 9.000.000 |
8 Hari |
|
| 1610 |
Fakultas Hukum |
Mei 2026 |
525111 |
Insentif Kelola BLU |
2026-05-19 |
73/UN47.B9/SPP-LS 10 Remun Ins. Kelola/2026 |
2026-05-20 |
1102W |
Rp. 9.000.000 |
1 Hari |
|
| 1611 |
Fakultas Hukum |
Juli 2026 |
525111 |
Insentif Kelola BLU |
2026-06-15 |
86/UN47.B9/SPP-LS 12 Remun Ins. Kelola/2026 |
2026-07-01 |
1431W |
Rp. 9.000.000 |
16 Hari |
|
| 1612 |
Fakultas Hukum |
Agustus 2026 |
525111 |
Insentif Kelola BLU |
2026-07-09 |
92/UN47.B9/SPP-LS 15 Remun Ins. Kelola/2026 |
2026-08-04 |
1827W |
Rp. 9.000.000 |
26 Hari |
|
| 1613 |
Fakultas Hukum |
Agustus 2026 |
525111 |
Insentif Kelola BLU |
2026-08-31 |
111/UN47.B9/SPP-LS 16 Remun Ins Kelola /2026 |
2026-09-03 |
2193W |
Rp. 9.000.000 |
3 Hari |
|
| 1614 |
Fakultas Hukum |
September 2026 |
525111 |
Insentif Kelola BLU |
2026-09-14 |
126/UN47.B9/SPP-LS 19 Remun Ins Kelola /2026 |
|
|
Rp. 9.000.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1615 |
Fakultas Hukum |
April 2026 |
525119 |
Biaya Pengembangan Sistem Informasi Fakultas |
2026-04-08 |
41/UN47.B9/SPP-LS8/2026 |
2026-04-10 |
0748W |
Rp. 15.000.000 |
2 Hari |
|
| 1616 |
Fakultas Hukum |
Maret 2026 |
525119 |
Biaya Pengembangan Sistem Informasi Pogram Studi (Prodi) |
2026-04-08 |
35/UN47.B9/SPP-GUP 2/2026 |
2026-04-10 |
0751W |
Rp. 6.240.588 |
2 Hari |
|
| 1617 |
Fakultas Hukum |
Oktober 2026 |
525119 |
Biaya Pengembangan Sistem Informasi Pogram Studi (Prodi) |
2026-10-05 |
GU NIHIL 3 |
|
|
Rp. 8.759.412 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 1618 |
Fakultas Hukum |
Maret 2026 |
525111 |
Insentif PPK-UK (1 org x 5 bln) |
2026-04-08 |
33/UN47.B9/SPP-GUP 2/2026 |
2026-04-10 |
0752W |
Rp. 3.450.000 |
2 Hari |
|
| 1619 |
Fakultas Hukum |
April 2026 |
525111 |
Insentif PPK-UK (1 org x 5 bln) |
2026-05-18 |
67/UN47.B9/SPP-GUP 4/2026 |
2026-05-20 |
1107W |
Rp. 1.150.000 |
2 Hari |
|
| 1620 |
Fakultas Hukum |
Mei 2026 |
525111 |
Insentif PPK-UK (1 org x 5 bln) |
2026-06-15 |
82/UN47.B9/SPP-GUP 5/2026 |
2026-06-30 |
1415W |
Rp. 1.150.000 |
15 Hari |
|
| 1621 |
Fakultas Hukum |
Maret 2026 |
525111 |
Insentif Penguji Tagihan/Verifikator UK (1 org x 5 bln) |
2026-04-08 |
33/UN47.B9/SPP-GUP 2/2026 |
2026-04-10 |
0752W |
Rp. 1.410.000 |
2 Hari |
|
| 1622 |
Fakultas Hukum |
April 2026 |
525111 |
Insentif Penguji Tagihan/Verifikator UK (1 org x 5 bln) |
2026-05-18 |
67/UN47.B9/SPP-GUP 4/2026 |
2026-05-20 |
1107W |
Rp. 470.000 |
2 Hari |
|
| 1623 |
Fakultas Hukum |
Mei 2026 |
525111 |
Insentif Penguji Tagihan/Verifikator UK (1 org x 5 bln) |
2026-06-15 |
82/UN47.B9/SPP-GUP 5/2026 |
2026-06-30 |
1415W |
Rp. 470.000 |
15 Hari |
|
| 1624 |
Fakultas Hukum |
Juni 2026 |
525176 |
Insentif PPK-UK (1 org x 7 bln) |
2026-08-12 |
106/UN47.B9/SPP-GUP 6/2026 |
2026-08-20 |
2049W |
Rp. 2.300.000 |
8 Hari |
|
| 1625 |
Fakultas Hukum |
September 2026 |
525176 |
Insentif PPK-UK (1 org x 7 bln) |
2026-09-28 |
140/UN47.B9/SPP-GUP 8/2026 |
|
|
Rp. 1.150.000 |
8 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 06 Oktober 2026 (8 Hari) |
| 1626 |
Fakultas Hukum |
Juni 2026 |
525176 |
Insentif Penguji Tagihan/Verifikator UK (1 org x 7 bln) |
2026-08-12 |
106/UN47.B9/SPP-GUP 6/2026 |
2026-08-20 |
2049W |
Rp. 940.000 |
8 Hari |
|
| 1627 |
Fakultas Hukum |
September 2026 |
525176 |
Insentif Penguji Tagihan/Verifikator UK (1 org x 7 bln) |
2026-09-28 |
140/UN47.B9/SPP-GUP 8/2026 |
|
|
Rp. 940.000 |
8 Hari |
Belum ada SP2D terhitung dari 28 September 2026 hingga 06 Oktober 2026 (8 Hari) |
| 1628 |
Fakultas Hukum |
Oktober 2026 |
525119 |
Bantuan biaya Pendaftaran Terkait Kegiatan Tenaga Pendidik Dalam Perngembangan SDM |
2026-10-05 |
GU NIHIL 3 |
|
|
Rp. 3.000.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 1629 |
Fakultas Hukum |
Juni 2026 |
525115 |
Tiket Perjalanan (PP) bagi Tenaga Kependidikan untuk mengikuti Seminar/Pelatihan Pengembangan Karir |
2026-08-12 |
102/UN47.B9/SPP-GUP 6/2026 |
2026-08-20 |
2048W |
Rp. 1.200.000 |
8 Hari |
|
| 1630 |
Fakultas Hukum |
September 2026 |
525115 |
Tiket Perjalanan (PP) bagi Tenaga Kependidikan untuk mengikuti Seminar/Pelatihan Pengembangan Karir |
2026-09-14 |
TUP NIHIL 3 |
|
|
Rp. 1.400.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1631 |
Fakultas Hukum |
Juni 2026 |
525115 |
Uang Harian bagi Tenaga Kependidikan untuk mengikuti Seminar/Pelatihan Pengembangan Karir |
2026-08-12 |
102/UN47.B9/SPP-GUP 6/2026 |
2026-08-20 |
2048W |
Rp. 2.000.000 |
8 Hari |
|
| 1632 |
Fakultas Hukum |
September 2026 |
525115 |
Uang Harian bagi Tenaga Kependidikan untuk mengikuti Seminar/Pelatihan Pengembangan Karir |
2026-09-14 |
TUP NIHIL 3 |
|
|
Rp. 2.260.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1633 |
Fakultas Hukum |
Juni 2026 |
525115 |
Akomodasi bagi Tenaga Kependidikan untuk mengikuti Seminar/Pelatihan Pengembangan Karir |
2026-08-12 |
102/UN47.B9/SPP-GUP 6/2026 |
2026-08-20 |
2048W |
Rp. 1.950.000 |
8 Hari |
|
| 1634 |
Fakultas Hukum |
September 2026 |
525115 |
Akomodasi bagi Tenaga Kependidikan untuk mengikuti Seminar/Pelatihan Pengembangan Karir |
2026-09-14 |
TUP NIHIL 3 |
|
|
Rp. 4.400.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1635 |
Fakultas Hukum |
Juni 2026 |
525115 |
Tiket Perjalanan (PP) |
2026-08-12 |
102/UN47.B9/SPP-GUP 6/2026 |
2026-08-20 |
2048W |
Rp. 5.303.300 |
8 Hari |
|
| 1636 |
Fakultas Hukum |
Juni 2026 |
525115 |
Uang Harian (1 org x 5 hari) |
2026-08-12 |
102/UN47.B9/SPP-GUP 6/2026 |
2026-08-20 |
2048W |
Rp. 2.962.000 |
8 Hari |
|
| 1637 |
Fakultas Hukum |
Juni 2026 |
525115 |
Akomodasi (1 org x 4 hari) |
2026-08-12 |
102/UN47.B9/SPP-GUP 6/2026 |
2026-08-20 |
2048W |
Rp. 3.736.875 |
8 Hari |
|
| 1638 |
Fakultas Hukum |
April 2026 |
525119 |
Monitoring dan Evaluasi Indikator Kinerja |
2026-05-18 |
69/UN47.B9/SPP-GUP 4/2026 |
2026-05-20 |
1108W |
Rp. 2.640.000 |
2 Hari |
|
| 1639 |
Fakultas Hukum |
Juni 2026 |
525119 |
Pelaksanaa kegiatan Penelitian Kerjasama dengan Institusi Lain Dalam Negeri/Luar Negeri |
2026-06-02 |
74/UN47.B9/SPP-LS 11/2026 |
2026-06-09 |
1280W |
Rp. 20.000.000 |
7 Hari |
|
| 1640 |
Fakultas Hukum |
September 2026 |
525119 |
Pelaksanaa kegiatan Penelitian Kerjasama dengan Institusi Lain Dalam Negeri/Luar Negeri |
2026-08-31 |
115/UN47.B9/SPP-LS 18/2026 |
2026-09-02 |
2185W |
Rp. 20.000.000 |
2 Hari |
|
| 1641 |
Fakultas Hukum |
Juni 2026 |
525119 |
Pelaksanaan kegiatan Penelitian Akselerasi Dosen dan Mahasiswa |
2026-06-02 |
74/UN47.B9/SPP-LS 11/2026 |
2026-06-09 |
1280W |
Rp. 70.000.000 |
7 Hari |
|
| 1642 |
Fakultas Hukum |
September 2026 |
525119 |
Pelaksanaan kegiatan Penelitian Akselerasi Dosen dan Mahasiswa |
2026-08-31 |
115/UN47.B9/SPP-LS 18/2026 |
2026-09-02 |
2185W |
Rp. 30.000.000 |
2 Hari |
|
| 1643 |
Fakultas Hukum |
September 2026 |
525119 |
Bantuan biaya penerbitan Artikel Ilmiah pada Jurnal Terakreditasi/Bereputasi Internasional |
|
|
|
|
Rp. 27.000.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 1644 |
Fakultas Hukum |
Januari 2026 |
525119 |
Biaya Langganan Grammarly Premium, Turnitin/I-Thenticate, Zoom Premium |
2026-03-04 |
11/UN47.B9/SPP-GUP 1/2026 |
2026-03-09 |
0373W |
Rp. 50.000 |
5 Hari |
|
| 1645 |
Fakultas Hukum |
Mei 2026 |
525119 |
Biaya Langganan Grammarly Premium, Turnitin/I-Thenticate, Zoom Premium |
2026-06-15 |
80/UN47.B9/SPP-GUP 5/2026 |
2026-06-30 |
1414W |
Rp. 170.000 |
15 Hari |
|
| 1646 |
Sekretariat Dewan Pengawas |
Mei 2026 |
537112 |
PC All In One |
2026-05-12 |
35/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-05-22 |
1123K |
Rp. 17.610.000 |
10 Hari |
|
| 1647 |
Sekretariat Dewan Pengawas |
Maret 2026 |
525114 |
Pemeliharaan Listrik |
2026-03-09 |
18/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-03-13 |
0530K |
Rp. 15.500.000 |
4 Hari |
|
| 1648 |
Sekretariat Dewan Pengawas |
Agustus 2026 |
525114 |
Pemeliharaan Listrik |
2026-08-26 |
65/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-09-10 |
2249K |
Rp. 15.000.000 |
15 Hari |
|
| 1649 |
Sekretariat Dewan Pengawas |
Juli 2026 |
525114 |
Pemeliharaan Printer |
|
|
|
|
Rp. 1.150.000 |
97 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Juli 2026 hingga 06 Oktober 2026 (97 Hari) |
| 1650 |
Sekretariat Dewan Pengawas |
Agustus 2026 |
525114 |
Pemeliharaan Printer |
|
|
|
|
Rp. 258.000 |
66 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Agustus 2026 hingga 06 Oktober 2026 (66 Hari) |
| 1651 |
Sekretariat Dewan Pengawas |
Februari 2026 |
525112 |
Belanja Konsumsi Berat |
2026-02-24 |
09/UN47.A2/SPP-GU/DEWAS/2026 |
2026-02-26 |
0239K |
Rp. 5.490.000 |
2 Hari |
|
| 1652 |
Sekretariat Dewan Pengawas |
Maret 2026 |
525112 |
Belanja Konsumsi Berat |
2026-03-09 |
20/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-03-13 |
0532K |
Rp. 1.630.000 |
4 Hari |
|
| 1653 |
Sekretariat Dewan Pengawas |
Maret 2026 |
525112 |
Belanja Konsumsi Berat |
2026-04-06 |
22/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-04-07 |
0664K |
Rp. 1.900.000 |
1 Hari |
|
| 1654 |
Sekretariat Dewan Pengawas |
April 2026 |
525112 |
Belanja Konsumsi Berat |
2026-05-12 |
36/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-05-22 |
1124K |
Rp. 2.000.000 |
10 Hari |
|
| 1655 |
Sekretariat Dewan Pengawas |
Mei 2026 |
525112 |
Belanja Konsumsi Berat |
2026-06-11 |
43/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-06-29 |
1374K |
Rp. 2.430.000 |
18 Hari |
|
| 1656 |
Sekretariat Dewan Pengawas |
Juni 2026 |
525112 |
Belanja Konsumsi Berat |
2026-07-01 |
44/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-07-07 |
1533K |
Rp. 2.000.000 |
6 Hari |
|
| 1657 |
Sekretariat Dewan Pengawas |
Juli 2026 |
525112 |
Belanja Konsumsi Berat |
2026-07-21 |
53/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-07-28 |
1715K |
Rp. 4.800.000 |
7 Hari |
|
| 1658 |
Sekretariat Dewan Pengawas |
Agustus 2026 |
525112 |
Belanja Konsumsi Berat |
2026-08-26 |
62/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-09-10 |
2246K |
Rp. 4.060.000 |
15 Hari |
|
| 1659 |
Sekretariat Dewan Pengawas |
September 2026 |
525112 |
Belanja Konsumsi Berat |
2026-09-15 |
66/UN47.A2/SPP-GUP/DEWAS/2026 |
|
|
Rp. 1.090.700 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 1660 |
Sekretariat Dewan Pengawas |
Februari 2026 |
525112 |
Belanja Konsumsi Ringan |
2026-02-24 |
09/UN47.A2/SPP-GU/DEWAS/2026 |
2026-02-26 |
0239K |
Rp. 1.968.000 |
2 Hari |
|
| 1661 |
Sekretariat Dewan Pengawas |
Maret 2026 |
525112 |
Belanja Konsumsi Ringan |
2026-02-24 |
09/UN47.A2/SPP-GU/DEWAS/2026 |
2026-02-26 |
0239K |
Rp. 1.900.000 |
2 Hari |
|
| 1662 |
Sekretariat Dewan Pengawas |
Maret 2026 |
525112 |
Belanja Konsumsi Ringan |
2026-03-02 |
12/UN47.A2/SPP-GU/DEWAS/2026 |
2026-03-03 |
0297K |
Rp. 3.100.000 |
1 Hari |
|
| 1663 |
Sekretariat Dewan Pengawas |
Maret 2026 |
525112 |
Belanja Konsumsi Ringan |
2026-03-09 |
20/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-03-13 |
0532K |
Rp. 1.120.000 |
4 Hari |
|
| 1664 |
Sekretariat Dewan Pengawas |
Maret 2026 |
525112 |
Belanja Konsumsi Ringan |
2026-04-06 |
22/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-04-07 |
0664K |
Rp. 1.238.000 |
1 Hari |
|
| 1665 |
Sekretariat Dewan Pengawas |
April 2026 |
525112 |
Belanja Konsumsi Ringan |
2026-04-13 |
27/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-04-23 |
0868K |
Rp. 613.000 |
10 Hari |
|
| 1666 |
Sekretariat Dewan Pengawas |
April 2026 |
525112 |
Belanja Konsumsi Ringan |
2026-05-12 |
36/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-05-22 |
1124K |
Rp. 1.000.000 |
10 Hari |
|
| 1667 |
Sekretariat Dewan Pengawas |
Mei 2026 |
525112 |
Belanja Konsumsi Ringan |
2026-06-11 |
43/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-06-29 |
1374K |
Rp. 1.785.000 |
18 Hari |
|
| 1668 |
Sekretariat Dewan Pengawas |
Juni 2026 |
525112 |
Belanja Konsumsi Ringan |
2026-07-01 |
44/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-07-07 |
1533K |
Rp. 1.739.000 |
6 Hari |
|
| 1669 |
Sekretariat Dewan Pengawas |
Juli 2026 |
525112 |
Belanja Konsumsi Ringan |
2026-07-09 |
49/UN47.A2/SPP-GUP/DEWAS/202 |
2026-07-16 |
1641K |
Rp. 1.180.000 |
7 Hari |
|
| 1670 |
Sekretariat Dewan Pengawas |
Agustus 2026 |
525112 |
Belanja Konsumsi Ringan |
2026-08-26 |
59/UN47.A2/SPP-TUP NIHIL/DEWAS/2026 |
2026-09-09 |
2226K |
Rp. 7.928.600 |
14 Hari |
|
| 1671 |
Program Pascasarjana |
Maret 2026 |
525114 |
Pemeliharaan AC |
2026-03-31 |
17/UN47.C/SPP-GU/2026 |
2026-04-06 |
0638I |
Rp. 5.640.613 |
6 Hari |
|
| 1672 |
Sekretariat Dewan Pengawas |
Januari 2026 |
525112 |
Belanja kebutuhan dasar perkantoran |
2026-02-12 |
02/UN47.A2/SPP-GU/DEWAS/2026 |
2026-02-20 |
0192K |
Rp. 8.826.000 |
8 Hari |
|
| 1673 |
Sekretariat Dewan Pengawas |
Januari 2026 |
525112 |
Belanja kebutuhan dasar perkantoran |
2026-02-20 |
05/UN47.A2/SPP-TUP NIHIL DEWAS/2026 |
2026-02-24 |
0223K |
Rp. 8.924.780 |
4 Hari |
|
| 1674 |
Program Pascasarjana |
Juli 2026 |
525114 |
Pemeliharaan AC |
2026-08-13 |
72/UN47.C/SPP-GU/2026 |
2026-09-16 |
2343I |
Rp. 1.862.245 |
34 Hari |
|
| 1675 |
Program Pascasarjana |
Agustus 2026 |
525114 |
Pemeliharaan AC |
2026-08-13 |
72/UN47.C/SPP-GU/2026 |
2026-09-16 |
2343I |
Rp. 2.510.204 |
34 Hari |
|
| 1676 |
Sekretariat Dewan Pengawas |
Maret 2026 |
525112 |
Belanja kebutuhan dasar perkantoran |
2026-03-02 |
12/UN47.A2/SPP-GU/DEWAS/2026 |
2026-03-03 |
0297K |
Rp. 7.377.200 |
1 Hari |
|
| 1677 |
Sekretariat Dewan Pengawas |
Maret 2026 |
525112 |
Belanja kebutuhan dasar perkantoran |
2026-03-09 |
20/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-03-13 |
0532K |
Rp. 1.750.000 |
4 Hari |
|
| 1678 |
Program Pascasarjana |
September 2026 |
525114 |
Pemeliharaan AC |
2026-09-25 |
138/UN47.C/SPP-GU/2026 |
|
|
Rp. 1.833.028 |
11 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 06 Oktober 2026 (11 Hari) |
| 1679 |
Sekretariat Dewan Pengawas |
April 2026 |
525112 |
Belanja kebutuhan dasar perkantoran |
2026-04-13 |
27/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-04-23 |
0868K |
Rp. 1.750.000 |
10 Hari |
|
| 1680 |
Sekretariat Dewan Pengawas |
April 2026 |
525112 |
Belanja kebutuhan dasar perkantoran |
2026-05-12 |
36/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-05-22 |
1124K |
Rp. 18.273.289 |
10 Hari |
|
| 1681 |
Program Pascasarjana |
Maret 2026 |
525114 |
Pemeliharaan Jaringan Listrik dan Air |
2026-03-31 |
17/UN47.C/SPP-GU/2026 |
2026-04-06 |
0638I |
Rp. 1.745.000 |
6 Hari |
|
| 1682 |
Sekretariat Dewan Pengawas |
Mei 2026 |
525112 |
Belanja kebutuhan dasar perkantoran |
2026-05-12 |
36/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-05-22 |
1124K |
Rp. 1.750.000 |
10 Hari |
|
| 1683 |
Sekretariat Dewan Pengawas |
Mei 2026 |
525112 |
Belanja kebutuhan dasar perkantoran |
2026-06-11 |
43/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-06-29 |
1374K |
Rp. 7.559.000 |
18 Hari |
|
| 1684 |
Program Pascasarjana |
Juni 2026 |
525114 |
Pemeliharaan Jaringan Listrik dan Air |
2026-05-18 |
27/UN47.C/SPP-GU/2026 |
2026-06-03 |
1208I |
Rp. 3.284.694 |
16 Hari |
|
| 1685 |
Program Pascasarjana |
Juni 2026 |
525114 |
Pemeliharaan Jaringan Listrik dan Air |
2026-07-09 |
44/UN47.C/SPTB-GU/2026 |
2026-07-29 |
1732I |
Rp. 3.829.051 |
20 Hari |
|
| 1686 |
Sekretariat Dewan Pengawas |
Juni 2026 |
525112 |
Belanja kebutuhan dasar perkantoran |
2026-07-01 |
44/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-07-07 |
1533K |
Rp. 1.000.000 |
6 Hari |
|
| 1687 |
Sekretariat Dewan Pengawas |
Juni 2026 |
525112 |
Belanja kebutuhan dasar perkantoran |
2026-07-21 |
53/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-07-28 |
1715K |
Rp. 5.250.000 |
7 Hari |
|
| 1688 |
Program Pascasarjana |
Juni 2026 |
525114 |
Pemeliharaan Komputer |
2026-07-09 |
44/UN47.C/SPTB-GU/2026 |
2026-07-29 |
1732I |
Rp. 2.491.837 |
20 Hari |
|
| 1689 |
Sekretariat Dewan Pengawas |
Agustus 2026 |
525112 |
Belanja kebutuhan dasar perkantoran |
2026-08-26 |
59/UN47.A2/SPP-TUP NIHIL/DEWAS/2026 |
2026-09-09 |
2226K |
Rp. 6.111.600 |
14 Hari |
|
| 1690 |
Program Pascasarjana |
Agustus 2026 |
525114 |
Pemeliharaan Komputer |
2026-08-13 |
72/UN47.C/SPP-GU/2026 |
2026-09-16 |
2343I |
Rp. 1.224.490 |
34 Hari |
|
| 1691 |
Sekretariat Dewan Pengawas |
September 2026 |
525112 |
Belanja kebutuhan dasar perkantoran |
2026-09-15 |
66/UN47.A2/SPP-GUP/DEWAS/2026 |
|
|
Rp. 2.075.300 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 1692 |
Program Pascasarjana |
Mei 2026 |
525114 |
Pemeliharaaan Gedung Kuliah |
2026-05-05 |
55/UN47.C/SPP-LS/2026 |
2026-07-15 |
1638I |
Rp. 37.480.000 |
71 Hari |
|
| 1693 |
Sekretariat Dewan Pengawas |
Februari 2026 |
525119 |
Pelaksanaan Audit Eksternal oleh Kantor Akuntan Publik
(KAP) |
2026-02-22 |
08/UN47.A2/SPP-LS/DEWAS/2026 |
2026-02-25 |
0232K |
Rp. 40.526.933 |
3 Hari |
|
| 1694 |
Sekretariat Dewan Pengawas |
April 2026 |
525119 |
Pelaksanaan Audit Eksternal oleh Kantor Akuntan Publik
(KAP) |
2026-04-09 |
26/UN47.A2/SPP-LS/DEWAS/2026 |
2026-04-15 |
0791K |
Rp. 54.035.910 |
6 Hari |
|
| 1695 |
Program Pascasarjana |
Juni 2026 |
525115 |
Biaya Perjalanan Kegiatan Asosiasi/Forum Ilmiah |
2026-06-09 |
36/UN47.C/SPP-LS/2026 |
2026-07-06 |
1502I |
Rp. 18.654.172 |
27 Hari |
|
| 1696 |
Sekretariat Dewan Pengawas |
Mei 2026 |
525119 |
Pelaksanaan Audit Eksternal oleh Kantor Akuntan Publik
(KAP) |
2026-05-06 |
34/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-05-13 |
1050K |
Rp. 40.526.933 |
7 Hari |
|
| 1697 |
Program Pascasarjana |
Juni 2026 |
525115 |
Biaya Perjalanan Kegiatan Asosiasi/Forum Ilmiah |
2026-07-14 |
2/UN47.C/SPTB-LS/2026 |
2026-07-29 |
1746I |
Rp. 17.613.440 |
15 Hari |
|
| 1698 |
Sekretariat Dewan Pengawas |
Juli 2026 |
525119 |
Pelaksanaan Audit Eksternal oleh Kantor Akuntan Publik
(KAP) |
|
|
|
|
Rp. 5.000.000 |
97 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Juli 2026 hingga 06 Oktober 2026 (97 Hari) |
| 1699 |
Program Pascasarjana |
Juli 2026 |
525115 |
Biaya Perjalanan Kegiatan Asosiasi/Forum Ilmiah |
2026-07-14 |
2/UN47.C/SPTB-LS/2026 |
2026-07-29 |
1746I |
Rp. 1.433.600 |
15 Hari |
|
| 1700 |
Program Pascasarjana |
Agustus 2026 |
525115 |
Biaya Perjalanan Kegiatan Asosiasi/Forum Ilmiah |
2026-08-24 |
82/UN47.C/SPP-LS/2026 |
2026-09-02 |
2178I |
Rp. 40.189.020 |
9 Hari |
|
| 1701 |
Sekretariat Dewan Pengawas |
Agustus 2026 |
525119 |
Penyusunan SOP/Panduan Terkait Dewan Pengawas |
2026-08-26 |
64/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-09-10 |
2248K |
Rp. 10.000.000 |
15 Hari |
|
| 1702 |
Program Pascasarjana |
September 2026 |
525115 |
Biaya Perjalanan Kegiatan Asosiasi/Forum Ilmiah |
2026-09-10 |
106/UN47.C/SPP-LS/2026 |
|
|
Rp. 8.261.360 |
26 Hari |
Belum ada SP2D terhitung dari 10 September 2026 hingga 06 Oktober 2026 (26 Hari) |
| 1703 |
Sekretariat Dewan Pengawas |
September 2026 |
525119 |
Penyusunan SOP/Panduan Terkait Dewan Pengawas |
|
|
|
|
Rp. 9.600.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 1704 |
Program Pascasarjana |
Oktober 2026 |
525115 |
Biaya Perjalanan Kegiatan Asosiasi/Forum Ilmiah |
2026-10-01 |
150/UN47.C/SPP-LS/2026 |
|
|
Rp. 3.506.000 |
5 Hari |
Belum ada SP2D terhitung dari 01 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1705 |
Sekretariat Dewan Pengawas |
Maret 2026 |
525119 |
Monitoring dan Evaluasi Capaian Kontrak Kinerja Rektor
Tahun 2025 |
2026-02-24 |
10/UN47.A2/SPP-GU/DEWAS/2026 |
2026-02-26 |
0238K |
Rp. 30.000.000 |
2 Hari |
|
| 1706 |
Program Pascasarjana |
Juni 2026 |
525115 |
Biaya Uang Harian Asosiasi/Forum Ilmiah |
2026-06-09 |
36/UN47.C/SPP-LS/2026 |
2026-07-06 |
1502I |
Rp. 7.990.000 |
27 Hari |
|
| 1707 |
Program Pascasarjana |
Juni 2026 |
525115 |
Biaya Uang Harian Asosiasi/Forum Ilmiah |
2026-07-14 |
2/UN47.C/SPTB-LS/2026 |
2026-07-29 |
1746I |
Rp. 4.700.000 |
15 Hari |
|
| 1708 |
Sekretariat Dewan Pengawas |
Agustus 2026 |
525119 |
Monitoring dan Evaluasi Capaian Kontrak Kinerja Rektor
Tahun 2025 |
2026-08-03 |
55/UN47.A2/SPP-LS/DEWAS/2026 |
2026-08-13 |
1954K |
Rp. 25.000.000 |
10 Hari |
|
| 1709 |
Program Pascasarjana |
Juli 2026 |
525115 |
Biaya Uang Harian Asosiasi/Forum Ilmiah |
2026-07-14 |
2/UN47.C/SPTB-LS/2026 |
2026-07-29 |
1746I |
Rp. 3.350.000 |
15 Hari |
|
| 1710 |
Sekretariat Dewan Pengawas |
Januari 2026 |
525119 |
Bantuan Penyelenggaraan Kegiatan Tindak Lanjuti
Rekomendasi Dewas |
2026-02-12 |
03/UN47.A2/SPP-GU/DEWAS/2026 |
2026-02-20 |
0193K |
Rp. 17.500.000 |
8 Hari |
|
| 1711 |
Program Pascasarjana |
Agustus 2026 |
525115 |
Biaya Uang Harian Asosiasi/Forum Ilmiah |
2026-08-24 |
82/UN47.C/SPP-LS/2026 |
2026-09-02 |
2178I |
Rp. 16.444.400 |
9 Hari |
|
| 1712 |
Sekretariat Dewan Pengawas |
September 2026 |
525119 |
Bantuan Penyelenggaraan Kegiatan Tindak Lanjuti
Rekomendasi Dewas |
2026-02-24 |
10/UN47.A2/SPP-GU/DEWAS/2026 |
2026-02-26 |
0238K |
Rp. 15.000.000 |
2 Hari |
|
| 1713 |
Program Pascasarjana |
September 2026 |
525115 |
Biaya Uang Harian Asosiasi/Forum Ilmiah |
2026-09-10 |
106/UN47.C/SPP-LS/2026 |
|
|
Rp. 990.000 |
26 Hari |
Belum ada SP2D terhitung dari 10 September 2026 hingga 06 Oktober 2026 (26 Hari) |
| 1714 |
Sekretariat Dewan Pengawas |
Maret 2026 |
525119 |
Bantuan Penyelenggaraan Kegiatan Tindak Lanjuti
Rekomendasi Dewas |
2026-03-02 |
14/UN47.A2/SPP-GU/DEWAS/2026 |
2026-03-03 |
0295K |
Rp. 25.000.000 |
1 Hari |
|
| 1715 |
Sekretariat Dewan Pengawas |
Maret 2026 |
525119 |
Bantuan Penyelenggaraan Kegiatan Tindak Lanjuti
Rekomendasi Dewas |
2026-03-09 |
17/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-03-13 |
0529K |
Rp. 30.000.000 |
4 Hari |
|
| 1716 |
Sekretariat Dewan Pengawas |
Maret 2026 |
525119 |
Bantuan Penyelenggaraan Kegiatan Tindak Lanjuti
Rekomendasi Dewas |
2026-04-06 |
23/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-04-07 |
0667K |
Rp. 25.000.000 |
1 Hari |
|
| 1717 |
Program Pascasarjana |
Juni 2026 |
525115 |
Biaya Penginapan Kegiatan Asosiasi/Forum Ilmiah |
2026-06-09 |
36/UN47.C/SPP-LS/2026 |
2026-07-06 |
1502I |
Rp. 3.976.800 |
27 Hari |
|
| 1718 |
Program Pascasarjana |
Juni 2026 |
525115 |
Biaya Penginapan Kegiatan Asosiasi/Forum Ilmiah |
2026-07-14 |
2/UN47.C/SPTB-LS/2026 |
2026-07-29 |
1746I |
Rp. 8.278.798 |
15 Hari |
|
| 1719 |
Sekretariat Dewan Pengawas |
April 2026 |
525119 |
Bantuan Penyelenggaraan Kegiatan Tindak Lanjuti
Rekomendasi Dewas |
2026-04-13 |
29/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-04-23 |
0870K |
Rp. 25.000.000 |
10 Hari |
|
| 1720 |
Program Pascasarjana |
Juli 2026 |
525115 |
Biaya Penginapan Kegiatan Asosiasi/Forum Ilmiah |
2026-07-14 |
2/UN47.C/SPTB-LS/2026 |
2026-07-29 |
1746I |
Rp. 1.760.000 |
15 Hari |
|
| 1721 |
Sekretariat Dewan Pengawas |
Mei 2026 |
525119 |
Bantuan Penyelenggaraan Kegiatan Tindak Lanjuti
Rekomendasi Dewas |
2026-05-12 |
38/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-05-22 |
1126K |
Rp. 8.500.000 |
10 Hari |
|
| 1722 |
Sekretariat Dewan Pengawas |
Mei 2026 |
525119 |
Bantuan Penyelenggaraan Kegiatan Tindak Lanjuti
Rekomendasi Dewas |
2026-06-11 |
41/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-06-29 |
1375K |
Rp. 30.000.000 |
18 Hari |
|
| 1723 |
Program Pascasarjana |
Agustus 2026 |
525115 |
Biaya Penginapan Kegiatan Asosiasi/Forum Ilmiah |
2026-08-24 |
82/UN47.C/SPP-LS/2026 |
2026-09-02 |
2178I |
Rp. 8.149.090 |
9 Hari |
|
| 1724 |
Sekretariat Dewan Pengawas |
Juni 2026 |
525119 |
Bantuan Penyelenggaraan Kegiatan Tindak Lanjuti
Rekomendasi Dewas |
2026-07-01 |
46/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-07-07 |
1535K |
Rp. 7.500.000 |
6 Hari |
|
| 1725 |
Program Pascasarjana |
September 2026 |
525115 |
Biaya Penginapan Kegiatan Asosiasi/Forum Ilmiah |
2026-09-10 |
106/UN47.C/SPP-LS/2026 |
|
|
Rp. 2.194.442 |
26 Hari |
Belum ada SP2D terhitung dari 10 September 2026 hingga 06 Oktober 2026 (26 Hari) |
| 1726 |
Sekretariat Dewan Pengawas |
Juli 2026 |
525119 |
Bantuan Penyelenggaraan Kegiatan Tindak Lanjuti
Rekomendasi Dewas |
2026-07-09 |
50/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-07-16 |
1642K |
Rp. 20.000.000 |
7 Hari |
|
| 1727 |
Sekretariat Dewan Pengawas |
Juli 2026 |
525119 |
Bantuan Penyelenggaraan Kegiatan Tindak Lanjuti
Rekomendasi Dewas |
2026-07-21 |
54/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-07-28 |
1716K |
Rp. 20.000.000 |
7 Hari |
|
| 1728 |
Program Pascasarjana |
Agustus 2026 |
525119 |
Bantuan Biaya Registrasi Asosiasi/Forum Ilmiah |
2026-05-18 |
32/UN47.C/SPP-GU/2026 |
2026-06-03 |
1209I |
Rp. 4.515.000 |
16 Hari |
|
| 1729 |
Sekretariat Dewan Pengawas |
Agustus 2026 |
525119 |
Bantuan Penyelenggaraan Kegiatan Tindak Lanjuti
Rekomendasi Dewas |
2026-08-03 |
55/UN47.A2/SPP-LS/DEWAS/2026 |
2026-08-13 |
1954K |
Rp. 20.000.000 |
10 Hari |
|
| 1730 |
Program Pascasarjana |
Agustus 2026 |
525119 |
Bantuan Biaya Registrasi Asosiasi/Forum Ilmiah |
2026-07-14 |
54/UN47.C/SPP-LS/2026 |
2026-07-29 |
1759I |
Rp. 1.400.000 |
15 Hari |
|
| 1731 |
Sekretariat Dewan Pengawas |
Agustus 2026 |
525119 |
Bantuan Penyelenggaraan Kegiatan Tindak Lanjuti
Rekomendasi Dewas |
2026-08-26 |
64/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-09-10 |
2248K |
Rp. 26.000.000 |
15 Hari |
|
| 1732 |
Program Pascasarjana |
September 2026 |
525119 |
Bantuan Biaya Registrasi Asosiasi/Forum Ilmiah |
2026-08-24 |
84/UN47.C/SPP-LS/2026 |
2026-09-02 |
2179I |
Rp. 5.600.000 |
9 Hari |
|
| 1733 |
Sekretariat Dewan Pengawas |
September 2026 |
525119 |
Bantuan Penyelenggaraan Kegiatan Tindak Lanjuti
Rekomendasi Dewas |
2026-09-15 |
68/UN47.A2/SPP-GUP/DEWAS/2026 |
|
|
Rp. 7.500.000 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 1734 |
Program Pascasarjana |
September 2026 |
525119 |
Bantuan Biaya Registrasi Asosiasi/Forum Ilmiah |
2026-09-10 |
108/UN47.C/SPP-LS/2026 |
|
|
Rp. 5.750.000 |
26 Hari |
Belum ada SP2D terhitung dari 10 September 2026 hingga 06 Oktober 2026 (26 Hari) |
| 1735 |
Program Pascasarjana |
September 2026 |
525119 |
Bantuan Biaya Registrasi Asosiasi/Forum Ilmiah |
2026-09-25 |
144/UN47.C/SPP-GU/2026 |
|
|
Rp. 1.300.000 |
11 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 06 Oktober 2026 (11 Hari) |
| 1736 |
Sekretariat Dewan Pengawas |
Januari 2026 |
525119 |
Paket Meeting |
2026-02-20 |
07/UN47.A2/SPP-TUP NIHIL DEWAS/2026 |
2026-02-24 |
0222K |
Rp. 17.940.000 |
4 Hari |
|
| 1737 |
Program Pascasarjana |
Maret 2026 |
525119 |
Bantuan Biaya Penerbitan Jurnal IA/MOA/Artikel Bersama |
2026-07-31 |
68/UN47.C/SPP-LS/2026 |
2026-08-11 |
1874I |
Rp. 3.000.000 |
11 Hari |
|
| 1738 |
Sekretariat Dewan Pengawas |
Maret 2026 |
525119 |
Paket Meeting |
2026-03-09 |
17/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-03-13 |
0529K |
Rp. 13.000.000 |
4 Hari |
|
| 1739 |
Program Pascasarjana |
Agustus 2026 |
525119 |
Bantuan Biaya Penerbitan Jurnal IA/MOA/Artikel Bersama |
2026-08-15 |
80/UN47.C/SPP-LS/2026 |
2026-08-28 |
2121I |
Rp. 15.000.000 |
13 Hari |
|
| 1740 |
Sekretariat Dewan Pengawas |
Agustus 2026 |
525119 |
Paket Meeting |
2026-08-26 |
61/UN47.A2/SPP-TUP NIHIL/DEWAS/2026 |
2026-09-09 |
2225K |
Rp. 18.710.000 |
14 Hari |
|
| 1741 |
Sekretariat Dewan Pengawas |
Agustus 2026 |
525115 |
Tiket Perjalanan Dinas PP |
2026-08-15 |
80/UN47.C/SPP-LS/2026 |
2026-08-28 |
2121I |
Rp. 5.000.000 |
13 Hari |
|
| 1742 |
Sekretariat Dewan Pengawas |
Januari 2026 |
525115 |
Tiket Perjalanan Dinas PP |
2026-02-20 |
06/UN47.A2/SPP-TUP NIHIL DEWAS/2026 |
2026-02-24 |
0221K |
Rp. 68.275.220 |
4 Hari |
|
| 1743 |
Sekretariat Dewan Pengawas |
Oktober 2026 |
525115 |
Tiket Perjalanan Dinas PP |
2026-10-01 |
152/UN47.C/SPP-LS/2026 |
|
|
Rp. 5.000.000 |
5 Hari |
Belum ada SP2D terhitung dari 01 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1744 |
Sekretariat Dewan Pengawas |
Maret 2026 |
525115 |
Tiket Perjalanan Dinas PP |
2026-03-02 |
13/UN47.A2/SPP-GU/DEWAS/2026 |
2026-03-03 |
0296K |
Rp. 10.900.800 |
1 Hari |
|
| 1745 |
Sekretariat Dewan Pengawas |
Juni 2026 |
525115 |
Tiket Perjalanan Dinas PP |
2026-05-06 |
32/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-05-13 |
1048K |
Rp. 18.705.540 |
7 Hari |
|
| 1746 |
Program Pascasarjana |
Juni 2026 |
525119 |
Bantuan Biaya Akreditasi Prodi |
2026-05-18 |
32/UN47.C/SPP-GU/2026 |
2026-06-03 |
1209I |
Rp. 15.985.704 |
16 Hari |
|
| 1747 |
Sekretariat Dewan Pengawas |
Juni 2026 |
525115 |
Tiket Perjalanan Dinas PP |
2026-05-12 |
37/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-05-22 |
1125K |
Rp. 9.252.711 |
10 Hari |
|
| 1748 |
Program Pascasarjana |
Juni 2026 |
525119 |
Bantuan Biaya Akreditasi Prodi |
2026-07-09 |
48/UN47.C/SPP-GU/2026 |
2026-07-29 |
1731I |
Rp. 56.832.868 |
20 Hari |
|
| 1749 |
Sekretariat Dewan Pengawas |
Agustus 2026 |
525115 |
Tiket Perjalanan Dinas PP |
2026-07-01 |
45/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-07-07 |
1534K |
Rp. 12.099.000 |
6 Hari |
|
| 1750 |
Program Pascasarjana |
Agustus 2026 |
525119 |
Bantuan Biaya Akreditasi Prodi |
2026-08-13 |
76/UN47.C/SPP-GU/2026 |
2026-09-16 |
2345I |
Rp. 35.700.000 |
34 Hari |
|
| 1751 |
Sekretariat Dewan Pengawas |
Agustus 2026 |
525115 |
Tiket Perjalanan Dinas PP |
2026-08-26 |
60/UN47.A2/SPP-TUP NIHIL/DEWAS/2026 |
2026-09-09 |
2224K |
Rp. 36.804.260 |
14 Hari |
|
| 1752 |
Program Pascasarjana |
September 2026 |
525119 |
Bantuan Biaya Akreditasi Prodi |
2026-09-25 |
144/UN47.C/SPP-GU/2026 |
|
|
Rp. 32.893.597 |
11 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 06 Oktober 2026 (11 Hari) |
| 1753 |
Program Pascasarjana |
September 2026 |
525119 |
Bantuan Biaya Akreditasi Prodi |
2026-09-30 |
146/UN47.C/SPP-GU/2026 |
|
|
Rp. 33.370.216 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 1754 |
Sekretariat Dewan Pengawas |
Januari 2026 |
525115 |
Hotel/Penginapan Terkait Perjalanan Dinas |
2026-02-20 |
06/UN47.A2/SPP-TUP NIHIL DEWAS/2026 |
2026-02-24 |
0221K |
Rp. 32.280.000 |
4 Hari |
|
| 1755 |
Program Pascasarjana |
Oktober 2026 |
525119 |
Bantuan Biaya Akreditasi Prodi |
2026-10-01 |
152/UN47.C/SPP-LS/2026 |
|
|
Rp. 6.544.200 |
5 Hari |
Belum ada SP2D terhitung dari 01 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1756 |
Sekretariat Dewan Pengawas |
Maret 2026 |
525115 |
Hotel/Penginapan Terkait Perjalanan Dinas |
2026-03-02 |
13/UN47.A2/SPP-GU/DEWAS/2026 |
2026-03-03 |
0296K |
Rp. 3.360.000 |
1 Hari |
|
| 1757 |
Sekretariat Dewan Pengawas |
April 2026 |
525115 |
Hotel/Penginapan Terkait Perjalanan Dinas |
2026-04-13 |
28/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-04-23 |
0869K |
Rp. 3.045.000 |
10 Hari |
|
| 1758 |
Program Pascasarjana |
Maret 2026 |
525112 |
Biaya Kebutuhan dasar Perkantoran Dalam Negeri |
2026-03-31 |
15/UN47.C/SPP-GU/2026 |
2026-04-06 |
0637I |
Rp. 51.447.509 |
6 Hari |
|
| 1759 |
Sekretariat Dewan Pengawas |
Mei 2026 |
525115 |
Hotel/Penginapan Terkait Perjalanan Dinas |
2026-05-06 |
32/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-05-13 |
1048K |
Rp. 5.608.711 |
7 Hari |
|
| 1760 |
Program Pascasarjana |
Juni 2026 |
525112 |
Biaya Kebutuhan dasar Perkantoran Dalam Negeri |
2026-05-18 |
25/UN47.C/SPP-GU/2026 |
2026-06-03 |
1207I |
Rp. 28.372.452 |
16 Hari |
|
| 1761 |
Program Pascasarjana |
Juni 2026 |
525112 |
Biaya Kebutuhan dasar Perkantoran Dalam Negeri |
2026-07-09 |
42/UN47.C/SPP-GU/2026 |
2026-07-29 |
1730I |
Rp. 2.381.200 |
20 Hari |
|
| 1762 |
Sekretariat Dewan Pengawas |
Juni 2026 |
525115 |
Hotel/Penginapan Terkait Perjalanan Dinas |
2026-07-01 |
45/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-07-07 |
1534K |
Rp. 3.900.000 |
6 Hari |
|
| 1763 |
Program Pascasarjana |
Agustus 2026 |
525112 |
Biaya Kebutuhan dasar Perkantoran Dalam Negeri |
2026-08-13 |
70/UN47.C/SPP-GU/2026 |
2026-09-16 |
2342I |
Rp. 3.269.100 |
34 Hari |
|
| 1764 |
Sekretariat Dewan Pengawas |
September 2026 |
525115 |
Hotel/Penginapan Terkait Perjalanan Dinas |
2026-08-26 |
60/UN47.A2/SPP-TUP NIHIL/DEWAS/2026 |
2026-09-09 |
2224K |
Rp. 4.651.000 |
14 Hari |
|
| 1765 |
Program Pascasarjana |
September 2026 |
525112 |
Biaya Kebutuhan dasar Perkantoran Dalam Negeri |
2026-09-27 |
136/UN47.C/SPP-GU/2026 |
|
|
Rp. 6.750.000 |
9 Hari |
Belum ada SP2D terhitung dari 27 September 2026 hingga 06 Oktober 2026 (9 Hari) |
| 1766 |
Sekretariat Dewan Pengawas |
September 2026 |
525115 |
Hotel/Penginapan Terkait Perjalanan Dinas |
2026-08-26 |
63/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-09-10 |
2247K |
Rp. 3.780.000 |
15 Hari |
|
| 1767 |
Program Pascasarjana |
September 2026 |
525112 |
Biaya Kebutuhan dasar Perkantoran Dalam Negeri |
2026-10-01 |
148/UN47.C/SPP-LS/2026 |
|
|
Rp. 2.152.000 |
5 Hari |
Belum ada SP2D terhitung dari 01 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1768 |
Sekretariat Dewan Pengawas |
September 2026 |
525115 |
Hotel/Penginapan Terkait Perjalanan Dinas |
2026-09-15 |
67/UN47.A2/SPP-GUP/DEWAS/2026 |
|
|
Rp. 1.650.000 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 1769 |
Program Pascasarjana |
April 2026 |
525119 |
Insentif tambahan Penguji Proposal, Kelayakan dan Ujian Tesis |
2026-04-28 |
35/UN47.C/SPP-LS/2026 |
2026-07-02 |
1461I |
Rp. 72.510.400 |
65 Hari |
|
| 1770 |
Program Pascasarjana |
April 2026 |
525119 |
Insentif tambahan Penguji Proposal, Kelayakan dan Ujian Tesis |
2026-04-30 |
43/UN47.C/SPP-LS/2026 |
2026-06-30 |
1387I |
Rp. 12.320.000 |
61 Hari |
|
| 1771 |
Sekretariat Dewan Pengawas |
Januari 2026 |
525115 |
Taksi Bandara Lokal dan Tempat Tujuan |
2026-02-20 |
06/UN47.A2/SPP-TUP NIHIL DEWAS/2026 |
2026-02-24 |
0221K |
Rp. 12.000.000 |
4 Hari |
|
| 1772 |
Program Pascasarjana |
Agustus 2026 |
525119 |
Insentif tambahan Penguji Proposal, Kelayakan dan Ujian Tesis |
2026-08-29 |
94/UN47.C/SPP-LS/2026 |
|
|
Rp. 9.150.000 |
38 Hari |
Belum ada SP2D terhitung dari 29 Agustus 2026 hingga 06 Oktober 2026 (38 Hari) |
| 1773 |
Program Pascasarjana |
Agustus 2026 |
525119 |
Insentif tambahan Penguji Proposal, Kelayakan dan Ujian Tesis |
2026-08-31 |
96/UN47.C/SPP-LS/2026 |
|
|
Rp. 2.600.000 |
36 Hari |
Belum ada SP2D terhitung dari 31 Agustus 2026 hingga 06 Oktober 2026 (36 Hari) |
| 1774 |
Sekretariat Dewan Pengawas |
Maret 2026 |
525115 |
Taksi Bandara Lokal dan Tempat Tujuan |
2026-03-02 |
13/UN47.A2/SPP-GU/DEWAS/2026 |
2026-03-03 |
0296K |
Rp. 2.000.000 |
1 Hari |
|
| 1775 |
Program Pascasarjana |
Mei 2026 |
525119 |
Insentif tambahan Penguji Proposal, Kelayakan dan Ujian Tesis |
2026-09-11 |
116/UN47.C/SPP-LS/2026 |
|
|
Rp. 3.050.000 |
25 Hari |
Belum ada SP2D terhitung dari 11 September 2026 hingga 06 Oktober 2026 (25 Hari) |
| 1776 |
Program Pascasarjana |
Mei 2026 |
525119 |
Insentif tambahan Penguji Proposal, Kelayakan dan Ujian Tesis |
2026-09-11 |
120/UN47.C/SPP-LS/2026 |
|
|
Rp. 16.500.000 |
25 Hari |
Belum ada SP2D terhitung dari 11 September 2026 hingga 06 Oktober 2026 (25 Hari) |
| 1777 |
Program Pascasarjana |
Mei 2026 |
525119 |
Insentif tambahan Penguji Proposal, Kelayakan dan Ujian Tesis |
2026-09-11 |
124/UN47.C/SPP-LS/2026 |
|
|
Rp. 15.250.000 |
25 Hari |
Belum ada SP2D terhitung dari 11 September 2026 hingga 06 Oktober 2026 (25 Hari) |
| 1778 |
Program Pascasarjana |
Mei 2026 |
525119 |
Insentif tambahan Penguji Proposal, Kelayakan dan Ujian Tesis |
2026-09-14 |
128/UN47.C/SPP-LS/2026 |
|
|
Rp. 3.750.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1779 |
Sekretariat Dewan Pengawas |
Juni 2026 |
525115 |
Taksi Bandara Lokal dan Tempat Tujuan |
2026-07-01 |
45/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-07-07 |
1534K |
Rp. 2.000.000 |
6 Hari |
|
| 1780 |
Program Pascasarjana |
Mei 2026 |
525119 |
Insentif tambahan Penguji Proposal, Kelayakan dan Ujian Tesis |
2026-09-14 |
134/UN47.C/SPP-LS/2026 |
|
|
Rp. 22.500.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1781 |
Program Pascasarjana |
Mei 2026 |
525119 |
Insentif tambahan Penguji Proposal, Kelayakan dan Ujian Tesis |
2026-10-02 |
154/UN47.C/SPP-LS/2026 |
|
|
Rp. 29.500.000 |
4 Hari |
Belum ada SP2D terhitung dari 02 Oktober 2026 hingga 06 Oktober 2026 (4 Hari) |
| 1782 |
Sekretariat Dewan Pengawas |
Agustus 2026 |
525115 |
Taksi Bandara Lokal dan Tempat Tujuan |
2026-08-26 |
63/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-09-10 |
2247K |
Rp. 1.200.000 |
15 Hari |
|
| 1783 |
Program Pascasarjana |
Oktober 2026 |
525119 |
Insentif tambahan Penguji Proposal, Kelayakan dan Ujian Tesis |
|
|
|
|
Rp. 5.200.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1784 |
Sekretariat Dewan Pengawas |
September 2026 |
525115 |
Taksi Bandara Lokal dan Tempat Tujuan |
2026-09-15 |
67/UN47.A2/SPP-GUP/DEWAS/2026 |
|
|
Rp. 700.000 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 1785 |
Program Pascasarjana |
April 2026 |
525119 |
Insentif Tambahan Mengajar Semester Ganjil 2025/2026 |
2026-04-22 |
31/UN47.C/SPP-LS/2026 |
2026-07-02 |
1462I |
Rp. 58.360.000 |
71 Hari |
|
| 1786 |
Program Pascasarjana |
April 2026 |
525119 |
Insentif Tambahan Mengajar Semester Ganjil 2025/2026 |
2026-04-28 |
37/UN47.C/SPP-LS/2026 |
2026-07-02 |
1463I |
Rp. 32.578.400 |
65 Hari |
|
| 1787 |
Sekretariat Dewan Pengawas |
Januari 2026 |
525115 |
Uang Harian |
2026-02-20 |
06/UN47.A2/SPP-TUP NIHIL DEWAS/2026 |
2026-02-24 |
0221K |
Rp. 15.580.000 |
4 Hari |
|
| 1788 |
Program Pascasarjana |
April 2026 |
525119 |
Insentif Tambahan Mengajar Semester Ganjil 2025/2026 |
2026-04-30 |
45/UN47.C/SPP-LS/2026 |
2026-06-30 |
1388I |
Rp. 8.600.000 |
61 Hari |
|
| 1789 |
Sekretariat Dewan Pengawas |
Mei 2026 |
525115 |
Uang Harian |
2026-03-02 |
13/UN47.A2/SPP-GU/DEWAS/2026 |
2026-03-03 |
0296K |
Rp. 4.240.000 |
1 Hari |
|
| 1790 |
Program Pascasarjana |
Mei 2026 |
525119 |
Insentif Tambahan Mengajar Semester Ganjil 2025/2026 |
2026-04-21 |
29/UN47.C/SPP-LS/2026 |
2026-05-26 |
1159I |
Rp. 28.560.000 |
35 Hari |
|
| 1791 |
Sekretariat Dewan Pengawas |
Mei 2026 |
525115 |
Uang Harian |
2026-05-06 |
32/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-05-13 |
1048K |
Rp. 6.360.000 |
7 Hari |
|
| 1792 |
Program Pascasarjana |
Juni 2026 |
525119 |
Insentif Tambahan Mengajar Semester Ganjil 2025/2026 |
2026-04-22 |
33/UN47.C/SPP-LS/2026 |
2026-06-03 |
1202I |
Rp. 17.893.333 |
42 Hari |
|
| 1793 |
Sekretariat Dewan Pengawas |
Juni 2026 |
525115 |
Uang Harian |
2026-07-01 |
45/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-07-07 |
1534K |
Rp. 4.240.000 |
6 Hari |
|
| 1794 |
Program Pascasarjana |
September 2026 |
525119 |
Insentif Tambahan Mengajar Semester Ganjil 2025/2026 |
2026-10-02 |
154/UN47.C/SPP-LS/2026 |
|
|
Rp. 27.750.000 |
4 Hari |
Belum ada SP2D terhitung dari 02 Oktober 2026 hingga 06 Oktober 2026 (4 Hari) |
| 1795 |
Sekretariat Dewan Pengawas |
Agustus 2026 |
525115 |
Uang Harian |
2026-08-26 |
60/UN47.A2/SPP-TUP NIHIL/DEWAS/2026 |
2026-09-09 |
2224K |
Rp. 2.870.000 |
14 Hari |
|
| 1796 |
Sekretariat Dewan Pengawas |
Agustus 2026 |
525115 |
Uang Harian |
2026-08-26 |
63/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-09-10 |
2247K |
Rp. 2.960.000 |
15 Hari |
|
| 1797 |
Program Pascasarjana |
September 2026 |
525119 |
Insentif Tambahan Pembimbing Tesis |
2026-04-28 |
39/UN47.C/SPP-LS/2026 |
2026-07-02 |
1464I |
Rp. 57.038.000 |
65 Hari |
|
| 1798 |
Sekretariat Dewan Pengawas |
September 2026 |
525115 |
Uang Harian |
2026-09-15 |
67/UN47.A2/SPP-GUP/DEWAS/2026 |
|
|
Rp. 1.370.000 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 1799 |
Program Pascasarjana |
September 2026 |
525119 |
Insentif Tambahan Pembimbing Tesis |
2026-04-28 |
41/UN47.C/SPP-LS/2026 |
2026-06-30 |
1386I |
Rp. 29.073.333 |
63 Hari |
|
| 1800 |
Program Pascasarjana |
September 2026 |
525119 |
Insentif Tambahan Pembimbing Tesis |
2026-04-30 |
47/UN47.C/SPP-LS/2026 |
2026-06-30 |
1389I |
Rp. 22.715.000 |
61 Hari |
|
| 1801 |
Sekretariat Dewan Pengawas |
Maret 2026 |
525119 |
Sewa Kenderaan Dinas Operasional Sekretariat Dewan
Pengawas |
2026-02-24 |
10/UN47.A2/SPP-GU/DEWAS/2026 |
2026-02-26 |
0238K |
Rp. 7.022.000 |
2 Hari |
|
| 1802 |
Sekretariat Dewan Pengawas |
Maret 2026 |
525119 |
Sewa Kenderaan Dinas Operasional Sekretariat Dewan
Pengawas |
2026-03-02 |
14/UN47.A2/SPP-GU/DEWAS/2026 |
2026-03-03 |
0295K |
Rp. 7.022.000 |
1 Hari |
|
| 1803 |
Sekretariat Dewan Pengawas |
Maret 2026 |
525119 |
Sewa Kenderaan Dinas Operasional Sekretariat Dewan
Pengawas |
2026-04-06 |
23/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-04-07 |
0667K |
Rp. 7.022.000 |
1 Hari |
|
| 1804 |
Program Pascasarjana |
April 2026 |
525119 |
Insentif Tambahan Penguji Seminar Proposal/Kelayakan/Ujian Disertasi |
2026-04-30 |
49/UN47.C/SPP-LS/2026 |
2026-06-30 |
1390I |
Rp. 71.675.500 |
61 Hari |
|
| 1805 |
Sekretariat Dewan Pengawas |
April 2026 |
525119 |
Sewa Kenderaan Dinas Operasional Sekretariat Dewan
Pengawas |
2026-04-13 |
29/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-04-23 |
0870K |
Rp. 7.022.000 |
10 Hari |
|
| 1806 |
Program Pascasarjana |
Mei 2026 |
525112 |
Biaya Konsumsi Ringan Rapat Kerja |
2026-05-18 |
25/UN47.C/SPP-GU/2026 |
2026-06-03 |
1207I |
Rp. 161.500 |
16 Hari |
|
| 1807 |
Sekretariat Dewan Pengawas |
Mei 2026 |
525119 |
Sewa Kenderaan Dinas Operasional Sekretariat Dewan
Pengawas |
2026-06-11 |
41/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-06-29 |
1375K |
Rp. 7.022.000 |
18 Hari |
|
| 1808 |
Program Pascasarjana |
Juli 2026 |
525112 |
Biaya Konsumsi Ringan Rapat Kerja |
2026-08-13 |
70/UN47.C/SPP-GU/2026 |
2026-09-16 |
2342I |
Rp. 4.125.000 |
34 Hari |
|
| 1809 |
Sekretariat Dewan Pengawas |
Juni 2026 |
525119 |
Sewa Kenderaan Dinas Operasional Sekretariat Dewan
Pengawas |
2026-07-01 |
46/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-07-07 |
1535K |
Rp. 7.022.000 |
6 Hari |
|
| 1810 |
Program Pascasarjana |
Agustus 2026 |
525112 |
Biaya Konsumsi Ringan Rapat Kerja |
2026-08-13 |
70/UN47.C/SPP-GU/2026 |
2026-09-16 |
2342I |
Rp. 1.434.000 |
34 Hari |
|
| 1811 |
Sekretariat Dewan Pengawas |
September 2026 |
525119 |
Sewa Kenderaan Dinas Operasional Sekretariat Dewan
Pengawas |
2026-08-03 |
55/UN47.A2/SPP-LS/DEWAS/2026 |
2026-08-13 |
1954K |
Rp. 7.022.000 |
10 Hari |
|
| 1812 |
Program Pascasarjana |
September 2026 |
525112 |
Biaya Konsumsi Ringan Rapat Kerja |
2026-09-27 |
136/UN47.C/SPP-GU/2026 |
|
|
Rp. 11.716.921 |
9 Hari |
Belum ada SP2D terhitung dari 27 September 2026 hingga 06 Oktober 2026 (9 Hari) |
| 1813 |
Sekretariat Dewan Pengawas |
September 2026 |
525119 |
Sewa Kenderaan Dinas Operasional Sekretariat Dewan
Pengawas |
2026-09-15 |
68/UN47.A2/SPP-GUP/DEWAS/2026 |
|
|
Rp. 7.022.000 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 1814 |
Program Pascasarjana |
Maret 2026 |
525112 |
Biaya Konsumsi Berat Rapat Kerja |
2026-03-31 |
15/UN47.C/SPP-GU/2026 |
2026-04-06 |
0637I |
Rp. 2.900.000 |
6 Hari |
|
| 1815 |
Program Pascasarjana |
Juni 2026 |
525112 |
Biaya Konsumsi Berat Rapat Kerja |
2026-05-18 |
25/UN47.C/SPP-GU/2026 |
2026-06-03 |
1207I |
Rp. 3.718.800 |
16 Hari |
|
| 1816 |
Program Pascasarjana |
Juni 2026 |
525112 |
Biaya Konsumsi Berat Rapat Kerja |
2026-07-09 |
42/UN47.C/SPP-GU/2026 |
2026-07-29 |
1730I |
Rp. 1.225.000 |
20 Hari |
|
| 1817 |
Program Pascasarjana |
Juli 2026 |
525112 |
Biaya Konsumsi Berat Rapat Kerja |
2026-08-13 |
70/UN47.C/SPP-GU/2026 |
2026-09-16 |
2342I |
Rp. 4.441.625 |
34 Hari |
|
| 1818 |
Sekretariat Dewan Pengawas |
Maret 2026 |
525119 |
Pengembangan Sistem Informasi Sekretariat DewanPengawas |
2026-04-06 |
25/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-04-07 |
0666K |
Rp. 7.500.000 |
1 Hari |
|
| 1819 |
Program Pascasarjana |
Juni 2026 |
525112 |
Biaya Konsumsi Berat Rapat Kerja |
2026-08-13 |
70/UN47.C/SPP-GU/2026 |
2026-09-16 |
2342I |
Rp. 14.470.127 |
34 Hari |
|
| 1820 |
Sekretariat Dewan Pengawas |
Juni 2026 |
525119 |
Pengembangan Sistem Informasi Sekretariat DewanPengawas |
2026-07-01 |
48/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-07-07 |
1537K |
Rp. 12.500.000 |
6 Hari |
|
| 1821 |
Program Pascasarjana |
September 2026 |
525112 |
Biaya Konsumsi Berat Rapat Kerja |
2026-09-27 |
136/UN47.C/SPP-GU/2026 |
|
|
Rp. 5.144.500 |
9 Hari |
Belum ada SP2D terhitung dari 27 September 2026 hingga 06 Oktober 2026 (9 Hari) |
| 1822 |
Sekretariat Dewan Pengawas |
September 2026 |
525119 |
Pengembangan Sistem Informasi Sekretariat DewanPengawas |
|
|
|
|
Rp. 6.000.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 1823 |
Program Pascasarjana |
Oktober 2026 |
525112 |
Biaya Konsumsi Berat Rapat Kerja |
2026-10-01 |
148/UN47.C/SPP-LS/2026 |
|
|
Rp. 1.005.000 |
5 Hari |
Belum ada SP2D terhitung dari 01 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1824 |
Program Pascasarjana |
September 2026 |
525112 |
Paket Fullboard Meeting Pelaksanaan Rapat Kerja |
2026-02-24 |
11/UN47.A2/SPP-GU/DEWAS/2026 |
2026-02-26 |
0240K |
Rp. 1.150.000 |
2 Hari |
|
| 1825 |
Program Pascasarjana |
September 2026 |
525112 |
Paket Fullboard Meeting Pelaksanaan Rapat Kerja |
2026-09-27 |
136/UN47.C/SPP-GU/2026 |
|
|
Rp. 3.483.021 |
9 Hari |
Belum ada SP2D terhitung dari 27 September 2026 hingga 06 Oktober 2026 (9 Hari) |
| 1826 |
Program Pascasarjana |
Oktober 2026 |
525112 |
Paket Fullboard Meeting Pelaksanaan Rapat Kerja |
2026-04-06 |
24/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-04-07 |
0665K |
Rp. 1.150.000 |
1 Hari |
|
| 1827 |
Program Pascasarjana |
Oktober 2026 |
525112 |
Paket Fullboard Meeting Pelaksanaan Rapat Kerja |
2026-10-01 |
148/UN47.C/SPP-LS/2026 |
|
|
Rp. 1.350.000 |
5 Hari |
Belum ada SP2D terhitung dari 01 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1828 |
Program Pascasarjana |
April 2026 |
525112 |
Paket Fullboard Meeting Pelaksanaan Rapat Kerja |
2026-04-13 |
30/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-04-23 |
0871K |
Rp. 1.150.000 |
10 Hari |
|
| 1829 |
Program Pascasarjana |
September 2026 |
525115 |
Biaya Tiket PP Perjalanan Dinas Pimpinan |
2026-09-10 |
104/UN47.C/SPP-LS/2026 |
|
|
Rp. 1.515.900 |
26 Hari |
Belum ada SP2D terhitung dari 10 September 2026 hingga 06 Oktober 2026 (26 Hari) |
| 1830 |
Program Pascasarjana |
Mei 2026 |
525112 |
Paket Fullboard Meeting Pelaksanaan Rapat Kerja |
2026-05-12 |
39/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-05-22 |
1127K |
Rp. 1.150.000 |
10 Hari |
|
| 1831 |
Program Pascasarjana |
Mei 2026 |
525112 |
Paket Fullboard Meeting Pelaksanaan Rapat Kerja |
2026-06-11 |
42/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-06-29 |
1376K |
Rp. 1.150.000 |
18 Hari |
|
| 1832 |
Program Pascasarjana |
September 2026 |
525115 |
Biaya Uang Harian Perjalanan Dinas Pimpinan |
2026-09-10 |
104/UN47.C/SPP-LS/2026 |
|
|
Rp. 3.840.000 |
26 Hari |
Belum ada SP2D terhitung dari 10 September 2026 hingga 06 Oktober 2026 (26 Hari) |
| 1833 |
Program Pascasarjana |
September 2026 |
525112 |
Paket Fullboard Meeting Pelaksanaan Rapat Kerja |
2026-07-09 |
51/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-07-16 |
1643K |
Rp. 1.150.000 |
7 Hari |
|
| 1834 |
Sekretariat Dewan Pengawas |
September 2026 |
525111 |
Insentif Verifikator/Penguji Tagihan Unit Kerja |
2026-09-10 |
104/UN47.C/SPP-LS/2026 |
|
|
Rp. 4.125.000 |
26 Hari |
Belum ada SP2D terhitung dari 10 September 2026 hingga 06 Oktober 2026 (26 Hari) |
| 1835 |
Sekretariat Dewan Pengawas |
Februari 2026 |
525111 |
Insentif Verifikator/Penguji Tagihan Unit Kerja |
2026-02-24 |
11/UN47.A2/SPP-GU/DEWAS/2026 |
2026-02-26 |
0240K |
Rp. 470.000 |
2 Hari |
|
| 1836 |
Sekretariat Dewan Pengawas |
Maret 2026 |
525111 |
Insentif Verifikator/Penguji Tagihan Unit Kerja |
2026-04-06 |
24/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-04-07 |
0665K |
Rp. 470.000 |
1 Hari |
|
| 1837 |
Program Pascasarjana |
Juli 2026 |
525112 |
Biaya Cetak Buku Pedoman/Transkrip Nilai/Sertifikat |
2026-07-22 |
56/UN47.C/SP-LS/2026 |
2026-08-11 |
1894I |
Rp. 2.000.000 |
20 Hari |
|
| 1838 |
Sekretariat Dewan Pengawas |
April 2026 |
525111 |
Insentif Verifikator/Penguji Tagihan Unit Kerja |
2026-04-13 |
30/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-04-23 |
0871K |
Rp. 470.000 |
10 Hari |
|
| 1839 |
Program Pascasarjana |
Mei 2026 |
525119 |
Operasional Kenderaan Dinas Pimpinan |
2026-08-13 |
74/UN47.C/SPP-GU/2026 |
2026-09-16 |
2344I |
Rp. 957.875 |
34 Hari |
|
| 1840 |
Sekretariat Dewan Pengawas |
Mei 2026 |
525111 |
Insentif Verifikator/Penguji Tagihan Unit Kerja |
2026-06-11 |
42/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-06-29 |
1376K |
Rp. 470.000 |
18 Hari |
|
| 1841 |
Sekretariat Dewan Pengawas |
Juli 2026 |
525111 |
Insentif Verifikator/Penguji Tagihan Unit Kerja |
2026-07-09 |
51/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-07-16 |
1643K |
Rp. 470.000 |
7 Hari |
|
| 1842 |
Program Pascasarjana |
Maret 2026 |
525111 |
Insentif Kelola Koordinator Program Studi |
2026-02-12 |
05/UN47.C/SPP-LS/2026 |
2026-03-10 |
0421I |
Rp. 102.500.000 |
26 Hari |
|
| 1843 |
Program Pascasarjana |
Maret 2026 |
525111 |
Insentif Kelola Koordinator Program Studi |
2026-03-02 |
07/UN47.C/SPP-LS/2026 |
2026-03-10 |
0422I |
Rp. 205.000.000 |
8 Hari |
|
| 1844 |
Sekretariat Dewan Pengawas |
April 2026 |
525176 |
Insentif PPK Unit Kerja |
2026-08-03 |
57/UN47.A2/SPP-LS/DEWAS/2026 |
2026-08-13 |
1952K |
Rp. 1.150.000 |
10 Hari |
|
| 1845 |
Program Pascasarjana |
April 2026 |
525111 |
Insentif Kelola Koordinator Program Studi |
2026-04-10 |
25/UN47.C/SPP-LS/2026 |
2026-04-16 |
0816I |
Rp. 105.500.000 |
6 Hari |
|
| 1846 |
Sekretariat Dewan Pengawas |
September 2026 |
525176 |
Insentif PPK Unit Kerja |
|
|
|
|
Rp. 1.150.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 1847 |
Sekretariat Dewan Pengawas |
September 2026 |
525176 |
Insentif PPK Unit Kerja |
2026-09-15 |
70/UN47.A2/SPP-GUP/DEWAS/2026 |
|
|
Rp. 1.150.000 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 1848 |
Program Pascasarjana |
Juni 2026 |
525111 |
Insentif Kelola Koordinator Program Studi |
2026-05-07 |
57/UN47.C/SPP-LS/2026 |
2026-06-04 |
1234I |
Rp. 105.500.000 |
28 Hari |
|
| 1849 |
Program Pascasarjana |
Juni 2026 |
525111 |
Insentif Kelola Koordinator Program Studi |
2026-06-10 |
38/UN47.C/SPP-LS/2026 |
2026-07-06 |
1503I |
Rp. 105.500.000 |
26 Hari |
|
| 1850 |
Sekretariat Dewan Pengawas |
Juli 2026 |
525176 |
Insentif Verifikator/Penguji Tagihan Unit Kerja |
2026-08-03 |
57/UN47.A2/SPP-LS/DEWAS/2026 |
2026-08-13 |
1952K |
Rp. 470.000 |
10 Hari |
|
| 1851 |
Program Pascasarjana |
Juli 2026 |
525111 |
Insentif Kelola Koordinator Program Studi |
2026-07-29 |
62/UN47.C/SPP-LS/2026 |
2026-08-11 |
1877I |
Rp. 105.500.000 |
13 Hari |
|
| 1852 |
Sekretariat Dewan Pengawas |
September 2026 |
525176 |
Insentif Verifikator/Penguji Tagihan Unit Kerja |
|
|
|
|
Rp. 470.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 1853 |
Sekretariat Dewan Pengawas |
September 2026 |
525176 |
Insentif Verifikator/Penguji Tagihan Unit Kerja |
2026-09-15 |
70/UN47.A2/SPP-GUP/DEWAS/2026 |
|
|
Rp. 470.000 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 1854 |
Program Pascasarjana |
Agustus 2026 |
525111 |
Insentif Kelola Koordinator Program Studi |
2026-08-24 |
88/UN47.C/SPP-LS/2026 |
|
|
Rp. 105.500.000 |
43 Hari |
Belum ada SP2D terhitung dari 24 Agustus 2026 hingga 06 Oktober 2026 (43 Hari) |
| 1855 |
Program Pascasarjana |
Agustus 2026 |
525111 |
Insentif Kelola Koordinator Program Studi |
2026-08-29 |
92/UN47.C/SPP-LS/2026 |
|
|
Rp. 2.655.000 |
38 Hari |
Belum ada SP2D terhitung dari 29 Agustus 2026 hingga 06 Oktober 2026 (38 Hari) |
| 1856 |
Program Pascasarjana |
Agustus 2026 |
525111 |
Insentif Kelola Koordinator Program Studi |
2026-08-31 |
98/UN47.C/SPP-LS/2026 |
|
|
Rp. 2.655.000 |
36 Hari |
Belum ada SP2D terhitung dari 31 Agustus 2026 hingga 06 Oktober 2026 (36 Hari) |
| 1857 |
Program Pascasarjana |
September 2026 |
525111 |
Insentif Kelola Koordinator Program Studi |
2026-09-10 |
112/UN47.C/SPP-LS/2026 |
|
|
Rp. 117.500.000 |
26 Hari |
Belum ada SP2D terhitung dari 10 September 2026 hingga 06 Oktober 2026 (26 Hari) |
| 1858 |
Program Pascasarjana |
September 2026 |
525111 |
Insentif Kelola Koordinator Program Studi |
2026-09-11 |
114/UN47.C/SPP-LS/2026 |
|
|
Rp. 2.655.000 |
25 Hari |
Belum ada SP2D terhitung dari 11 September 2026 hingga 06 Oktober 2026 (25 Hari) |
| 1859 |
Program Pascasarjana |
September 2026 |
525111 |
Insentif Kelola Koordinator Program Studi |
2026-09-11 |
118/UN47.C/SPP-LS/2026 |
|
|
Rp. 6.025.000 |
25 Hari |
Belum ada SP2D terhitung dari 11 September 2026 hingga 06 Oktober 2026 (25 Hari) |
| 1860 |
Program Pascasarjana |
September 2026 |
525111 |
Insentif Kelola Koordinator Program Studi |
2026-09-11 |
122/UN47.C/SPP-LS/2026 |
|
|
Rp. 2.655.000 |
25 Hari |
Belum ada SP2D terhitung dari 11 September 2026 hingga 06 Oktober 2026 (25 Hari) |
| 1861 |
Sekretariat Dewan Pengawas |
Maret 2026 |
525111 |
Insentif Tim Pelaksana Kegiatan/Sekretariat Dewan Pengawas |
2026-03-05 |
16/UN47.A2/SPP-LS/DEWAS/2026 |
2026-03-09 |
0361K |
Rp. 19.800.000 |
4 Hari |
|
| 1862 |
Program Pascasarjana |
September 2026 |
525111 |
Insentif Kelola Koordinator Program Studi |
2026-09-14 |
126/UN47.C/SPP-LS/2026 |
|
|
Rp. 29.010.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1863 |
Sekretariat Dewan Pengawas |
Maret 2026 |
525111 |
Insentif Tim Pelaksana Kegiatan/Sekretariat Dewan Pengawas |
2026-04-06 |
24/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-04-07 |
0665K |
Rp. 9.000.000 |
1 Hari |
|
| 1864 |
Program Pascasarjana |
September 2026 |
525111 |
Insentif Kelola Koordinator Program Studi |
2026-09-14 |
130/UN47.C/SPP-LS/2026 |
|
|
Rp. 57.775.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1865 |
Program Pascasarjana |
September 2026 |
525111 |
Insentif Kelola Koordinator Program Studi |
2026-10-02 |
156/UN47.C/SPP-LS/2026 |
|
|
Rp. 35.185.000 |
4 Hari |
Belum ada SP2D terhitung dari 02 Oktober 2026 hingga 06 Oktober 2026 (4 Hari) |
| 1866 |
Sekretariat Dewan Pengawas |
Mei 2026 |
525111 |
Insentif Tim Pelaksana Kegiatan/Sekretariat Dewan Pengawas |
2026-05-06 |
33/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-05-13 |
1049K |
Rp. 23.950.000 |
7 Hari |
|
| 1867 |
Sekretariat Dewan Pengawas |
Mei 2026 |
525111 |
Insentif Tim Pelaksana Kegiatan/Sekretariat Dewan Pengawas |
2026-06-11 |
42/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-06-29 |
1376K |
Rp. 9.000.000 |
18 Hari |
|
| 1868 |
Program Pascasarjana |
Oktober 2026 |
525111 |
Insentif Kelola Koordinator Program Studi |
|
|
|
|
Rp. 5.010.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1869 |
Sekretariat Dewan Pengawas |
Juni 2026 |
525111 |
Insentif Tim Pelaksana Kegiatan/Sekretariat Dewan Pengawas |
2026-07-01 |
47/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-07-07 |
1536K |
Rp. 9.000.000 |
6 Hari |
|
| 1870 |
Program Pascasarjana |
Juli 2026 |
525111 |
Insentif Kinerja Pascasarjana |
2026-01-15 |
03/UN47.C/SPP_LS/2026 |
2026-01-26 |
0099I |
Rp. 79.800.000 |
11 Hari |
|
| 1871 |
Sekretariat Dewan Pengawas |
Juli 2026 |
525111 |
Insentif Tim Pelaksana Kegiatan/Sekretariat Dewan Pengawas |
2026-07-09 |
51/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-07-16 |
1643K |
Rp. 20.200.000 |
7 Hari |
|
| 1872 |
Sekretariat Dewan Pengawas |
Juli 2026 |
525111 |
Insentif Tim Pelaksana Kegiatan/Sekretariat Dewan Pengawas |
2026-07-21 |
55/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-07-28 |
1717K |
Rp. 9.000.000 |
7 Hari |
|
| 1873 |
Program Pascasarjana |
Maret 2026 |
525111 |
Insentif Kinerja Pascasarjana |
2026-03-09 |
09/UN47.C/SPP-LS/2026 |
2026-03-17 |
0586I |
Rp. 34.200.000 |
8 Hari |
|
| 1874 |
Sekretariat Dewan Pengawas |
Januari 2026 |
525111 |
Remunerasi Dewan Pengawas Badan Layanan Umum |
2026-02-12 |
04/UN47.A2/SPP-GU/DEWAS/2026 |
2026-02-20 |
0194K |
Rp. 36.674.000 |
8 Hari |
|
| 1875 |
Program Pascasarjana |
Juni 2026 |
525111 |
Insentif Kinerja Pascasarjana |
2026-06-04 |
34/UN47.C/SPP-LS/2026 |
2026-06-30 |
1391I |
Rp. 9.680.000 |
26 Hari |
|
| 1876 |
Sekretariat Dewan Pengawas |
Maret 2026 |
525111 |
Remunerasi Dewan Pengawas Badan Layanan Umum |
2026-03-02 |
15/UN47.A2/SPP-LS/DEWAS/2026 |
2026-03-03 |
0298K |
Rp. 23.950.000 |
1 Hari |
|
| 1877 |
Sekretariat Dewan Pengawas |
Maret 2026 |
525111 |
Remunerasi Dewan Pengawas Badan Layanan Umum |
2026-04-06 |
24/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-04-07 |
0665K |
Rp. 9.720.000 |
1 Hari |
|
| 1878 |
Program Pascasarjana |
Juli 2026 |
525111 |
Insentif Kinerja Pascasarjana |
2026-07-07 |
40/UN47.C/SPP-LS/2026 |
2026-07-30 |
1797I |
Rp. 79.800.000 |
23 Hari |
|
| 1879 |
Sekretariat Dewan Pengawas |
April 2026 |
525111 |
Remunerasi Dewan Pengawas Badan Layanan Umum |
2026-04-13 |
30/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-04-23 |
0871K |
Rp. 23.950.000 |
10 Hari |
|
| 1880 |
Program Pascasarjana |
September 2026 |
525111 |
Insentif Kinerja Pascasarjana |
2026-09-08 |
100/UN47.C/SPP-LS/2026 |
|
|
Rp. 34.200.000 |
28 Hari |
Belum ada SP2D terhitung dari 08 September 2026 hingga 06 Oktober 2026 (28 Hari) |
| 1881 |
Program Pascasarjana |
September 2026 |
525111 |
Insentif Kinerja Pascasarjana |
2026-10-02 |
156/UN47.C/SPP-LS/2026 |
|
|
Rp. 31.250.000 |
4 Hari |
Belum ada SP2D terhitung dari 02 Oktober 2026 hingga 06 Oktober 2026 (4 Hari) |
| 1882 |
Sekretariat Dewan Pengawas |
Mei 2026 |
525111 |
Remunerasi Dewan Pengawas Badan Layanan Umum |
2026-06-11 |
42/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-06-29 |
1376K |
Rp. 3.584.000 |
18 Hari |
|
| 1883 |
Program Pascasarjana |
Oktober 2026 |
525111 |
Insentif Kinerja Pascasarjana |
2026-10-05 |
158/UN47.C/SPP-LS/2026 |
|
|
Rp. 117.500.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 1884 |
Sekretariat Dewan Pengawas |
Juli 2026 |
525111 |
Remunerasi Dewan Pengawas Badan Layanan Umum |
2026-07-21 |
55/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-07-28 |
1717K |
Rp. 23.950.000 |
7 Hari |
|
| 1885 |
Program Pascasarjana |
Oktober 2026 |
525111 |
Insentif Kinerja Pascasarjana |
2026-10-05 |
160/UN47.C/SPP-LS/2026 |
|
|
Rp. 117.500.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 1886 |
Sekretariat Dewan Pengawas |
Agustus 2026 |
525111 |
Remunerasi Dewan Pengawas Badan Layanan Umum |
2026-08-03 |
58/UN47.A2/SPP-LS/DEWAS/2026 |
2026-08-13 |
1953K |
Rp. 23.950.000 |
10 Hari |
|
| 1887 |
Program Pascasarjana |
April 2026 |
525119 |
Pembuatan/Pengembangan/Teknologi Informasi berupa Aplikasi Layanan Pengaduan |
2026-03-13 |
11/UN47.C/SPP-LS/2026 |
2026-03-17 |
0604I |
Rp. 16.989.795 |
4 Hari |
|
| 1888 |
Program Pascasarjana |
April 2026 |
525119 |
Pembuatan/Pengembangan/Teknologi Informasi berupa Aplikasi Layanan Pengaduan |
2026-03-16 |
13/UN47.C/SPP-LS/2026 |
2026-03-30 |
0613I |
Rp. 25.000.000 |
14 Hari |
|
| 1889 |
Sekretariat Dewan Pengawas |
September 2026 |
525111 |
Remunerasi Dewan Pengawas Badan Layanan Umum |
2026-09-15 |
69/UN47.A2/SPP-GUP/DEWAS/2026 |
|
|
Rp. 23.950.000 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 1890 |
Sekretariat Dewan Pengawas |
September 2026 |
525111 |
Remunerasi Dewan Pengawas Badan Layanan Umum |
2026-09-24 |
73/UN47.A2/SPP-LS/DEWAS/2026 |
|
|
Rp. 23.950.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 1891 |
Program Pascasarjana |
Juni 2026 |
525119 |
Pembuatan/Pengembangan/Teknologi Informasi berupa Aplikasi Layanan Pengaduan |
2026-05-18 |
31/UN47.C/SPP-GU/2026 |
2026-06-03 |
1210I |
Rp. 10.500.000 |
16 Hari |
|
| 1892 |
Program Pascasarjana |
Agustus 2026 |
525119 |
Pembuatan/Pengembangan/Teknologi Informasi berupa Aplikasi Layanan Pengaduan |
2026-08-24 |
86/UN47.C/SPP-LS/2026 |
|
|
Rp. 49.600.000 |
43 Hari |
Belum ada SP2D terhitung dari 24 Agustus 2026 hingga 06 Oktober 2026 (43 Hari) |
| 1893 |
Sekretariat Dewan Pengawas |
Maret 2026 |
525119 |
Kegiatan Penyusunan dan Pelaporan Indikator (Key Performance Indicators) Dewan Pengawas BLU UNG |
2026-03-11 |
21/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-03-13 |
0524K |
Rp. 25.000.000 |
2 Hari |
|
| 1894 |
Program Pascasarjana |
Juli 2026 |
525111 |
Insentif PPK Pascasarjana |
2026-03-31 |
21/UN47.C/SPP-GU/2026 |
2026-04-06 |
0640I |
Rp. 2.300.000 |
6 Hari |
|
| 1895 |
Sekretariat Dewan Pengawas |
Juli 2026 |
525119 |
Kegiatan Penyusunan dan Pelaporan Indikator (Key Performance Indicators) Dewan Pengawas BLU UNG |
2026-07-09 |
52/UN47.A2/SPP-GUP/DEWAS/2026 |
2026-07-16 |
1644K |
Rp. 20.000.000 |
7 Hari |
|
| 1896 |
Program Pascasarjana |
Juni 2026 |
525111 |
Insentif PPK Pascasarjana |
2026-05-18 |
29/UN47.C/SPP-GU/2026 |
2026-06-03 |
1211I |
Rp. 2.300.000 |
16 Hari |
|
| 1897 |
Program Pascasarjana |
Juni 2026 |
525111 |
Insentif PPK Pascasarjana |
2026-07-09 |
46/UN47.C/SPP-GU/2026 |
2026-07-29 |
1733I |
Rp. 2.300.000 |
20 Hari |
|
| 1898 |
Sekretariat Dewan Pengawas |
Agustus 2026 |
525176 |
Insentif Tim Pelaksana Kegiatan/Sekretariat Dewan Pengawas |
2026-08-03 |
57/UN47.A2/SPP-LS/DEWAS/2026 |
2026-08-13 |
1952K |
Rp. 9.000.000 |
10 Hari |
|
| 1899 |
Program Pascasarjana |
Maret 2026 |
525111 |
Insentif Verifikator Pascasarjana |
2026-03-31 |
21/UN47.C/SPP-GU/2026 |
2026-04-06 |
0640I |
Rp. 940.000 |
6 Hari |
|
| 1900 |
Sekretariat Dewan Pengawas |
September 2026 |
525176 |
Insentif Tim Pelaksana Kegiatan/Sekretariat Dewan Pengawas |
2026-09-15 |
70/UN47.A2/SPP-GUP/DEWAS/2026 |
|
|
Rp. 9.000.000 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 1901 |
Sekretariat Dewan Pengawas |
September 2026 |
525176 |
Insentif Tim Pelaksana Kegiatan/Sekretariat Dewan Pengawas |
2026-09-24 |
72/UN47.A2/SPP-LS/DEWAS/2026 |
|
|
Rp. 9.000.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 1902 |
Program Pascasarjana |
Juni 2026 |
525111 |
Insentif Verifikator Pascasarjana |
2026-05-18 |
29/UN47.C/SPP-GU/2026 |
2026-06-03 |
1211I |
Rp. 940.000 |
16 Hari |
|
| 1903 |
Program Pascasarjana |
Juni 2026 |
525111 |
Insentif Verifikator Pascasarjana |
2026-07-09 |
46/UN47.C/SPP-GU/2026 |
2026-07-29 |
1733I |
Rp. 940.000 |
20 Hari |
|
| 1904 |
Program Pascasarjana |
Oktober 2026 |
525176 |
Insentif PPK |
2026-10-05 |
162/UN47.C/SPP-LS/2026 |
|
|
Rp. 4.600.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 1905 |
Program Pascasarjana |
Oktober 2026 |
525176 |
Insentif Verifkator Pascasarjana |
2026-10-05 |
162/UN47.C/SPP-LS/2026 |
|
|
Rp. 1.880.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 1906 |
Program Pascasarjana |
Mei 2026 |
525119 |
Bantuan Biaya Kegiatan Workshop Kurikulum dan Lokakarya Pengembangan Karakter Tenaga Kependidikan |
2026-04-15 |
27/UN47.C/SPP-LS/2026 |
2026-05-05 |
0985I |
Rp. 31.540.973 |
20 Hari |
|
| 1907 |
Program Pascasarjana |
September 2026 |
525119 |
Bantuan Biaya Kegiatan Workshop Kurikulum dan Lokakarya Pengembangan Karakter Tenaga Kependidikan |
2026-09-25 |
142/UN47.C/SPP-GU/2026 |
|
|
Rp. 3.501.000 |
11 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 06 Oktober 2026 (11 Hari) |
| 1908 |
Program Pascasarjana |
Juli 2026 |
525119 |
Bantuan BIaya Peneltian Kolaborasi Mahasiswa |
2026-07-29 |
64/UN47.C/SPP-LS/2026 |
2026-08-11 |
1875I |
Rp. 187.500.000 |
13 Hari |
|
| 1909 |
Program Pascasarjana |
Maret 2026 |
525119 |
Bantuan Biaya Penerbitan Jurnal Nasional Terakreditasi |
2026-03-31 |
19/UN47.C/SPP-GU/2026 |
2026-04-06 |
0639I |
Rp. 5.000.000 |
6 Hari |
|
| 1910 |
Program Pascasarjana |
April 2026 |
525119 |
Bantuan Biaya Penerbitan Jurnal Nasional Terakreditasi |
2026-04-02 |
23/UN47.C/SPP-LS/2026 |
2026-04-09 |
0728I |
Rp. 6.000.000 |
7 Hari |
|
| 1911 |
Program Pascasarjana |
Juli 2026 |
525119 |
Bantuan Biaya Penerbitan Jurnal Nasional Terakreditasi |
2026-07-09 |
50/UN47.C/SPP-LS/2026 |
2026-07-28 |
1719I |
Rp. 30.000.000 |
19 Hari |
|
| 1912 |
Program Pascasarjana |
Juli 2026 |
525119 |
Bantuan Biaya Penerbitan Jurnal Nasional Terakreditasi |
2026-07-22 |
58/UN47.C/SPP-LS/2026 |
2026-08-11 |
1878I |
Rp. 6.000.000 |
20 Hari |
|
| 1913 |
Program Pascasarjana |
Juli 2026 |
525119 |
Bantuan Biaya Penerbitan Jurnal Nasional Terakreditasi |
2026-07-31 |
66/UN47.C/SPP-LS/2026 |
2026-08-11 |
1876I |
Rp. 27.000.000 |
11 Hari |
|
| 1914 |
Program Pascasarjana |
September 2026 |
525119 |
Bantuan Biaya Penerbitan Jurnal Nasional Terakreditasi |
2026-09-25 |
140/UN47.C/SPP-GU/2026 |
|
|
Rp. 3.000.000 |
11 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 06 Oktober 2026 (11 Hari) |
| 1915 |
Program Pascasarjana |
April 2026 |
525119 |
Bantuan Biaya Penerbitan Jurnal International Bereputasi |
2026-04-02 |
23/UN47.C/SPP-LS/2026 |
2026-04-09 |
0728I |
Rp. 45.000.000 |
7 Hari |
|
| 1916 |
Program Pascasarjana |
Juni 2026 |
525119 |
Bantuan Biaya Penerbitan Jurnal International Bereputasi |
2026-05-05 |
51/UN47.C/SPP-LS/2026 |
2026-06-02 |
1200I |
Rp. 15.000.000 |
28 Hari |
|
| 1917 |
Program Pascasarjana |
Juni 2026 |
525119 |
Bantuan Biaya Penerbitan Jurnal International Bereputasi |
2026-05-05 |
53/UN47.C/SPP-LS/2026 |
2026-06-03 |
1201I |
Rp. 15.000.000 |
29 Hari |
|
| 1918 |
Program Pascasarjana |
Juli 2026 |
525119 |
Bantuan Biaya Program Pengabdian kepada Masyarakat |
2026-07-29 |
60/UN47.C/SPP-LS/2026 |
2026-08-28 |
2092I |
Rp. 42.000.000 |
30 Hari |
|
| 1919 |
Program Pascasarjana |
Agustus 2026 |
525119 |
Bantuan Biaya Program Pengabdian kepada Masyarakat |
2026-07-29 |
60/UN47.C/SPP-LS/2026 |
2026-08-28 |
2092I |
Rp. 3.000.000 |
30 Hari |
|
| 1920 |
Program Pascasarjana |
Agustus 2026 |
525119 |
Bantuan Biaya Penerbitan Jurnal |
2026-08-15 |
78/UN47.C/SPP-LS/2026 |
2026-08-28 |
2122I |
Rp. 15.000.000 |
13 Hari |
|
| 1921 |
UPA Bimbingan dan Konseling |
Maret 2026 |
537112 |
Pengadaan Laptop |
2026-04-06 |
05/UN47.E3/KU.01.00/SPP/GUP-II/2026 |
2026-04-16 |
0823AF |
Rp. 18.000.000 |
10 Hari |
|
| 1922 |
UPA Bimbingan dan Konseling |
Januari 2026 |
537112 |
Pengadaan Kamera |
2026-02-20 |
02/UN47.E3/KU.01.00/SPP/GUP-I/2026 |
2026-02-27 |
0265AF |
Rp. 16.675.000 |
7 Hari |
|
| 1923 |
UPA Bimbingan dan Konseling |
Maret 2026 |
537112 |
Pengadaan Kursi satu Seater |
2026-04-06 |
05/UN47.E3/KU.01.00/SPP/GUP-II/2026 |
2026-04-16 |
0823AF |
Rp. 4.162.500 |
10 Hari |
|
| 1924 |
UPA Pengembangan Karier dan Kewirausahaan |
Maret 2026 |
537112 |
Pengadaan Komputer/Laptop Perkantoran |
2026-03-12 |
03/SPP-LS/UN47.E3/KU/2026 |
2026-03-13 |
0508V |
Rp. 13.772.325 |
1 Hari |
|
| 1925 |
UPA Bimbingan dan Konseling |
April 2026 |
537112 |
Pengadaan Kursi satu Seater |
2026-04-27 |
09/UN47.E3/KU.01.00/SPP/GUP-III/2026 |
2026-04-30 |
0953AF |
Rp. 5.837.500 |
3 Hari |
|
| 1926 |
UPA Pengembangan Karier dan Kewirausahaan |
Juli 2026 |
537112 |
Pengadaan dan Pemasangan CCTV |
2026-06-08 |
24/SPP-LS/UN47.E3/KU/2026 |
2026-07-06 |
1510V |
Rp. 15.550.272 |
28 Hari |
|
| 1927 |
UPA Bimbingan dan Konseling |
April 2026 |
537112 |
Pengadaan LCD Proyektor |
2026-04-27 |
09/UN47.E3/KU.01.00/SPP/GUP-III/2026 |
2026-04-30 |
0953AF |
Rp. 15.325.000 |
3 Hari |
|
| 1928 |
UPA Pengembangan Karier dan Kewirausahaan |
April 2026 |
525114 |
Pemeliharaan AC |
2026-05-11 |
17/SPP-GUP/UN47-E3/KU/2026 |
2026-05-26 |
1164V |
Rp. 200.000 |
15 Hari |
|
| 1929 |
UPA Bimbingan dan Konseling |
April 2026 |
525114 |
Pemeliharaan Peralatan Kantor |
2026-04-27 |
12/UN47.E3/KU.01.00/SPP/GUP-III/2026 |
2026-04-30 |
0956AF |
Rp. 1.000.000 |
3 Hari |
|
| 1930 |
UPA Bimbingan dan Konseling |
Juni 2026 |
525114 |
Pemeliharaan Peralatan Kantor |
2026-07-23 |
21/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1815AF |
Rp. 2.966.500 |
11 Hari |
|
| 1931 |
UPA Bimbingan dan Konseling |
Juni 2026 |
525114 |
Pemeliharaan Jaringan Listrik UPA BK |
2026-07-23 |
21/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1815AF |
Rp. 606.000 |
11 Hari |
|
| 1932 |
UPA Pengembangan Karier dan Kewirausahaan |
Februari 2026 |
525114 |
Pemeliharaan Komputer/Laptop |
2026-03-13 |
07/SPP-GUP/UNG47-E3/KU/2026 |
2026-03-16 |
0584V |
Rp. 2.653.100 |
3 Hari |
|
| 1933 |
UPA Bimbingan dan Konseling |
Oktober 2026 |
525114 |
Pemeliharaan Jaringan Listrik UPA BK |
2026-10-05 |
39/UN47.E3/KU.01.00/SPP/GUP-NIHIL/2026 |
|
|
Rp. 890.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 1934 |
UPA Bimbingan dan Konseling |
September 2026 |
525119 |
Paket Meeting Kegiatan Workshop Dosen PA |
2026-09-24 |
35/UN47.E3/KU.01.00/SPP/GUP-VII/2026 |
|
|
Rp. 22.800.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 1935 |
UPA Pengembangan Karier dan Kewirausahaan |
Juni 2026 |
525114 |
Biaya Pemeliharaan Gedung dan Bangunan Pendukung Perkantoran |
2026-05-20 |
20/SPP-LS/UN47.E3/KU/2026 |
2026-06-18 |
1306V |
Rp. 31.250.000 |
29 Hari |
|
| 1936 |
UPA Pengembangan Karier dan Kewirausahaan |
September 2026 |
525119 |
Biaya Pelaksanaan Kegiatan Bidang Alumni dan Tracer Studi |
2026-09-24 |
31/UN47.E3/KU.01.00/SPP/TUP-NIHIL/2026 |
|
|
Rp. 14.250.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 1937 |
UPA Pengembangan Karier dan Kewirausahaan |
Mei 2026 |
525119 |
Biaya Pelaksanaan Kegiatan Bidang Alumni dan Tracer Studi |
|
|
|
|
Rp. 10.000.000 |
158 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Mei 2026 hingga 06 Oktober 2026 (158 Hari) |
| 1938 |
UPA Pengembangan Karier dan Kewirausahaan |
Agustus 2026 |
525119 |
Biaya Pelaksanaan Kegiatan Bidang Alumni dan Tracer Studi |
2026-08-19 |
41/SPP.GUP./UN47.E3/KU/2026 |
2026-08-24 |
2066V |
Rp. 10.000.000 |
5 Hari |
|
| 1939 |
UPA Bimbingan dan Konseling |
Mei 2026 |
525119 |
Paket Meeting Pelatihan Public Speaking |
2026-05-20 |
17/UN47.E3/KU.01.00/SPP/GUP-IV/2026 |
2026-05-21 |
1119AF |
Rp. 14.250.000 |
1 Hari |
|
| 1940 |
UPA Pengembangan Karier dan Kewirausahaan |
Maret 2026 |
525119 |
Biaya Pembuatan/Pengembangan Aplikasi Tracer Studi |
2026-03-11 |
10/SPP-GUP/UNG.E3/KU/2026 |
2026-03-16 |
0583V |
Rp. 27.500.000 |
5 Hari |
|
| 1941 |
UPA Bimbingan dan Konseling |
Juni 2026 |
525119 |
Biaya Langganan Zoom Meeting Pro Pelaksanaan Kegiatan Webinar Series 2025 |
2026-07-23 |
24/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1818AF |
Rp. 150.000 |
11 Hari |
|
| 1942 |
UPA Pengembangan Karier dan Kewirausahaan |
Mei 2026 |
525112 |
Biaya Konsumsi Kegiatan Review/Seleksi/Pendampingan Pengunggahan Proposal PPK Ormawa |
2026-06-25 |
28/SPP-GUP/UN47.E3/KU/2026 |
2026-07-02 |
1454V |
Rp. 760.000 |
7 Hari |
|
| 1943 |
UPA Bimbingan dan Konseling |
Oktober 2026 |
525119 |
Biaya Langganan Zoom Meeting Pro Pelaksanaan Kegiatan Webinar Series 2025 |
2026-10-05 |
42/UN47.E3/KU.01.00/SPP/GUP-NIHIL/2026 |
|
|
Rp. 450.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 1944 |
UPA Pengembangan Karier dan Kewirausahaan |
Agustus 2026 |
525112 |
Biaya Konsumsi Kegiatan Review/Seleksi/Pendampingan Pengunggahan Proposal PPK Ormawa |
2026-08-12 |
40/SPP.GUP/UN47.E3/KU/2026 |
2026-08-24 |
2065V |
Rp. 479.000 |
12 Hari |
|
| 1945 |
UPA Pengembangan Karier dan Kewirausahaan |
April 2026 |
525112 |
Biaya Konsumsi Kegiatan Review/Seleksi/Pendampingan Pengunggahan Proposal PPK Ormawa |
|
|
|
|
Rp. 310.000 |
188 Hari |
Belum ada SPP dan SP2D terhitung dari 1 April 2026 hingga 06 Oktober 2026 (188 Hari) |
| 1946 |
UPA Bimbingan dan Konseling |
Mei 2026 |
525119 |
Kegiatan Goes to Fakulty dilingkungan UNG |
2026-05-20 |
17/UN47.E3/KU.01.00/SPP/GUP-IV/2026 |
2026-05-21 |
1119AF |
Rp. 10.000.000 |
1 Hari |
|
| 1947 |
UPA Pengembangan Karier dan Kewirausahaan |
Maret 2026 |
525119 |
Bantuan Biaya Kegiatan Organisasi Kemahasiswaan dan Kegiatan Kemahasiswaan Lainnya |
2026-02-13 |
02/SPP-LS/UN47.E3/KU/2026 |
2026-03-06 |
0342V |
Rp. 48.964.000 |
21 Hari |
|
| 1948 |
UPA Pengembangan Karier dan Kewirausahaan |
Maret 2026 |
525119 |
Bantuan Biaya Kegiatan Organisasi Kemahasiswaan dan Kegiatan Kemahasiswaan Lainnya |
2026-03-30 |
12/SPP.GUP/UN47.E3/KU/2026 |
2026-04-06 |
0646V |
Rp. 38.100.000 |
7 Hari |
|
| 1949 |
UPA Bimbingan dan Konseling |
Mei 2026 |
525119 |
Honorarium Narasumber Public Speaking |
2026-05-20 |
17/UN47.E3/KU.01.00/SPP/GUP-IV/2026 |
2026-05-21 |
1119AF |
Rp. 5.400.000 |
1 Hari |
|
| 1950 |
UPA Pengembangan Karier dan Kewirausahaan |
April 2026 |
525119 |
Bantuan Biaya Kegiatan Organisasi Kemahasiswaan dan Kegiatan Kemahasiswaan Lainnya |
2026-04-15 |
14/SPP-GUP/UN47.E3/KU/2026 |
2026-04-20 |
0835V |
Rp. 55.000.000 |
5 Hari |
|
| 1951 |
UPA Pengembangan Karier dan Kewirausahaan |
April 2026 |
525119 |
Bantuan Biaya Kegiatan Organisasi Kemahasiswaan dan Kegiatan Kemahasiswaan Lainnya |
2026-05-11 |
19/SPP-GUP/UN47.E3/KU/2026 |
2026-05-26 |
1166V |
Rp. 25.190.000 |
15 Hari |
|
| 1952 |
UPA Bimbingan dan Konseling |
Juni 2026 |
525119 |
Honorarium Narasumber Pelatihan Mahasiswa Untuk Persiapan Kerja |
2026-07-23 |
24/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1818AF |
Rp. 3.600.000 |
11 Hari |
|
| 1953 |
UPA Pengembangan Karier dan Kewirausahaan |
Mei 2026 |
525119 |
Bantuan Biaya Kegiatan Organisasi Kemahasiswaan dan Kegiatan Kemahasiswaan Lainnya |
2026-06-25 |
29/SPP-GUP/UN47.E3/KU/2026 |
2026-07-02 |
1455V |
Rp. 48.000.000 |
7 Hari |
|
| 1954 |
UPA Pengembangan Karier dan Kewirausahaan |
Juni 2026 |
525119 |
Bantuan Biaya Kegiatan Organisasi Kemahasiswaan dan Kegiatan Kemahasiswaan Lainnya |
2026-06-09 |
25/SPP-LS/UN47.E3/KU/2026 |
2026-06-26 |
1336V |
Rp. 75.000.000 |
17 Hari |
|
| 1955 |
UPA Pengembangan Karier dan Kewirausahaan |
Juni 2026 |
525119 |
Bantuan Biaya Kegiatan Organisasi Kemahasiswaan dan Kegiatan Kemahasiswaan Lainnya |
2026-06-25 |
29/SPP-GUP/UN47.E3/KU/2026 |
2026-07-02 |
1455V |
Rp. 3.000.000 |
7 Hari |
|
| 1956 |
UPA Bimbingan dan Konseling |
September 2026 |
525119 |
Honorarium Narasumber Pelatihan Growth Mindset Mahasiswa |
2026-09-24 |
31/UN47.E3/KU.01.00/SPP/TUP-NIHIL/2026 |
|
|
Rp. 3.600.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 1957 |
UPA Pengembangan Karier dan Kewirausahaan |
Juli 2026 |
525119 |
Bantuan Biaya Kegiatan Organisasi Kemahasiswaan dan Kegiatan Kemahasiswaan Lainnya |
|
|
|
|
Rp. 10.000.000 |
97 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Juli 2026 hingga 06 Oktober 2026 (97 Hari) |
| 1958 |
UPA Pengembangan Karier dan Kewirausahaan |
Juli 2026 |
525119 |
Bantuan Biaya Kegiatan Organisasi Kemahasiswaan dan Kegiatan Kemahasiswaan Lainnya |
2026-06-11 |
26/SPP-LS/UN47.E3/KU/2026 |
2026-07-06 |
1511V |
Rp. 50.090.000 |
25 Hari |
|
| 1959 |
UPA Pengembangan Karier dan Kewirausahaan |
Juli 2026 |
525119 |
Bantuan Biaya Kegiatan Organisasi Kemahasiswaan dan Kegiatan Kemahasiswaan Lainnya |
2026-07-31 |
32/SPP-TUP NIHIL/UN47.E3/KU/2026 |
2026-08-06 |
1857V |
Rp. 134.350.000 |
6 Hari |
|
| 1960 |
UPA Bimbingan dan Konseling |
Maret 2026 |
525119 |
Honorarium Narasumber Webinar Series 2026 |
2026-04-06 |
08/UN47.E3/KU.01.00/SPP/GUP-II/2026 |
2026-04-16 |
0826AF |
Rp. 900.000 |
10 Hari |
|
| 1961 |
UPA Pengembangan Karier dan Kewirausahaan |
Agustus 2026 |
525119 |
Bantuan Biaya Kegiatan Organisasi Kemahasiswaan dan Kegiatan Kemahasiswaan Lainnya |
2026-08-03 |
33/SPP-LS/UN47.E3/KU/2026 |
2026-08-10 |
1873V |
Rp. 80.000.000 |
7 Hari |
|
| 1962 |
UPA Pengembangan Karier dan Kewirausahaan |
Agustus 2026 |
525119 |
Bantuan Biaya Kegiatan Organisasi Kemahasiswaan dan Kegiatan Kemahasiswaan Lainnya |
2026-09-02 |
42/SPP-LS/UN47.E3/KU/2026 |
|
|
Rp. 47.207.400 |
34 Hari |
Belum ada SP2D terhitung dari 02 September 2026 hingga 06 Oktober 2026 (34 Hari) |
| 1963 |
UPA Bimbingan dan Konseling |
April 2026 |
525119 |
Honorarium Narasumber Webinar Series 2026 |
2026-04-27 |
14/UN47.E3/KU.01.00/SPP/GUP-III/2026 |
2026-04-30 |
0958AF |
Rp. 900.000 |
3 Hari |
|
| 1964 |
UPA Pengembangan Karier dan Kewirausahaan |
Agustus 2026 |
525119 |
Bantuan Biaya Kegiatan Organisasi Kemahasiswaan dan Kegiatan Kemahasiswaan Lainnya |
2026-09-02 |
44/SPP-LS/UN47.E3/KU/2026 |
|
|
Rp. 30.300.000 |
34 Hari |
Belum ada SP2D terhitung dari 02 September 2026 hingga 06 Oktober 2026 (34 Hari) |
| 1965 |
UPA Pengembangan Karier dan Kewirausahaan |
Agustus 2026 |
525119 |
Bantuan Biaya Kegiatan Organisasi Kemahasiswaan dan Kegiatan Kemahasiswaan Lainnya |
2026-09-14 |
45/SPP-TUP.NIHIL/UN47.E3/KU/2026 |
|
|
Rp. 122.665.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 1966 |
UPA Bimbingan dan Konseling |
Juli 2026 |
525119 |
Honorarium Narasumber Webinar Series 2026 |
2026-07-23 |
24/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1818AF |
Rp. 900.000 |
11 Hari |
|
| 1967 |
UPA Pengembangan Karier dan Kewirausahaan |
September 2026 |
525119 |
Bantuan Biaya Kegiatan Organisasi Kemahasiswaan dan Kegiatan Kemahasiswaan Lainnya |
2026-09-02 |
43/SPP.LS/UN47.E3/KU/2026 |
|
|
Rp. 19.290.000 |
34 Hari |
Belum ada SP2D terhitung dari 02 September 2026 hingga 06 Oktober 2026 (34 Hari) |
| 1968 |
UPA Pengembangan Karier dan Kewirausahaan |
September 2026 |
525119 |
Bantuan Biaya Kegiatan Organisasi Kemahasiswaan dan Kegiatan Kemahasiswaan Lainnya |
2026-09-21 |
48/SPP-LS/UN47.E3/KU/2026 |
|
|
Rp. 58.964.400 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 1969 |
UPA Pengembangan Karier dan Kewirausahaan |
September 2026 |
525119 |
Bantuan Biaya Kegiatan Organisasi Kemahasiswaan dan Kegiatan Kemahasiswaan Lainnya |
2026-09-24 |
54/SPP-GUP/UN47.E3/KU/2026 |
|
|
Rp. 2.300.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 1970 |
UPA Bimbingan dan Konseling |
September 2026 |
525119 |
Honorarium Narasumber Webinar Series 2026 |
2026-09-24 |
31/UN47.E3/KU.01.00/SPP/TUP-NIHIL/2026 |
|
|
Rp. 900.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 1971 |
UPA Bimbingan dan Konseling |
Oktober 2026 |
525119 |
Honorarium Narasumber Webinar Series 2026 |
2026-10-05 |
42/UN47.E3/KU.01.00/SPP/GUP-NIHIL/2026 |
|
|
Rp. 1.800.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 1972 |
UPA Pengembangan Karier dan Kewirausahaan |
Oktober 2026 |
525119 |
Bantuan Biaya Kegiatan Organisasi Kemahasiswaan dan Kegiatan Kemahasiswaan Lainnya |
|
|
|
|
Rp. 7.000.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1973 |
UPA Pengembangan Karier dan Kewirausahaan |
Juni 2026 |
525119 |
Keikutsertaan Pada Kegiatan Abdidaya Ormawa |
2026-07-23 |
24/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1818AF |
Rp. 12.127.320 |
11 Hari |
|
| 1974 |
UPA Pengembangan Karier dan Kewirausahaan |
April 2026 |
525112 |
Biaya Konsumsi Kegiatan Review/Seleksi/Pendampingan Pengunggahan Proposal PKM dan P2MW |
2026-05-11 |
18/SPP-GUP/UN47.E3/KU/2026 |
2026-05-26 |
1165V |
Rp. 1.900.000 |
15 Hari |
|
| 1975 |
UPA Bimbingan dan Konseling |
September 2026 |
525119 |
Kegiatan Seminar Literasi Keuangan Mahasiswa KIP-K |
2026-09-24 |
31/UN47.E3/KU.01.00/SPP/TUP-NIHIL/2026 |
|
|
Rp. 9.150.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 1976 |
UPA Pengembangan Karier dan Kewirausahaan |
September 2026 |
525112 |
Biaya Konsumsi Kegiatan Review/Seleksi/Pendampingan Pengunggahan Proposal PKM dan P2MW |
|
|
|
|
Rp. 9.000.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 1977 |
UPA Pengembangan Karier dan Kewirausahaan |
September 2026 |
525112 |
Biaya Konsumsi Kegiatan Review/Seleksi/Pendampingan Pengunggahan Proposal PKM dan P2MW |
2026-09-24 |
53/SPP-GUP/UN47.E3/KU/2026 |
|
|
Rp. 1.670.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 1978 |
UPA Bimbingan dan Konseling |
Maret 2026 |
525112 |
Biaya Kebutuhan Dasar Perkantoran |
2026-04-06 |
06/UN47.E3/KU.01.00/SPP/GUP-II/2026 |
2026-04-16 |
0824AF |
Rp. 7.653.500 |
10 Hari |
|
| 1979 |
UPA Pengembangan Karier dan Kewirausahaan |
Mei 2026 |
525112 |
Biaya Konsumsi Kegiatan Pendampingan Kelompok PKM/P2MW Lolos Pendanaan |
2026-05-11 |
18/SPP-GUP/UN47.E3/KU/2026 |
2026-05-26 |
1165V |
Rp. 605.000 |
15 Hari |
|
| 1980 |
UPA Bimbingan dan Konseling |
April 2026 |
525112 |
Biaya Kebutuhan Dasar Perkantoran |
2026-04-27 |
10/UN47.E3/KU.01.00/SPP/GUP-III/2026 |
2026-04-30 |
0955AF |
Rp. 237.500 |
3 Hari |
|
| 1981 |
UPA Bimbingan dan Konseling |
Juni 2026 |
525112 |
Biaya Kebutuhan Dasar Perkantoran |
2026-07-23 |
18/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1812AF |
Rp. 730.000 |
11 Hari |
|
| 1982 |
UPA Bimbingan dan Konseling |
Juli 2026 |
525112 |
Biaya Kebutuhan Dasar Perkantoran |
2026-07-23 |
18/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1812AF |
Rp. 945.180 |
11 Hari |
|
| 1983 |
UPA Pengembangan Karier dan Kewirausahaan |
Maret 2026 |
525112 |
Biaya Kebutuhan Dasar Perkantoran |
2026-03-30 |
11/SPP.GUP/UN47.E3/KU/2026 |
2026-04-06 |
0645V |
Rp. 2.121.000 |
7 Hari |
|
| 1984 |
UPA Bimbingan dan Konseling |
September 2026 |
525112 |
Biaya Kebutuhan Dasar Perkantoran |
2026-09-24 |
32/UN47.E3/KU.01.00/SPP/GUP-VII/2026 |
|
|
Rp. 260.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 1985 |
UPA Pengembangan Karier dan Kewirausahaan |
Oktober 2026 |
525112 |
Biaya Kebutuhan Dasar Perkantoran |
2026-05-11 |
15/SPP-GUP/UN47.E3/KU/2026 |
2026-05-26 |
1162V |
Rp. 802.500 |
15 Hari |
|
| 1986 |
UPA Bimbingan dan Konseling |
Oktober 2026 |
525112 |
Biaya Kebutuhan Dasar Perkantoran |
2026-10-05 |
36/UN47.E3/KU.01.00/SPP/GUP-NIHIL/2026 |
|
|
Rp. 3.206.930 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 1987 |
UPA Pengembangan Karier dan Kewirausahaan |
Mei 2026 |
525112 |
Biaya Kebutuhan Dasar Perkantoran |
2026-05-11 |
15/SPP-GUP/UN47.E3/KU/2026 |
2026-05-26 |
1162V |
Rp. 890.900 |
15 Hari |
|
| 1988 |
UPA Bimbingan dan Konseling |
September 2026 |
525115 |
Tiket PP |
2026-09-24 |
29/UN47.E3/KU.01.00/SPP/TUP-NIHIL/2026 |
2026-09-28 |
2531AF |
Rp. 17.778.460 |
4 Hari |
|
| 1989 |
UPA Bimbingan dan Konseling |
September 2026 |
525115 |
Tiket PP |
2026-09-24 |
33/UN47.E3/KU.01.00/SPP/GUP-VII/2026 |
|
|
Rp. 700.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 1990 |
UPA Pengembangan Karier dan Kewirausahaan |
Juli 2026 |
525112 |
Biaya Kebutuhan Dasar Perkantoran |
2026-08-12 |
35/SPP.GUP/UN47.E3/KU/2026 |
2026-08-24 |
2060V |
Rp. 281.500 |
12 Hari |
|
| 1991 |
UPA Bimbingan dan Konseling |
Agustus 2026 |
525115 |
Tiket PP |
2026-10-05 |
37/UN47.E3/KU.01.00/SPP/GUP-NIHIL/2026 |
|
|
Rp. 2.385.420 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 1992 |
UPA Pengembangan Karier dan Kewirausahaan |
Agustus 2026 |
525112 |
Biaya Kebutuhan Dasar Perkantoran |
2026-08-12 |
35/SPP.GUP/UN47.E3/KU/2026 |
2026-08-24 |
2060V |
Rp. 853.500 |
12 Hari |
|
| 1993 |
UPA Pengembangan Karier dan Kewirausahaan |
September 2026 |
525112 |
Biaya Kebutuhan Dasar Perkantoran |
2026-09-24 |
49/SPP-GUP/UN47.E3/KU/2026 |
|
|
Rp. 2.297.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 1994 |
UPA Bimbingan dan Konseling |
September 2026 |
525115 |
Uang Harian |
2026-09-24 |
29/UN47.E3/KU.01.00/SPP/TUP-NIHIL/2026 |
2026-09-28 |
2531AF |
Rp. 6.610.000 |
4 Hari |
|
| 1995 |
UPA Bimbingan dan Konseling |
September 2026 |
525115 |
Uang Harian |
2026-09-24 |
33/UN47.E3/KU.01.00/SPP/GUP-VII/2026 |
|
|
Rp. 1.000.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 1996 |
UPA Pengembangan Karier dan Kewirausahaan |
Oktober 2026 |
525112 |
Biaya Kebutuhan Dasar Perkantoran |
|
|
|
|
Rp. 1.980.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 1997 |
UPA Bimbingan dan Konseling |
Oktober 2026 |
525115 |
Uang Harian |
2026-10-05 |
37/UN47.E3/KU.01.00/SPP/GUP-NIHIL/2026 |
|
|
Rp. 1.450.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 1998 |
UPA Bimbingan dan Konseling |
September 2026 |
525115 |
Penginapan |
2026-03-11 |
05/SPP-GUP/UNG.E3/KU/2026 |
2026-03-16 |
0579V |
Rp. 3.000.000 |
5 Hari |
|
| 1999 |
UPA Bimbingan dan Konseling |
September 2026 |
525115 |
Penginapan |
2026-09-24 |
33/UN47.E3/KU.01.00/SPP/GUP-VII/2026 |
|
|
Rp. 1.440.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 2000 |
UPA Bimbingan dan Konseling |
Oktober 2026 |
525115 |
Penginapan |
2026-03-30 |
11/SPP.GUP/UN47.E3/KU/2026 |
2026-04-06 |
0645V |
Rp. 14.779.000 |
7 Hari |
|
| 2001 |
UPA Bimbingan dan Konseling |
Oktober 2026 |
525115 |
Penginapan |
2026-10-05 |
37/UN47.E3/KU.01.00/SPP/GUP-NIHIL/2026 |
|
|
Rp. 2.920.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 2002 |
UPA Bimbingan dan Konseling |
Maret 2026 |
525115 |
Penginapan |
2026-03-11 |
05/SPP-GUP/UNG.E3/KU/2026 |
2026-03-16 |
0579V |
Rp. 221.000 |
5 Hari |
|
| 2003 |
UPA Bimbingan dan Konseling |
Mei 2026 |
525115 |
Transport |
2026-05-20 |
15/UN47.E3/KU.01.00/SPP/GUP-IV/2026 |
2026-05-21 |
1121AF |
Rp. 2.500.000 |
1 Hari |
|
| 2004 |
UPA Pengembangan Karier dan Kewirausahaan |
Januari 2026 |
525115 |
Biaya Tiket Pesawat-PP Terkait Kegiatan Kelembagaan/Kerjasama Kemahasiswaan |
2026-03-11 |
06/SPP-GUP/UNG.E3/KU/2026 |
2026-03-16 |
0580V |
Rp. 5.256.560 |
5 Hari |
|
| 2005 |
UPA Bimbingan dan Konseling |
Juni 2026 |
525115 |
Transport |
2026-07-23 |
19/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1813AF |
Rp. 300.000 |
11 Hari |
|
| 2006 |
UPA Pengembangan Karier dan Kewirausahaan |
Maret 2026 |
525115 |
Biaya Tiket Pesawat-PP Terkait Kegiatan Kelembagaan/Kerjasama Kemahasiswaan |
2026-03-11 |
06/SPP-GUP/UNG.E3/KU/2026 |
2026-03-16 |
0580V |
Rp. 2.948.900 |
5 Hari |
|
| 2007 |
UPA Bimbingan dan Konseling |
September 2026 |
525115 |
Transport |
2026-09-24 |
29/UN47.E3/KU.01.00/SPP/TUP-NIHIL/2026 |
2026-09-28 |
2531AF |
Rp. 2.190.000 |
4 Hari |
|
| 2008 |
UPA Pengembangan Karier dan Kewirausahaan |
April 2026 |
525115 |
Biaya Tiket Pesawat-PP Terkait Kegiatan Kelembagaan/Kerjasama Kemahasiswaan |
2026-05-11 |
16/SPP-GUP/UN47.E3/KU/2026 |
2026-05-26 |
1163V |
Rp. 11.771.600 |
15 Hari |
|
| 2009 |
UPA Bimbingan dan Konseling |
Oktober 2026 |
525115 |
Transport |
2026-10-05 |
37/UN47.E3/KU.01.00/SPP/GUP-NIHIL/2026 |
|
|
Rp. 730.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 2010 |
UPA Pengembangan Karier dan Kewirausahaan |
Agustus 2026 |
525115 |
Biaya Tiket Pesawat-PP Terkait Kegiatan Kelembagaan/Kerjasama Kemahasiswaan |
2026-09-24 |
50/SPP-GUP/UN47.E3/KU/2026 |
|
|
Rp. 9.513.090 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 2011 |
UPA Pengembangan Karier dan Kewirausahaan |
Agustus 2026 |
525115 |
Biaya Tiket Pesawat-PP Terkait Kegiatan Kelembagaan/Kerjasama Kemahasiswaan |
2026-09-24 |
50/SPP-GUP/UN47.E3/KU/2026 |
|
|
Rp. 20.783.857 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 2012 |
UPA Bimbingan dan Konseling |
Agustus 2026 |
525119 |
Bantuan Biaya Pendaftaran Seminar/Diklat |
2026-08-04 |
26/UN47.E3/KU.01.00/SPP/GUP-VI/2026 |
2026-08-13 |
1962AF |
Rp. 2.850.000 |
9 Hari |
|
| 2013 |
UPA Bimbingan dan Konseling |
September 2026 |
525119 |
Bantuan Biaya Pendaftaran Seminar/Diklat |
2026-09-24 |
34/UN47.E3/KU.01.00/SPP/GUP-VII/2026 |
|
|
Rp. 6.800.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 2014 |
UPA Pengembangan Karier dan Kewirausahaan |
Januari 2026 |
525115 |
Biaya Transport Lokal-PP Terkait Kegiatan Kelembagaan/Kerjasama Kemahasiswaan |
2026-03-11 |
06/SPP-GUP/UNG.E3/KU/2026 |
2026-03-16 |
0580V |
Rp. 1.012.000 |
5 Hari |
|
| 2015 |
UPA Bimbingan dan Konseling |
Oktober 2026 |
525119 |
Bantuan Biaya Pendaftaran Seminar/Diklat |
2026-10-05 |
38/UN47.E3/KU.01.00/SPP/GUP-NIHIL/2026 |
|
|
Rp. 5.350.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 2016 |
UPA Pengembangan Karier dan Kewirausahaan |
Januari 2026 |
525115 |
Biaya Hotel/Penginapan Terkait Kegiatan Kelembagaan/Kerjasama Kemahasiswaan |
2026-03-11 |
06/SPP-GUP/UNG.E3/KU/2026 |
2026-03-16 |
0580V |
Rp. 2.100.000 |
5 Hari |
|
| 2017 |
UPA Pengembangan Karier dan Kewirausahaan |
Maret 2026 |
525115 |
Biaya Hotel/Penginapan Terkait Kegiatan Kelembagaan/Kerjasama Kemahasiswaan |
2026-03-11 |
06/SPP-GUP/UNG.E3/KU/2026 |
2026-03-16 |
0580V |
Rp. 1.660.000 |
5 Hari |
|
| 2018 |
UPA Bimbingan dan Konseling |
Maret 2026 |
525112 |
Konsumsi Rapat Evaluasi Kinerja Triwulan |
2026-04-06 |
06/UN47.E3/KU.01.00/SPP/GUP-II/2026 |
2026-04-16 |
0824AF |
Rp. 414.000 |
10 Hari |
|
| 2019 |
UPA Pengembangan Karier dan Kewirausahaan |
Agustus 2026 |
525115 |
Biaya Hotel/Penginapan Terkait Kegiatan Kelembagaan/Kerjasama Kemahasiswaan |
2026-05-11 |
16/SPP-GUP/UN47.E3/KU/2026 |
2026-05-26 |
1163V |
Rp. 7.280.000 |
15 Hari |
|
| 2020 |
UPA Bimbingan dan Konseling |
Agustus 2026 |
525112 |
Konsumsi Rapat Evaluasi Kinerja Triwulan |
2026-08-04 |
25/UN47.E3/KU.01.00/SPP/GUP-VI/2026 |
2026-08-13 |
1963AF |
Rp. 681.250 |
9 Hari |
|
| 2021 |
UPA Bimbingan dan Konseling |
Oktober 2026 |
525112 |
Konsumsi Rapat Evaluasi Kinerja Triwulan |
2026-10-05 |
36/UN47.E3/KU.01.00/SPP/GUP-NIHIL/2026 |
|
|
Rp. 1.940.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 2022 |
UPA Pengembangan Karier dan Kewirausahaan |
Januari 2026 |
525115 |
Uang Harian Terkait Kegiatan Kelembagaan/Kerjasama Kemahasiswaan |
2026-03-11 |
06/SPP-GUP/UNG.E3/KU/2026 |
2026-03-16 |
0580V |
Rp. 1.590.000 |
5 Hari |
|
| 2023 |
UPA Pengembangan Karier dan Kewirausahaan |
Januari 2026 |
525115 |
Uang Harian Terkait Kegiatan Kelembagaan/Kerjasama Kemahasiswaan |
2026-03-11 |
06/SPP-GUP/UNG.E3/KU/2026 |
2026-03-16 |
0580V |
Rp. 2.120.000 |
5 Hari |
|
| 2024 |
UPA Bimbingan dan Konseling |
Januari 2026 |
525112 |
Biaya Konsumsi Tamu Pimpinan |
2026-02-20 |
03/UN47.E3/Ku.01.00/SPP/GUP-I/2026 |
2026-02-27 |
0267AF |
Rp. 1.200.000 |
7 Hari |
|
| 2025 |
UPA Pengembangan Karier dan Kewirausahaan |
Agustus 2026 |
525115 |
Uang Harian Terkait Kegiatan Kelembagaan/Kerjasama Kemahasiswaan |
2026-05-11 |
16/SPP-GUP/UN47.E3/KU/2026 |
2026-05-26 |
1163V |
Rp. 6.360.000 |
15 Hari |
|
| 2026 |
UPA Bimbingan dan Konseling |
Agustus 2026 |
525112 |
Biaya Konsumsi Tamu Pimpinan |
2026-08-04 |
25/UN47.E3/KU.01.00/SPP/GUP-VI/2026 |
2026-08-13 |
1963AF |
Rp. 968.750 |
9 Hari |
|
| 2027 |
UPA Bimbingan dan Konseling |
Oktober 2026 |
525112 |
Biaya Konsumsi Tamu Pimpinan |
2026-10-05 |
36/UN47.E3/KU.01.00/SPP/GUP-NIHIL/2026 |
|
|
Rp. 1.489.565 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 2028 |
UPA Pengembangan Karier dan Kewirausahaan |
April 2026 |
525119 |
Biaya Sewa Mobil Operasional Dinas Pimpinan (KDO) |
2026-04-06 |
13/SPP-LS/UN47.E3/KU/2026 |
2026-04-10 |
0747V |
Rp. 19.500.000 |
4 Hari |
|
| 2029 |
UPA Bimbingan dan Konseling |
Januari 2026 |
525119 |
Paket Meeting Kegiatan Rapat Kerja UPA BK |
2026-02-20 |
04/UN47.E3/KU.01.00/SPP/GUP-I/2026 |
2026-02-27 |
0266AF |
Rp. 15.125.000 |
7 Hari |
|
| 2030 |
UPA Pengembangan Karier dan Kewirausahaan |
Juli 2026 |
525119 |
Biaya Sewa Mobil Operasional Dinas Pimpinan (KDO) |
2026-08-12 |
36/SPP.GUP/UN47.E3/KU/2026 |
2026-08-24 |
2061V |
Rp. 19.500.000 |
12 Hari |
|
| 2031 |
UPA Pengembangan Karier dan Kewirausahaan |
April 2026 |
525119 |
Biaya Sewa Mobil Operasional Dinas Pimpinan (KDO) |
|
|
|
|
Rp. 19.500.000 |
188 Hari |
Belum ada SPP dan SP2D terhitung dari 1 April 2026 hingga 06 Oktober 2026 (188 Hari) |
| 2032 |
UPA Bimbingan dan Konseling |
April 2026 |
525119 |
Biaya Cetak Leaflet/Flyer/Banner untuk Sosialisasi |
2026-04-27 |
11/UN47.E3/KU.01.00/SPP/GUP-III/2026 |
2026-04-30 |
0954AF |
Rp. 3.000.000 |
3 Hari |
|
| 2033 |
UPA Bimbingan dan Konseling |
September 2026 |
525119 |
Pelaksanaan Sosialisasi Manajemen Resiko |
2026-09-24 |
51/SPP-GUP/UN47.E3/KU/2026 |
|
|
Rp. 9.291.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 2034 |
UPA Bimbingan dan Konseling |
Juli 2026 |
525119 |
Pelaksanaan Sosialisasi Manajemen Resiko |
2026-07-23 |
20/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1814AF |
Rp. 925.000 |
11 Hari |
|
| 2035 |
UPA Pengembangan Karier dan Kewirausahaan |
Maret 2026 |
525119 |
Biaya Pembuatan/Pengembangan Aplikasi Survey Kepuasan Pengguna Lulusan |
2026-03-11 |
04/SPP-LS/UNG.E3/KU/2026 |
2026-03-16 |
0577V |
Rp. 37.500.000 |
5 Hari |
|
| 2036 |
UPA Bimbingan dan Konseling |
Juli 2026 |
525119 |
Pelaksanaan Kegiatan Penjajakan Kerjasama Produktif dengan institusi Non Industri dan Non Perguruan Tinggi |
2026-07-23 |
23/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1817AF |
Rp. 5.000.000 |
11 Hari |
|
| 2037 |
UPA Bimbingan dan Konseling |
Juni 2026 |
525119 |
Pelaksanaan Kegiatan Penjajakan Kerjasama Produktif dengan institusi Non Industri dan Non Perguruan Tinggi |
2026-09-24 |
30/UN47.E3/KU.01.00/SPP/TUP-NIHIL/2026 |
2026-09-28 |
2530AF |
Rp. 2.500.000 |
4 Hari |
|
| 2038 |
UPA Pengembangan Karier dan Kewirausahaan |
Juni 2026 |
525111 |
Honorarium PPK Unit |
2026-06-25 |
27/SPP-GUP/UN47.E3/KU/2026 |
2026-07-02 |
1453V |
Rp. 2.300.000 |
7 Hari |
|
| 2039 |
UPA Bimbingan dan Konseling |
Oktober 2026 |
525119 |
Pelaksanaan Kegiatan Penjajakan Kerjasama Produktif dengan institusi Non Industri dan Non Perguruan Tinggi |
2026-10-05 |
40/UN47.E3/KU.01.00/SPP/GUP-NIHIL/2026 |
|
|
Rp. 2.500.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 2040 |
UPA Pengembangan Karier dan Kewirausahaan |
Juli 2026 |
525111 |
Honorarium PPK Unit |
2026-08-12 |
37/SPP.GUP/UN47.E3/KU/2026 |
2026-08-24 |
2062V |
Rp. 2.300.000 |
12 Hari |
|
| 2041 |
UPA Bimbingan dan Konseling |
Maret 2026 |
525111 |
Honorarium PPK Unit Kerja UPA BK |
2026-04-06 |
07/UN47.E3/KU.01.00/SPP/GUP-II/2026 |
2026-04-16 |
0825AF |
Rp. 610.000 |
10 Hari |
|
| 2042 |
UPA Pengembangan Karier dan Kewirausahaan |
Maret 2026 |
525111 |
Honorarium Verifikator Unit |
2026-03-11 |
08/SPP-GUP/UNG.E3/KU/2026 |
2026-03-16 |
0581V |
Rp. 940.000 |
5 Hari |
|
| 2043 |
UPA Bimbingan dan Konseling |
April 2026 |
525111 |
Honorarium PPK Unit Kerja UPA BK |
2026-04-27 |
13/UN47.E3/KU.01.00/SPP/GUP-III/2026 |
2026-04-30 |
0957AF |
Rp. 1.220.000 |
3 Hari |
|
| 2044 |
UPA Pengembangan Karier dan Kewirausahaan |
Juni 2026 |
525111 |
Honorarium Verifikator Unit |
2026-06-25 |
27/SPP-GUP/UN47.E3/KU/2026 |
2026-07-02 |
1453V |
Rp. 940.000 |
7 Hari |
|
| 2045 |
UPA Bimbingan dan Konseling |
Mei 2026 |
525111 |
Honorarium PPK Unit Kerja UPA BK |
2026-05-20 |
16/UN47.E3/KU.01.00/SPP/GUP-IV/2026 |
2026-05-21 |
1120AF |
Rp. 610.000 |
1 Hari |
|
| 2046 |
UPA Pengembangan Karier dan Kewirausahaan |
Juli 2026 |
525111 |
Honorarium Verifikator Unit |
2026-08-12 |
37/SPP.GUP/UN47.E3/KU/2026 |
2026-08-24 |
2062V |
Rp. 940.000 |
12 Hari |
|
| 2047 |
UPA Bimbingan dan Konseling |
Juni 2026 |
525111 |
Honorarium PPK Unit Kerja UPA BK |
2026-07-23 |
22/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1816AF |
Rp. 610.000 |
11 Hari |
|
| 2048 |
UPA Bimbingan dan Konseling |
Januari 2026 |
525111 |
Honorarium PPK Unit Kerja UPA BK |
2026-07-23 |
22/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1816AF |
Rp. 610.000 |
11 Hari |
|
| 2049 |
UPA Pengembangan Karier dan Kewirausahaan |
Januari 2026 |
525112 |
Biaya ATM/ATK Perencanaan dan Pengelolaan Keuangan |
2026-03-11 |
09/SPP-GUP/UNG.E3/KU/2026 |
2026-03-16 |
0582V |
Rp. 1.665.000 |
5 Hari |
|
| 2050 |
UPA Pengembangan Karier dan Kewirausahaan |
Juli 2026 |
525112 |
Biaya ATM/ATK Perencanaan dan Pengelolaan Keuangan |
2026-08-12 |
38/SPP.GUP/UN47.E3/KU/2026 |
2026-08-24 |
2063V |
Rp. 1.500.000 |
12 Hari |
|
| 2051 |
UPA Bimbingan dan Konseling |
Maret 2026 |
525111 |
Honorarium Verifikator Unit Kerja UPA BK |
2026-04-06 |
07/UN47.E3/KU.01.00/SPP/GUP-II/2026 |
2026-04-16 |
0825AF |
Rp. 240.000 |
10 Hari |
|
| 2052 |
UPA Bimbingan dan Konseling |
April 2026 |
525111 |
Honorarium Verifikator Unit Kerja UPA BK |
2026-04-27 |
13/UN47.E3/KU.01.00/SPP/GUP-III/2026 |
2026-04-30 |
0957AF |
Rp. 480.000 |
3 Hari |
|
| 2053 |
UPA Pengembangan Karier dan Kewirausahaan |
Oktober 2026 |
525176 |
Honorarium Verifikator Unit |
|
|
|
|
Rp. 1.410.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2054 |
UPA Bimbingan dan Konseling |
Mei 2026 |
525111 |
Honorarium Verifikator Unit Kerja UPA BK |
2026-05-20 |
16/UN47.E3/KU.01.00/SPP/GUP-IV/2026 |
2026-05-21 |
1120AF |
Rp. 240.000 |
1 Hari |
|
| 2055 |
UPA Pengembangan Karier dan Kewirausahaan |
Juni 2026 |
525115 |
Biaya Tiket Pesawat-PP Terkait Kegiatan |
2026-08-12 |
39/SPP.GUP/UN47.E3/KU/2026 |
2026-08-24 |
2064V |
Rp. 6.600.000 |
12 Hari |
|
| 2056 |
UPA Bimbingan dan Konseling |
Juni 2026 |
525111 |
Honorarium Verifikator Unit Kerja UPA BK |
2026-07-23 |
22/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1816AF |
Rp. 240.000 |
11 Hari |
|
| 2057 |
UPA Pengembangan Karier dan Kewirausahaan |
September 2026 |
525115 |
Biaya Tiket Pesawat-PP Terkait Kegiatan |
2026-09-24 |
52/SPP-GUP/UN47.E3/KU/2026 |
|
|
Rp. 3.330.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 2058 |
UPA Bimbingan dan Konseling |
Juli 2026 |
525111 |
Honorarium Verifikator Unit Kerja UPA BK |
2026-07-23 |
22/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1816AF |
Rp. 240.000 |
11 Hari |
|
| 2059 |
UPA Pengembangan Karier dan Kewirausahaan |
September 2026 |
525115 |
Biaya Transport Lokal-PP Terkait Kegiatan |
2026-09-24 |
52/SPP-GUP/UN47.E3/KU/2026 |
|
|
Rp. 700.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 2060 |
UPA Bimbingan dan Konseling |
Maret 2026 |
525111 |
Honorarium PPK Unit Kerja UPA BK Desember 2025 |
2026-04-06 |
07/UN47.E3/KU.01.00/SPP/GUP-II/2026 |
2026-04-16 |
0825AF |
Rp. 730.000 |
10 Hari |
|
| 2061 |
UPA Pengembangan Karier dan Kewirausahaan |
Maret 2026 |
525115 |
Uang Harian Peserta Kegiatan |
2026-04-06 |
07/UN47.E3/KU.01.00/SPP/GUP-II/2026 |
2026-04-16 |
0825AF |
Rp. 290.000 |
10 Hari |
|
| 2062 |
UPA Bimbingan dan Konseling |
Oktober 2026 |
525176 |
Honorarium PPK Unit Kerja UPA BK |
2026-10-05 |
41/UN47.E3/KU.01.00/SPP/GUP-NIHIL/2026 |
|
|
Rp. 1.830.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 2063 |
UPA Bimbingan dan Konseling |
Oktober 2026 |
525176 |
Honorarium Verifikator Unit Kerja UPA BK |
2026-10-05 |
41/UN47.E3/KU.01.00/SPP/GUP-NIHIL/2026 |
|
|
Rp. 720.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 2064 |
UPA Bimbingan dan Konseling |
Agustus 2026 |
525119 |
Paket Meeting Pelatihan Manajemen Stress Pegawai dan Dosen |
2026-08-04 |
27/UN47.E3/KU.01.00/SPP/GUP-VI/2026 |
2026-08-13 |
1964AF |
Rp. 28.500.000 |
9 Hari |
|
| 2065 |
UPA Bimbingan dan Konseling |
Juli 2026 |
525119 |
Pelaksanaan Kegiatan Pencanangan Zona Integritas |
2026-07-23 |
23/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1817AF |
Rp. 3.050.000 |
11 Hari |
|
| 2066 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525114 |
Pemeliharaan AC |
2026-06-17 |
090/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1487S |
Rp. 3.397.959 |
16 Hari |
|
| 2067 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525114 |
Pemeliharan Printer, Komputer, Laptop, dan Peralatan elektronik kantor |
2026-04-02 |
042/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0649S |
Rp. 17.899.600 |
5 Hari |
|
| 2068 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525114 |
Pemeliharan Printer, Komputer, Laptop, dan Peralatan elektronik kantor |
2026-08-10 |
134/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1900S |
Rp. 14.750.000 |
2 Hari |
|
| 2069 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525114 |
Pemeliharan Printer, Komputer, Laptop, dan Peralatan elektronik kantor |
2026-09-16 |
169/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 6.275.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2070 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525114 |
Pemeliharaan Listrik dan Air |
2026-04-27 |
061/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0926S |
Rp. 39.650.000 |
2 Hari |
|
| 2071 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525114 |
Pemeliharaan Listrik dan Air |
|
|
|
|
Rp. 16.670.600 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2072 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525114 |
Pemeliharaan jaringan internet dan CCTV |
|
|
|
|
Rp. 6.323.800 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2073 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525114 |
Pemeliharan Gedung kantor bertingkat BAKP |
2026-03-02 |
035/UN47.A1/LS-BAKP/2026 |
2026-03-04 |
0307S |
Rp. 111.783.000 |
2 Hari |
|
| 2074 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525114 |
Pemeliharan Gedung kantor bertingkat BAKP |
2026-09-21 |
178/UN47.A1/LS-BAKP/2026 |
|
|
Rp. 49.723.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 2075 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525115 |
Tiket PP |
2026-06-08 |
085/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1300S |
Rp. 6.050.300 |
7 Hari |
|
| 2076 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525115 |
Tiket PP |
2026-06-17 |
095/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1492S |
Rp. 21.491.520 |
16 Hari |
|
| 2077 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525115 |
Tiket PP |
2026-08-10 |
139/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1905S |
Rp. 10.422.680 |
2 Hari |
|
| 2078 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525115 |
Tiket PP |
2026-09-15 |
163/UN47.A1/TUP NIHIL.7_BAKP/2026 |
2026-09-16 |
2357S |
Rp. 130.611.300 |
1 Hari |
|
| 2079 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525115 |
Tiket PP |
|
|
|
|
Rp. 3.947.070 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2080 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525115 |
Hotel |
2026-06-08 |
085/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1300S |
Rp. 750.000 |
7 Hari |
|
| 2081 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525115 |
Hotel |
2026-06-17 |
095/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1492S |
Rp. 5.962.401 |
16 Hari |
|
| 2082 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525115 |
Hotel |
2026-08-10 |
139/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1905S |
Rp. 5.740.000 |
2 Hari |
|
| 2083 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525115 |
Hotel |
2026-09-15 |
163/UN47.A1/TUP NIHIL.7_BAKP/2026 |
2026-09-16 |
2357S |
Rp. 36.945.709 |
1 Hari |
|
| 2084 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525115 |
Uang Harian |
2026-06-08 |
085/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1300S |
Rp. 1.230.000 |
7 Hari |
|
| 2085 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525115 |
Uang Harian |
2026-06-17 |
095/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1492S |
Rp. 11.480.000 |
16 Hari |
|
| 2086 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525115 |
Uang Harian |
2026-08-10 |
139/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1905S |
Rp. 2.460.000 |
2 Hari |
|
| 2087 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525115 |
Uang Harian |
2026-09-15 |
163/UN47.A1/TUP NIHIL.7_BAKP/2026 |
2026-09-16 |
2357S |
Rp. 65.600.000 |
1 Hari |
|
| 2088 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525115 |
Transport Lokal |
2026-06-08 |
085/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1300S |
Rp. 600.000 |
7 Hari |
|
| 2089 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525115 |
Transport Lokal |
2026-06-17 |
095/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1492S |
Rp. 2.226.000 |
16 Hari |
|
| 2090 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525115 |
Transport Lokal |
2026-08-10 |
139/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1905S |
Rp. 450.000 |
2 Hari |
|
| 2091 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525115 |
Transport Lokal |
2026-09-15 |
163/UN47.A1/TUP NIHIL.7_BAKP/2026 |
2026-09-16 |
2357S |
Rp. 24.198.321 |
1 Hari |
|
| 2092 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525112 |
Konsumsi berat dan ringan |
2026-02-11 |
021/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0183S |
Rp. 330.000 |
2 Hari |
|
| 2093 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525112 |
Konsumsi berat dan ringan |
2026-03-02 |
032/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0315S |
Rp. 3.780.000 |
2 Hari |
|
| 2094 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525112 |
Konsumsi berat dan ringan |
2026-04-02 |
047/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0654S |
Rp. 4.500.000 |
5 Hari |
|
| 2095 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525112 |
Konsumsi berat dan ringan |
2026-04-27 |
065/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0930S |
Rp. 2.550.000 |
2 Hari |
|
| 2096 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525112 |
Konsumsi berat dan ringan |
2026-06-08 |
084/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1299S |
Rp. 3.903.000 |
7 Hari |
|
| 2097 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525112 |
Konsumsi berat dan ringan |
2026-06-17 |
094/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1491S |
Rp. 1.989.000 |
16 Hari |
|
| 2098 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Konsumsi berat dan ringan |
2026-07-21 |
121/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1712S |
Rp. 7.298.000 |
7 Hari |
|
| 2099 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Konsumsi berat dan ringan |
2026-08-10 |
138/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1904S |
Rp. 1.998.000 |
2 Hari |
|
| 2100 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525112 |
Konsumsi berat dan ringan |
2026-09-01 |
154/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2199S |
Rp. 4.575.000 |
2 Hari |
|
| 2101 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525112 |
Konsumsi berat dan ringan |
2026-09-16 |
176/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 3.360.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2102 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525112 |
Konsumsi berat dan ringan |
|
|
|
|
Rp. 915.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2103 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-04-02 |
048/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0655S |
Rp. 28.000.000 |
5 Hari |
|
| 2104 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-04-27 |
066/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0931S |
Rp. 3.500.000 |
2 Hari |
|
| 2105 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-05-12 |
078/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1080S |
Rp. 60.150.000 |
6 Hari |
|
| 2106 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-06-08 |
086/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1301S |
Rp. 12.500.000 |
7 Hari |
|
| 2107 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-06-17 |
096/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1493S |
Rp. 50.912.400 |
16 Hari |
|
| 2108 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-07-13 |
109/UN47.A1/LS-BAKP/2026 |
2026-07-21 |
1653S |
Rp. 19.500.000 |
8 Hari |
|
| 2109 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-07-21 |
122/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1713S |
Rp. 125.000 |
7 Hari |
|
| 2110 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-08-10 |
140/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1944S |
Rp. 27.873.600 |
2 Hari |
|
| 2111 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-08-24 |
145/UN47.A1/LS-BAKP/2026 |
2026-08-26 |
2086S |
Rp. 240.000.000 |
2 Hari |
|
| 2112 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-09-01 |
155/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2198S |
Rp. 25.990.000 |
2 Hari |
|
| 2113 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-09-15 |
164/UN47.A1/TUP NIHIL.7-BAKP/2026 |
2026-09-16 |
2358S |
Rp. 37.950.000 |
1 Hari |
|
| 2114 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-09-16 |
177/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 11.200.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2115 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
bantuan Pelaksanaan PKKMB |
2026-08-24 |
143/UN47.A1/TUP NIHIL.6-BAKP |
2026-08-26 |
2115S |
Rp. 467.400.000 |
2 Hari |
|
| 2116 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525112 |
Konsumsi berat dan ringan |
2026-04-27 |
065/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0930S |
Rp. 1.400.000 |
2 Hari |
|
| 2117 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525119 |
Bantuan Belanja barang dan jasa lainnya terkait Kegiatan |
2026-02-11 |
022/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0184S |
Rp. 48.000.000 |
2 Hari |
|
| 2118 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Bantuan Belanja barang dan jasa lainnya terkait Kegiatan |
2026-03-02 |
033/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0316S |
Rp. 22.305.000 |
2 Hari |
|
| 2119 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Bantuan Belanja barang dan jasa lainnya terkait Kegiatan |
2026-06-08 |
087/UN47.A1/LS-BAKP/2026 |
2026-07-01 |
1434S |
Rp. 25.500.000 |
23 Hari |
|
| 2120 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525112 |
Belanja kebutuhan dasar kantor pada kegiatan |
2026-05-12 |
077/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1079S |
Rp. 6.250.500 |
6 Hari |
|
| 2121 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Belanja kebutuhan dasar kantor pada kegiatan |
2026-07-20 |
112/UN47.A1/TUP NIHIL.4-BAKP/2026 |
2026-07-24 |
1697S |
Rp. 6.950.000 |
4 Hari |
|
| 2122 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
bantuan biaya Aplikasi CAT |
2026-07-13 |
106/UN47.A1/LS-BAKP/2026 |
2026-07-24 |
1700S |
Rp. 47.500.000 |
11 Hari |
|
| 2123 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Honor Panitia kegiatan |
2026-07-20 |
113/UN47.A1/TUP NIHIL.4-BAKP/2026 |
2026-07-24 |
1698S |
Rp. 73.500.000 |
4 Hari |
|
| 2124 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Biaya Konsumsi Ringan dan Berat |
2026-07-20 |
112/UN47.A1/TUP NIHIL.4-BAKP/2026 |
2026-07-24 |
1697S |
Rp. 22.463.000 |
4 Hari |
|
| 2125 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Biaya Konsumsi Ringan dan Berat |
2026-07-21 |
121/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1712S |
Rp. 9.600.000 |
7 Hari |
|
| 2126 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Biaya Konsumsi Ringan dan Berat |
2026-08-10 |
138/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1904S |
Rp. 2.257.500 |
2 Hari |
|
| 2127 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525112 |
Konsumsi berat dan ringan |
2026-02-11 |
021/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0183S |
Rp. 587.000 |
2 Hari |
|
| 2128 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525112 |
Konsumsi berat dan ringan |
2026-03-02 |
032/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0315S |
Rp. 9.750.000 |
2 Hari |
|
| 2129 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525114 |
Biaya pemeliharaan server feeder PD DIKTI |
2026-06-30 |
101/UN47.A1/LS-BAKP/2026 |
2026-07-06 |
1500S |
Rp. 25.000.000 |
6 Hari |
|
| 2130 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
Bantuan pelaksanaan kegiatan sinkronisasi PD DIKTI |
2026-04-02 |
048/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0655S |
Rp. 13.500.000 |
5 Hari |
|
| 2131 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Bantuan pelaksanaan kegiatan sinkronisasi PD DIKTI |
2026-05-12 |
078/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1080S |
Rp. 12.525.000 |
6 Hari |
|
| 2132 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Bantuan pelaksanaan kegiatan sinkronisasi PD DIKTI |
2026-06-08 |
086/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1301S |
Rp. 12.375.000 |
7 Hari |
|
| 2133 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
Bantuan Pengembalian UKT mahasiswa Program KIP-K 2026 |
2026-03-10 |
039/UN47.A1/LS-BAKP/2026 |
2026-03-13 |
0500S |
Rp. 409.575.200 |
3 Hari |
|
| 2134 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Bantuan beasiswa Program For international Class (PIC) Tahun 2026 |
2026-08-24 |
143/UN47.A1/TUP NIHIL.6-BAKP |
2026-08-26 |
2115S |
Rp. 76.500.000 |
2 Hari |
|
| 2135 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Bantuan beasiswa Program For international Class (PIC) Tahun 2026 |
2026-09-15 |
164/UN47.A1/TUP NIHIL.7-BAKP/2026 |
2026-09-16 |
2358S |
Rp. 17.000.000 |
1 Hari |
|
| 2136 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Bantuan biaya kegiatan ORMAWA mahasiswa (senat fakultas dan HMJ) |
2026-04-27 |
066/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0931S |
Rp. 2.500.000 |
2 Hari |
|
| 2137 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525119 |
Bantuan biaya kegiatan ORMAWA mahasiswa (senat fakultas dan HMJ) |
|
|
|
|
Rp. 38.053.801 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2138 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Pembinaan BEM , UKM dan UKK |
2026-05-12 |
078/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1080S |
Rp. 58.000.000 |
6 Hari |
|
| 2139 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Pembinaan BEM , UKM dan UKK |
2026-06-08 |
086/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1301S |
Rp. 23.500.000 |
7 Hari |
|
| 2140 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525119 |
Pembinaan BEM , UKM dan UKK |
2026-06-17 |
096/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1493S |
Rp. 20.650.000 |
16 Hari |
|
| 2141 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Pembinaan BEM , UKM dan UKK |
2026-09-01 |
155/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2198S |
Rp. 15.562.500 |
2 Hari |
|
| 2142 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Pembinaan BEM , UKM dan UKK |
2026-09-16 |
177/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 19.783.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2143 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525119 |
Pembinaan BEM , UKM dan UKK |
|
|
|
|
Rp. 2.000.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2144 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Kalender akademik untuk mahasiswa baru |
2026-09-02 |
156/UN47.A1/LS-BAKP/2026 |
2026-09-10 |
2255S |
Rp. 47.844.000 |
8 Hari |
|
| 2145 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Kalender akademik untuk mahasiswa baru |
2026-09-16 |
177/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 20.556.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2146 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Bantuan Pelaksanaan PEKSIMINAS |
2026-08-07 |
131/UN47.A1/LS-BAKP/2026 |
2026-08-12 |
1896S |
Rp. 105.000.000 |
5 Hari |
|
| 2147 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Bantuan Pelaksanaan PEKSIMINAS |
2026-08-24 |
143/UN47.A1/TUP NIHIL.6-BAKP |
2026-08-26 |
2115S |
Rp. 50.400.000 |
2 Hari |
|
| 2148 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Bantuan Pelaksanaan PEKSIMINAS |
2026-09-02 |
157/UN47.A1/LS-BAKP/2026 |
2026-09-03 |
2196S |
Rp. 200.000.000 |
1 Hari |
|
| 2149 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Bantuan Pelaksanaan PEKSIMINAS |
2026-09-15 |
164/UN47.A1/TUP NIHIL.7-BAKP/2026 |
2026-09-16 |
2358S |
Rp. 74.150.000 |
1 Hari |
|
| 2150 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525112 |
Belanja kebutuhan dasar kantor terkait kegiatan |
2026-02-10 |
012/UN47.A1/TUP NIHIL.1-BAKP/2026 |
2026-02-12 |
0165S |
Rp. 8.595.200 |
2 Hari |
|
| 2151 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525112 |
Belanja kebutuhan dasar kantor terkait kegiatan |
2026-04-02 |
047/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0654S |
Rp. 12.850.000 |
5 Hari |
|
| 2152 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525112 |
Belanja kebutuhan dasar kantor terkait kegiatan |
2026-04-21 |
053/UN47.A1/TUP NIHIL.2-BAKP/2026 |
2026-04-28 |
0908S |
Rp. 8.787.400 |
7 Hari |
|
| 2153 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525112 |
Belanja kebutuhan dasar kantor terkait kegiatan |
2026-06-29 |
098/UN47.A1/TUP NIHIL.3-BAKP/2026 |
2026-07-03 |
1479S |
Rp. 5.530.500 |
4 Hari |
|
| 2154 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Belanja kebutuhan dasar kantor terkait kegiatan |
2026-08-03 |
127/UN47.A1/TUP NIHIL.5-BAKP/2026 |
2026-08-11 |
1891S |
Rp. 6.382.700 |
8 Hari |
|
| 2155 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Belanja kebutuhan dasar kantor terkait kegiatan |
2026-08-10 |
138/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1904S |
Rp. 1.500.000 |
2 Hari |
|
| 2156 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525112 |
Belanja kebutuhan dasar kantor terkait kegiatan |
|
|
|
|
Rp. 9.177.500 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2157 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525112 |
Konsumsi ringan |
2026-02-10 |
012/UN47.A1/TUP NIHIL.1-BAKP/2026 |
2026-02-12 |
0165S |
Rp. 32.460.000 |
2 Hari |
|
| 2158 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525112 |
Konsumsi ringan |
2026-03-02 |
032/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0315S |
Rp. 600.000 |
2 Hari |
|
| 2159 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525112 |
Konsumsi ringan |
2026-04-21 |
053/UN47.A1/TUP NIHIL.2-BAKP/2026 |
2026-04-28 |
0908S |
Rp. 33.200.000 |
7 Hari |
|
| 2160 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525112 |
Konsumsi ringan |
2026-06-29 |
098/UN47.A1/TUP NIHIL.3-BAKP/2026 |
2026-07-03 |
1479S |
Rp. 33.100.000 |
4 Hari |
|
| 2161 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Konsumsi ringan |
2026-08-03 |
127/UN47.A1/TUP NIHIL.5-BAKP/2026 |
2026-08-11 |
1891S |
Rp. 33.100.000 |
8 Hari |
|
| 2162 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Konsumsi ringan |
2026-08-10 |
138/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1904S |
Rp. 600.000 |
2 Hari |
|
| 2163 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525112 |
Konsumsi ringan |
|
|
|
|
Rp. 33.100.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2164 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525112 |
Konsumsi ringan |
|
|
|
|
Rp. 375.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2165 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525112 |
Konsumsi berat |
2026-02-10 |
012/UN47.A1/TUP NIHIL.1-BAKP/2026 |
2026-02-12 |
0165S |
Rp. 39.900.000 |
2 Hari |
|
| 2166 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525112 |
Konsumsi berat |
2026-03-02 |
032/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0315S |
Rp. 512.000 |
2 Hari |
|
| 2167 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525112 |
Konsumsi berat |
2026-04-21 |
053/UN47.A1/TUP NIHIL.2-BAKP/2026 |
2026-04-28 |
0908S |
Rp. 43.317.000 |
7 Hari |
|
| 2168 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525112 |
Konsumsi berat |
2026-04-27 |
065/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0930S |
Rp. 1.960.000 |
2 Hari |
|
| 2169 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525112 |
Konsumsi berat |
2026-06-29 |
098/UN47.A1/TUP NIHIL.3-BAKP/2026 |
2026-07-03 |
1479S |
Rp. 44.517.000 |
4 Hari |
|
| 2170 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Konsumsi berat |
2026-07-21 |
121/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1712S |
Rp. 1.925.000 |
7 Hari |
|
| 2171 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Konsumsi berat |
2026-08-03 |
127/UN47.A1/TUP NIHIL.5-BAKP/2026 |
2026-08-11 |
1891S |
Rp. 39.117.000 |
8 Hari |
|
| 2172 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Konsumsi berat |
2026-08-10 |
138/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1904S |
Rp. 4.620.000 |
2 Hari |
|
| 2173 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525112 |
Konsumsi berat |
|
|
|
|
Rp. 44.227.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2174 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525113 |
Honor panitia kegiatan |
2026-02-10 |
013/UN47.A1/TUP NIHIL.1-BAKP/2026 |
2026-02-12 |
0166S |
Rp. 35.054.400 |
2 Hari |
|
| 2175 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525113 |
Honor panitia kegiatan |
2026-04-21 |
054/UN47.A1/TUP NIHIL.2-BAKP/2026 |
2026-04-28 |
0909S |
Rp. 35.804.400 |
7 Hari |
|
| 2176 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525113 |
Honor panitia kegiatan |
2026-06-29 |
099/UN47.A1/TUP NIHIL.3-BAKP/2026 |
2026-07-03 |
1480S |
Rp. 36.067.600 |
4 Hari |
|
| 2177 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525113 |
Honor panitia kegiatan |
2026-08-03 |
128/UN47.A1/TUP NIHIL.5-BAKP/2026 |
2026-08-11 |
1892S |
Rp. 36.078.000 |
8 Hari |
|
| 2178 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525113 |
Honor panitia kegiatan |
|
|
|
|
Rp. 35.889.450 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2179 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Belanja Kertas Ijazah |
2026-07-13 |
107UN47.A/LS-BAKP/2026 |
2026-07-30 |
1775S |
Rp. 113.775.000 |
17 Hari |
|
| 2180 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Belanja Kertas SKPI |
2026-07-20 |
114/UN47.A1/LS-BAKP/2026 |
2026-08-03 |
1803S |
Rp. 224.700.000 |
14 Hari |
|
| 2181 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Belanja Kertas Transkrip Nilai |
2026-07-13 |
108/UN47.A1/LS-BAKP/2026 |
2026-08-03 |
1805S |
Rp. 97.125.000 |
21 Hari |
|
| 2182 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Belanja Penyediaan barang dan jasa lainnya terkait kegiatan |
2026-02-10 |
014/UN47.A1/TUP NIHIL.1-BAKP/2026 |
2026-02-12 |
0167S |
Rp. 329.622.900 |
2 Hari |
|
| 2183 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Belanja Penyediaan barang dan jasa lainnya terkait kegiatan |
2026-04-21 |
055/UN47.A1/TUP NIHIL.2-BAKP/2026 |
2026-04-28 |
0910S |
Rp. 374.402.900 |
7 Hari |
|
| 2184 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Belanja Penyediaan barang dan jasa lainnya terkait kegiatan |
2026-04-22 |
056/UN47.A1/LS-BAKP/2026 |
2026-04-28 |
0907S |
Rp. 48.500.000 |
6 Hari |
|
| 2185 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Belanja Penyediaan barang dan jasa lainnya terkait kegiatan |
2026-04-22 |
058/UN47.A1/LS-BAKP/2026 |
2026-04-28 |
0912S |
Rp. 12.125.000 |
6 Hari |
|
| 2186 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Belanja Penyediaan barang dan jasa lainnya terkait kegiatan |
2026-04-27 |
066/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0931S |
Rp. 8.025.000 |
2 Hari |
|
| 2187 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525119 |
Belanja Penyediaan barang dan jasa lainnya terkait kegiatan |
2026-06-29 |
100/UN47.A1/TUP NIHIL.3-BAKP/2026 |
2026-07-03 |
1481S |
Rp. 377.469.400 |
4 Hari |
|
| 2188 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Belanja Penyediaan barang dan jasa lainnya terkait kegiatan |
2026-07-21 |
122/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1713S |
Rp. 39.625.000 |
7 Hari |
|
| 2189 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Belanja Penyediaan barang dan jasa lainnya terkait kegiatan |
2026-08-03 |
129/UN47.A1/TUP NIHIL.5-BAKP/2026 |
2026-08-11 |
1893S |
Rp. 383.002.900 |
8 Hari |
|
| 2190 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Belanja Penyediaan barang dan jasa lainnya terkait kegiatan |
2026-08-10 |
140/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1944S |
Rp. 6.750.000 |
2 Hari |
|
| 2191 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Belanja Penyediaan barang dan jasa lainnya terkait kegiatan |
2026-08-07 |
130/UN47.A1/LS-BAKP/2026 |
2026-08-13 |
1948S |
Rp. 40.000.000 |
6 Hari |
|
| 2192 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Belanja Penyediaan barang dan jasa lainnya terkait kegiatan |
|
|
|
|
Rp. 359.913.400 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2193 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Bantuan biaya terjemahan dan translate indonesia - inggris SKPI |
2026-07-13 |
105/UN47.A1/LS-BAKP/2026 |
2026-07-29 |
1753S |
Rp. 128.000.000 |
16 Hari |
|
| 2194 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525112 |
Belanja kebutuhan dasar kantor |
2026-02-11 |
016/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0178S |
Rp. 16.471.900 |
2 Hari |
|
| 2195 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525112 |
Belanja kebutuhan dasar kantor |
2026-03-02 |
027/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0310S |
Rp. 8.250.000 |
2 Hari |
|
| 2196 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525112 |
Belanja kebutuhan dasar kantor |
2026-04-27 |
059/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0924S |
Rp. 2.324.500 |
2 Hari |
|
| 2197 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525112 |
Belanja kebutuhan dasar kantor |
2026-05-12 |
071/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1073S |
Rp. 7.778.000 |
6 Hari |
|
| 2198 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Belanja kebutuhan dasar kantor |
2026-07-21 |
115/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1706S |
Rp. 7.845.900 |
7 Hari |
|
| 2199 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525112 |
Belanja kebutuhan dasar kantor |
2026-09-01 |
147/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2206S |
Rp. 4.155.200 |
2 Hari |
|
| 2200 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525112 |
Belanja kebutuhan dasar kantor |
2026-09-16 |
167/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 15.350.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2201 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525112 |
Belanja kebutuhan dasar kantor |
|
|
|
|
Rp. 346.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2202 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Pencetakan Kartu Mahasiswa |
2026-07-28 |
125/UN47.A1/LS-BAKP/2026 |
2026-08-03 |
1801S |
Rp. 131.257.000 |
6 Hari |
|
| 2203 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525119 |
Pencetakan Kartu Mahasiswa |
|
|
|
|
Rp. 35.224.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2204 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan Perkantoran |
2026-02-11 |
017/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0179S |
Rp. 10.057.600 |
2 Hari |
|
| 2205 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan Perkantoran |
2026-03-02 |
028/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0311S |
Rp. 2.302.000 |
2 Hari |
|
| 2206 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan Perkantoran |
2026-04-02 |
041/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0648S |
Rp. 773.000 |
5 Hari |
|
| 2207 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan Perkantoran |
2026-04-27 |
060/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0925S |
Rp. 5.189.500 |
2 Hari |
|
| 2208 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan Perkantoran |
2026-05-12 |
072/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1074S |
Rp. 5.293.900 |
6 Hari |
|
| 2209 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan Perkantoran |
2026-06-08 |
080/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1295S |
Rp. 6.857.800 |
7 Hari |
|
| 2210 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan Perkantoran |
2026-07-21 |
116/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1707S |
Rp. 6.797.800 |
7 Hari |
|
| 2211 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan Perkantoran |
2026-09-01 |
148/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2205S |
Rp. 3.468.900 |
2 Hari |
|
| 2212 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan Perkantoran |
2026-09-16 |
168/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 1.953.400 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2213 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan Perkantoran |
|
|
|
|
Rp. 270.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2214 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Biaya Penyediaan Batik Seragam Kantor |
2026-08-10 |
133/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1899S |
Rp. 19.475.000 |
2 Hari |
|
| 2215 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525112 |
Belanja Konsumsi Berat Rapat |
2026-02-11 |
016/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0178S |
Rp. 1.850.000 |
2 Hari |
|
| 2216 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525112 |
Belanja Konsumsi Berat Rapat |
2026-04-02 |
040/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0647S |
Rp. 3.600.000 |
5 Hari |
|
| 2217 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525112 |
Belanja Konsumsi Berat Rapat |
2026-05-12 |
071/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1073S |
Rp. 1.600.000 |
6 Hari |
|
| 2218 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525112 |
Belanja Konsumsi Ringan Rapat |
2026-05-12 |
071/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1073S |
Rp. 600.000 |
6 Hari |
|
| 2219 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525112 |
Belanja Konsumsi Ringan Rapat |
2026-06-08 |
079/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1294S |
Rp. 928.000 |
7 Hari |
|
| 2220 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Belanja Konsumsi Ringan Rapat |
2026-07-21 |
115/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1706S |
Rp. 580.000 |
7 Hari |
|
| 2221 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525112 |
Belanja Konsumsi Ringan Rapat |
2026-09-01 |
147/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2206S |
Rp. 900.000 |
2 Hari |
|
| 2222 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait rapat kerja |
2026-04-02 |
041/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0648S |
Rp. 1.500.000 |
5 Hari |
|
| 2223 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait rapat kerja |
2026-05-12 |
072/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1074S |
Rp. 54.000 |
6 Hari |
|
| 2224 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait rapat kerja |
2026-08-10 |
133/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1899S |
Rp. 2.627.000 |
2 Hari |
|
| 2225 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait rapat kerja |
2026-09-01 |
148/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2205S |
Rp. 2.035.000 |
2 Hari |
|
| 2226 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait rapat kerja |
2026-09-16 |
168/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 1.860.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2227 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait rapat kerja |
|
|
|
|
Rp. 1.707.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2228 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Bantuan Belanja Operasional KDO |
2026-03-02 |
028/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0311S |
Rp. 29.999.800 |
2 Hari |
|
| 2229 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
Bantuan Belanja Operasional KDO |
2026-04-02 |
041/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0648S |
Rp. 14.999.900 |
5 Hari |
|
| 2230 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Bantuan Belanja Operasional KDO |
2026-04-27 |
060/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0925S |
Rp. 14.999.900 |
2 Hari |
|
| 2231 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Bantuan Belanja Operasional KDO |
2026-06-08 |
080/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1295S |
Rp. 14.999.900 |
7 Hari |
|
| 2232 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Bantuan Belanja Operasional KDO |
2026-07-14 |
110/UN47.A1/LS-BAKP/2026 |
2026-07-22 |
1678S |
Rp. 14.999.900 |
8 Hari |
|
| 2233 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Bantuan Belanja Operasional KDO |
2026-07-21 |
116/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1707S |
Rp. 14.999.900 |
7 Hari |
|
| 2234 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Bantuan Belanja Operasional KDO |
2026-09-01 |
148/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2205S |
Rp. 14.999.900 |
2 Hari |
|
| 2235 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Bantuan Belanja Operasional KDO |
2026-09-15 |
161/UN47.A1/LS-BAKP/2026 |
|
|
Rp. 14.999.900 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 2236 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525119 |
Biaya Operasional KDO Pimpinan (Eselon II) |
2026-02-11 |
017/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0179S |
Rp. 500.000 |
2 Hari |
|
| 2237 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Biaya Operasional KDO Pimpinan (Eselon II) |
2026-03-02 |
028/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0311S |
Rp. 1.850.000 |
2 Hari |
|
| 2238 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
Biaya Operasional KDO Pimpinan (Eselon II) |
2026-04-02 |
041/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0648S |
Rp. 1.400.000 |
5 Hari |
|
| 2239 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Biaya Operasional KDO Pimpinan (Eselon II) |
2026-05-12 |
072/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1074S |
Rp. 1.092.260 |
6 Hari |
|
| 2240 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Biaya Operasional KDO Pimpinan (Eselon II) |
2026-07-21 |
116/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1707S |
Rp. 1.849.000 |
7 Hari |
|
| 2241 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Biaya Operasional KDO Pimpinan (Eselon II) |
2026-08-10 |
133/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1899S |
Rp. 700.000 |
2 Hari |
|
| 2242 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Biaya Operasional KDO Pimpinan (Eselon II) |
2026-09-01 |
148/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2205S |
Rp. 700.000 |
2 Hari |
|
| 2243 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Biaya Operasional KDO Pimpinan (Eselon II) |
2026-09-16 |
168/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 1.000.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2244 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
Pemeliharaan KDO Plat Merah |
2026-04-02 |
041/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0648S |
Rp. 11.326.550 |
5 Hari |
|
| 2245 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Pemeliharaan KDO Plat Merah |
2026-05-12 |
072/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1074S |
Rp. 674.892 |
6 Hari |
|
| 2246 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Pemeliharaan KDO Plat Merah |
2026-09-01 |
148/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2205S |
Rp. 10.000.000 |
2 Hari |
|
| 2247 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525115 |
Tiket PP |
2026-02-11 |
019/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0181S |
Rp. 21.663.520 |
2 Hari |
|
| 2248 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525115 |
Tiket PP |
2026-06-17 |
092/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1489S |
Rp. 20.480.420 |
16 Hari |
|
| 2249 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525115 |
Tiket PP |
2026-09-01 |
150/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2203S |
Rp. 8.847.920 |
2 Hari |
|
| 2250 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525115 |
Tiket PP |
2026-09-15 |
162/UN47.A1/TUP NIHIL.7_BAKP/2026 |
2026-09-16 |
2356S |
Rp. 1.431.900 |
1 Hari |
|
| 2251 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525115 |
Hotel |
2026-02-11 |
019/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0181S |
Rp. 5.318.100 |
2 Hari |
|
| 2252 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525115 |
Hotel |
2026-06-17 |
092/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1489S |
Rp. 4.394.505 |
16 Hari |
|
| 2253 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525115 |
Hotel |
2026-09-01 |
150/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2203S |
Rp. 21.376.800 |
2 Hari |
|
| 2254 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525115 |
Hotel |
2026-09-15 |
162/UN47.A1/TUP NIHIL.7_BAKP/2026 |
2026-09-16 |
2356S |
Rp. 7.458.770 |
1 Hari |
|
| 2255 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525115 |
Uang Harian |
2026-02-11 |
019/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0181S |
Rp. 6.890.000 |
2 Hari |
|
| 2256 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525115 |
Uang Harian |
2026-06-17 |
092/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1489S |
Rp. 4.770.000 |
16 Hari |
|
| 2257 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525115 |
Uang Harian |
2026-09-01 |
150/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2203S |
Rp. 15.120.000 |
2 Hari |
|
| 2258 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525115 |
Uang Harian |
2026-09-15 |
162/UN47.A1/TUP NIHIL.7_BAKP/2026 |
2026-09-16 |
2356S |
Rp. 5.000.000 |
1 Hari |
|
| 2259 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525115 |
Transport Lokal |
2026-02-11 |
019/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0181S |
Rp. 3.536.000 |
2 Hari |
|
| 2260 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525115 |
Transport Lokal |
2026-06-17 |
092/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1489S |
Rp. 2.250.000 |
16 Hari |
|
| 2261 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525115 |
Transport Lokal |
2026-09-01 |
150/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2203S |
Rp. 9.750.000 |
2 Hari |
|
| 2262 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525115 |
Transport Lokal |
2026-09-15 |
162/UN47.A1/TUP NIHIL.7_BAKP/2026 |
2026-09-16 |
2356S |
Rp. 2.930.000 |
1 Hari |
|
| 2263 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Biaya Paket Meeting Kegiatan Perencanaan |
2026-02-04 |
009/UN47.A1/LS-BAKP/2026 |
2026-02-06 |
0137S |
Rp. 67.500.000 |
2 Hari |
|
| 2264 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Biaya Paket Meeting Kegiatan Perencanaan |
2026-02-10 |
011/UN47.A1/TUP NIHIL.1-BAKP/2026 |
2026-02-12 |
0164S |
Rp. 81.800.000 |
2 Hari |
|
| 2265 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525111 |
Insentif Pejabat Pembuat Komitmen (PPK) Unit kerja |
2026-04-02 |
043/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0650S |
Rp. 3.500.000 |
5 Hari |
|
| 2266 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525111 |
Insentif Pejabat Pembuat Komitmen (PPK) Unit kerja |
2026-05-12 |
073/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1075S |
Rp. 3.500.000 |
6 Hari |
|
| 2267 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525111 |
Insentif Pejabat Pembuat Komitmen (PPK) Unit kerja |
2026-07-21 |
117/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1708S |
Rp. 3.500.000 |
7 Hari |
|
| 2268 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525111 |
Insentif Penguji Tagihan (verifikator) unit kerja |
2026-04-02 |
043/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0650S |
Rp. 1.500.000 |
5 Hari |
|
| 2269 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525111 |
Insentif Penguji Tagihan (verifikator) unit kerja |
2026-05-12 |
073/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1075S |
Rp. 1.500.000 |
6 Hari |
|
| 2270 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525111 |
Insentif Penguji Tagihan (verifikator) unit kerja |
2026-07-21 |
117/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1708S |
Rp. 1.500.000 |
7 Hari |
|
| 2271 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525112 |
Belanja Kebutuhan dasar terkait kegiatan |
2026-04-27 |
063/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0928S |
Rp. 11.800.000 |
2 Hari |
|
| 2272 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525112 |
Belanja Kebutuhan dasar terkait kegiatan |
2026-06-08 |
081/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1296S |
Rp. 10.000.000 |
7 Hari |
|
| 2273 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Belanja Kebutuhan dasar terkait kegiatan |
2026-08-10 |
135/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1901S |
Rp. 5.002.800 |
2 Hari |
|
| 2274 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525112 |
Belanja Kebutuhan dasar terkait kegiatan |
|
|
|
|
Rp. 15.086.250 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2275 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525112 |
Konsumsi berat dan ringan |
2026-02-11 |
018/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0180S |
Rp. 3.360.000 |
2 Hari |
|
| 2276 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525112 |
Konsumsi berat dan ringan |
2026-02-10 |
010/UN47.A1/TUP NIHIL.1-BAKP/2026 |
2026-02-12 |
0163S |
Rp. 4.556.000 |
2 Hari |
|
| 2277 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525112 |
Konsumsi berat dan ringan |
2026-03-02 |
029/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0312S |
Rp. 300.000 |
2 Hari |
|
| 2278 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525112 |
Konsumsi berat dan ringan |
2026-04-02 |
044/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0651S |
Rp. 1.020.000 |
5 Hari |
|
| 2279 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Konsumsi berat dan ringan |
2026-08-10 |
135/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1901S |
Rp. 4.250.000 |
2 Hari |
|
| 2280 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525112 |
Konsumsi berat dan ringan |
|
|
|
|
Rp. 320.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2281 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-02-11 |
020/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0182S |
Rp. 130.000 |
2 Hari |
|
| 2282 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-02-10 |
011/UN47.A1/TUP NIHIL.1-BAKP/2026 |
2026-02-12 |
0164S |
Rp. 35.400.000 |
2 Hari |
|
| 2283 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-03-02 |
031/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0314S |
Rp. 30.215.000 |
2 Hari |
|
| 2284 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-08-10 |
137/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1903S |
Rp. 130.000 |
2 Hari |
|
| 2285 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525176 |
Insentif Pejabat Pembuat Komitmen (PPK) Unit kerja |
2026-09-01 |
153/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2200S |
Rp. 1.750.000 |
2 Hari |
|
| 2286 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525176 |
Insentif Pejabat Pembuat Komitmen (PPK) Unit kerja |
2026-09-16 |
175/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 1.750.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2287 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525176 |
Insentif Penguji Tagihan (verifikator) unit kerja |
2026-09-01 |
153/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2200S |
Rp. 750.000 |
2 Hari |
|
| 2288 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525176 |
Insentif Penguji Tagihan (verifikator) unit kerja |
2026-09-16 |
175/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 750.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2289 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Bantuan Kegiatan Reviu Pagu Indikatif 2027 dan Finalisasi Dokumen RSB |
2026-07-31 |
126/UN47.A1/LS-BAKP/2026 |
2026-08-03 |
1820S |
Rp. 87.550.000 |
3 Hari |
|
| 2290 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIAT |
2026-01-23 |
003/UN47.A1/LS-BAKP/2026 |
2026-01-27 |
0109S |
Rp. 35.000.000 |
4 Hari |
|
| 2291 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIAT |
2026-02-12 |
023/UN47.A1/LS-BAKP/2026 |
2026-02-23 |
0211S |
Rp. 35.000.000 |
11 Hari |
|
| 2292 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIAT |
2026-03-09 |
037/UN47.A1/LS-BAKP/2026 |
2026-03-11 |
0446S |
Rp. 35.000.000 |
2 Hari |
|
| 2293 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIAT |
2026-04-07 |
050/UN47.A1/LS-BAKP/2026 |
2026-04-09 |
0731S |
Rp. 35.000.000 |
2 Hari |
|
| 2294 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIAT |
2026-05-11 |
068/UN47.A1/LS-BAKP/2026 |
2026-05-26 |
1158S |
Rp. 35.000.000 |
15 Hari |
|
| 2295 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIAT |
2026-06-09 |
088/UN47.A1/LS-BAKP/2026 |
2026-06-29 |
1349S |
Rp. 35.000.000 |
20 Hari |
|
| 2296 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIAT |
2026-07-13 |
103/UN47.A1/LS-BAKP/2026 |
2026-07-22 |
1679S |
Rp. 35.000.000 |
9 Hari |
|
| 2297 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIAT |
2026-08-10 |
141/UN47.A1/LS-BAKP/2026 |
2026-08-12 |
1897S |
Rp. 35.000.000 |
2 Hari |
|
| 2298 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIAT |
2026-09-02 |
158/UN47.A1/LS-BAKP/2026 |
2026-09-10 |
2256S |
Rp. 35.000.000 |
8 Hari |
|
| 2299 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIRBA |
2026-01-23 |
005/UN47.A1/LS-BAKP/2026 |
2026-01-27 |
0108S |
Rp. 25.000.000 |
4 Hari |
|
| 2300 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIRBA |
2026-03-02 |
031/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0314S |
Rp. 25.000.000 |
2 Hari |
|
| 2301 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIRBA |
2026-04-02 |
046/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0653S |
Rp. 25.000.000 |
5 Hari |
|
| 2302 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIRBA |
2026-04-27 |
064/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0929S |
Rp. 25.000.000 |
2 Hari |
|
| 2303 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIRBA |
2026-05-12 |
076/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1078S |
Rp. 25.000.000 |
6 Hari |
|
| 2304 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIRBA |
2026-06-17 |
093/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1490S |
Rp. 25.000.000 |
16 Hari |
|
| 2305 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIRBA |
2026-07-21 |
120/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1711S |
Rp. 25.000.000 |
7 Hari |
|
| 2306 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIRBA |
2026-09-01 |
151/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2202S |
Rp. 25.000.000 |
2 Hari |
|
| 2307 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIRBA |
2026-09-16 |
173/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 25.000.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2308 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIMANTAP |
2026-04-27 |
064/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0929S |
Rp. 45.000.000 |
2 Hari |
|
| 2309 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIMANTAP |
2026-07-21 |
120/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1711S |
Rp. 45.000.000 |
7 Hari |
|
| 2310 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIMANTAP |
|
|
|
|
Rp. 45.000.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2311 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-01-23 |
004/UN47.A1/LS-BAKP/2026 |
2026-01-27 |
0110S |
Rp. 27.000.000 |
4 Hari |
|
| 2312 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-02-02 |
008/UN47.A1/LS-BAKP/2026 |
2026-02-06 |
0136S |
Rp. 27.000.000 |
4 Hari |
|
| 2313 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-02-12 |
024/UN47.A1/LS-BAKP/2026 |
2026-02-23 |
0210S |
Rp. 27.000.000 |
11 Hari |
|
| 2314 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-03-02 |
031/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0314S |
Rp. 27.000.000 |
2 Hari |
|
| 2315 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-03-09 |
038/UN47.A1/LS-BAKP/2026 |
2026-03-11 |
0445S |
Rp. 27.000.000 |
2 Hari |
|
| 2316 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-04-02 |
046/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0653S |
Rp. 27.000.000 |
5 Hari |
|
| 2317 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-04-07 |
051/UN47.A1/LS-BAKP/2026 |
2026-04-09 |
0730S |
Rp. 27.000.000 |
2 Hari |
|
| 2318 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-04-27 |
064/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0929S |
Rp. 27.000.000 |
2 Hari |
|
| 2319 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-05-11 |
069/UN47.A1/LS-BAKP/2026 |
2026-05-26 |
1157S |
Rp. 27.000.000 |
15 Hari |
|
| 2320 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-06-08 |
083/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1298S |
Rp. 27.000.000 |
7 Hari |
|
| 2321 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-06-09 |
089/UN47.A1/LS-BAKP/2026 |
2026-06-29 |
1350S |
Rp. 27.000.000 |
20 Hari |
|
| 2322 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-06-17 |
093/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1490S |
Rp. 27.000.000 |
16 Hari |
|
| 2323 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-07-13 |
104/UN47.A1/LS-BAKP/2026 |
2026-07-22 |
1680S |
Rp. 27.000.000 |
9 Hari |
|
| 2324 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-07-23 |
124/UN47.A1/LS-BAKP/2026 |
2026-07-29 |
1752S |
Rp. 27.000.000 |
6 Hari |
|
| 2325 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-08-10 |
142/UN47.A1/LS-BAKP/2026 |
2026-08-12 |
1898S |
Rp. 27.000.000 |
2 Hari |
|
| 2326 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-09-01 |
151/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2202S |
Rp. 27.000.000 |
2 Hari |
|
| 2327 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-09-02 |
159/UN47.A1/LS-BAKP/2026 |
2026-09-10 |
2236S |
Rp. 27.000.000 |
8 Hari |
|
| 2328 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-09-16 |
173/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 27.000.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2329 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Pembuatan Video Profil dan Aplikasi AI media Informasi |
2026-03-02 |
031/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0314S |
Rp. 31.166.000 |
2 Hari |
|
| 2330 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
Pembuatan Video Profil dan Aplikasi AI media Informasi |
2026-03-02 |
034/UN47.A1/LS-BAKP/2026 |
2026-03-04 |
0308S |
Rp. 47.000.000 |
2 Hari |
|
| 2331 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
Pembuatan Video Profil dan Aplikasi AI media Informasi |
2026-04-02 |
046/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0653S |
Rp. 15.583.000 |
5 Hari |
|
| 2332 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Pembuatan Video Profil dan Aplikasi AI media Informasi |
2026-04-07 |
052/UN47.A1/LS-BAKP.2026 |
2026-04-09 |
0729S |
Rp. 38.500.000 |
2 Hari |
|
| 2333 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Pembuatan Video Profil dan Aplikasi AI media Informasi |
2026-04-27 |
064/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0929S |
Rp. 15.583.000 |
2 Hari |
|
| 2334 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Pembuatan Video Profil dan Aplikasi AI media Informasi |
2026-05-12 |
076/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1078S |
Rp. 15.583.000 |
6 Hari |
|
| 2335 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Pembuatan Video Profil dan Aplikasi AI media Informasi |
2026-07-21 |
120/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1711S |
Rp. 15.583.000 |
7 Hari |
|
| 2336 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Pembuatan Video Profil dan Aplikasi AI media Informasi |
2026-08-10 |
137/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1903S |
Rp. 15.583.000 |
2 Hari |
|
| 2337 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Pembuatan Video Profil dan Aplikasi AI media Informasi |
2026-09-01 |
151/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2202S |
Rp. 15.583.000 |
2 Hari |
|
| 2338 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Pembuatan Video Profil dan Aplikasi AI media Informasi |
2026-09-16 |
173/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 15.583.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2339 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Pembuatan Video Profil dan Aplikasi AI media Informasi |
2026-09-22 |
179/UN47.A1/LS-BAKP/2026 |
|
|
Rp. 41.500.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 2340 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525115 |
Tiket PP |
2026-02-11 |
019/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0181S |
Rp. 13.829.480 |
2 Hari |
|
| 2341 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525115 |
Tiket PP |
2026-03-02 |
030/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0313S |
Rp. 1.845.000 |
2 Hari |
|
| 2342 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525115 |
Tiket PP |
2026-04-02 |
045/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0652S |
Rp. 14.756.960 |
5 Hari |
|
| 2343 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525115 |
Tiket PP |
2026-05-12 |
075/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1077S |
Rp. 13.166.740 |
6 Hari |
|
| 2344 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525115 |
Tiket PP |
2026-06-08 |
082/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1297P |
Rp. 22.356.200 |
7 Hari |
|
| 2345 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525115 |
Tiket PP |
2026-06-17 |
092/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1489S |
Rp. 6.172.880 |
16 Hari |
|
| 2346 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525115 |
Tiket PP |
2026-08-10 |
136/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1902S |
Rp. 6.073.820 |
2 Hari |
|
| 2347 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525115 |
Tiket PP |
2026-09-01 |
150/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2203S |
Rp. 4.433.080 |
2 Hari |
|
| 2348 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525115 |
Tiket PP |
|
|
|
|
Rp. 10.874.440 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2349 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525115 |
Hotel |
2026-02-11 |
019/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0181S |
Rp. 14.934.500 |
2 Hari |
|
| 2350 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525115 |
Hotel |
2026-03-02 |
030/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0313S |
Rp. 7.035.000 |
2 Hari |
|
| 2351 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525115 |
Hotel |
2026-04-02 |
045/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0652S |
Rp. 9.854.840 |
5 Hari |
|
| 2352 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525115 |
Hotel |
2026-05-12 |
075/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1077S |
Rp. 5.068.608 |
6 Hari |
|
| 2353 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525115 |
Hotel |
2026-06-08 |
082/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1297P |
Rp. 8.590.100 |
7 Hari |
|
| 2354 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525115 |
Hotel |
2026-06-17 |
092/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1489S |
Rp. 1.981.815 |
16 Hari |
|
| 2355 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525115 |
Hotel |
2026-08-10 |
136/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1902S |
Rp. 1.454.500 |
2 Hari |
|
| 2356 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525115 |
Hotel |
2026-09-01 |
150/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2203S |
Rp. 2.580.000 |
2 Hari |
|
| 2357 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525115 |
Hotel |
2026-09-15 |
162/UN47.A1/TUP NIHIL.7_BAKP/2026 |
2026-09-16 |
2356S |
Rp. 2.200.000 |
1 Hari |
|
| 2358 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525115 |
Hotel |
2026-09-16 |
171/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 900.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2359 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525115 |
Hotel |
|
|
|
|
Rp. 6.916.504 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2360 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525115 |
Uang Harian |
2026-02-11 |
019/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0181S |
Rp. 38.850.000 |
2 Hari |
|
| 2361 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525115 |
Uang Harian |
2026-03-02 |
030/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0313S |
Rp. 15.540.000 |
2 Hari |
|
| 2362 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525115 |
Uang Harian |
2026-04-02 |
045/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0652S |
Rp. 6.890.000 |
5 Hari |
|
| 2363 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525115 |
Uang Harian |
2026-05-12 |
075/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1077S |
Rp. 3.600.000 |
6 Hari |
|
| 2364 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525115 |
Uang Harian |
2026-06-08 |
082/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1297P |
Rp. 6.970.000 |
7 Hari |
|
| 2365 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525115 |
Uang Harian |
2026-06-17 |
092/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1489S |
Rp. 1.920.000 |
16 Hari |
|
| 2366 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525115 |
Uang Harian |
2026-08-10 |
136/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1902S |
Rp. 1.590.000 |
2 Hari |
|
| 2367 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525115 |
Uang Harian |
2026-09-01 |
150/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2203S |
Rp. 2.150.000 |
2 Hari |
|
| 2368 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525115 |
Uang Harian |
2026-09-15 |
162/UN47.A1/TUP NIHIL.7_BAKP/2026 |
2026-09-16 |
2356S |
Rp. 1.130.000 |
1 Hari |
|
| 2369 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525115 |
Uang Harian |
2026-09-16 |
171/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 1.850.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2370 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525115 |
Uang Harian |
|
|
|
|
Rp. 3.220.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2371 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525115 |
Transport Lokal |
2026-02-11 |
019/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0181S |
Rp. 12.800.000 |
2 Hari |
|
| 2372 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525115 |
Transport Lokal |
2026-03-02 |
030/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0313S |
Rp. 5.650.000 |
2 Hari |
|
| 2373 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525115 |
Transport Lokal |
2026-04-02 |
045/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0652S |
Rp. 1.889.500 |
5 Hari |
|
| 2374 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525115 |
Transport Lokal |
2026-05-12 |
075/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1077S |
Rp. 1.500.000 |
6 Hari |
|
| 2375 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525115 |
Transport Lokal |
2026-06-08 |
082/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1297P |
Rp. 2.243.000 |
7 Hari |
|
| 2376 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525115 |
Transport Lokal |
2026-06-17 |
092/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1489S |
Rp. 500.000 |
16 Hari |
|
| 2377 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525115 |
Transport Lokal |
2026-08-10 |
136/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1902S |
Rp. 820.000 |
2 Hari |
|
| 2378 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525115 |
Transport Lokal |
2026-09-01 |
150/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2203S |
Rp. 360.000 |
2 Hari |
|
| 2379 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525115 |
Transport Lokal |
2026-09-15 |
162/UN47.A1/TUP NIHIL.7_BAKP/2026 |
2026-09-16 |
2356S |
Rp. 700.000 |
1 Hari |
|
| 2380 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525115 |
Transport Lokal |
2026-09-16 |
171/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 700.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2381 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525115 |
Transport Lokal |
|
|
|
|
Rp. 750.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2382 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525119 |
Paket Meeting Terkait Kegiatan Akademik |
2026-01-23 |
002/UN47.A1/LS-BAKP/2026 |
2026-01-27 |
0111S |
Rp. 73.125.000 |
4 Hari |
|
| 2383 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Bantuan kegiatan dan jasa lainnya terkait kegiatan |
2026-02-10 |
011/UN47.A1/TUP NIHIL.1-BAKP/2026 |
2026-02-12 |
0164S |
Rp. 129.706.500 |
2 Hari |
|
| 2384 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Bantuan kegiatan dan jasa lainnya terkait kegiatan |
2026-06-08 |
083/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1298S |
Rp. 10.800.000 |
7 Hari |
|
| 2385 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Bantuan kegiatan dan jasa lainnya terkait kegiatan |
2026-07-20 |
111/UN47.A1/TUP NIHIL.4-BAKP/2026 |
2026-07-24 |
1696S |
Rp. 36.800.000 |
4 Hari |
|
| 2386 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Bantuan kegiatan dan jasa lainnya terkait kegiatan |
2026-08-10 |
137/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1903S |
Rp. 44.200.000 |
2 Hari |
|
| 2387 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Bantuan kegiatan dan jasa lainnya terkait kegiatan |
2026-09-16 |
173/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 2.576.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2388 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525112 |
Belanja kebutuhan dasar kegiatan |
2026-06-08 |
081/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1296S |
Rp. 1.799.400 |
7 Hari |
|
| 2389 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525112 |
Belanja kebutuhan dasar kegiatan |
2026-09-01 |
149/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2204S |
Rp. 1.832.500 |
2 Hari |
|
| 2390 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525112 |
Belanja kebutuhan dasar kegiatan |
2026-09-16 |
172/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 11.879.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2391 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Bantuan pelaksaan SNPMB, SNBT 2026 |
2026-04-27 |
064/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0929S |
Rp. 6.800.000 |
2 Hari |
|
| 2392 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Bantuan Kegiatan pengelolaan pelaporan KIP-K |
2026-07-21 |
120/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1711S |
Rp. 17.700.000 |
7 Hari |
|
| 2393 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525112 |
Konsumsi Berat dan Ringan |
2026-02-11 |
018/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0180S |
Rp. 1.800.000 |
2 Hari |
|
| 2394 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525112 |
Konsumsi Berat dan Ringan |
2026-02-10 |
010/UN47.A1/TUP NIHIL.1-BAKP/2026 |
2026-02-12 |
0163S |
Rp. 2.100.000 |
2 Hari |
|
| 2395 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525112 |
Konsumsi Berat dan Ringan |
2026-05-12 |
074/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1076S |
Rp. 1.880.000 |
6 Hari |
|
| 2396 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525112 |
Konsumsi Berat dan Ringan |
2026-06-08 |
081/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1296S |
Rp. 20.423.700 |
7 Hari |
|
| 2397 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Konsumsi Berat dan Ringan |
2026-07-21 |
118/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1709S |
Rp. 3.950.000 |
7 Hari |
|
| 2398 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525112 |
Konsumsi Berat dan Ringan |
2026-09-01 |
149/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2204S |
Rp. 10.800.000 |
2 Hari |
|
| 2399 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525112 |
Konsumsi Berat dan Ringan |
2026-09-16 |
172/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 15.225.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2400 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525112 |
Konsumsi Berat dan Ringan |
|
|
|
|
Rp. 16.560.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2401 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525111 |
Honor Pengelola Penyusunan Laporan Kinerja Universitas |
2026-04-02 |
043/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0650S |
Rp. 9.000.000 |
5 Hari |
|
| 2402 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525111 |
Honor Pengelola Penyusunan Laporan Kinerja Universitas |
2026-05-12 |
073/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1075S |
Rp. 9.000.000 |
6 Hari |
|
| 2403 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525111 |
Honor Pengelola Penyusunan Laporan Kinerja Universitas |
2026-07-21 |
117/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1708S |
Rp. 9.000.000 |
7 Hari |
|
| 2404 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
uang lembur di hari lbur |
2026-04-02 |
046/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0653S |
Rp. 7.178.000 |
5 Hari |
|
| 2405 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
Belanja barang dan jasa lainnya terkait kegiatan |
2026-04-02 |
046/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0653S |
Rp. 11.669.250 |
5 Hari |
|
| 2406 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Belanja barang dan jasa lainnya terkait kegiatan |
2026-04-27 |
064/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0929S |
Rp. 14.200.000 |
2 Hari |
|
| 2407 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Belanja barang dan jasa lainnya terkait kegiatan |
2026-05-12 |
076/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1078S |
Rp. 11.850.000 |
6 Hari |
|
| 2408 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Belanja barang dan jasa lainnya terkait kegiatan |
2026-07-21 |
120/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1711S |
Rp. 22.098.500 |
7 Hari |
|
| 2409 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Belanja barang dan jasa lainnya terkait kegiatan |
2026-08-10 |
137/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1903S |
Rp. 28.579.000 |
2 Hari |
|
| 2410 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Belanja barang dan jasa lainnya terkait kegiatan |
2026-09-16 |
173/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 11.960.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2411 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525112 |
Konsumsi Berat dan Ringan |
2026-04-02 |
044/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0651S |
Rp. 2.650.000 |
5 Hari |
|
| 2412 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525112 |
Konsumsi Berat dan Ringan |
2026-05-12 |
074/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1076S |
Rp. 3.060.000 |
6 Hari |
|
| 2413 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Konsumsi Berat dan Ringan |
2026-07-21 |
118/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1709S |
Rp. 2.450.000 |
7 Hari |
|
| 2414 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Konsumsi Berat dan Ringan |
2026-07-21 |
119/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1710S |
Rp. 1.200.000 |
7 Hari |
|
| 2415 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525111 |
Honor Penyusun Rencana Strategi Bisnis Universitas |
2026-04-27 |
062/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0927S |
Rp. 17.850.000 |
2 Hari |
|
| 2416 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525111 |
Honor Penyusun Rencana Strategi Bisnis Universitas |
2026-06-17 |
091/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1488S |
Rp. 11.900.000 |
16 Hari |
|
| 2417 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525111 |
Honor Penyusun Rencana Strategi Bisnis Universitas |
2026-07-21 |
117/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1708S |
Rp. 5.950.000 |
7 Hari |
|
| 2418 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525115 |
Hotel |
|
|
|
|
Rp. 2.275.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2419 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525115 |
Uang Harian |
|
|
|
|
Rp. 2.180.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2420 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Biaya Paket Meeting Kegiatan RSB |
|
|
|
|
Rp. 32.500.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2421 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525111 |
Honor Tim Kolaboratif dan Operator SARPRAS |
2026-06-17 |
091/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1488S |
Rp. 25.500.000 |
16 Hari |
|
| 2422 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525111 |
Honor Tim Kolaboratif dan Operator SARPRAS |
2026-07-21 |
117/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1708S |
Rp. 5.100.000 |
7 Hari |
|
| 2423 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525171 |
Honor Pengelola Penyusunan Laporan Kinerja Universitas |
2026-09-01 |
152/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2201S |
Rp. 4.500.000 |
2 Hari |
|
| 2424 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525171 |
Honor Pengelola Penyusunan Laporan Kinerja Universitas |
2026-09-16 |
174/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 4.500.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2425 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525171 |
Honor Penyusun Rencana Strategi Bisnis Universitas |
2026-09-01 |
152/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2201S |
Rp. 5.950.000 |
2 Hari |
|
| 2426 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525171 |
Honor Penyusun Rencana Strategi Bisnis Universitas |
2026-09-16 |
174/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 5.950.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2427 |
UPA Teknologi Informasi dan Komunikasi |
Januari 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-02-25 |
02/UN47.E2/SPP-GU/KU/2026 |
2026-03-04 |
0301N |
Rp. 7.500.000 |
7 Hari |
|
| 2428 |
UPA Teknologi Informasi dan Komunikasi |
Mei 2026 |
537112 |
Pengadaan Meubelair Perkantoran |
2026-05-18 |
22/UN47.E2/SPP-GU/KU/2026 |
2026-06-02 |
1186N |
Rp. 22.468.000 |
15 Hari |
|
| 2429 |
UPA Teknologi Informasi dan Komunikasi |
Januari 2026 |
525114 |
Pemeliharaan dan Optimalisasi Server Pendukung Perkantoran |
2026-02-25 |
05/UN47.E2/SPP-GU/KU/2026 |
2026-03-04 |
0303N |
Rp. 17.000.000 |
7 Hari |
|
| 2430 |
UPA Teknologi Informasi dan Komunikasi |
Maret 2026 |
525114 |
Pemeliharaan dan Optimalisasi Server Pendukung Perkantoran |
2026-03-09 |
10/UN47.E2/SPP-GU/KU/2026 |
2026-03-11 |
0463N |
Rp. 17.000.000 |
2 Hari |
|
| 2431 |
UPA Teknologi Informasi dan Komunikasi |
Maret 2026 |
525114 |
Pemeliharaan dan Optimalisasi Server Pendukung Perkantoran |
2026-04-07 |
16/UN47.E2/SPP-GU/KU/2026 |
2026-04-15 |
0795N |
Rp. 17.000.000 |
8 Hari |
|
| 2432 |
UPA Teknologi Informasi dan Komunikasi |
April 2026 |
525114 |
Pemeliharaan dan Optimalisasi Server Pendukung Perkantoran |
2026-04-29 |
19/UN47.E2/SPP-GU/KU/2026 |
2026-05-06 |
1008N |
Rp. 17.000.000 |
7 Hari |
|
| 2433 |
UPA Teknologi Informasi dan Komunikasi |
Mei 2026 |
525114 |
Pemeliharaan dan Optimalisasi Server Pendukung Perkantoran |
2026-05-18 |
25/UN47.E2/SPP-GU/KU/2026 |
2026-06-02 |
1189N |
Rp. 17.000.000 |
15 Hari |
|
| 2434 |
UPA Teknologi Informasi dan Komunikasi |
Juni 2026 |
525114 |
Pemeliharaan dan Optimalisasi Server Pendukung Perkantoran |
2026-06-17 |
29/UN47.E2/SPP-GU/KU/2026 |
2026-07-06 |
1523N |
Rp. 17.000.000 |
19 Hari |
|
| 2435 |
UPA Teknologi Informasi dan Komunikasi |
Juli 2026 |
525114 |
Pemeliharaan dan Optimalisasi Server Pendukung Perkantoran |
2026-07-27 |
33/UN47.E2/SPP-GU/KU/2026 |
2026-08-03 |
1809N |
Rp. 17.000.000 |
7 Hari |
|
| 2436 |
UPA Teknologi Informasi dan Komunikasi |
Agustus 2026 |
525114 |
Pemeliharaan dan Optimalisasi Server Pendukung Perkantoran |
2026-08-12 |
38/UN47.E2/SPP-GU/KU/2026 |
2026-08-24 |
2075N |
Rp. 17.000.000 |
12 Hari |
|
| 2437 |
UPA Teknologi Informasi dan Komunikasi |
September 2026 |
525114 |
Pemeliharaan dan Optimalisasi Server Pendukung Perkantoran |
2026-09-22 |
45/UN47.E2/SPP-GU/KU/2026 |
|
|
Rp. 17.000.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 2438 |
UPA Teknologi Informasi dan Komunikasi |
Oktober 2026 |
525114 |
Pemeliharaan dan Optimalisasi Server Pendukung Perkantoran |
2026-10-05 |
51/UN47.E2/SPP-GU NIHIL/KU/2026 |
|
|
Rp. 17.000.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 2439 |
UPA Teknologi Informasi dan Komunikasi |
Januari 2026 |
525114 |
Pemeliharaan dan Optimalisasi Infrastruktur Jaringan Pendukung Perkantoran |
2026-02-25 |
05/UN47.E2/SPP-GU/KU/2026 |
2026-03-04 |
0303N |
Rp. 5.000.000 |
7 Hari |
|
| 2440 |
UPA Teknologi Informasi dan Komunikasi |
Maret 2026 |
525114 |
Pemeliharaan dan Optimalisasi Infrastruktur Jaringan Pendukung Perkantoran |
2026-03-09 |
10/UN47.E2/SPP-GU/KU/2026 |
2026-03-11 |
0463N |
Rp. 17.000.000 |
2 Hari |
|
| 2441 |
UPA Teknologi Informasi dan Komunikasi |
Maret 2026 |
525114 |
Pemeliharaan dan Optimalisasi Infrastruktur Jaringan Pendukung Perkantoran |
2026-04-07 |
16/UN47.E2/SPP-GU/KU/2026 |
2026-04-15 |
0795N |
Rp. 19.000.000 |
8 Hari |
|
| 2442 |
UPA Teknologi Informasi dan Komunikasi |
April 2026 |
525114 |
Pemeliharaan dan Optimalisasi Infrastruktur Jaringan Pendukung Perkantoran |
2026-04-07 |
16/UN47.E2/SPP-GU/KU/2026 |
2026-04-15 |
0795N |
Rp. 6.320.000 |
8 Hari |
|
| 2443 |
UPA Teknologi Informasi dan Komunikasi |
April 2026 |
525114 |
Pemeliharaan dan Optimalisasi Infrastruktur Jaringan Pendukung Perkantoran |
2026-04-29 |
19/UN47.E2/SPP-GU/KU/2026 |
2026-05-06 |
1008N |
Rp. 17.000.000 |
7 Hari |
|
| 2444 |
UPA Teknologi Informasi dan Komunikasi |
Mei 2026 |
525114 |
Pemeliharaan dan Optimalisasi Infrastruktur Jaringan Pendukung Perkantoran |
2026-05-18 |
25/UN47.E2/SPP-GU/KU/2026 |
2026-06-02 |
1189N |
Rp. 17.000.000 |
15 Hari |
|
| 2445 |
UPA Teknologi Informasi dan Komunikasi |
Juni 2026 |
525114 |
Pemeliharaan dan Optimalisasi Infrastruktur Jaringan Pendukung Perkantoran |
2026-06-17 |
29/UN47.E2/SPP-GU/KU/2026 |
2026-07-06 |
1523N |
Rp. 17.000.000 |
19 Hari |
|
| 2446 |
UPA Teknologi Informasi dan Komunikasi |
Juli 2026 |
525114 |
Pemeliharaan dan Optimalisasi Infrastruktur Jaringan Pendukung Perkantoran |
2026-07-27 |
33/UN47.E2/SPP-GU/KU/2026 |
2026-08-03 |
1809N |
Rp. 18.500.000 |
7 Hari |
|
| 2447 |
UPA Teknologi Informasi dan Komunikasi |
Agustus 2026 |
525114 |
Pemeliharaan dan Optimalisasi Infrastruktur Jaringan Pendukung Perkantoran |
2026-08-31 |
41/UN47.E2/SPP-GU/KU/2026 |
2026-09-10 |
2250N |
Rp. 35.000.000 |
10 Hari |
|
| 2448 |
UPA Teknologi Informasi dan Komunikasi |
September 2026 |
525114 |
Pemeliharaan dan Optimalisasi Infrastruktur Jaringan Pendukung Perkantoran |
2026-09-22 |
45/UN47.E2/SPP-GU/KU/2026 |
|
|
Rp. 7.500.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 2449 |
UPA Teknologi Informasi dan Komunikasi |
Oktober 2026 |
525114 |
Pemeliharaan dan Optimalisasi Infrastruktur Jaringan Pendukung Perkantoran |
2026-10-05 |
51/UN47.E2/SPP-GU NIHIL/KU/2026 |
|
|
Rp. 13.196.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 2450 |
UPA Teknologi Informasi dan Komunikasi |
Juni 2026 |
525114 |
Pemeliharaan Jaringan Listrik, Air, Gedung dan Pendukung Perkantoran |
2026-06-17 |
29/UN47.E2/SPP-GU/KU/2026 |
2026-07-06 |
1523N |
Rp. 22.330.304 |
19 Hari |
|
| 2451 |
UPA Teknologi Informasi dan Komunikasi |
September 2026 |
525114 |
Pemeliharaan Jaringan Listrik, Air, Gedung dan Pendukung Perkantoran |
2026-09-22 |
45/UN47.E2/SPP-GU/KU/2026 |
|
|
Rp. 4.600.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 2452 |
UPA Teknologi Informasi dan Komunikasi |
April 2026 |
525114 |
Pemeliharaan Perangkat KomputerPerkantoran |
2026-04-07 |
16/UN47.E2/SPP-GU/KU/2026 |
2026-04-15 |
0795N |
Rp. 350.000 |
8 Hari |
|
| 2453 |
UPA Teknologi Informasi dan Komunikasi |
Juli 2026 |
525114 |
Pemeliharaan Perangkat KomputerPerkantoran |
2026-07-27 |
33/UN47.E2/SPP-GU/KU/2026 |
2026-08-03 |
1809N |
Rp. 1.750.000 |
7 Hari |
|
| 2454 |
UPA Teknologi Informasi dan Komunikasi |
Agustus 2026 |
525114 |
Pemeliharaan Perangkat KomputerPerkantoran |
2026-08-12 |
38/UN47.E2/SPP-GU/KU/2026 |
2026-08-24 |
2075N |
Rp. 5.380.000 |
12 Hari |
|
| 2455 |
UPA Teknologi Informasi dan Komunikasi |
April 2026 |
525114 |
Pemeliharaan Genset 100KVA Pendukung Perkantoran |
2026-04-29 |
19/UN47.E2/SPP-GU/KU/2026 |
2026-05-06 |
1008N |
Rp. 30.000.000 |
7 Hari |
|
| 2456 |
UPA Teknologi Informasi dan Komunikasi |
April 2026 |
525114 |
Pemeliharaan AC Pendukung Perkantoran |
2026-04-07 |
16/UN47.E2/SPP-GU/KU/2026 |
2026-04-15 |
0795N |
Rp. 5.500.000 |
8 Hari |
|
| 2457 |
UPA Teknologi Informasi dan Komunikasi |
Juni 2026 |
525114 |
Pemeliharaan AC Pendukung Perkantoran |
2026-06-17 |
29/UN47.E2/SPP-GU/KU/2026 |
2026-07-06 |
1523N |
Rp. 1.385.000 |
19 Hari |
|
| 2458 |
UPA Teknologi Informasi dan Komunikasi |
September 2026 |
525114 |
Pemeliharaan AC Pendukung Perkantoran |
2026-09-22 |
45/UN47.E2/SPP-GU/KU/2026 |
|
|
Rp. 2.975.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 2459 |
UPA Teknologi Informasi dan Komunikasi |
Januari 2026 |
525114 |
Pemeliharaan Printer Pendukung Perkantoran |
2026-02-25 |
05/UN47.E2/SPP-GU/KU/2026 |
2026-03-04 |
0303N |
Rp. 1.800.000 |
7 Hari |
|
| 2460 |
UPA Teknologi Informasi dan Komunikasi |
Agustus 2026 |
525112 |
Biaya cetak Sertifikat Pelatihan TIK Mahasiswa Baru |
2026-08-12 |
39/UN47.E2/SPP-GU/KU/202 |
2026-08-24 |
2076N |
Rp. 41.600.000 |
12 Hari |
|
| 2461 |
UPA Teknologi Informasi dan Komunikasi |
Agustus 2026 |
525115 |
Biaya Tiket Perjalanan Koordinasi Kelembagaan (4 orang) |
2026-08-12 |
40/UN47.E2/SPP-GU/KU/2026 |
2026-08-24 |
2077N |
Rp. 1.400.000 |
12 Hari |
|
| 2462 |
UPA Teknologi Informasi dan Komunikasi |
Agustus 2026 |
525115 |
Biaya Penginapan (3 Orang x 4 Hari) |
2026-08-12 |
40/UN47.E2/SPP-GU/KU/2026 |
2026-08-24 |
2077N |
Rp. 1.650.000 |
12 Hari |
|
| 2463 |
UPA Teknologi Informasi dan Komunikasi |
September 2026 |
525115 |
Biaya Penginapan (3 Orang x 4 Hari) |
2026-09-22 |
48/UN47.E2/SPP-GU/KU/2026 |
|
|
Rp. 1.800.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 2464 |
UPA Teknologi Informasi dan Komunikasi |
Januari 2026 |
525115 |
Uang Harian (3 Orang x 4 hari) |
2026-02-25 |
07/UN47.E2/SPP-GU/KU/2026 |
2026-03-04 |
0305N |
Rp. 2.400.000 |
7 Hari |
|
| 2465 |
UPA Teknologi Informasi dan Komunikasi |
Agustus 2026 |
525115 |
Uang Harian (3 Orang x 4 hari) |
2026-08-12 |
40/UN47.E2/SPP-GU/KU/2026 |
2026-08-24 |
2077N |
Rp. 2.000.000 |
12 Hari |
|
| 2466 |
UPA Teknologi Informasi dan Komunikasi |
Januari 2026 |
525112 |
Operasional Perkantoran, ATM/ATK,barang Habis Pakai |
2026-02-25 |
03/UN47.E2/SPP-GU/KU/2026 |
2026-03-04 |
0306N |
Rp. 4.067.600 |
7 Hari |
|
| 2467 |
UPA Teknologi Informasi dan Komunikasi |
Maret 2026 |
525112 |
Operasional Perkantoran, ATM/ATK,barang Habis Pakai |
2026-04-07 |
14/UN47.E2/SPP-GU/KU/2026 |
2026-04-15 |
0793N |
Rp. 713.500 |
8 Hari |
|
| 2468 |
UPA Teknologi Informasi dan Komunikasi |
April 2026 |
525112 |
Operasional Perkantoran, ATM/ATK,barang Habis Pakai |
2026-04-07 |
14/UN47.E2/SPP-GU/KU/2026 |
2026-04-15 |
0793N |
Rp. 320.500 |
8 Hari |
|
| 2469 |
UPA Teknologi Informasi dan Komunikasi |
Mei 2026 |
525112 |
Operasional Perkantoran, ATM/ATK,barang Habis Pakai |
2026-05-18 |
23/UN47.E2/SPP-GU/KU/2026 |
2026-06-02 |
1187N |
Rp. 2.175.000 |
15 Hari |
|
| 2470 |
UPA Teknologi Informasi dan Komunikasi |
Juni 2026 |
525112 |
Operasional Perkantoran, ATM/ATK,barang Habis Pakai |
2026-06-17 |
27/UN47.E2/SPP-GU/KU/2026 |
2026-07-06 |
1521N |
Rp. 1.778.500 |
19 Hari |
|
| 2471 |
UPA Teknologi Informasi dan Komunikasi |
Juli 2026 |
525112 |
Operasional Perkantoran, ATM/ATK,barang Habis Pakai |
2026-07-27 |
31/UN47.E2/SPP-GU/KU/2026 |
2026-08-03 |
1807N |
Rp. 2.492.700 |
7 Hari |
|
| 2472 |
UPA Teknologi Informasi dan Komunikasi |
Agustus 2026 |
525112 |
Operasional Perkantoran, ATM/ATK,barang Habis Pakai |
2026-08-12 |
36/UN47.E2/SPP-GU/KU/2026 |
2026-08-24 |
2073N |
Rp. 474.000 |
12 Hari |
|
| 2473 |
UPA Teknologi Informasi dan Komunikasi |
September 2026 |
525112 |
Operasional Perkantoran, ATM/ATK,barang Habis Pakai |
2026-09-22 |
43/UN47.E2/SPP-GU/KU/2026 |
|
|
Rp. 5.175.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 2474 |
UPA Teknologi Informasi dan Komunikasi |
Oktober 2026 |
525112 |
Operasional Perkantoran, ATM/ATK,barang Habis Pakai |
2026-10-05 |
49/UN47.E2/SPP-GU NIHIL/KU/2026 |
|
|
Rp. 25.584.934 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 2475 |
UPA Teknologi Informasi dan Komunikasi |
Januari 2026 |
525112 |
Biaya Konsumsi Berat |
2026-02-25 |
03/UN47.E2/SPP-GU/KU/2026 |
2026-03-04 |
0306N |
Rp. 630.300 |
7 Hari |
|
| 2476 |
UPA Teknologi Informasi dan Komunikasi |
Juli 2026 |
525112 |
Biaya Konsumsi Berat |
2026-07-27 |
31/UN47.E2/SPP-GU/KU/2026 |
2026-08-03 |
1807N |
Rp. 1.200.000 |
7 Hari |
|
| 2477 |
UPA Teknologi Informasi dan Komunikasi |
Oktober 2026 |
525112 |
Biaya Konsumsi Berat |
2026-10-05 |
49/UN47.E2/SPP-GU NIHIL/KU/2026 |
|
|
Rp. 1.500.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 2478 |
UPA Teknologi Informasi dan Komunikasi |
Januari 2026 |
525112 |
Konsumsi Tamu Pimpinan |
2026-02-25 |
03/UN47.E2/SPP-GU/KU/2026 |
2026-03-04 |
0306N |
Rp. 2.000.000 |
7 Hari |
|
| 2479 |
UPA Teknologi Informasi dan Komunikasi |
Maret 2026 |
525112 |
Konsumsi Tamu Pimpinan |
2026-03-09 |
09/UN47.E2/SPP-GU/KU/2026 |
2026-03-11 |
0462N |
Rp. 300.000 |
2 Hari |
|
| 2480 |
UPA Teknologi Informasi dan Komunikasi |
Mei 2026 |
525112 |
Konsumsi Tamu Pimpinan |
2026-05-18 |
23/UN47.E2/SPP-GU/KU/2026 |
2026-06-02 |
1187N |
Rp. 267.000 |
15 Hari |
|
| 2481 |
UPA Teknologi Informasi dan Komunikasi |
Juli 2026 |
525112 |
Konsumsi Tamu Pimpinan |
2026-07-27 |
31/UN47.E2/SPP-GU/KU/2026 |
2026-08-03 |
1807N |
Rp. 1.500.000 |
7 Hari |
|
| 2482 |
UPA Teknologi Informasi dan Komunikasi |
Agustus 2026 |
525112 |
Konsumsi Tamu Pimpinan |
2026-08-12 |
36/UN47.E2/SPP-GU/KU/2026 |
2026-08-24 |
2073N |
Rp. 1.200.000 |
12 Hari |
|
| 2483 |
UPA Teknologi Informasi dan Komunikasi |
Oktober 2026 |
525112 |
Konsumsi Tamu Pimpinan |
2026-10-05 |
49/UN47.E2/SPP-GU NIHIL/KU/2026 |
|
|
Rp. 1.725.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 2484 |
UPA Teknologi Informasi dan Komunikasi |
Januari 2026 |
525119 |
Langganan Zoom Meeting |
2026-02-25 |
04/UN47.E2/SPP-GU/KU/2026 |
2026-03-04 |
0302N |
Rp. 2.500.000 |
7 Hari |
|
| 2485 |
UPA Teknologi Informasi dan Komunikasi |
Maret 2026 |
525119 |
Langganan Zoom Meeting |
2026-04-07 |
15/UN47.E2/SPP-GU/KU/2026 |
2026-04-15 |
0794N |
Rp. 5.000.000 |
8 Hari |
|
| 2486 |
UPA Teknologi Informasi dan Komunikasi |
Mei 2026 |
525119 |
Langganan Zoom Meeting |
2026-05-18 |
24/UN47.E2/SPP-GU/KU/2026 |
2026-06-02 |
1188N |
Rp. 5.000.000 |
15 Hari |
|
| 2487 |
UPA Teknologi Informasi dan Komunikasi |
Juni 2026 |
525119 |
Langganan Zoom Meeting |
2026-06-17 |
28/UN47.E2/SPP-GU/KU/2026 |
2026-07-06 |
1522N |
Rp. 2.500.000 |
19 Hari |
|
| 2488 |
UPA Teknologi Informasi dan Komunikasi |
Juli 2026 |
525119 |
Langganan Zoom Meeting |
2026-07-27 |
32/UN47.E2/SPP-GU/KU/2026 |
2026-08-03 |
1808N |
Rp. 2.500.000 |
7 Hari |
|
| 2489 |
UPA Teknologi Informasi dan Komunikasi |
Agustus 2026 |
525119 |
Langganan Zoom Meeting |
2026-08-12 |
37/UN47.E2/SPP-GU/KU/2026 |
2026-08-24 |
2074N |
Rp. 2.500.000 |
12 Hari |
|
| 2490 |
UPA Teknologi Informasi dan Komunikasi |
September 2026 |
525119 |
Langganan Zoom Meeting |
2026-09-22 |
44/UN47.E2/SPP-GU/KU/2026 |
|
|
Rp. 2.500.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 2491 |
UPA Teknologi Informasi dan Komunikasi |
Oktober 2026 |
525119 |
Langganan Zoom Meeting |
2026-10-05 |
50/UN47.E2/SPP-GU NIHIL/KU/2026 |
|
|
Rp. 2.500.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 2492 |
UPA Teknologi Informasi dan Komunikasi |
Maret 2026 |
525119 |
Anti Virus Server |
2026-04-07 |
15/UN47.E2/SPP-GU/KU/2026 |
2026-04-15 |
0794N |
Rp. 1.500.000 |
8 Hari |
|
| 2493 |
UPA Teknologi Informasi dan Komunikasi |
April 2026 |
525119 |
Anti Virus Server |
2026-04-07 |
15/UN47.E2/SPP-GU/KU/2026 |
2026-04-15 |
0794N |
Rp. 1.500.000 |
8 Hari |
|
| 2494 |
UPA Teknologi Informasi dan Komunikasi |
Mei 2026 |
525119 |
Anti Virus Server |
2026-05-18 |
24/UN47.E2/SPP-GU/KU/2026 |
2026-06-02 |
1188N |
Rp. 750.000 |
15 Hari |
|
| 2495 |
UPA Teknologi Informasi dan Komunikasi |
Juni 2026 |
525119 |
Anti Virus Server |
2026-06-17 |
28/UN47.E2/SPP-GU/KU/2026 |
2026-07-06 |
1522N |
Rp. 750.000 |
19 Hari |
|
| 2496 |
UPA Teknologi Informasi dan Komunikasi |
Juli 2026 |
525119 |
Anti Virus Server |
2026-07-27 |
32/UN47.E2/SPP-GU/KU/2026 |
2026-08-03 |
1808N |
Rp. 750.000 |
7 Hari |
|
| 2497 |
UPA Teknologi Informasi dan Komunikasi |
Agustus 2026 |
525119 |
Anti Virus Server |
2026-08-12 |
37/UN47.E2/SPP-GU/KU/2026 |
2026-08-24 |
2074N |
Rp. 750.000 |
12 Hari |
|
| 2498 |
UPA Teknologi Informasi dan Komunikasi |
September 2026 |
525119 |
Anti Virus Server |
2026-09-22 |
44/UN47.E2/SPP-GU/KU/2026 |
|
|
Rp. 750.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 2499 |
UPA Teknologi Informasi dan Komunikasi |
Oktober 2026 |
525119 |
Anti Virus Server |
2026-10-05 |
50/UN47.E2/SPP-GU NIHIL/KU/2026 |
|
|
Rp. 750.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 2500 |
UPA Teknologi Informasi dan Komunikasi |
September 2026 |
525119 |
Langganan Website Translation |
2026-09-22 |
44/UN47.E2/SPP-GU/KU/2026 |
|
|
Rp. 5.000.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 2501 |
UPA Teknologi Informasi dan Komunikasi |
April 2026 |
525119 |
Langganan Message Service |
2026-04-07 |
15/UN47.E2/SPP-GU/KU/2026 |
2026-04-15 |
0794N |
Rp. 350.000 |
8 Hari |
|
| 2502 |
UPA Teknologi Informasi dan Komunikasi |
Januari 2026 |
525119 |
Langganan Artificial intelligence (AI) |
2026-02-25 |
04/UN47.E2/SPP-GU/KU/2026 |
2026-03-04 |
0302N |
Rp. 1.000.000 |
7 Hari |
|
| 2503 |
UPA Teknologi Informasi dan Komunikasi |
Maret 2026 |
525119 |
Langganan Artificial intelligence (AI) |
2026-04-07 |
15/UN47.E2/SPP-GU/KU/2026 |
2026-04-15 |
0794N |
Rp. 2.000.000 |
8 Hari |
|
| 2504 |
UPA Teknologi Informasi dan Komunikasi |
April 2026 |
525119 |
Langganan Artificial intelligence (AI) |
2026-04-07 |
15/UN47.E2/SPP-GU/KU/2026 |
2026-04-15 |
0794N |
Rp. 1.000.000 |
8 Hari |
|
| 2505 |
UPA Teknologi Informasi dan Komunikasi |
Mei 2026 |
525119 |
Langganan Artificial intelligence (AI) |
2026-05-18 |
24/UN47.E2/SPP-GU/KU/2026 |
2026-06-02 |
1188N |
Rp. 1.000.000 |
15 Hari |
|
| 2506 |
UPA Teknologi Informasi dan Komunikasi |
Juni 2026 |
525119 |
Langganan Artificial intelligence (AI) |
2026-06-17 |
28/UN47.E2/SPP-GU/KU/2026 |
2026-07-06 |
1522N |
Rp. 1.000.000 |
19 Hari |
|
| 2507 |
UPA Teknologi Informasi dan Komunikasi |
Juli 2026 |
525119 |
Langganan Artificial intelligence (AI) |
2026-07-27 |
32/UN47.E2/SPP-GU/KU/2026 |
2026-08-03 |
1808N |
Rp. 1.000.000 |
7 Hari |
|
| 2508 |
UPA Teknologi Informasi dan Komunikasi |
Agustus 2026 |
525119 |
Langganan Artificial intelligence (AI) |
2026-08-12 |
37/UN47.E2/SPP-GU/KU/2026 |
2026-08-24 |
2074N |
Rp. 1.000.000 |
12 Hari |
|
| 2509 |
UPA Teknologi Informasi dan Komunikasi |
September 2026 |
525119 |
Langganan Artificial intelligence (AI) |
2026-09-22 |
44/UN47.E2/SPP-GU/KU/2026 |
|
|
Rp. 1.000.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 2510 |
UPA Teknologi Informasi dan Komunikasi |
Oktober 2026 |
525119 |
Langganan Artificial intelligence (AI) |
2026-10-05 |
50/UN47.E2/SPP-GU NIHIL/KU/2026 |
|
|
Rp. 1.000.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 2511 |
UPA Teknologi Informasi dan Komunikasi |
Januari 2026 |
525119 |
Layanan Docker Server |
2026-02-25 |
04/UN47.E2/SPP-GU/KU/2026 |
2026-03-04 |
0302N |
Rp. 2.000.000 |
7 Hari |
|
| 2512 |
UPA Teknologi Informasi dan Komunikasi |
Maret 2026 |
525119 |
Aplikasi Perkantoran Microsoft |
2026-03-10 |
12/UN47.E2/SPP-LS/KU/2026 |
2026-03-13 |
0503N |
Rp. 98.568.000 |
3 Hari |
|
| 2513 |
UPA Teknologi Informasi dan Komunikasi |
Januari 2026 |
525119 |
Pengembangan Sistem Informasi Universitas/Fakultas/Unit |
2026-02-25 |
06/UN47.E2/SPP-GU/KU/2026 |
2026-03-04 |
0304N |
Rp. 29.000.000 |
7 Hari |
|
| 2514 |
UPA Teknologi Informasi dan Komunikasi |
Maret 2026 |
525119 |
Pengembangan Sistem Informasi Universitas/Fakultas/Unit |
2026-03-06 |
08/UN47.E2/SPP-LS/KU/2026 |
2026-03-11 |
0461N |
Rp. 80.000.000 |
5 Hari |
|
| 2515 |
UPA Teknologi Informasi dan Komunikasi |
Maret 2026 |
525119 |
Pengembangan Sistem Informasi Universitas/Fakultas/Unit |
2026-03-09 |
11/UN47.E2/SPP-GU/KU/2026 |
2026-03-11 |
0464N |
Rp. 35.000.000 |
2 Hari |
|
| 2516 |
UPA Teknologi Informasi dan Komunikasi |
April 2026 |
525119 |
Pengembangan Sistem Informasi Universitas/Fakultas/Unit |
2026-04-07 |
13/UN47.E2/SPP-LS/KU/2026 |
2026-04-15 |
0792N |
Rp. 30.000.000 |
8 Hari |
|
| 2517 |
UPA Teknologi Informasi dan Komunikasi |
Juni 2026 |
525119 |
Pengembangan Sistem Informasi Universitas/Fakultas/Unit |
2026-05-05 |
21/UN47.E2/SPP-LS/KU/2026 |
2026-06-02 |
1197N |
Rp. 26.000.000 |
28 Hari |
|
| 2518 |
UPA Teknologi Informasi dan Komunikasi |
Agustus 2026 |
525119 |
Pengembangan Sistem Informasi Universitas/Fakultas/Unit |
2026-08-31 |
42/UN47.E2/SPP-GU/KU/2026 |
2026-09-10 |
2251N |
Rp. 27.000.000 |
10 Hari |
|
| 2519 |
UPA Teknologi Informasi dan Komunikasi |
September 2026 |
525119 |
Pengembangan Sistem Informasi Universitas/Fakultas/Unit |
2026-09-22 |
46/UN47.E2/SPP-GU/KU/2026 |
|
|
Rp. 25.000.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 2520 |
UPA Teknologi Informasi dan Komunikasi |
Maret 2026 |
525119 |
Pengembangan Sistem Informasi Dokumen Elektronik |
2026-03-09 |
11/UN47.E2/SPP-GU/KU/2026 |
2026-03-11 |
0464N |
Rp. 5.700.000 |
2 Hari |
|
| 2521 |
UPA Teknologi Informasi dan Komunikasi |
Maret 2026 |
525119 |
Pengembangan Sistem Informasi Dokumen Elektronik |
2026-04-07 |
18/UN47.E2/SPP-GU/KU/2026 |
2026-04-15 |
0797N |
Rp. 9.500.000 |
8 Hari |
|
| 2522 |
UPA Teknologi Informasi dan Komunikasi |
April 2026 |
525119 |
Pengembangan Sistem Informasi Dokumen Elektronik |
2026-04-29 |
20/UN47.E2/SPP-GU/KU/2026 |
2026-05-06 |
1009N |
Rp. 9.000.000 |
7 Hari |
|
| 2523 |
UPA Teknologi Informasi dan Komunikasi |
Juli 2026 |
525119 |
Pengembangan Sistem Informasi Dokumen Elektronik |
2026-07-27 |
35/UN47.E2/SPP-GU/KU/2026 |
2026-08-03 |
1811N |
Rp. 10.250.000 |
7 Hari |
|
| 2524 |
UPA Teknologi Informasi dan Komunikasi |
Agustus 2026 |
525119 |
Pengembangan Sistem Informasi Dokumen Elektronik |
2026-08-31 |
42/UN47.E2/SPP-GU/KU/2026 |
2026-09-10 |
2251N |
Rp. 10.000.000 |
10 Hari |
|
| 2525 |
UPA Teknologi Informasi dan Komunikasi |
Oktober 2026 |
525119 |
Pengembangan Sistem Informasi Dokumen Elektronik |
2026-10-05 |
52/UN47.E2/SPP-GU NIHIL/KU/2026 |
|
|
Rp. 10.550.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 2526 |
UPA Teknologi Informasi dan Komunikasi |
Maret 2026 |
525111 |
Insentif PPK Unit |
2026-04-07 |
17/UN47.E2/SPP-GU/KU/2026 |
2026-04-15 |
0796N |
Rp. 1.220.000 |
8 Hari |
|
| 2527 |
UPA Teknologi Informasi dan Komunikasi |
April 2026 |
525111 |
Insentif PPK Unit |
2026-04-07 |
17/UN47.E2/SPP-GU/KU/2026 |
2026-04-15 |
0796N |
Rp. 610.000 |
8 Hari |
|
| 2528 |
UPA Teknologi Informasi dan Komunikasi |
Mei 2026 |
525111 |
Insentif PPK Unit |
2026-05-18 |
26/UN47.E2/SPP-GU/KU/2026 |
2026-06-02 |
1190N |
Rp. 610.000 |
15 Hari |
|
| 2529 |
UPA Teknologi Informasi dan Komunikasi |
Juni 2026 |
525111 |
Insentif PPK Unit |
2026-06-17 |
30/UN47.E2/SPP-GU/KU/2026 |
2026-07-06 |
1524N |
Rp. 610.000 |
19 Hari |
|
| 2530 |
UPA Teknologi Informasi dan Komunikasi |
Juli 2026 |
525111 |
Insentif PPK Unit |
2026-07-27 |
34/UN47.E2/SPP-GU/KU/2026 |
2026-08-03 |
1810N |
Rp. 610.000 |
7 Hari |
|
| 2531 |
UPA Teknologi Informasi dan Komunikasi |
Maret 2026 |
525111 |
Insentif Penguji Tagihan /Verifikator UK |
2026-04-07 |
17/UN47.E2/SPP-GU/KU/2026 |
2026-04-15 |
0796N |
Rp. 480.000 |
8 Hari |
|
| 2532 |
UPA Teknologi Informasi dan Komunikasi |
April 2026 |
525111 |
Insentif Penguji Tagihan /Verifikator UK |
2026-04-07 |
17/UN47.E2/SPP-GU/KU/2026 |
2026-04-15 |
0796N |
Rp. 240.000 |
8 Hari |
|
| 2533 |
UPA Teknologi Informasi dan Komunikasi |
Mei 2026 |
525111 |
Insentif Penguji Tagihan /Verifikator UK |
2026-05-18 |
26/UN47.E2/SPP-GU/KU/2026 |
2026-06-02 |
1190N |
Rp. 240.000 |
15 Hari |
|
| 2534 |
UPA Teknologi Informasi dan Komunikasi |
Juni 2026 |
525111 |
Insentif Penguji Tagihan /Verifikator UK |
2026-06-17 |
30/UN47.E2/SPP-GU/KU/2026 |
2026-07-06 |
1524N |
Rp. 240.000 |
19 Hari |
|
| 2535 |
UPA Teknologi Informasi dan Komunikasi |
Juli 2026 |
525111 |
Insentif Penguji Tagihan /Verifikator UK |
2026-07-27 |
34/UN47.E2/SPP-GU/KU/2026 |
2026-08-03 |
1810N |
Rp. 240.000 |
7 Hari |
|
| 2536 |
UPA Teknologi Informasi dan Komunikasi |
September 2026 |
525176 |
Insentif PPK Unit |
2026-09-22 |
47/UN47.E2/SPP-GU/KU/2026 |
|
|
Rp. 1.220.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 2537 |
UPA Teknologi Informasi dan Komunikasi |
Oktober 2026 |
525176 |
Insentif PPK Unit |
2026-10-05 |
53/UN47.E2/SPP-GU NIHIL/KU/2026 |
|
|
Rp. 610.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 2538 |
UPA Teknologi Informasi dan Komunikasi |
September 2026 |
525176 |
Insentif Penguji Tagihan Verifikator UK |
2026-09-22 |
47/UN47.E2/SPP-GU/KU/2026 |
|
|
Rp. 480.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 2539 |
UPA Teknologi Informasi dan Komunikasi |
Oktober 2026 |
525176 |
Insentif Penguji Tagihan Verifikator UK |
2026-10-05 |
53/UN47.E2/SPP-GU NIHIL/KU/2026 |
|
|
Rp. 240.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 2540 |
UPA Teknologi Informasi dan Komunikasi |
Agustus 2026 |
525119 |
Manajemen Resiko |
2026-08-31 |
42/UN47.E2/SPP-GU/KU/2026 |
2026-09-10 |
2251N |
Rp. 1.000.000 |
10 Hari |
|
| 2541 |
UPA Teknologi Informasi dan Komunikasi |
Agustus 2026 |
525119 |
Sosialisasi pencegahan dan penanganan anti kekerasan, Anti Narkoba dan Anti Korupsi |
2026-08-31 |
42/UN47.E2/SPP-GU/KU/2026 |
2026-09-10 |
2251N |
Rp. 1.000.000 |
10 Hari |
|
| 2542 |
UPA Teknologi Informasi dan Komunikasi |
Agustus 2026 |
525119 |
Penerapan Zona Integritas |
2026-08-31 |
42/UN47.E2/SPP-GU/KU/2026 |
2026-09-10 |
2251N |
Rp. 1.000.000 |
10 Hari |
|
| 2543 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
September 2026 |
537112 |
Pengadaan LED Display |
|
|
|
|
Rp. 52.513.706 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2544 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Oktober 2026 |
537112 |
Pengadaan LED Display |
|
|
|
|
Rp. 4.891.744 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2545 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
September 2026 |
537112 |
Pengadaan Komputer |
|
|
|
|
Rp. 9.990.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2546 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Januari 2026 |
537112 |
Pengadaan AC |
2026-03-02 |
02/UN47.D1/SPP.GUP-1/LPPM/2026 |
2026-03-10 |
0412J |
Rp. 8.039.000 |
8 Hari |
|
| 2547 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Januari 2026 |
525114 |
Pemeliharaan laptop dan komputer |
2026-03-02 |
07/UN47.D1/SPP.GUP-1/LPPM/2026 |
2026-03-10 |
0417J |
Rp. 6.682.653 |
8 Hari |
|
| 2548 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Maret 2026 |
525114 |
Pemeliharaan laptop dan komputer |
2026-05-19 |
21/UN47.D1/SPP.GUP-2/LPPM/2026 |
2026-06-29 |
1381J |
Rp. 751.000 |
41 Hari |
|
| 2549 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Juni 2026 |
525114 |
Pemeliharaan laptop dan komputer |
2026-09-01 |
39/UN47.D1/SPP.GUP-3/LPPM/2026 |
|
|
Rp. 2.155.000 |
35 Hari |
Belum ada SP2D terhitung dari 01 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2550 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Januari 2026 |
525114 |
Pemeliharaan AC |
2026-03-02 |
07/UN47.D1/SPP.GUP-1/LPPM/2026 |
2026-03-10 |
0417J |
Rp. 1.045.500 |
8 Hari |
|
| 2551 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Maret 2026 |
525114 |
Pemeliharaan AC |
2026-05-19 |
21/UN47.D1/SPP.GUP-2/LPPM/2026 |
2026-06-29 |
1381J |
Rp. 2.926.276 |
41 Hari |
|
| 2552 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Maret 2026 |
525114 |
Belanja pemeliharaan gedung halaman perkantoran |
2026-05-19 |
21/UN47.D1/SPP.GUP-2/LPPM/2026 |
2026-06-29 |
1381J |
Rp. 1.500.000 |
41 Hari |
|
| 2553 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Januari 2026 |
525119 |
Pelaksanaan Raker Lembaga Dan Penguatan Kapasitas Kelembagaan Dan Kegiatan LPTK |
2026-03-02 |
10/UN47.D1/SPP.GUP-1/LPPM/2026 |
2026-03-10 |
0420J |
Rp. 7.000.000 |
8 Hari |
|
| 2554 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Maret 2026 |
525119 |
Pelaksanaan Raker Lembaga Dan Penguatan Kapasitas Kelembagaan Dan Kegiatan LPTK |
2026-05-19 |
25/UN47.D1/SPP.GUP-2/LPPM/2026 |
2026-06-29 |
1385J |
Rp. 8.248.000 |
41 Hari |
|
| 2555 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Januari 2026 |
525112 |
Belanja Kebutuhan Dasar kantor |
2026-03-02 |
03/UN47.D1/SPP.GUP-1/LPPM/2026 |
2026-03-10 |
0413J |
Rp. 10.806.053 |
8 Hari |
|
| 2556 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Maret 2026 |
525112 |
Belanja Kebutuhan Dasar kantor |
2026-05-19 |
17/UN47.D1/SPP.GUP-2/LPPM/2026 |
2026-06-29 |
1377J |
Rp. 8.492.700 |
41 Hari |
|
| 2557 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Juni 2026 |
525112 |
Belanja Kebutuhan Dasar kantor |
2026-09-01 |
35/UN47.D1/SPP.GUP-3/LPPM/2026 |
|
|
Rp. 6.690.280 |
35 Hari |
Belum ada SP2D terhitung dari 01 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2558 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
September 2026 |
525112 |
Belanja Kebutuhan Dasar kantor |
|
|
|
|
Rp. 11.957.050 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2559 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Januari 2026 |
525112 |
Konsumsi ringan dan berat tamu pimpinan |
2026-03-02 |
03/UN47.D1/SPP.GUP-1/LPPM/2026 |
2026-03-10 |
0413J |
Rp. 8.751.674 |
8 Hari |
|
| 2560 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Maret 2026 |
525112 |
Konsumsi ringan dan berat tamu pimpinan |
2026-05-19 |
17/UN47.D1/SPP.GUP-2/LPPM/2026 |
2026-06-29 |
1377J |
Rp. 3.477.600 |
41 Hari |
|
| 2561 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Juni 2026 |
525112 |
Konsumsi ringan dan berat tamu pimpinan |
2026-09-01 |
35/UN47.D1/SPP.GUP-3/LPPM/2026 |
|
|
Rp. 6.173.487 |
35 Hari |
Belum ada SP2D terhitung dari 01 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2562 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
September 2026 |
525112 |
Konsumsi ringan dan berat tamu pimpinan |
|
|
|
|
Rp. 4.160.429 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2563 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Januari 2026 |
525115 |
Tiket perjalanan PP (5 orang x 4 kegiatan) |
2026-03-02 |
04/UN47.D1/SPP.GUP-1/LPPM/2026 |
2026-03-10 |
0414J |
Rp. 6.136.260 |
8 Hari |
|
| 2564 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Maret 2026 |
525115 |
Tiket perjalanan PP (5 orang x 4 kegiatan) |
2026-05-19 |
18/UN47.D1/SPP.GUP-2/LPPM/2026 |
2026-06-29 |
1378J |
Rp. 17.062.487 |
41 Hari |
|
| 2565 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Juni 2026 |
525115 |
Tiket perjalanan PP (5 orang x 4 kegiatan) |
2026-09-01 |
36/UN47.D1/SPP.GUP-3/LPPM/2026 |
|
|
Rp. 20.361.922 |
35 Hari |
Belum ada SP2D terhitung dari 01 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2566 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Januari 2026 |
525115 |
Biaya hotel (5 orang x 4 kegiata x 3 hari) |
2026-03-02 |
04/UN47.D1/SPP.GUP-1/LPPM/2026 |
2026-03-10 |
0414J |
Rp. 4.230.001 |
8 Hari |
|
| 2567 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Januari 2026 |
525115 |
Uang harian (5 orang x 4 kegiatan x 4 hari) |
2026-03-02 |
04/UN47.D1/SPP.GUP-1/LPPM/2026 |
2026-03-10 |
0414J |
Rp. 1.120.000 |
8 Hari |
|
| 2568 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Juni 2026 |
525115 |
Uang harian (5 orang x 4 kegiatan x 4 hari) |
2026-09-01 |
36/UN47.D1/SPP.GUP-3/LPPM/2026 |
|
|
Rp. 16.840.199 |
35 Hari |
Belum ada SP2D terhitung dari 01 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2569 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Januari 2026 |
525115 |
Tranport lokal (5 orang x 4 kegiatan) |
2026-03-02 |
04/UN47.D1/SPP.GUP-1/LPPM/2026 |
2026-03-10 |
0414J |
Rp. 500.000 |
8 Hari |
|
| 2570 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Juni 2026 |
525115 |
Tranport lokal (5 orang x 4 kegiatan) |
2026-09-01 |
36/UN47.D1/SPP.GUP-3/LPPM/2026 |
|
|
Rp. 3.434.143 |
35 Hari |
Belum ada SP2D terhitung dari 01 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2571 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
April 2026 |
525119 |
Pengembangan sistem aplikasi Paluwala |
2026-04-22 |
13/UN47.D1/SPP.LS-2/LPPM/2026 |
2026-04-29 |
0915J |
Rp. 30.010.776 |
7 Hari |
|
| 2572 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Maret 2026 |
525111 |
Honor PPK UK |
2026-05-19 |
24/UN47.D1/SPP.GUP-2/LPPM/2026 |
2026-06-29 |
1384J |
Rp. 3.450.000 |
41 Hari |
|
| 2573 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Juni 2026 |
525111 |
Honor PPK UK |
2026-09-01 |
42/UN47.D1/SPP.GUP-3/LPPM/2026 |
|
|
Rp. 3.450.000 |
35 Hari |
Belum ada SP2D terhitung dari 01 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2574 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Maret 2026 |
525111 |
Honor verifikator UK |
2026-05-19 |
24/UN47.D1/SPP.GUP-2/LPPM/2026 |
2026-06-29 |
1384J |
Rp. 1.410.000 |
41 Hari |
|
| 2575 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Juni 2026 |
525111 |
Honor verifikator UK |
2026-09-01 |
42/UN47.D1/SPP.GUP-3/LPPM/2026 |
|
|
Rp. 1.410.000 |
35 Hari |
Belum ada SP2D terhitung dari 01 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2576 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
September 2026 |
525176 |
Honor PPK UK |
|
|
|
|
Rp. 4.600.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2577 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
September 2026 |
525176 |
Honor verivikator UK |
|
|
|
|
Rp. 1.880.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2578 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
September 2026 |
525115 |
Uang harian (5 orang x 2 kegiatan x 4 hari) |
|
|
|
|
Rp. 2.930.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2579 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Juni 2026 |
525115 |
Transport lokal (5 orang x 2 kegiatan) |
2026-09-01 |
43/UN47.D1/SPP.GUP-3/LPPM/2026 |
|
|
Rp. 2.600.000 |
35 Hari |
Belum ada SP2D terhitung dari 01 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2580 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
September 2026 |
525115 |
Transport lokal (5 orang x 2 kegiatan) |
|
|
|
|
Rp. 2.930.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2581 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Januari 2026 |
525119 |
Honorarium pemateri (7 orang x 3 jam) |
2026-03-02 |
05/UN47.D1/SPP.GUP-1/LPPM/2026 |
2026-03-10 |
0415J |
Rp. 12.600.000 |
8 Hari |
|
| 2582 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
September 2026 |
525119 |
Pembayaran pemeliharaan jurnal DOI |
|
|
|
|
Rp. 46.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2583 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
September 2026 |
525119 |
Bantuan publikasi dosen (artikel ilmiah, Paten, HKI, Buku) |
2026-09-10 |
44/UN47.D1/SPP.LS-10/LPPM/2026 |
|
|
Rp. 172.000.000 |
26 Hari |
Belum ada SP2D terhitung dari 10 September 2026 hingga 06 Oktober 2026 (26 Hari) |
| 2584 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Mei 2026 |
525119 |
Hibah Penelitian |
2026-05-04 |
14/UN47.D1/SPP.LS-32/LPPM/2026 |
2026-05-21 |
1116J |
Rp. 350.000.000 |
17 Hari |
|
| 2585 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Juli 2026 |
525119 |
Hibah Penelitian |
2026-05-07 |
15/UN47.D1/SPP.LS-4/LPPM/2026 |
2026-07-02 |
1459J |
Rp. 700.000.000 |
56 Hari |
|
| 2586 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Juli 2026 |
525119 |
Hibah Penelitian |
2026-05-07 |
16/UN47.D1/SPP.LS-4/LPPM/2026 |
2026-07-02 |
1460J |
Rp. 595.000.000 |
56 Hari |
|
| 2587 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Juli 2026 |
525119 |
Hibah Penelitian |
2026-07-01 |
27/UN47.D1/SPP.LS-6/LPPM/2026 |
2026-07-14 |
1615J |
Rp. 237.500.000 |
13 Hari |
|
| 2588 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Agustus 2026 |
525119 |
Hibah Penelitian |
2026-07-28 |
30/UN47.D1/SPP.LS-8/LPPM/2026 |
2026-08-03 |
1828J |
Rp. 255.000.000 |
6 Hari |
|
| 2589 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Agustus 2026 |
525119 |
Hibah Penelitian |
2026-07-28 |
31/UN47.D1/SPP.LS-8/LPPM/2026 |
2026-08-03 |
1829J |
Rp. 300.000.000 |
6 Hari |
|
| 2590 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
September 2026 |
525119 |
Hibah Penelitian |
2026-09-10 |
44/UN47.D1/SPP.LS-10/LPPM/2026 |
|
|
Rp. 37.500.000 |
26 Hari |
Belum ada SP2D terhitung dari 10 September 2026 hingga 06 Oktober 2026 (26 Hari) |
| 2591 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Januari 2026 |
525119 |
Insentif reviewer proposal penelitian |
2026-03-02 |
05/UN47.D1/SPP.GUP-1/LPPM/2026 |
2026-03-10 |
0415J |
Rp. 10.500.000 |
8 Hari |
|
| 2592 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Maret 2026 |
525119 |
Insentif reviewer proposal penelitian |
2026-05-19 |
19/UN47.D1/SPP.GUP-2/LPPM/2026 |
2026-06-29 |
1379J |
Rp. 38.800.000 |
41 Hari |
|
| 2593 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Juni 2026 |
525119 |
Insentif reviewer proposal penelitian |
2026-09-01 |
37/UN47.D1/SPP.GUP-3/LPPM/2026 |
|
|
Rp. 350.000 |
35 Hari |
Belum ada SP2D terhitung dari 01 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2594 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Januari 2026 |
525112 |
Biaya cetak baliho |
2026-03-02 |
06/UN47.D1/SPP.GUP-1/LPPM/2026 |
2026-03-10 |
0416J |
Rp. 44.000 |
8 Hari |
|
| 2595 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Maret 2026 |
525112 |
Biaya cetak baliho |
2026-05-19 |
20/UN47.D1/SPP.GUP-2/LPPM/2026 |
2026-06-29 |
1380J |
Rp. 66.000 |
41 Hari |
|
| 2596 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Juni 2026 |
525112 |
Biaya cetak baliho |
2026-09-01 |
38/UN47.D1/SPP.GUP-3/LPPM/2026 |
|
|
Rp. 192.000 |
35 Hari |
Belum ada SP2D terhitung dari 01 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2597 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
September 2026 |
525112 |
Biaya cetak baliho |
|
|
|
|
Rp. 144.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2598 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Maret 2026 |
525112 |
Konsumsi ringan terkait kegiatan |
2026-05-19 |
20/UN47.D1/SPP.GUP-2/LPPM/2026 |
2026-06-29 |
1380J |
Rp. 6.250.000 |
41 Hari |
|
| 2599 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Juni 2026 |
525112 |
Konsumsi ringan terkait kegiatan |
2026-09-01 |
38/UN47.D1/SPP.GUP-3/LPPM/2026 |
|
|
Rp. 840.000 |
35 Hari |
Belum ada SP2D terhitung dari 01 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2600 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
September 2026 |
525112 |
Konsumsi ringan terkait kegiatan |
|
|
|
|
Rp. 31.632.653 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2601 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Juni 2026 |
525112 |
Konsumsi berat terkait kegiatan |
2026-09-01 |
38/UN47.D1/SPP.GUP-3/LPPM/2026 |
|
|
Rp. 8.342.857 |
35 Hari |
Belum ada SP2D terhitung dari 01 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2602 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
September 2026 |
525112 |
Konsumsi berat terkait kegiatan |
|
|
|
|
Rp. 14.285.714 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2603 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Maret 2026 |
525115 |
Uang transport survei dan monev (21 orang x 2 kegiatan |
2026-05-19 |
22/UN47.D1/SPP.GUP-2/LPPM/2026 |
2026-06-29 |
1382J |
Rp. 2.500.000 |
41 Hari |
|
| 2604 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Juni 2026 |
525115 |
Uang transport survei dan monev (21 orang x 2 kegiatan |
2026-09-01 |
40/UN47.D1/SPP.GUP-3/LPPM/2026 |
|
|
Rp. 15.150.000 |
35 Hari |
Belum ada SP2D terhitung dari 01 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2605 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Agustus 2026 |
525115 |
Uang transport survei dan monev (21 orang x 2 kegiatan |
2026-09-01 |
40/UN47.D1/SPP.GUP-3/LPPM/2026 |
|
|
Rp. 250.000 |
35 Hari |
Belum ada SP2D terhitung dari 01 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2606 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Januari 2026 |
525115 |
Uang harian kegiatan survei dan monev (21 orang x 2 hari x 2 Kegiatan) |
2026-03-02 |
08/UN47.D1/SPP.GUP-1/LPPM/2026 |
2026-03-10 |
0418J |
Rp. 1.000.000 |
8 Hari |
|
| 2607 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Maret 2026 |
525115 |
Uang harian kegiatan survei dan monev (21 orang x 2 hari x 2 Kegiatan) |
2026-05-19 |
22/UN47.D1/SPP.GUP-2/LPPM/2026 |
2026-06-29 |
1382J |
Rp. 11.550.000 |
41 Hari |
|
| 2608 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Juni 2026 |
525115 |
Uang harian kegiatan survei dan monev (21 orang x 2 hari x 2 Kegiatan) |
2026-09-01 |
40/UN47.D1/SPP.GUP-3/LPPM/2026 |
|
|
Rp. 10.450.000 |
35 Hari |
Belum ada SP2D terhitung dari 01 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2609 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
September 2026 |
525115 |
Uang harian kegiatan survei dan monev (21 orang x 2 hari x 2 Kegiatan) |
|
|
|
|
Rp. 29.100.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2610 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
April 2026 |
525119 |
Penyusunan dan cetak Panduan PPM |
2026-04-22 |
12/UN47.D1/SPP.LS-2/LPPM/2026 |
2026-04-28 |
0914J |
Rp. 29.999.902 |
6 Hari |
|
| 2611 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Maret 2026 |
525119 |
Biaya peminjaman sound sistem dan kursi pada kegiatan coaching mahasiswa |
2026-05-19 |
23/UN47.D1/SPP.GUP-2/LPPM/2026 |
2026-06-29 |
1383J |
Rp. 509.694 |
41 Hari |
|
| 2612 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Juni 2026 |
525119 |
Biaya peminjaman sound sistem dan kursi pada kegiatan coaching mahasiswa |
2026-09-01 |
41/UN47.D1/SPP.GUP-3/LPPM/2026 |
|
|
Rp. 3.964.285 |
35 Hari |
Belum ada SP2D terhitung dari 01 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2613 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
September 2026 |
525119 |
Biaya peminjaman sound sistem dan kursi pada kegiatan coaching mahasiswa |
|
|
|
|
Rp. 5.500.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2614 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Januari 2026 |
525119 |
Biaya peliputan kegiatan coaching mahasiswa |
2026-03-02 |
09/UN47.D1/SPP.GUP-1/LPPM/2026 |
2026-03-10 |
0419J |
Rp. 1.500.000 |
8 Hari |
|
| 2615 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Maret 2026 |
525119 |
Biaya peliputan kegiatan coaching mahasiswa |
2026-05-19 |
23/UN47.D1/SPP.GUP-2/LPPM/2026 |
2026-06-29 |
1383J |
Rp. 1.000.000 |
41 Hari |
|
| 2616 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
April 2026 |
525119 |
Kegiatan Pengabdian Kepada Masyarakat |
2026-04-08 |
11/UN47.D1/SPP.LS-1/LPPM/2026 |
2026-04-15 |
0801J |
Rp. 179.620.000 |
7 Hari |
|
| 2617 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
April 2026 |
525119 |
Kegiatan Pengabdian Kepada Masyarakat |
2026-04-22 |
12/UN47.D1/SPP.LS-2/LPPM/2026 |
2026-04-28 |
0914J |
Rp. 100.000.000 |
6 Hari |
|
| 2618 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Juni 2026 |
525119 |
Kegiatan Pengabdian Kepada Masyarakat |
2026-05-19 |
26/UN47.D1/SPP.LS-5/LPPM/2026 |
2026-06-18 |
1313J |
Rp. 76.980.000 |
30 Hari |
|
| 2619 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Juli 2026 |
525119 |
Kegiatan Pengabdian Kepada Masyarakat |
2026-07-01 |
28/UN47.D1/SPP.LS-6/LPPM/2026 |
2026-07-14 |
1616J |
Rp. 200.160.000 |
13 Hari |
|
| 2620 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Juli 2026 |
525119 |
Kegiatan Pengabdian Kepada Masyarakat |
2026-07-15 |
29/UN47.D1/SPP.LS-7/LPPM/2026 |
2026-07-29 |
1751J |
Rp. 247.800.000 |
14 Hari |
|
| 2621 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Agustus 2026 |
525119 |
Kegiatan Pengabdian Kepada Masyarakat |
2026-07-28 |
32/UN47.D1/SPP.LS-8/LPPM/2026 |
2026-08-03 |
1830J |
Rp. 8.640.000 |
6 Hari |
|
| 2622 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Agustus 2026 |
525119 |
Kegiatan Pengabdian Kepada Masyarakat |
2026-08-18 |
33/UN47.D1/SPP.LS-9/LPPM/2026 |
2026-08-26 |
2084J |
Rp. 190.200.000 |
8 Hari |
|
| 2623 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Agustus 2026 |
525119 |
Kegiatan Pengabdian Kepada Masyarakat |
2026-08-18 |
34/UN47.D1/SPP.LS-9/LPPM/2026 |
2026-08-26 |
2085J |
Rp. 818.720.000 |
8 Hari |
|
| 2624 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
September 2026 |
525119 |
Kegiatan Pengabdian Kepada Masyarakat |
2026-09-10 |
45/UN47.D1/SPP.LS-10/LPPM/202 |
|
|
Rp. 386.880.000 |
26 Hari |
Belum ada SP2D terhitung dari 10 September 2026 hingga 06 Oktober 2026 (26 Hari) |
| 2625 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Januari 2026 |
525119 |
Insentif reviewer proposal Pengabdian Kepada Masyarakat |
2026-03-02 |
09/UN47.D1/SPP.GUP-1/LPPM/2026 |
2026-03-10 |
0419J |
Rp. 26.000.000 |
8 Hari |
|
| 2626 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Maret 2026 |
525119 |
Insentif reviewer proposal Pengabdian Kepada Masyarakat |
2026-05-19 |
23/UN47.D1/SPP.GUP-2/LPPM/2026 |
2026-06-29 |
1383J |
Rp. 12.350.000 |
41 Hari |
|
| 2627 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Juni 2026 |
525119 |
Insentif reviewer proposal Pengabdian Kepada Masyarakat |
2026-09-01 |
41/UN47.D1/SPP.GUP-3/LPPM/2026 |
|
|
Rp. 25.775.000 |
35 Hari |
Belum ada SP2D terhitung dari 01 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2628 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Oktober 2026 |
525119 |
Insentif reviewer proposal Pengabdian Kepada Masyarakat |
|
|
|
|
Rp. 24.000.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2629 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
Juni 2026 |
525119 |
Transport/BBM lokal kegiatan pengabdian |
2026-09-01 |
41/UN47.D1/SPP.GUP-3/LPPM/2026 |
|
|
Rp. 1.800.000 |
35 Hari |
Belum ada SP2D terhitung dari 01 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2630 |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat |
September 2026 |
525119 |
Transport/BBM lokal kegiatan pengabdian |
|
|
|
|
Rp. 650.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2631 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Februari 2026 |
537112 |
Belanaj Peralatan Perkantoran (AC dll). |
2026-03-10 |
05/UN47.B4/SPP.GU.1.FMIPA/KU.00.01/2026 |
2026-03-16 |
0590V |
Rp. 7.888.326 |
6 Hari |
|
| 2632 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
April 2026 |
537112 |
Belanaj Peralatan Perkantoran (AC dll). |
2026-04-29 |
15/UN47.B4/SPP.GU.3.FMIPA/KU.00.01/2026 |
2026-05-25 |
1146C |
Rp. 4.000.508 |
26 Hari |
|
| 2633 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juni 2026 |
537112 |
Belanaj Peralatan Perkantoran (AC dll). |
2026-06-12 |
23/UN47.B4/SPP.LS.12.FMIPA/KU.00.01/2026 |
2026-08-12 |
1821C |
Rp. 21.110.000 |
61 Hari |
|
| 2634 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
April 2026 |
537112 |
Belanja Alat Pendukung Perkantoran (PC, Laptop, Printer DLL) |
2026-04-29 |
15/UN47.B4/SPP.GU.3.FMIPA/KU.00.01/2026 |
2026-05-25 |
1146C |
Rp. 8.508.122 |
26 Hari |
|
| 2635 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juni 2026 |
537112 |
Belanja Alat Pendukung Perkantoran (PC, Laptop, Printer DLL) |
2026-05-06 |
14/UN47.B4/SPP.10.FMIPA/KU.00.01/2026 |
2026-06-25 |
1339C |
Rp. 46.203.045 |
50 Hari |
|
| 2636 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juli 2026 |
537112 |
Belanja Alat Pendukung Perkantoran (PC, Laptop, Printer DLL) |
2026-07-29 |
22/UN47.B4/SPP.GU.5.FMIPA/KU.00.01/2026 |
2026-08-28 |
2124C |
Rp. 9.481.207 |
30 Hari |
|
| 2637 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
537112 |
Belanja Alat Pendukung Perkantoran (PC, Laptop, Printer DLL) |
2026-09-15 |
70/UN47.B4/SPP.LS.22.FMIPA/KU.00.01/2026 |
|
|
Rp. 10.480.203 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 2638 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Mei 2026 |
537112 |
Pengadaan Meubelair |
2026-06-10 |
16/UN47.B4/SPP.GU.4.FMIPA/KU.00.01/2026 |
2026-07-02 |
1448C |
Rp. 20.130.572 |
22 Hari |
|
| 2639 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
April 2026 |
525114 |
Pemeliharaan Gedung dan Bangunan serta Gedung Laboratorium |
2026-04-08 |
07/UN47.B4/SPP.GU.2.FMIPA/KU.00.01/2026 |
2026-04-20 |
0840C |
Rp. 36.549.252 |
12 Hari |
|
| 2640 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
April 2026 |
525114 |
Pemeliharaan Gedung dan Bangunan serta Gedung Laboratorium |
2026-04-29 |
12/UN47.B4/SPP.GU.3.FMIPA/KU.00.01/2026 |
2026-05-25 |
1143C |
Rp. 49.240.795 |
26 Hari |
|
| 2641 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Mei 2026 |
525114 |
Pemeliharaan Gedung dan Bangunan serta Gedung Laboratorium |
2026-06-10 |
18/UN47.B4/SPP.GU.4.FMIPA/KU.00.01/2026 |
2026-07-02 |
1450C |
Rp. 48.784.987 |
22 Hari |
|
| 2642 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juli 2026 |
525114 |
Pemeliharaan Gedung dan Bangunan serta Gedung Laboratorium |
2026-07-29 |
21/UN47.B4/SPP.GU.5.FMIPA/KU.00.01/2026 |
2026-08-28 |
2123C |
Rp. 49.493.167 |
30 Hari |
|
| 2643 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525114 |
Pemeliharaan Gedung dan Bangunan serta Gedung Laboratorium |
2026-09-14 |
27/UN47.B4/SPP.GU.6.FMIPA/KU.00.01/2026 |
|
|
Rp. 43.640.887 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 2644 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525114 |
Pemeliharaan Gedung dan Bangunan serta Gedung Laboratorium |
2026-09-15 |
69/UN47.B4/SPP.LS.22.FMIPA/KU.00.01/2026 |
|
|
Rp. 25.429.226 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 2645 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525114 |
Pemeliharaan Gedung dan Bangunan serta Gedung Laboratorium |
2026-09-15 |
71/UN47.B4/SPP.LS.22.FMIPA/KU.00.01/2026 |
|
|
Rp. 24.212.612 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 2646 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Oktober 2026 |
525114 |
Pemeliharaan Gedung dan Bangunan serta Gedung Laboratorium |
|
|
|
|
Rp. 21.359.340 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2647 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Februari 2026 |
525114 |
Pemeliharaan AC |
2026-03-10 |
06/UN47.B4/SPP.GU.1.FMIPA/KU.00.01/2026 |
2026-03-16 |
0587C |
Rp. 1.500.000 |
6 Hari |
|
| 2648 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
April 2026 |
525114 |
Pemeliharaan AC |
2026-04-08 |
08/UN47.B4/SPP.GU.2.FMIPA/KU.00.01/2026 |
2026-04-20 |
0839C |
Rp. 2.378.571 |
12 Hari |
|
| 2649 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
April 2026 |
525114 |
Pemeliharaan AC |
2026-04-29 |
13/UN47.B4/SPP.GU.3.FMIPA/KU.00.01/2026 |
2026-05-25 |
1144C |
Rp. 9.570.918 |
26 Hari |
|
| 2650 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525114 |
Pemeliharaan AC |
|
|
|
|
Rp. 14.400.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2651 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525114 |
Pemeliharaan AC |
2026-09-14 |
29/UN47.B4/SPP.GU.6.FMIPA/KU.00.01/2026 |
|
|
Rp. 30.638.264 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 2652 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
April 2026 |
525114 |
Pemeliharaan Jaringan Internet, listrik dan Instalasi Air |
2026-04-08 |
08/UN47.B4/SPP.GU.2.FMIPA/KU.00.01/2026 |
2026-04-20 |
0839C |
Rp. 13.264.011 |
12 Hari |
|
| 2653 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juni 2026 |
525114 |
Pemeliharaan Jaringan Internet, listrik dan Instalasi Air |
2026-06-10 |
20/UN47.B4/SPP.GU.4.FMIPA/KU.00.01/2026 |
2026-07-02 |
1451C |
Rp. 18.482.142 |
22 Hari |
|
| 2654 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juli 2026 |
525114 |
Pemeliharaan Jaringan Internet, listrik dan Instalasi Air |
2026-07-29 |
25/UN47.B4/SPP.GU.5.FMIPA/KU.00.01/2026 |
2026-08-28 |
2127C |
Rp. 22.681.377 |
30 Hari |
|
| 2655 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525114 |
Pemeliharaan Komputer dan Printer |
2026-09-14 |
28/UN47.B4/SPP.GU.6.FMIPA/KU.00.01/2026 |
|
|
Rp. 17.459.388 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 2656 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Oktober 2026 |
525114 |
Pemeliharaan Komputer dan Printer |
|
|
|
|
Rp. 14.000.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2657 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Januari 2026 |
525119 |
Bantuan biaya pelaksanaan kegiatan Sosialisasi Penerimaan mahasiswa baru untuk Prodi FMIPA |
2026-03-10 |
04/UN47.B4/SPP.GU.1.FMIPA/KU.00.01/2026 |
2026-03-16 |
0589C |
Rp. 24.000.000 |
6 Hari |
|
| 2658 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
April 2026 |
525119 |
Bantuan biaya pelaksanaan kegiatan Sosialisasi Penerimaan mahasiswa baru untuk Prodi FMIPA |
2026-04-29 |
14/UN47.B4/SPP.GU.3.FMIPA/KU.00.01/2026 |
2026-05-25 |
1145C |
Rp. 30.160.000 |
26 Hari |
|
| 2659 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Mei 2026 |
525119 |
Bantuan biaya pelaksanaan kegiatan Sosialisasi Penerimaan mahasiswa baru untuk Prodi FMIPA |
2026-04-10 |
12/UN47.B4/SPP.08.FMIPA/KU.00.01/2026 |
2026-04-30 |
0951C |
Rp. 13.000.000 |
20 Hari |
|
| 2660 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525119 |
Bantuan biaya pelaksanaan kegiatan Sosialisasi Penerimaan mahasiswa baru untuk Prodi FMIPA |
2026-09-15 |
67/UN47.B4/SPP.LS.22.FMIPA/KU.00.01/2026 |
|
|
Rp. 2.800.000 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 2661 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Februari 2026 |
525119 |
Bantuan Pelaksanaan Kuliah Umum Pakar |
2026-03-10 |
04/UN47.B4/SPP.GU.1.FMIPA/KU.00.01/2026 |
2026-03-16 |
0589C |
Rp. 5.000.000 |
6 Hari |
|
| 2662 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Agustus 2026 |
525119 |
Bantuan Pelaksanaan Kuliah Umum Pakar |
2026-08-12 |
49/UN47.B4/SPP.LS.19.FMIPA/KU.00.01/2026 |
|
|
Rp. 5.000.000 |
55 Hari |
Belum ada SP2D terhitung dari 12 Agustus 2026 hingga 06 Oktober 2026 (55 Hari) |
| 2663 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Agustus 2026 |
525119 |
Bantuan Pelaksanaan Penyusunan RPS berbasis OB/PJBL |
2026-08-11 |
45/UN47.B4/SPP.LS.18.FMIPA/KU.00.01/2026 |
|
|
Rp. 15.000.000 |
56 Hari |
Belum ada SP2D terhitung dari 11 Agustus 2026 hingga 06 Oktober 2026 (56 Hari) |
| 2664 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Agustus 2026 |
525119 |
Bantuan Pelaksanaan Penyusunan RPS berbasis OB/PJBL |
2026-08-11 |
46/UN47.B4/SPP.LS.18.FMIPA/KU.00.01/2026 |
|
|
Rp. 15.000.000 |
56 Hari |
Belum ada SP2D terhitung dari 11 Agustus 2026 hingga 06 Oktober 2026 (56 Hari) |
| 2665 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Agustus 2026 |
525119 |
Bantuan Pelaksanaan Penyusunan RPS berbasis OB/PJBL |
2026-08-11 |
37/UN47.B4/SPP.LS.18.FMIPA/KU.00.01/2026 |
|
|
Rp. 22.500.000 |
56 Hari |
Belum ada SP2D terhitung dari 11 Agustus 2026 hingga 06 Oktober 2026 (56 Hari) |
| 2666 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Agustus 2026 |
525119 |
Bantuan Pelaksanaan Penyusunan RPS berbasis OB/PJBL |
2026-08-11 |
38/UN47.B4/SPP.LS.18.FMIPA/KU.00.01/2026 |
|
|
Rp. 22.500.000 |
56 Hari |
Belum ada SP2D terhitung dari 11 Agustus 2026 hingga 06 Oktober 2026 (56 Hari) |
| 2667 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Agustus 2026 |
525119 |
Bantuan Pelaksanaan Penyusunan RPS berbasis OB/PJBL |
2026-08-11 |
40/UN47.B4/SPP.LS.18.FMIPA/KU.00.01/2026 |
|
|
Rp. 15.000.000 |
56 Hari |
Belum ada SP2D terhitung dari 11 Agustus 2026 hingga 06 Oktober 2026 (56 Hari) |
| 2668 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525119 |
Bantuan Pelaksanaan Penyusunan RPS berbasis OB/PJBL |
2026-09-14 |
55/UN47.B4/SPP.LS.21.FMIPA/KU.00.01/2026 |
|
|
Rp. 22.500.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 2669 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Oktober 2026 |
525119 |
Bantuan Pelaksanaan Penyusunan RPS berbasis OB/PJBL |
|
|
|
|
Rp. 3.000.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2670 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Mei 2026 |
525119 |
Bantuan Kegiatan Workshoop Kurikulum berdampak berbasis OB di Tingkatan Fakultas |
2026-04-10 |
12/UN47.B4/SPP.08.FMIPA/KU.00.01/2026 |
2026-04-30 |
0951C |
Rp. 17.500.000 |
20 Hari |
|
| 2671 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juni 2026 |
525119 |
Bantuan Kegiatan Workshoop Kurikulum berdampak berbasis OB di Tingkatan Prodi |
2026-06-12 |
25/UN47.B4/SPP.LS.12.FMIPA/KU.00.01/2026 |
2026-08-11 |
1824C |
Rp. 18.000.000 |
60 Hari |
|
| 2672 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juli 2026 |
525119 |
Bantuan Kegiatan Workshoop Kurikulum berdampak berbasis OB di Tingkatan Prodi |
2026-07-30 |
36/UN47.B4/SPP.LS.17.FMIPA/KU.00.01/2026 |
2026-08-21 |
2021C |
Rp. 9.000.000 |
22 Hari |
|
| 2673 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Agustus 2026 |
525119 |
Bantuan Kegiatan Workshoop Kurikulum berdampak berbasis OB di Tingkatan Prodi |
2026-08-12 |
49/UN47.B4/SPP.LS.19.FMIPA/KU.00.01/2026 |
|
|
Rp. 16.000.000 |
55 Hari |
Belum ada SP2D terhitung dari 12 Agustus 2026 hingga 06 Oktober 2026 (55 Hari) |
| 2674 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Oktober 2026 |
525119 |
Bantuan Kegiatan Workshoop Kurikulum berdampak berbasis OB di Tingkatan Prodi |
|
|
|
|
Rp. 35.000.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2675 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Januari 2026 |
525119 |
Bantuan Kegiatan Rutin Pelaksanaan ORMAWA (prodi/HMJ) |
2026-03-10 |
04/UN47.B4/SPP.GU.1.FMIPA/KU.00.01/2026 |
2026-03-16 |
0589C |
Rp. 2.045.280 |
6 Hari |
|
| 2676 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juli 2026 |
525119 |
Bantuan Kegiatan Rutin Pelaksanaan ORMAWA (prodi/HMJ) |
2026-07-30 |
36/UN47.B4/SPP.LS.17.FMIPA/KU.00.01/2026 |
2026-08-21 |
2021C |
Rp. 1.000.000 |
22 Hari |
|
| 2677 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525119 |
Bantuan Kegiatan Rutin Pelaksanaan ORMAWA (prodi/HMJ) |
2026-09-15 |
67/UN47.B4/SPP.LS.22.FMIPA/KU.00.01/2026 |
|
|
Rp. 1.500.000 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 2678 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Agustus 2026 |
525119 |
Pelaksanaan Pengenalan Kampus PKKMB untuk Mahasiswa Baru |
2026-09-05 |
5/UN47.B4/SPP.TUP.1.FMIPA/KU.00.01/2026 |
|
|
Rp. 45.000.000 |
31 Hari |
Belum ada SP2D terhitung dari 05 September 2026 hingga 06 Oktober 2026 (31 Hari) |
| 2679 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Mei 2026 |
525119 |
Bantuan Pelaksanaan Kegiatan Mahasiswa Pada Ajang Berprestasi Regional |
2026-06-12 |
22/UN47.B4/SPP.LS.12.FMIPA/KU.00.01/2026 |
2026-08-11 |
1822C |
Rp. 30.400.000 |
60 Hari |
|
| 2680 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juni 2026 |
525119 |
Bantuan Pelaksanaan Kegiatan Mahasiswa Pada Ajang Berprestasi Regional |
2026-06-12 |
22/UN47.B4/SPP.LS.12.FMIPA/KU.00.01/2026 |
2026-08-11 |
1822C |
Rp. 7.550.000 |
60 Hari |
|
| 2681 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juni 2026 |
525119 |
Bantuan Pelaksanaan Kegiatan Mahasiswa Pada Ajang Berprestasi Regional |
2026-06-12 |
25/UN47.B4/SPP.LS.12.FMIPA/KU.00.01/2026 |
2026-08-11 |
1824C |
Rp. 750.000 |
60 Hari |
|
| 2682 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Agustus 2026 |
525119 |
Bantuan Pelaksanaan Kegiatan Mahasiswa Pada Ajang Berprestasi Regional |
2026-09-05 |
5/UN47.B4/SPP.TUP.1.FMIPA/KU.00.01/2026 |
|
|
Rp. 7.195.220 |
31 Hari |
Belum ada SP2D terhitung dari 05 September 2026 hingga 06 Oktober 2026 (31 Hari) |
| 2683 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525119 |
Bantuan Pelaksanaan Kegiatan Mahasiswa Pada Ajang Berprestasi Regional |
2026-09-15 |
65/UN47.B4/SPP.LS.22.FMIPA/KU.00.01/2026 |
|
|
Rp. 14.000.000 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 2684 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525119 |
Bantuan Pelaksanaan Kegiatan Mahasiswa Pada Ajang Berprestasi Regional |
2026-09-15 |
67/UN47.B4/SPP.LS.22.FMIPA/KU.00.01/2026 |
|
|
Rp. 8.700.000 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 2685 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Oktober 2026 |
525119 |
Bantuan Pelaksanaan Kegiatan Mahasiswa Pada Ajang Berprestasi Regional |
|
|
|
|
Rp. 4.000.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2686 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juli 2026 |
525115 |
Tiket Pesawat PP Perjalanan Untuk Mengikuti Asosiasi Forum Ilmiah (MIPA NET, PEPSILI, IAGI, IGI, AMLI) |
2026-07-30 |
33/UN47.B4/SPP.LS.17.FMIPA/KU.00.01/2026 |
2026-08-21 |
2018C |
Rp. 8.519.860 |
22 Hari |
|
| 2687 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Agustus 2026 |
525115 |
Tiket Pesawat PP Perjalanan Untuk Mengikuti Asosiasi Forum Ilmiah (MIPA NET, PEPSILI, IAGI, IGI, AMLI) |
2026-09-05 |
3/UN47.B4/SPP.TUP.1.FMIPA/KU.00.01/2026 |
|
|
Rp. 51.373.949 |
31 Hari |
Belum ada SP2D terhitung dari 05 September 2026 hingga 06 Oktober 2026 (31 Hari) |
| 2688 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juli 2026 |
525115 |
Penginapan dalam rangka Mengikuti Asosiasi Forum ILmiah (MIPA NET, PEPSILI, IAGI, IGI, AMLI) |
2026-07-30 |
33/UN47.B4/SPP.LS.17.FMIPA/KU.00.01/2026 |
2026-08-21 |
2018C |
Rp. 4.980.000 |
22 Hari |
|
| 2689 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Agustus 2026 |
525115 |
Penginapan dalam rangka Mengikuti Asosiasi Forum ILmiah (MIPA NET, PEPSILI, IAGI, IGI, AMLI) |
2026-09-05 |
3/UN47.B4/SPP.TUP.1.FMIPA/KU.00.01/2026 |
|
|
Rp. 12.910.000 |
31 Hari |
Belum ada SP2D terhitung dari 05 September 2026 hingga 06 Oktober 2026 (31 Hari) |
| 2690 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juli 2026 |
525115 |
Uang Harian dalam rangka Mengikuti Asosiasi Forum ILmiah (MIPA NET, PEPSILI, IAGI, IGI, AMLI) |
2026-07-30 |
33/UN47.B4/SPP.LS.17.FMIPA/KU.00.01/2026 |
2026-08-21 |
2018C |
Rp. 2.460.000 |
22 Hari |
|
| 2691 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Agustus 2026 |
525115 |
Uang Harian dalam rangka Mengikuti Asosiasi Forum ILmiah (MIPA NET, PEPSILI, IAGI, IGI, AMLI) |
2026-09-05 |
3/UN47.B4/SPP.TUP.1.FMIPA/KU.00.01/2026 |
|
|
Rp. 17.074.000 |
31 Hari |
Belum ada SP2D terhitung dari 05 September 2026 hingga 06 Oktober 2026 (31 Hari) |
| 2692 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Mei 2026 |
525119 |
Bantuan Iuran Asosiasi Jurusan/Prodi (AMLI, MIPA NET, PEPSILI, IAGI, IGI dll) |
2026-04-10 |
12/UN47.B4/SPP.08.FMIPA/KU.00.01/2026 |
2026-04-30 |
0951C |
Rp. 15.500.000 |
20 Hari |
|
| 2693 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juli 2026 |
525119 |
Bantuan Iuran Asosiasi Jurusan/Prodi (AMLI, MIPA NET, PEPSILI, IAGI, IGI dll) |
2026-07-30 |
36/UN47.B4/SPP.LS.17.FMIPA/KU.00.01/2026 |
2026-08-21 |
2021C |
Rp. 1.500.000 |
22 Hari |
|
| 2694 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Agustus 2026 |
525119 |
Bantuan Iuran Asosiasi Jurusan/Prodi (AMLI, MIPA NET, PEPSILI, IAGI, IGI dll) |
2026-09-05 |
5/UN47.B4/SPP.TUP.1.FMIPA/KU.00.01/2026 |
|
|
Rp. 13.000.000 |
31 Hari |
Belum ada SP2D terhitung dari 05 September 2026 hingga 06 Oktober 2026 (31 Hari) |
| 2695 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juni 2026 |
525119 |
Bantuan Biaya Pelaksanaan Implementasi Agridmen (IA) Prodi (Perguruan Tinggi/lembaga dalam Negeri) |
2026-06-12 |
25/UN47.B4/SPP.LS.12.FMIPA/KU.00.01/2026 |
2026-08-11 |
1824C |
Rp. 500.000 |
60 Hari |
|
| 2696 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Oktober 2026 |
525119 |
Bantuan Pelaksanaan Semester Antara |
|
|
|
|
Rp. 12.840.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2697 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juni 2026 |
525119 |
Bantuan Penyusunan Dokumen Laporan Kinerja Program Studi dan Dokumen Laporan Evaluasi Diri |
2026-06-12 |
22/UN47.B4/SPP.LS.12.FMIPA/KU.00.01/2026 |
2026-08-11 |
1822C |
Rp. 6.000.000 |
60 Hari |
|
| 2698 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juni 2026 |
525119 |
Bantuan Penyusunan Dokumen Laporan Kinerja Program Studi dan Dokumen Laporan Evaluasi Diri |
2026-06-12 |
25/UN47.B4/SPP.LS.12.FMIPA/KU.00.01/2026 |
2026-08-11 |
1824C |
Rp. 3.000.000 |
60 Hari |
|
| 2699 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Mei 2026 |
525119 |
Bantuan Pelaksanaan kegiatan Simulasi Akreditasi Program Studi |
2026-04-10 |
12/UN47.B4/SPP.08.FMIPA/KU.00.01/2026 |
2026-04-30 |
0951C |
Rp. 7.000.000 |
20 Hari |
|
| 2700 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Januari 2026 |
525119 |
Bantuan Pelaksanaan kegiatan Visitasi Akreditasi Program Studi |
2026-03-10 |
04/UN47.B4/SPP.GU.1.FMIPA/KU.00.01/2026 |
2026-03-16 |
0589C |
Rp. 35.000.000 |
6 Hari |
|
| 2701 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juni 2026 |
525119 |
Bantuan Pelaksanaan kegiatan Visitasi Akreditasi Program Studi |
2026-06-12 |
22/UN47.B4/SPP.LS.12.FMIPA/KU.00.01/2026 |
2026-08-11 |
1822C |
Rp. 35.000.000 |
60 Hari |
|
| 2702 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Agustus 2026 |
525119 |
Bantuan Pelaksanaan kegiatan Visitasi Akreditasi Program Studi |
2026-08-12 |
49/UN47.B4/SPP.LS.19.FMIPA/KU.00.01/2026 |
|
|
Rp. 70.000.000 |
55 Hari |
Belum ada SP2D terhitung dari 12 Agustus 2026 hingga 06 Oktober 2026 (55 Hari) |
| 2703 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
April 2026 |
525119 |
Bantuan Penyusunan Dokumen Akreditasi Laboratorium Kimia Berstandar ISO |
2026-04-08 |
09/UN47.B4/SPP.GU.2.FMIPA/KU.00.01/2026 |
2026-04-20 |
0838C |
Rp. 22.000.000 |
12 Hari |
|
| 2704 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Agustus 2026 |
525119 |
Bantuan Penyusunan Dokumen Akreditasi Laboratorium Kimia Berstandar ISO |
2026-08-12 |
50/UN47.B4/SPP.LS.19.FMIPA/KU.00.01/2026 |
|
|
Rp. 15.000.000 |
55 Hari |
Belum ada SP2D terhitung dari 12 Agustus 2026 hingga 06 Oktober 2026 (55 Hari) |
| 2705 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Agustus 2026 |
525119 |
Bantuan Penyusunan Dokumen Akreditasi Laboratorium Biologi Berstandar ISO |
2026-08-12 |
50/UN47.B4/SPP.LS.19.FMIPA/KU.00.01/2026 |
|
|
Rp. 10.000.000 |
55 Hari |
Belum ada SP2D terhitung dari 12 Agustus 2026 hingga 06 Oktober 2026 (55 Hari) |
| 2706 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Agustus 2026 |
525119 |
Bantuan kepada mahasiswa untuk mengikuti ujian Sertifikasi Kompetensi/profesi |
2026-08-11 |
40/UN47.B4/SPP.LS.18.FMIPA/KU.00.01/2026 |
|
|
Rp. 5.250.000 |
56 Hari |
Belum ada SP2D terhitung dari 11 Agustus 2026 hingga 06 Oktober 2026 (56 Hari) |
| 2707 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Februari 2026 |
525112 |
Belanja Kebutuhan Dasar Perkantoran (ATM dan ATK) bahan habis Pakai serta Kebutuhan Rencana Biaya Anggaran |
2026-03-10 |
01/UN47.B4/SPP.GU.1.FMIPA/KU.00.01/2026 |
2026-03-16 |
0588C |
Rp. 14.722.900 |
6 Hari |
|
| 2708 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
April 2026 |
525112 |
Belanja Kebutuhan Dasar Perkantoran (ATM dan ATK) bahan habis Pakai serta Kebutuhan Rencana Biaya Anggaran |
2026-04-08 |
10/UN47.B4/SPP.GU.2.FMIPA/KU.00.01/2026 |
2026-04-20 |
0841C |
Rp. 24.773.881 |
12 Hari |
|
| 2709 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juni 2026 |
525112 |
Belanja Kebutuhan Dasar Perkantoran (ATM dan ATK) bahan habis Pakai serta Kebutuhan Rencana Biaya Anggaran |
2026-06-10 |
17/UN47.B4/SPP.GU.4.FMIPA/KU.00.01/2026 |
2026-07-02 |
1449C |
Rp. 10.126.200 |
22 Hari |
|
| 2710 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juli 2026 |
525112 |
Belanja Kebutuhan Dasar Perkantoran (ATM dan ATK) bahan habis Pakai serta Kebutuhan Rencana Biaya Anggaran |
2026-07-29 |
23/UN47.B4/SPP.GU.5.FMIPA/KU.00.01/2026 |
2026-08-28 |
2125C |
Rp. 6.466.300 |
30 Hari |
|
| 2711 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525112 |
Belanja Kebutuhan Dasar Perkantoran (ATM dan ATK) bahan habis Pakai serta Kebutuhan Rencana Biaya Anggaran |
2026-09-14 |
30/UN47.B4/SPP.GU.6.FMIPA/KU.00.01/2026 |
|
|
Rp. 2.983.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 2712 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Februari 2026 |
525112 |
Biaya Konsumsi Berat Rapat Kerja dan Konsumsi Tamu Pimpinan |
2026-03-10 |
01/UN47.B4/SPP.GU.1.FMIPA/KU.00.01/2026 |
2026-03-16 |
0588C |
Rp. 2.000.000 |
6 Hari |
|
| 2713 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
April 2026 |
525112 |
Biaya Konsumsi Berat Rapat Kerja dan Konsumsi Tamu Pimpinan |
2026-04-08 |
10/UN47.B4/SPP.GU.2.FMIPA/KU.00.01/2026 |
2026-04-20 |
0841C |
Rp. 3.964.286 |
12 Hari |
|
| 2714 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
April 2026 |
525112 |
Biaya Konsumsi Berat Rapat Kerja dan Konsumsi Tamu Pimpinan |
2026-04-29 |
11/UN47.B4/SPP.GU.3.FMIPA/KU.00.01/2026 |
2026-05-25 |
1142C |
Rp. 1.785.000 |
26 Hari |
|
| 2715 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juli 2026 |
525112 |
Biaya Konsumsi Berat Rapat Kerja dan Konsumsi Tamu Pimpinan |
2026-07-29 |
23/UN47.B4/SPP.GU.5.FMIPA/KU.00.01/2026 |
2026-08-28 |
2125C |
Rp. 12.244.898 |
30 Hari |
|
| 2716 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525112 |
Biaya Konsumsi Berat Rapat Kerja dan Konsumsi Tamu Pimpinan |
2026-09-14 |
30/UN47.B4/SPP.GU.6.FMIPA/KU.00.01/2026 |
|
|
Rp. 8.459.796 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 2717 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Januari 2026 |
525112 |
Biaya Konsumsi ringan Rapat Kerja dan Konsumsi Tamu Pimpinan |
2026-03-10 |
01/UN47.B4/SPP.GU.1.FMIPA/KU.00.01/2026 |
2026-03-16 |
0588C |
Rp. 1.980.000 |
6 Hari |
|
| 2718 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Februari 2026 |
525112 |
Biaya Konsumsi ringan Rapat Kerja dan Konsumsi Tamu Pimpinan |
2026-03-10 |
01/UN47.B4/SPP.GU.1.FMIPA/KU.00.01/2026 |
2026-03-16 |
0588C |
Rp. 1.128.500 |
6 Hari |
|
| 2719 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
April 2026 |
525112 |
Biaya Konsumsi ringan Rapat Kerja dan Konsumsi Tamu Pimpinan |
2026-04-08 |
10/UN47.B4/SPP.GU.2.FMIPA/KU.00.01/2026 |
2026-04-20 |
0841C |
Rp. 1.976.500 |
12 Hari |
|
| 2720 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
April 2026 |
525112 |
Biaya Konsumsi ringan Rapat Kerja dan Konsumsi Tamu Pimpinan |
2026-04-29 |
11/UN47.B4/SPP.GU.3.FMIPA/KU.00.01/2026 |
2026-05-25 |
1142C |
Rp. 1.669.500 |
26 Hari |
|
| 2721 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juni 2026 |
525112 |
Biaya Konsumsi ringan Rapat Kerja dan Konsumsi Tamu Pimpinan |
2026-06-10 |
17/UN47.B4/SPP.GU.4.FMIPA/KU.00.01/2026 |
2026-07-02 |
1449C |
Rp. 475.000 |
22 Hari |
|
| 2722 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juli 2026 |
525112 |
Biaya Konsumsi ringan Rapat Kerja dan Konsumsi Tamu Pimpinan |
2026-07-29 |
23/UN47.B4/SPP.GU.5.FMIPA/KU.00.01/2026 |
2026-08-28 |
2125C |
Rp. 665.000 |
30 Hari |
|
| 2723 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525112 |
Biaya Konsumsi ringan Rapat Kerja dan Konsumsi Tamu Pimpinan |
|
|
|
|
Rp. 560.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2724 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525112 |
Biaya Konsumsi ringan Rapat Kerja dan Konsumsi Tamu Pimpinan |
2026-09-14 |
30/UN47.B4/SPP.GU.6.FMIPA/KU.00.01/2026 |
|
|
Rp. 1.800.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 2725 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Mei 2026 |
525119 |
Bantuan Pelaksanaan Rapat kerja FMIPA Akselerasi Kinerja Unggul Demi Mewujudkan Program Kerja yang Berdampak |
2026-04-10 |
09/UN47.B4/SPP.08.FMIPA/KU.00.01/2026 |
2026-04-30 |
0948C |
Rp. 20.000.000 |
20 Hari |
|
| 2726 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Agustus 2026 |
525115 |
Tiket Pesawat PP (Perjalanan Dinas Terkait Kegiatan) |
2026-09-05 |
4/UN47.B4/SPP.TUP.1.FMIPA/KU.00.01/2026 |
|
|
Rp. 9.344.800 |
31 Hari |
Belum ada SP2D terhitung dari 05 September 2026 hingga 06 Oktober 2026 (31 Hari) |
| 2727 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525115 |
Tiket Pesawat PP (Perjalanan Dinas Terkait Kegiatan) |
2026-09-15 |
62/UN47.B4/SPP.LS.22.FMIPA/KU.00.01/2026 |
|
|
Rp. 8.443.676 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 2728 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Agustus 2026 |
525115 |
Uang Harian (Perjalanan Dinas Terkait Kegiatan) |
2026-09-05 |
4/UN47.B4/SPP.TUP.1.FMIPA/KU.00.01/2026 |
|
|
Rp. 2.915.000 |
31 Hari |
Belum ada SP2D terhitung dari 05 September 2026 hingga 06 Oktober 2026 (31 Hari) |
| 2729 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525115 |
Uang Harian (Perjalanan Dinas Terkait Kegiatan) |
2026-09-05 |
4/UN47.B4/SPP.TUP.1.FMIPA/KU.00.01/2026 |
|
|
Rp. 4.643.909 |
31 Hari |
Belum ada SP2D terhitung dari 05 September 2026 hingga 06 Oktober 2026 (31 Hari) |
| 2730 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525115 |
Uang Harian (Perjalanan Dinas Terkait Kegiatan) |
2026-09-15 |
62/UN47.B4/SPP.LS.22.FMIPA/KU.00.01/2026 |
|
|
Rp. 390.000 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 2731 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Agustus 2026 |
525115 |
Hotel/Penginapa (Perjalanan Dinas Terkait Kegiatan) |
2026-09-05 |
4/UN47.B4/SPP.TUP.1.FMIPA/KU.00.01/2026 |
|
|
Rp. 4.000.000 |
31 Hari |
Belum ada SP2D terhitung dari 05 September 2026 hingga 06 Oktober 2026 (31 Hari) |
| 2732 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525115 |
Hotel/Penginapa (Perjalanan Dinas Terkait Kegiatan) |
2026-09-15 |
62/UN47.B4/SPP.LS.22.FMIPA/KU.00.01/2026 |
|
|
Rp. 4.878.020 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 2733 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juli 2026 |
525119 |
Belanja Barang dan Jasa Lainnya terkait Perjalanan |
2026-07-30 |
31/UN47.B4/SPP.LS.17.FMIPA/KU.00.01/2026 |
2026-08-21 |
2016C |
Rp. 1.800.000 |
22 Hari |
|
| 2734 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525119 |
Belanja Barang dan Jasa Lainnya terkait Perjalanan |
2026-09-15 |
66/UN47.B4/SPP.LS.22.FMIPA/KU.00.01/2026 |
|
|
Rp. 3.100.000 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 2735 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Januari 2026 |
525111 |
Pembayaran Remunerasi Jabatan |
2026-01-12 |
02/UN47.B4/SPP.02.FMIPA/KU.00.01/2026 |
2026-01-21 |
0076C |
Rp. 159.600.000 |
9 Hari |
|
| 2736 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Maret 2026 |
525111 |
Pembayaran Remunerasi Jabatan |
2026-03-09 |
06/UN47.B4/SPP.06.FMIPA/KU.00.01/2026 |
2026-03-16 |
0575C |
Rp. 68.400.000 |
7 Hari |
|
| 2737 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juli 2026 |
525111 |
Pembayaran Remunerasi Jabatan |
2026-07-13 |
29/UN47.B4/SPP.LS.15.FMIPA/KU.00.01/2026 |
2026-07-30 |
1796C |
Rp. 159.600.000 |
17 Hari |
|
| 2738 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525111 |
Pembayaran Remunerasi Jabatan |
2026-09-18 |
73/UN47.B4/SPP.LS.24.FMIPA/KU.00.01/2026 |
|
|
Rp. 68.400.000 |
18 Hari |
Belum ada SP2D terhitung dari 18 September 2026 hingga 06 Oktober 2026 (18 Hari) |
| 2739 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Januari 2026 |
525111 |
Pembayaran Remunerasi Fungsional |
2026-01-12 |
01/UN47.B4/SPP.01.FMIPA/KU.00.01/2026 |
2026-01-16 |
0043C |
Rp. 1.892.424.000 |
4 Hari |
|
| 2740 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Februari 2026 |
525111 |
Pembayaran Remunerasi Fungsional |
2026-01-20 |
04/UN47.B4/SPP.04.FMIPA/KU.00.01/2026 |
2026-02-09 |
0140C |
Rp. 28.080.000 |
20 Hari |
|
| 2741 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Maret 2026 |
525111 |
Pembayaran Remunerasi Fungsional |
2026-03-09 |
05/UN47.B4/SPP.05.FMIPA/KU.00.01/2026 |
2026-03-16 |
0573C |
Rp. 838.050.000 |
7 Hari |
|
| 2742 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juli 2026 |
525111 |
Pembayaran Remunerasi Fungsional |
2026-07-13 |
28/UN47.B4/SPP.LS.14.FMIPA/KU.00.01/2026 |
2026-07-27 |
1701C |
Rp. 1.851.300.000 |
14 Hari |
|
| 2743 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525111 |
Pembayaran Remunerasi Fungsional |
2026-09-18 |
72/UN47.B4/SPP.LS.23.FMIPA/KU.00.01/2026 |
|
|
Rp. 854.442.000 |
18 Hari |
Belum ada SP2D terhitung dari 18 September 2026 hingga 06 Oktober 2026 (18 Hari) |
| 2744 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Februari 2026 |
525111 |
Insentif Kelola |
2026-01-12 |
03/UN47.B4/SPP.03.FMIPA/KU.00.01/2026 |
2026-02-05 |
0133C |
Rp. 174.000.000 |
24 Hari |
|
| 2745 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Maret 2026 |
525111 |
Insentif Kelola |
2026-03-09 |
07/UN47.B4/SPP.07.FMIPA/KU.00.01/2026 |
2026-03-17 |
0574C |
Rp. 177.700.000 |
8 Hari |
|
| 2746 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
April 2026 |
525111 |
Insentif Kelola |
2026-04-14 |
13/UN47.B4/SPP.09.FMIPA/KU.00.01/2026 |
2026-04-22 |
0850C |
Rp. 89.700.000 |
8 Hari |
|
| 2747 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juli 2026 |
525111 |
Insentif Kelola |
2026-06-15 |
27/UN47.B4/SPP.LS.13.FMIPA/KU.00.01/2026 |
2026-07-09 |
1552C |
Rp. 179.400.000 |
24 Hari |
|
| 2748 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juli 2026 |
525111 |
Insentif Kelola |
2026-07-13 |
30/UN47.B4/SPP.LS.16.FMIPA/KU.00.01/2026 |
2026-08-20 |
2051C |
Rp. 9.000.000 |
38 Hari |
|
| 2749 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Agustus 2026 |
525111 |
Insentif Kelola |
2026-08-21 |
51/UN47.B4/SPP.LS.20.FMIPA/KU.00.01/2026 |
|
|
Rp. 187.400.000 |
46 Hari |
Belum ada SP2D terhitung dari 21 Agustus 2026 hingga 06 Oktober 2026 (46 Hari) |
| 2750 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Oktober 2026 |
525111 |
Insentif Kelola |
|
|
|
|
Rp. 185.400.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2751 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juli 2026 |
525119 |
Operasional Kenderaan Dinas Pimpinan |
2026-07-29 |
24/UN47.B4/SPP.GU.5.FMIPA/KU.00.01/2026 |
2026-08-28 |
2126C |
Rp. 3.959.876 |
30 Hari |
|
| 2752 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Januari 2026 |
525111 |
Insentif Pejabat Pembuat Komitmen Unit Kerja (PPK UK) |
2026-03-10 |
02/UN47.B4/SPP.GU.1.FMIPA/KU.00.01/2026 |
2026-03-16 |
0592C |
Rp. 2.660.000 |
6 Hari |
|
| 2753 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Mei 2026 |
525111 |
Insentif Pejabat Pembuat Komitmen Unit Kerja (PPK UK) |
2026-04-10 |
08/UN47.B4/SPP.08.FMIPA/KU.00.01/2026 |
2026-04-30 |
0947C |
Rp. 3.450.000 |
20 Hari |
|
| 2754 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Januari 2026 |
525111 |
Insentif Penguji Tagihan/Verifikator Unit Kerja |
2026-03-10 |
02/UN47.B4/SPP.GU.1.FMIPA/KU.00.01/2026 |
2026-03-16 |
0592C |
Rp. 1.060.000 |
6 Hari |
|
| 2755 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Mei 2026 |
525111 |
Insentif Penguji Tagihan/Verifikator Unit Kerja |
2026-04-10 |
08/UN47.B4/SPP.08.FMIPA/KU.00.01/2026 |
2026-04-30 |
0947C |
Rp. 1.320.000 |
20 Hari |
|
| 2756 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525176 |
Insentif Pejabat Pembuat Komitmen Unit Kerja (PPK UK) |
2026-09-15 |
68/UN47.B4/SPP.LS.22.FMIPA/KU.00.01/2026 |
|
|
Rp. 5.750.000 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 2757 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525176 |
Insentif Penguji Tagihan/Verifikator Unit Kerja |
2026-09-15 |
68/UN47.B4/SPP.LS.22.FMIPA/KU.00.01/2026 |
|
|
Rp. 2.200.000 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 2758 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juli 2026 |
525115 |
Tiket Pesawat PP (terkait Kegiatan Softskill/Pembinaan Karakter/Diklat/Lokakarya/Workshop/Seminar Tenaga Kependidikan) |
2026-07-30 |
32/UN47.B4/SPP.LS.17.FMIPA/KU.00.01/2026 |
2026-08-21 |
2017C |
Rp. 6.000.000 |
22 Hari |
|
| 2759 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Agustus 2026 |
525115 |
Tiket Pesawat PP (terkait Kegiatan Softskill/Pembinaan Karakter/Diklat/Lokakarya/Workshop/Seminar Tenaga Kependidikan) |
2026-09-05 |
1/UN47.B4/SPP.TUP.1.FMIPA/KU.00.01/2026 |
|
|
Rp. 800.000 |
31 Hari |
Belum ada SP2D terhitung dari 05 September 2026 hingga 06 Oktober 2026 (31 Hari) |
| 2760 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525115 |
Tiket Pesawat PP (terkait Kegiatan Softskill/Pembinaan Karakter/Diklat/Lokakarya/Workshop/Seminar Tenaga Kependidikan) |
2026-09-15 |
63UN47.B4/SPP.LS.22.FMIPA/KU.00.01/2026 |
|
|
Rp. 3.060.000 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 2761 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juli 2026 |
525115 |
Uang Harian (terkait Kegiatan Softskill/Pembinaan Karakter/Diklat/Lokakarya/Workshop/Seminar Tenaga Kependidikan) |
2026-07-30 |
32/UN47.B4/SPP.LS.17.FMIPA/KU.00.01/2026 |
2026-08-21 |
2017C |
Rp. 6.000.000 |
22 Hari |
|
| 2762 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Agustus 2026 |
525115 |
Uang Harian (terkait Kegiatan Softskill/Pembinaan Karakter/Diklat/Lokakarya/Workshop/Seminar Tenaga Kependidikan) |
2026-09-05 |
1/UN47.B4/SPP.TUP.1.FMIPA/KU.00.01/2026 |
|
|
Rp. 1.480.000 |
31 Hari |
Belum ada SP2D terhitung dari 05 September 2026 hingga 06 Oktober 2026 (31 Hari) |
| 2763 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juli 2026 |
525115 |
Hotel/Penginapan PP (terkait Kegiatan Softskill/Pembinaan Karakter/Diklat/Lokakarya/Workshop/Seminar Tenaga Kependidikan) |
2026-07-30 |
32/UN47.B4/SPP.LS.17.FMIPA/KU.00.01/2026 |
2026-08-21 |
2017C |
Rp. 3.697.650 |
22 Hari |
|
| 2764 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Agustus 2026 |
525115 |
Hotel/Penginapan PP (terkait Kegiatan Softskill/Pembinaan Karakter/Diklat/Lokakarya/Workshop/Seminar Tenaga Kependidikan) |
2026-09-05 |
1/UN47.B4/SPP.TUP.1.FMIPA/KU.00.01/2026 |
|
|
Rp. 1.150.000 |
31 Hari |
Belum ada SP2D terhitung dari 05 September 2026 hingga 06 Oktober 2026 (31 Hari) |
| 2765 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525115 |
Hotel/Penginapan PP (terkait Kegiatan Softskill/Pembinaan Karakter/Diklat/Lokakarya/Workshop/Seminar Tenaga Kependidikan) |
2026-09-15 |
63UN47.B4/SPP.LS.22.FMIPA/KU.00.01/2026 |
|
|
Rp. 2.200.000 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 2766 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525115 |
Transportasi lokal (terkait Kegiatan Softskill/Pembinaan Karakter/Diklat/Lokakarya/Workshop/Seminar Tenaga Kependidikan) |
2026-09-15 |
63UN47.B4/SPP.LS.22.FMIPA/KU.00.01/2026 |
|
|
Rp. 3.000.000 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 2767 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Februari 2026 |
525119 |
Belanja Barang dan Jasa Lainnya terkait kegiatan Workshoop, Seminar, Perjalanan Dll |
2026-03-10 |
03/UN47.B4/SPP.GU.1.FMIPA/KU.00.01/2026 |
2026-03-16 |
0591C |
Rp. 6.000.000 |
6 Hari |
|
| 2768 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Mei 2026 |
525119 |
Belanja Barang dan Jasa Lainnya terkait kegiatan Workshoop, Seminar, Perjalanan Dll |
2026-04-10 |
11/UN47.B4/SPP.08.FMIPA/KU.00.01/2026 |
2026-04-30 |
0950C |
Rp. 5.000.000 |
20 Hari |
|
| 2769 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juni 2026 |
525119 |
Belanja Barang dan Jasa Lainnya terkait kegiatan Workshoop, Seminar, Perjalanan Dll |
2026-06-12 |
24/UN47.B4/SPP.LS.12.FMIPA/KU.00.01/2026 |
2026-08-11 |
1823C |
Rp. 9.065.000 |
60 Hari |
|
| 2770 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Agustus 2026 |
525119 |
Belanja Barang dan Jasa Lainnya terkait kegiatan Workshoop, Seminar, Perjalanan Dll |
|
|
|
|
Rp. 1.800.000 |
66 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Agustus 2026 hingga 06 Oktober 2026 (66 Hari) |
| 2771 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Agustus 2026 |
525119 |
Belanja Barang dan Jasa Lainnya terkait kegiatan Workshoop, Seminar, Perjalanan Dll |
2026-09-05 |
2/UN47.B4/SPP.TUP.1.FMIPA/KU.00.01/2026 |
|
|
Rp. 5.250.000 |
31 Hari |
Belum ada SP2D terhitung dari 05 September 2026 hingga 06 Oktober 2026 (31 Hari) |
| 2772 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525119 |
Belanja Barang dan Jasa Lainnya terkait kegiatan Workshoop, Seminar, Perjalanan Dll |
|
|
|
|
Rp. 3.600.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2773 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Oktober 2026 |
525119 |
Belanja Barang dan Jasa Lainnya terkait kegiatan Workshoop, Seminar, Perjalanan Dll |
|
|
|
|
Rp. 11.754.677 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2774 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Oktober 2026 |
525119 |
Bantuan Pelaksanaan Sertifikasi Kompetensi Bagi Dosen |
|
|
|
|
Rp. 14.887.432 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2775 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525119 |
Bantuan kegiatan seminar Internasional Biometrik |
2026-09-15 |
64/UN47.B4/SPP.LS.22.FMIPA/KU.00.01/2026 |
|
|
Rp. 30.000.000 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 2776 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juni 2026 |
525119 |
Bantuan Kegiatan Sosialisai Pencegahan dan Penanganan Anti Kekerasan, Narkoba dan Anti Korupsi |
2026-06-10 |
19/UN47.B4/SPP.GU.4.FMIPA/KU.00.01/2026 |
2026-07-02 |
1452C |
Rp. 7.000.000 |
22 Hari |
|
| 2777 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juli 2026 |
525119 |
Bantuan Pelaksanaan Penelitian penghasil prototype/hilirisasi riset |
2026-06-02 |
19/UN47.B4/SPP.LS.11.FMIPA/KU.00.01/2026 |
2026-07-09 |
1554C |
Rp. 20.000.000 |
37 Hari |
|
| 2778 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juli 2026 |
525119 |
Bantuan Pelaksanaan Penelitian penghasil prototype/hilirisasi riset |
2026-06-02 |
20/UN47.B4/SPP.LS.11.FMIPA/KU.00.01/2026 |
2026-07-09 |
1553C |
Rp. 44.000.000 |
37 Hari |
|
| 2779 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juli 2026 |
525119 |
Bantuan Pelaksanaan Penelitian penghasil prototype/hilirisasi riset |
2026-07-30 |
34/UN47.B4/SPP.LS.17.FMIPA/KU.00.01/2026 |
2026-08-21 |
2019C |
Rp. 16.000.000 |
22 Hari |
|
| 2780 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Agustus 2026 |
525119 |
Bantuan Pelaksanaan Penelitian penghasil prototype/hilirisasi riset |
2026-06-02 |
19/UN47.B4/SPP.LS.11.FMIPA/KU.00.01/2026 |
2026-07-09 |
1554C |
Rp. 4.000.000 |
37 Hari |
|
| 2781 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525119 |
Bantuan Pelaksanaan Penelitian penghasil prototype/hilirisasi riset |
2026-09-14 |
54/UN47.B4/SPP.LS.21.FMIPA/KU.00.01/2026 |
|
|
Rp. 17.000.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 2782 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juli 2026 |
525119 |
Bantuan Pelaksanaan Pelaksanaan Penelitian Pengembangan |
2026-06-02 |
15/UN47.B4/SPP.LS.11.FMIPA/KU.00.01/2026 |
2026-07-09 |
1555C |
Rp. 84.000.000 |
37 Hari |
|
| 2783 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juli 2026 |
525119 |
Bantuan Pelaksanaan Pelaksanaan Penelitian Pengembangan |
2026-06-02 |
17/UN47.B4/SPP.LS.11.FMIPA/KU.00.01/2026 |
2026-07-09 |
1557C |
Rp. 192.000.000 |
37 Hari |
|
| 2784 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525119 |
Bantuan Pelaksanaan Pelaksanaan Penelitian Pengembangan |
2026-09-14 |
52/UN47.B4/SPP.LS.21.FMIPA/KU.00.01/2026 |
|
|
Rp. 48.000.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 2785 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525119 |
Bantuan Pelaksanaan Pelaksanaan Penelitian Pengembangan |
2026-09-14 |
53/UN47.B4/SPP.LS.21.FMIPA/KU.00.01/2026 |
|
|
Rp. 21.000.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 2786 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Agustus 2026 |
525119 |
Pelatihan Penulisan Artikel |
2026-08-12 |
48/UN47.B4/SPP.LS.19.FMIPA/KU.00.01/2026 |
|
|
Rp. 10.000.000 |
55 Hari |
Belum ada SP2D terhitung dari 12 Agustus 2026 hingga 06 Oktober 2026 (55 Hari) |
| 2787 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juli 2026 |
525119 |
Penerbitan Artikel Ilmiah Nasional Terakreditasi |
2026-06-02 |
16/UN47.B4/SPP.LS.11.FMIPA/KU.00.01/2026 |
2026-07-09 |
1556C |
Rp. 10.000.000 |
37 Hari |
|
| 2788 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juli 2026 |
525119 |
Penerbitan Artikel Internasional |
2026-06-02 |
18/UN47.B4/SPP.LS.11.FMIPA/KU.00.01/2026 |
2026-07-09 |
1558C |
Rp. 30.000.000 |
37 Hari |
|
| 2789 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525119 |
Bantuan Penulisan Buku |
2026-09-14 |
60/UN47.B4/SPP.LS.21.FMIPA/KU.00.01/2026 |
|
|
Rp. 15.000.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 2790 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Mei 2026 |
525119 |
Bantuan Pelaksanaan Pengabdian Kepada Masyarakat yang Berbasis SDGs |
2026-04-10 |
10/UN47.B4/SPP.08.FMIPA/KU.00.01/2026 |
2026-04-30 |
0949C |
Rp. 15.000.000 |
20 Hari |
|
| 2791 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525119 |
Bantuan Pelaksanaan Pengabdian Kepada Masyarakat yang Berbasis SDGs |
2026-09-14 |
59/UN47.B4/SPP.LS.21.FMIPA/KU.00.01/2026 |
|
|
Rp. 140.000.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 2792 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
September 2026 |
525119 |
Bantuan Pelaksanaan Pengabdian Kepada Masyarakat yang Berbasis SDGs |
2026-09-14 |
58/UN47.B4/SPP.LS.21.FMIPA/KU.00.01/2026 |
|
|
Rp. 70.000.000 |
22 Hari |
Belum ada SP2D terhitung dari 14 September 2026 hingga 06 Oktober 2026 (22 Hari) |
| 2793 |
Fakultas Matematika dan Ilmu Pengetahuan Alam |
Juli 2026 |
525119 |
Bantuan Penerbitan Hak Cipta |
2026-07-30 |
35/UN47.B4/SPP.LS.17.FMIPA/KU.00.01/2026 |
2026-08-21 |
2020C |
Rp. 2.500.000 |
22 Hari |
|
| 2794 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525114 |
Pemeliharaan AC |
2026-06-17 |
090/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1487S |
Rp. 3.397.959 |
16 Hari |
|
| 2795 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525114 |
Pemeliharan Printer, Komputer, Laptop, dan Peralatan elektronik kantor |
2026-04-02 |
042/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0649S |
Rp. 17.899.600 |
5 Hari |
|
| 2796 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525114 |
Pemeliharan Printer, Komputer, Laptop, dan Peralatan elektronik kantor |
2026-08-10 |
134/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1900S |
Rp. 14.750.000 |
2 Hari |
|
| 2797 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525114 |
Pemeliharan Printer, Komputer, Laptop, dan Peralatan elektronik kantor |
2026-09-16 |
169/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 6.275.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2798 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525114 |
Pemeliharaan Listrik dan Air |
2026-04-27 |
061/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0926S |
Rp. 39.650.000 |
2 Hari |
|
| 2799 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525114 |
Pemeliharaan Listrik dan Air |
|
|
|
|
Rp. 16.670.600 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2800 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525114 |
Pemeliharaan jaringan internet dan CCTV |
|
|
|
|
Rp. 6.323.800 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2801 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525114 |
Pemeliharan Gedung kantor bertingkat BAKP |
2026-03-02 |
035/UN47.A1/LS-BAKP/2026 |
2026-03-04 |
0307S |
Rp. 111.783.000 |
2 Hari |
|
| 2802 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525114 |
Pemeliharan Gedung kantor bertingkat BAKP |
2026-09-21 |
178/UN47.A1/LS-BAKP/2026 |
|
|
Rp. 49.723.000 |
15 Hari |
Belum ada SP2D terhitung dari 21 September 2026 hingga 06 Oktober 2026 (15 Hari) |
| 2803 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525115 |
Tiket PP |
2026-06-08 |
085/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1300S |
Rp. 6.050.300 |
7 Hari |
|
| 2804 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525115 |
Tiket PP |
2026-06-17 |
095/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1492S |
Rp. 21.491.520 |
16 Hari |
|
| 2805 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525115 |
Tiket PP |
2026-08-10 |
139/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1905S |
Rp. 10.422.680 |
2 Hari |
|
| 2806 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525115 |
Tiket PP |
2026-09-15 |
163/UN47.A1/TUP NIHIL.7_BAKP/2026 |
2026-09-16 |
2357S |
Rp. 130.611.300 |
1 Hari |
|
| 2807 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525115 |
Tiket PP |
|
|
|
|
Rp. 3.947.070 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2808 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525115 |
Hotel |
2026-06-08 |
085/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1300S |
Rp. 750.000 |
7 Hari |
|
| 2809 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525115 |
Hotel |
2026-06-17 |
095/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1492S |
Rp. 5.962.401 |
16 Hari |
|
| 2810 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525115 |
Hotel |
2026-08-10 |
139/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1905S |
Rp. 5.740.000 |
2 Hari |
|
| 2811 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525115 |
Hotel |
2026-09-15 |
163/UN47.A1/TUP NIHIL.7_BAKP/2026 |
2026-09-16 |
2357S |
Rp. 36.945.709 |
1 Hari |
|
| 2812 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525115 |
Uang Harian |
2026-06-08 |
085/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1300S |
Rp. 1.230.000 |
7 Hari |
|
| 2813 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525115 |
Uang Harian |
2026-06-17 |
095/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1492S |
Rp. 11.480.000 |
16 Hari |
|
| 2814 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525115 |
Uang Harian |
2026-08-10 |
139/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1905S |
Rp. 2.460.000 |
2 Hari |
|
| 2815 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525115 |
Uang Harian |
2026-09-15 |
163/UN47.A1/TUP NIHIL.7_BAKP/2026 |
2026-09-16 |
2357S |
Rp. 65.600.000 |
1 Hari |
|
| 2816 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525115 |
Transport Lokal |
2026-06-08 |
085/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1300S |
Rp. 600.000 |
7 Hari |
|
| 2817 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525115 |
Transport Lokal |
2026-06-17 |
095/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1492S |
Rp. 2.226.000 |
16 Hari |
|
| 2818 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525115 |
Transport Lokal |
2026-08-10 |
139/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1905S |
Rp. 450.000 |
2 Hari |
|
| 2819 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525115 |
Transport Lokal |
2026-09-15 |
163/UN47.A1/TUP NIHIL.7_BAKP/2026 |
2026-09-16 |
2357S |
Rp. 24.198.321 |
1 Hari |
|
| 2820 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525112 |
Konsumsi berat dan ringan |
2026-02-11 |
021/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0183S |
Rp. 330.000 |
2 Hari |
|
| 2821 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525112 |
Konsumsi berat dan ringan |
2026-03-02 |
032/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0315S |
Rp. 3.780.000 |
2 Hari |
|
| 2822 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525112 |
Konsumsi berat dan ringan |
2026-04-02 |
047/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0654S |
Rp. 4.500.000 |
5 Hari |
|
| 2823 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525112 |
Konsumsi berat dan ringan |
2026-04-27 |
065/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0930S |
Rp. 2.550.000 |
2 Hari |
|
| 2824 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525112 |
Konsumsi berat dan ringan |
2026-06-08 |
084/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1299S |
Rp. 3.903.000 |
7 Hari |
|
| 2825 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525112 |
Konsumsi berat dan ringan |
2026-06-17 |
094/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1491S |
Rp. 1.989.000 |
16 Hari |
|
| 2826 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Konsumsi berat dan ringan |
2026-07-21 |
121/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1712S |
Rp. 7.298.000 |
7 Hari |
|
| 2827 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Konsumsi berat dan ringan |
2026-08-10 |
138/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1904S |
Rp. 1.998.000 |
2 Hari |
|
| 2828 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525112 |
Konsumsi berat dan ringan |
2026-09-01 |
154/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2199S |
Rp. 4.575.000 |
2 Hari |
|
| 2829 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525112 |
Konsumsi berat dan ringan |
2026-09-16 |
176/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 3.360.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2830 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525112 |
Konsumsi berat dan ringan |
|
|
|
|
Rp. 915.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2831 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-04-02 |
048/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0655S |
Rp. 28.000.000 |
5 Hari |
|
| 2832 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-04-27 |
066/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0931S |
Rp. 3.500.000 |
2 Hari |
|
| 2833 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-05-12 |
078/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1080S |
Rp. 60.150.000 |
6 Hari |
|
| 2834 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-06-08 |
086/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1301S |
Rp. 12.500.000 |
7 Hari |
|
| 2835 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-06-17 |
096/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1493S |
Rp. 50.912.400 |
16 Hari |
|
| 2836 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-07-13 |
109/UN47.A1/LS-BAKP/2026 |
2026-07-21 |
1653S |
Rp. 19.500.000 |
8 Hari |
|
| 2837 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-07-21 |
122/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1713S |
Rp. 125.000 |
7 Hari |
|
| 2838 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-08-10 |
140/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1944S |
Rp. 27.873.600 |
2 Hari |
|
| 2839 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-08-24 |
145/UN47.A1/LS-BAKP/2026 |
2026-08-26 |
2086S |
Rp. 240.000.000 |
2 Hari |
|
| 2840 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-09-01 |
155/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2198S |
Rp. 25.990.000 |
2 Hari |
|
| 2841 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-09-15 |
164/UN47.A1/TUP NIHIL.7-BAKP/2026 |
2026-09-16 |
2358S |
Rp. 37.950.000 |
1 Hari |
|
| 2842 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-09-16 |
177/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 11.200.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2843 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
bantuan Pelaksanaan PKKMB |
2026-08-24 |
143/UN47.A1/TUP NIHIL.6-BAKP |
2026-08-26 |
2115S |
Rp. 467.400.000 |
2 Hari |
|
| 2844 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525112 |
Konsumsi berat dan ringan |
2026-04-27 |
065/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0930S |
Rp. 1.400.000 |
2 Hari |
|
| 2845 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525119 |
Bantuan Belanja barang dan jasa lainnya terkait Kegiatan |
2026-02-11 |
022/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0184S |
Rp. 48.000.000 |
2 Hari |
|
| 2846 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Bantuan Belanja barang dan jasa lainnya terkait Kegiatan |
2026-03-02 |
033/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0316S |
Rp. 22.305.000 |
2 Hari |
|
| 2847 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Bantuan Belanja barang dan jasa lainnya terkait Kegiatan |
2026-06-08 |
087/UN47.A1/LS-BAKP/2026 |
2026-07-01 |
1434S |
Rp. 25.500.000 |
23 Hari |
|
| 2848 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525112 |
Belanja kebutuhan dasar kantor pada kegiatan |
2026-05-12 |
077/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1079S |
Rp. 6.250.500 |
6 Hari |
|
| 2849 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Belanja kebutuhan dasar kantor pada kegiatan |
2026-07-20 |
112/UN47.A1/TUP NIHIL.4-BAKP/2026 |
2026-07-24 |
1697S |
Rp. 6.950.000 |
4 Hari |
|
| 2850 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
bantuan biaya Aplikasi CAT |
2026-07-13 |
106/UN47.A1/LS-BAKP/2026 |
2026-07-24 |
1700S |
Rp. 47.500.000 |
11 Hari |
|
| 2851 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Honor Panitia kegiatan |
2026-07-20 |
113/UN47.A1/TUP NIHIL.4-BAKP/2026 |
2026-07-24 |
1698S |
Rp. 73.500.000 |
4 Hari |
|
| 2852 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Biaya Konsumsi Ringan dan Berat |
2026-07-20 |
112/UN47.A1/TUP NIHIL.4-BAKP/2026 |
2026-07-24 |
1697S |
Rp. 22.463.000 |
4 Hari |
|
| 2853 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Biaya Konsumsi Ringan dan Berat |
2026-07-21 |
121/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1712S |
Rp. 9.600.000 |
7 Hari |
|
| 2854 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Biaya Konsumsi Ringan dan Berat |
2026-08-10 |
138/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1904S |
Rp. 2.257.500 |
2 Hari |
|
| 2855 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525112 |
Konsumsi berat dan ringan |
2026-02-11 |
021/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0183S |
Rp. 587.000 |
2 Hari |
|
| 2856 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525112 |
Konsumsi berat dan ringan |
2026-03-02 |
032/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0315S |
Rp. 9.750.000 |
2 Hari |
|
| 2857 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525114 |
Biaya pemeliharaan server feeder PD DIKTI |
2026-06-30 |
101/UN47.A1/LS-BAKP/2026 |
2026-07-06 |
1500S |
Rp. 25.000.000 |
6 Hari |
|
| 2858 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
Bantuan pelaksanaan kegiatan sinkronisasi PD DIKTI |
2026-04-02 |
048/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0655S |
Rp. 13.500.000 |
5 Hari |
|
| 2859 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Bantuan pelaksanaan kegiatan sinkronisasi PD DIKTI |
2026-05-12 |
078/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1080S |
Rp. 12.525.000 |
6 Hari |
|
| 2860 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Bantuan pelaksanaan kegiatan sinkronisasi PD DIKTI |
2026-06-08 |
086/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1301S |
Rp. 12.375.000 |
7 Hari |
|
| 2861 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
Bantuan Pengembalian UKT mahasiswa Program KIP-K 2026 |
2026-03-10 |
039/UN47.A1/LS-BAKP/2026 |
2026-03-13 |
0500S |
Rp. 409.575.200 |
3 Hari |
|
| 2862 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Bantuan beasiswa Program For international Class (PIC) Tahun 2026 |
2026-08-24 |
143/UN47.A1/TUP NIHIL.6-BAKP |
2026-08-26 |
2115S |
Rp. 76.500.000 |
2 Hari |
|
| 2863 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Bantuan beasiswa Program For international Class (PIC) Tahun 2026 |
2026-09-15 |
164/UN47.A1/TUP NIHIL.7-BAKP/2026 |
2026-09-16 |
2358S |
Rp. 17.000.000 |
1 Hari |
|
| 2864 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Bantuan biaya kegiatan ORMAWA mahasiswa (senat fakultas dan HMJ) |
2026-04-27 |
066/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0931S |
Rp. 2.500.000 |
2 Hari |
|
| 2865 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525119 |
Bantuan biaya kegiatan ORMAWA mahasiswa (senat fakultas dan HMJ) |
|
|
|
|
Rp. 38.053.801 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2866 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Pembinaan BEM , UKM dan UKK |
2026-05-12 |
078/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1080S |
Rp. 58.000.000 |
6 Hari |
|
| 2867 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Pembinaan BEM , UKM dan UKK |
2026-06-08 |
086/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1301S |
Rp. 23.500.000 |
7 Hari |
|
| 2868 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525119 |
Pembinaan BEM , UKM dan UKK |
2026-06-17 |
096/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1493S |
Rp. 20.650.000 |
16 Hari |
|
| 2869 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Pembinaan BEM , UKM dan UKK |
2026-09-01 |
155/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2198S |
Rp. 15.562.500 |
2 Hari |
|
| 2870 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Pembinaan BEM , UKM dan UKK |
2026-09-16 |
177/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 19.783.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2871 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525119 |
Pembinaan BEM , UKM dan UKK |
|
|
|
|
Rp. 2.000.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2872 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Kalender akademik untuk mahasiswa baru |
2026-09-02 |
156/UN47.A1/LS-BAKP/2026 |
2026-09-10 |
2255S |
Rp. 47.844.000 |
8 Hari |
|
| 2873 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Kalender akademik untuk mahasiswa baru |
2026-09-16 |
177/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 20.556.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2874 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Bantuan Pelaksanaan PEKSIMINAS |
2026-08-07 |
131/UN47.A1/LS-BAKP/2026 |
2026-08-12 |
1896S |
Rp. 105.000.000 |
5 Hari |
|
| 2875 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Bantuan Pelaksanaan PEKSIMINAS |
2026-08-24 |
143/UN47.A1/TUP NIHIL.6-BAKP |
2026-08-26 |
2115S |
Rp. 50.400.000 |
2 Hari |
|
| 2876 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Bantuan Pelaksanaan PEKSIMINAS |
2026-09-02 |
157/UN47.A1/LS-BAKP/2026 |
2026-09-03 |
2196S |
Rp. 200.000.000 |
1 Hari |
|
| 2877 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Bantuan Pelaksanaan PEKSIMINAS |
2026-09-15 |
164/UN47.A1/TUP NIHIL.7-BAKP/2026 |
2026-09-16 |
2358S |
Rp. 74.150.000 |
1 Hari |
|
| 2878 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525112 |
Belanja kebutuhan dasar kantor terkait kegiatan |
2026-02-10 |
012/UN47.A1/TUP NIHIL.1-BAKP/2026 |
2026-02-12 |
0165S |
Rp. 8.595.200 |
2 Hari |
|
| 2879 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525112 |
Belanja kebutuhan dasar kantor terkait kegiatan |
2026-04-02 |
047/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0654S |
Rp. 12.850.000 |
5 Hari |
|
| 2880 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525112 |
Belanja kebutuhan dasar kantor terkait kegiatan |
2026-04-21 |
053/UN47.A1/TUP NIHIL.2-BAKP/2026 |
2026-04-28 |
0908S |
Rp. 8.787.400 |
7 Hari |
|
| 2881 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525112 |
Belanja kebutuhan dasar kantor terkait kegiatan |
2026-06-29 |
098/UN47.A1/TUP NIHIL.3-BAKP/2026 |
2026-07-03 |
1479S |
Rp. 5.530.500 |
4 Hari |
|
| 2882 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Belanja kebutuhan dasar kantor terkait kegiatan |
2026-08-03 |
127/UN47.A1/TUP NIHIL.5-BAKP/2026 |
2026-08-11 |
1891S |
Rp. 6.382.700 |
8 Hari |
|
| 2883 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Belanja kebutuhan dasar kantor terkait kegiatan |
2026-08-10 |
138/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1904S |
Rp. 1.500.000 |
2 Hari |
|
| 2884 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525112 |
Belanja kebutuhan dasar kantor terkait kegiatan |
|
|
|
|
Rp. 9.830.300 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2885 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525112 |
Konsumsi ringan |
2026-02-10 |
012/UN47.A1/TUP NIHIL.1-BAKP/2026 |
2026-02-12 |
0165S |
Rp. 32.460.000 |
2 Hari |
|
| 2886 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525112 |
Konsumsi ringan |
2026-03-02 |
032/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0315S |
Rp. 600.000 |
2 Hari |
|
| 2887 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525112 |
Konsumsi ringan |
2026-04-21 |
053/UN47.A1/TUP NIHIL.2-BAKP/2026 |
2026-04-28 |
0908S |
Rp. 33.200.000 |
7 Hari |
|
| 2888 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525112 |
Konsumsi ringan |
2026-06-29 |
098/UN47.A1/TUP NIHIL.3-BAKP/2026 |
2026-07-03 |
1479S |
Rp. 33.100.000 |
4 Hari |
|
| 2889 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Konsumsi ringan |
2026-08-03 |
127/UN47.A1/TUP NIHIL.5-BAKP/2026 |
2026-08-11 |
1891S |
Rp. 33.100.000 |
8 Hari |
|
| 2890 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Konsumsi ringan |
2026-08-10 |
138/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1904S |
Rp. 600.000 |
2 Hari |
|
| 2891 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525112 |
Konsumsi ringan |
|
|
|
|
Rp. 33.100.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2892 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525112 |
Konsumsi ringan |
|
|
|
|
Rp. 375.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2893 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525112 |
Konsumsi berat |
2026-02-10 |
012/UN47.A1/TUP NIHIL.1-BAKP/2026 |
2026-02-12 |
0165S |
Rp. 39.900.000 |
2 Hari |
|
| 2894 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525112 |
Konsumsi berat |
2026-03-02 |
032/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0315S |
Rp. 512.000 |
2 Hari |
|
| 2895 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525112 |
Konsumsi berat |
2026-04-21 |
053/UN47.A1/TUP NIHIL.2-BAKP/2026 |
2026-04-28 |
0908S |
Rp. 43.317.000 |
7 Hari |
|
| 2896 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525112 |
Konsumsi berat |
2026-04-27 |
065/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0930S |
Rp. 1.960.000 |
2 Hari |
|
| 2897 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525112 |
Konsumsi berat |
2026-06-29 |
098/UN47.A1/TUP NIHIL.3-BAKP/2026 |
2026-07-03 |
1479S |
Rp. 44.517.000 |
4 Hari |
|
| 2898 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Konsumsi berat |
2026-07-21 |
121/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1712S |
Rp. 1.925.000 |
7 Hari |
|
| 2899 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Konsumsi berat |
2026-08-03 |
127/UN47.A1/TUP NIHIL.5-BAKP/2026 |
2026-08-11 |
1891S |
Rp. 39.117.000 |
8 Hari |
|
| 2900 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Konsumsi berat |
2026-08-10 |
138/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1904S |
Rp. 4.620.000 |
2 Hari |
|
| 2901 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525112 |
Konsumsi berat |
|
|
|
|
Rp. 44.227.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2902 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525113 |
Honor panitia kegiatan |
2026-02-10 |
013/UN47.A1/TUP NIHIL.1-BAKP/2026 |
2026-02-12 |
0166S |
Rp. 35.054.400 |
2 Hari |
|
| 2903 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525113 |
Honor panitia kegiatan |
2026-04-21 |
054/UN47.A1/TUP NIHIL.2-BAKP/2026 |
2026-04-28 |
0909S |
Rp. 35.804.400 |
7 Hari |
|
| 2904 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525113 |
Honor panitia kegiatan |
2026-06-29 |
099/UN47.A1/TUP NIHIL.3-BAKP/2026 |
2026-07-03 |
1480S |
Rp. 36.067.600 |
4 Hari |
|
| 2905 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525113 |
Honor panitia kegiatan |
2026-08-03 |
128/UN47.A1/TUP NIHIL.5-BAKP/2026 |
2026-08-11 |
1892S |
Rp. 36.078.000 |
8 Hari |
|
| 2906 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525113 |
Honor panitia kegiatan |
|
|
|
|
Rp. 35.889.450 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2907 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Belanja Kertas Ijazah |
2026-07-13 |
107UN47.A/LS-BAKP/2026 |
2026-07-30 |
1775S |
Rp. 113.775.000 |
17 Hari |
|
| 2908 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Belanja Kertas SKPI |
2026-07-20 |
114/UN47.A1/LS-BAKP/2026 |
2026-08-03 |
1803S |
Rp. 224.700.000 |
14 Hari |
|
| 2909 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Belanja Kertas Transkrip Nilai |
2026-07-13 |
108/UN47.A1/LS-BAKP/2026 |
2026-08-03 |
1805S |
Rp. 97.125.000 |
21 Hari |
|
| 2910 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Belanja Penyediaan barang dan jasa lainnya terkait kegiatan |
2026-02-10 |
014/UN47.A1/TUP NIHIL.1-BAKP/2026 |
2026-02-12 |
0167S |
Rp. 329.622.900 |
2 Hari |
|
| 2911 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Belanja Penyediaan barang dan jasa lainnya terkait kegiatan |
2026-04-21 |
055/UN47.A1/TUP NIHIL.2-BAKP/2026 |
2026-04-28 |
0910S |
Rp. 374.402.900 |
7 Hari |
|
| 2912 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Belanja Penyediaan barang dan jasa lainnya terkait kegiatan |
2026-04-22 |
056/UN47.A1/LS-BAKP/2026 |
2026-04-28 |
0907S |
Rp. 48.500.000 |
6 Hari |
|
| 2913 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Belanja Penyediaan barang dan jasa lainnya terkait kegiatan |
2026-04-22 |
058/UN47.A1/LS-BAKP/2026 |
2026-04-28 |
0912S |
Rp. 12.125.000 |
6 Hari |
|
| 2914 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Belanja Penyediaan barang dan jasa lainnya terkait kegiatan |
2026-04-27 |
066/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0931S |
Rp. 8.025.000 |
2 Hari |
|
| 2915 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525119 |
Belanja Penyediaan barang dan jasa lainnya terkait kegiatan |
2026-06-29 |
100/UN47.A1/TUP NIHIL.3-BAKP/2026 |
2026-07-03 |
1481S |
Rp. 377.469.400 |
4 Hari |
|
| 2916 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Belanja Penyediaan barang dan jasa lainnya terkait kegiatan |
2026-07-21 |
122/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1713S |
Rp. 39.625.000 |
7 Hari |
|
| 2917 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Belanja Penyediaan barang dan jasa lainnya terkait kegiatan |
2026-08-03 |
129/UN47.A1/TUP NIHIL.5-BAKP/2026 |
2026-08-11 |
1893S |
Rp. 383.002.900 |
8 Hari |
|
| 2918 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Belanja Penyediaan barang dan jasa lainnya terkait kegiatan |
2026-08-10 |
140/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1944S |
Rp. 6.750.000 |
2 Hari |
|
| 2919 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Belanja Penyediaan barang dan jasa lainnya terkait kegiatan |
2026-08-07 |
130/UN47.A1/LS-BAKP/2026 |
2026-08-13 |
1948S |
Rp. 40.000.000 |
6 Hari |
|
| 2920 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Belanja Penyediaan barang dan jasa lainnya terkait kegiatan |
|
|
|
|
Rp. 359.913.400 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 2921 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Bantuan biaya terjemahan dan translate indonesia - inggris SKPI |
2026-07-13 |
105/UN47.A1/LS-BAKP/2026 |
2026-07-29 |
1753S |
Rp. 128.000.000 |
16 Hari |
|
| 2922 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525112 |
Belanja kebutuhan dasar kantor |
2026-02-11 |
016/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0178S |
Rp. 16.471.900 |
2 Hari |
|
| 2923 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525112 |
Belanja kebutuhan dasar kantor |
2026-03-02 |
027/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0310S |
Rp. 8.250.000 |
2 Hari |
|
| 2924 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525112 |
Belanja kebutuhan dasar kantor |
2026-04-27 |
059/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0924S |
Rp. 2.324.500 |
2 Hari |
|
| 2925 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525112 |
Belanja kebutuhan dasar kantor |
2026-05-12 |
071/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1073S |
Rp. 7.778.000 |
6 Hari |
|
| 2926 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Belanja kebutuhan dasar kantor |
2026-07-21 |
115/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1706S |
Rp. 7.845.900 |
7 Hari |
|
| 2927 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525112 |
Belanja kebutuhan dasar kantor |
2026-09-01 |
147/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2206S |
Rp. 4.155.200 |
2 Hari |
|
| 2928 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525112 |
Belanja kebutuhan dasar kantor |
2026-09-16 |
167/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 15.350.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2929 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525112 |
Belanja kebutuhan dasar kantor |
|
|
|
|
Rp. 346.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2930 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Pencetakan Kartu Mahasiswa |
2026-07-28 |
125/UN47.A1/LS-BAKP/2026 |
2026-08-03 |
1801S |
Rp. 131.257.000 |
6 Hari |
|
| 2931 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525119 |
Pencetakan Kartu Mahasiswa |
|
|
|
|
Rp. 35.224.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2932 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan Perkantoran |
2026-02-11 |
017/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0179S |
Rp. 10.057.600 |
2 Hari |
|
| 2933 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan Perkantoran |
2026-03-02 |
028/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0311S |
Rp. 2.302.000 |
2 Hari |
|
| 2934 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan Perkantoran |
2026-04-02 |
041/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0648S |
Rp. 773.000 |
5 Hari |
|
| 2935 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan Perkantoran |
2026-04-27 |
060/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0925S |
Rp. 5.189.500 |
2 Hari |
|
| 2936 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan Perkantoran |
2026-05-12 |
072/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1074S |
Rp. 5.293.900 |
6 Hari |
|
| 2937 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan Perkantoran |
2026-06-08 |
080/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1295S |
Rp. 6.857.800 |
7 Hari |
|
| 2938 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan Perkantoran |
2026-07-21 |
116/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1707S |
Rp. 6.797.800 |
7 Hari |
|
| 2939 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan Perkantoran |
2026-09-01 |
148/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2205S |
Rp. 3.468.900 |
2 Hari |
|
| 2940 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan Perkantoran |
2026-09-16 |
168/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 1.953.400 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2941 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan Perkantoran |
|
|
|
|
Rp. 270.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2942 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Biaya Penyediaan Batik Seragam Kantor |
2026-08-10 |
133/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1899S |
Rp. 19.475.000 |
2 Hari |
|
| 2943 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525112 |
Belanja Konsumsi Berat Rapat |
2026-02-11 |
016/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0178S |
Rp. 1.850.000 |
2 Hari |
|
| 2944 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525112 |
Belanja Konsumsi Berat Rapat |
2026-04-02 |
040/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0647S |
Rp. 3.600.000 |
5 Hari |
|
| 2945 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525112 |
Belanja Konsumsi Berat Rapat |
2026-05-12 |
071/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1073S |
Rp. 1.600.000 |
6 Hari |
|
| 2946 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525112 |
Belanja Konsumsi Ringan Rapat |
2026-05-12 |
071/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1073S |
Rp. 600.000 |
6 Hari |
|
| 2947 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525112 |
Belanja Konsumsi Ringan Rapat |
2026-06-08 |
079/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1294S |
Rp. 928.000 |
7 Hari |
|
| 2948 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Belanja Konsumsi Ringan Rapat |
2026-07-21 |
115/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1706S |
Rp. 580.000 |
7 Hari |
|
| 2949 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525112 |
Belanja Konsumsi Ringan Rapat |
2026-09-01 |
147/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2206S |
Rp. 900.000 |
2 Hari |
|
| 2950 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait rapat kerja |
2026-04-02 |
041/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0648S |
Rp. 1.500.000 |
5 Hari |
|
| 2951 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait rapat kerja |
2026-05-12 |
072/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1074S |
Rp. 54.000 |
6 Hari |
|
| 2952 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait rapat kerja |
2026-08-10 |
133/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1899S |
Rp. 2.627.000 |
2 Hari |
|
| 2953 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait rapat kerja |
2026-09-01 |
148/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2205S |
Rp. 2.035.000 |
2 Hari |
|
| 2954 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait rapat kerja |
2026-09-16 |
168/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 1.860.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2955 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait rapat kerja |
|
|
|
|
Rp. 2.171.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 2956 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Bantuan Belanja Operasional KDO |
2026-03-02 |
028/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0311S |
Rp. 29.999.800 |
2 Hari |
|
| 2957 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
Bantuan Belanja Operasional KDO |
2026-04-02 |
041/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0648S |
Rp. 14.999.900 |
5 Hari |
|
| 2958 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Bantuan Belanja Operasional KDO |
2026-04-27 |
060/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0925S |
Rp. 14.999.900 |
2 Hari |
|
| 2959 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Bantuan Belanja Operasional KDO |
2026-06-08 |
080/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1295S |
Rp. 14.999.900 |
7 Hari |
|
| 2960 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Bantuan Belanja Operasional KDO |
2026-07-14 |
110/UN47.A1/LS-BAKP/2026 |
2026-07-22 |
1678S |
Rp. 14.999.900 |
8 Hari |
|
| 2961 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Bantuan Belanja Operasional KDO |
2026-07-21 |
116/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1707S |
Rp. 14.999.900 |
7 Hari |
|
| 2962 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Bantuan Belanja Operasional KDO |
2026-09-01 |
148/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2205S |
Rp. 14.999.900 |
2 Hari |
|
| 2963 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Bantuan Belanja Operasional KDO |
2026-09-15 |
161/UN47.A1/LS-BAKP/2026 |
|
|
Rp. 14.999.900 |
21 Hari |
Belum ada SP2D terhitung dari 15 September 2026 hingga 06 Oktober 2026 (21 Hari) |
| 2964 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525119 |
Biaya Operasional KDO Pimpinan (Eselon II) |
2026-02-11 |
017/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0179S |
Rp. 500.000 |
2 Hari |
|
| 2965 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Biaya Operasional KDO Pimpinan (Eselon II) |
2026-03-02 |
028/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0311S |
Rp. 1.850.000 |
2 Hari |
|
| 2966 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
Biaya Operasional KDO Pimpinan (Eselon II) |
2026-04-02 |
041/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0648S |
Rp. 1.400.000 |
5 Hari |
|
| 2967 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Biaya Operasional KDO Pimpinan (Eselon II) |
2026-05-12 |
072/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1074S |
Rp. 1.092.260 |
6 Hari |
|
| 2968 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Biaya Operasional KDO Pimpinan (Eselon II) |
2026-07-21 |
116/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1707S |
Rp. 1.849.000 |
7 Hari |
|
| 2969 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Biaya Operasional KDO Pimpinan (Eselon II) |
2026-08-10 |
133/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1899S |
Rp. 700.000 |
2 Hari |
|
| 2970 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Biaya Operasional KDO Pimpinan (Eselon II) |
2026-09-01 |
148/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2205S |
Rp. 700.000 |
2 Hari |
|
| 2971 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Biaya Operasional KDO Pimpinan (Eselon II) |
2026-09-16 |
168/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 1.000.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 2972 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
Pemeliharaan KDO Plat Merah |
2026-04-02 |
041/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0648S |
Rp. 11.326.550 |
5 Hari |
|
| 2973 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Pemeliharaan KDO Plat Merah |
2026-05-12 |
072/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1074S |
Rp. 674.892 |
6 Hari |
|
| 2974 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Pemeliharaan KDO Plat Merah |
2026-09-01 |
148/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2205S |
Rp. 10.000.000 |
2 Hari |
|
| 2975 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525115 |
Tiket PP |
2026-02-11 |
019/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0181S |
Rp. 21.663.520 |
2 Hari |
|
| 2976 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525115 |
Tiket PP |
2026-06-17 |
092/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1489S |
Rp. 20.480.420 |
16 Hari |
|
| 2977 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525115 |
Tiket PP |
2026-09-01 |
150/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2203S |
Rp. 8.847.920 |
2 Hari |
|
| 2978 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525115 |
Tiket PP |
2026-09-15 |
162/UN47.A1/TUP NIHIL.7_BAKP/2026 |
2026-09-16 |
2356S |
Rp. 1.431.900 |
1 Hari |
|
| 2979 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525115 |
Hotel |
2026-02-11 |
019/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0181S |
Rp. 5.318.100 |
2 Hari |
|
| 2980 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525115 |
Hotel |
2026-06-17 |
092/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1489S |
Rp. 4.394.505 |
16 Hari |
|
| 2981 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525115 |
Hotel |
2026-09-01 |
150/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2203S |
Rp. 21.376.800 |
2 Hari |
|
| 2982 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525115 |
Hotel |
2026-09-15 |
162/UN47.A1/TUP NIHIL.7_BAKP/2026 |
2026-09-16 |
2356S |
Rp. 7.458.770 |
1 Hari |
|
| 2983 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525115 |
Uang Harian |
2026-02-11 |
019/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0181S |
Rp. 6.890.000 |
2 Hari |
|
| 2984 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525115 |
Uang Harian |
2026-06-17 |
092/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1489S |
Rp. 4.770.000 |
16 Hari |
|
| 2985 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525115 |
Uang Harian |
2026-09-01 |
150/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2203S |
Rp. 15.120.000 |
2 Hari |
|
| 2986 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525115 |
Uang Harian |
2026-09-15 |
162/UN47.A1/TUP NIHIL.7_BAKP/2026 |
2026-09-16 |
2356S |
Rp. 5.000.000 |
1 Hari |
|
| 2987 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525115 |
Transport Lokal |
2026-02-11 |
019/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0181S |
Rp. 3.536.000 |
2 Hari |
|
| 2988 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525115 |
Transport Lokal |
2026-06-17 |
092/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1489S |
Rp. 2.250.000 |
16 Hari |
|
| 2989 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525115 |
Transport Lokal |
2026-09-01 |
150/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2203S |
Rp. 9.750.000 |
2 Hari |
|
| 2990 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525115 |
Transport Lokal |
2026-09-15 |
162/UN47.A1/TUP NIHIL.7_BAKP/2026 |
2026-09-16 |
2356S |
Rp. 2.930.000 |
1 Hari |
|
| 2991 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Biaya Paket Meeting Kegiatan Perencanaan |
2026-02-04 |
009/UN47.A1/LS-BAKP/2026 |
2026-02-06 |
0137S |
Rp. 67.500.000 |
2 Hari |
|
| 2992 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Biaya Paket Meeting Kegiatan Perencanaan |
2026-02-10 |
011/UN47.A1/TUP NIHIL.1-BAKP/2026 |
2026-02-12 |
0164S |
Rp. 81.800.000 |
2 Hari |
|
| 2993 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525111 |
Insentif Pejabat Pembuat Komitmen (PPK) Unit kerja |
2026-04-02 |
043/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0650S |
Rp. 3.500.000 |
5 Hari |
|
| 2994 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525111 |
Insentif Pejabat Pembuat Komitmen (PPK) Unit kerja |
2026-05-12 |
073/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1075S |
Rp. 3.500.000 |
6 Hari |
|
| 2995 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525111 |
Insentif Pejabat Pembuat Komitmen (PPK) Unit kerja |
2026-07-21 |
117/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1708S |
Rp. 3.500.000 |
7 Hari |
|
| 2996 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525111 |
Insentif Penguji Tagihan (verifikator) unit kerja |
2026-04-02 |
043/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0650S |
Rp. 1.500.000 |
5 Hari |
|
| 2997 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525111 |
Insentif Penguji Tagihan (verifikator) unit kerja |
2026-05-12 |
073/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1075S |
Rp. 1.500.000 |
6 Hari |
|
| 2998 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525111 |
Insentif Penguji Tagihan (verifikator) unit kerja |
2026-07-21 |
117/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1708S |
Rp. 1.500.000 |
7 Hari |
|
| 2999 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525112 |
Belanja Kebutuhan dasar terkait kegiatan |
2026-04-27 |
063/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0928S |
Rp. 11.800.000 |
2 Hari |
|
| 3000 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525112 |
Belanja Kebutuhan dasar terkait kegiatan |
2026-06-08 |
081/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1296S |
Rp. 10.000.000 |
7 Hari |
|
| 3001 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Belanja Kebutuhan dasar terkait kegiatan |
2026-08-10 |
135/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1901S |
Rp. 5.002.800 |
2 Hari |
|
| 3002 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525112 |
Belanja Kebutuhan dasar terkait kegiatan |
|
|
|
|
Rp. 15.086.250 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 3003 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525112 |
Konsumsi berat dan ringan |
2026-02-11 |
018/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0180S |
Rp. 3.360.000 |
2 Hari |
|
| 3004 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525112 |
Konsumsi berat dan ringan |
2026-02-10 |
010/UN47.A1/TUP NIHIL.1-BAKP/2026 |
2026-02-12 |
0163S |
Rp. 4.556.000 |
2 Hari |
|
| 3005 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525112 |
Konsumsi berat dan ringan |
2026-03-02 |
029/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0312S |
Rp. 300.000 |
2 Hari |
|
| 3006 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525112 |
Konsumsi berat dan ringan |
2026-04-02 |
044/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0651S |
Rp. 1.020.000 |
5 Hari |
|
| 3007 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525112 |
Konsumsi berat dan ringan |
2026-08-10 |
135/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1901S |
Rp. 4.250.000 |
2 Hari |
|
| 3008 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525112 |
Konsumsi berat dan ringan |
|
|
|
|
Rp. 320.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 3009 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-02-11 |
020/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0182S |
Rp. 130.000 |
2 Hari |
|
| 3010 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-02-10 |
011/UN47.A1/TUP NIHIL.1-BAKP/2026 |
2026-02-12 |
0164S |
Rp. 35.400.000 |
2 Hari |
|
| 3011 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-03-02 |
031/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0314S |
Rp. 30.215.000 |
2 Hari |
|
| 3012 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Bantuan belanja barang dan jasa lainnya terkait kegiatan |
2026-08-10 |
137/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1903S |
Rp. 130.000 |
2 Hari |
|
| 3013 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525176 |
Insentif Pejabat Pembuat Komitmen (PPK) Unit kerja |
2026-09-01 |
153/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2200S |
Rp. 1.750.000 |
2 Hari |
|
| 3014 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525176 |
Insentif Pejabat Pembuat Komitmen (PPK) Unit kerja |
2026-09-16 |
175/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 1.750.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 3015 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525176 |
Insentif Penguji Tagihan (verifikator) unit kerja |
2026-09-01 |
153/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2200S |
Rp. 750.000 |
2 Hari |
|
| 3016 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525176 |
Insentif Penguji Tagihan (verifikator) unit kerja |
2026-09-16 |
175/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 750.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 3017 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Bantuan Kegiatan Reviu Pagu Indikatif 2027 dan Finalisasi Dokumen RSB |
2026-07-31 |
126/UN47.A1/LS-BAKP/2026 |
2026-08-03 |
1820S |
Rp. 87.550.000 |
3 Hari |
|
| 3018 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIAT |
2026-01-23 |
003/UN47.A1/LS-BAKP/2026 |
2026-01-27 |
0109S |
Rp. 35.000.000 |
4 Hari |
|
| 3019 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIAT |
2026-02-12 |
023/UN47.A1/LS-BAKP/2026 |
2026-02-23 |
0211S |
Rp. 35.000.000 |
11 Hari |
|
| 3020 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIAT |
2026-03-09 |
037/UN47.A1/LS-BAKP/2026 |
2026-03-11 |
0446S |
Rp. 35.000.000 |
2 Hari |
|
| 3021 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIAT |
2026-04-07 |
050/UN47.A1/LS-BAKP/2026 |
2026-04-09 |
0731S |
Rp. 35.000.000 |
2 Hari |
|
| 3022 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIAT |
2026-05-11 |
068/UN47.A1/LS-BAKP/2026 |
2026-05-26 |
1158S |
Rp. 35.000.000 |
15 Hari |
|
| 3023 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIAT |
2026-06-09 |
088/UN47.A1/LS-BAKP/2026 |
2026-06-29 |
1349S |
Rp. 35.000.000 |
20 Hari |
|
| 3024 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIAT |
2026-07-13 |
103/UN47.A1/LS-BAKP/2026 |
2026-07-22 |
1679S |
Rp. 35.000.000 |
9 Hari |
|
| 3025 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIAT |
2026-08-10 |
141/UN47.A1/LS-BAKP/2026 |
2026-08-12 |
1897S |
Rp. 35.000.000 |
2 Hari |
|
| 3026 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIAT |
2026-09-02 |
158/UN47.A1/LS-BAKP/2026 |
2026-09-10 |
2256S |
Rp. 35.000.000 |
8 Hari |
|
| 3027 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIRBA |
2026-01-23 |
005/UN47.A1/LS-BAKP/2026 |
2026-01-27 |
0108S |
Rp. 25.000.000 |
4 Hari |
|
| 3028 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIRBA |
2026-03-02 |
031/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0314S |
Rp. 25.000.000 |
2 Hari |
|
| 3029 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIRBA |
2026-04-02 |
046/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0653S |
Rp. 25.000.000 |
5 Hari |
|
| 3030 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIRBA |
2026-04-27 |
064/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0929S |
Rp. 25.000.000 |
2 Hari |
|
| 3031 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIRBA |
2026-05-12 |
076/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1078S |
Rp. 25.000.000 |
6 Hari |
|
| 3032 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIRBA |
2026-06-17 |
093/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1490S |
Rp. 25.000.000 |
16 Hari |
|
| 3033 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIRBA |
2026-07-21 |
120/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1711S |
Rp. 25.000.000 |
7 Hari |
|
| 3034 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIRBA |
2026-09-01 |
151/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2202S |
Rp. 25.000.000 |
2 Hari |
|
| 3035 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIRBA |
2026-09-16 |
173/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 25.000.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 3036 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIMANTAP |
2026-04-27 |
064/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0929S |
Rp. 45.000.000 |
2 Hari |
|
| 3037 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIMANTAP |
2026-07-21 |
120/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1711S |
Rp. 45.000.000 |
7 Hari |
|
| 3038 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525119 |
Pengembangan dan maintenance Aplikasi SIMANTAP |
|
|
|
|
Rp. 45.000.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 3039 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-01-23 |
004/UN47.A1/LS-BAKP/2026 |
2026-01-27 |
0110S |
Rp. 27.000.000 |
4 Hari |
|
| 3040 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-02-02 |
008/UN47.A1/LS-BAKP/2026 |
2026-02-06 |
0136S |
Rp. 27.000.000 |
4 Hari |
|
| 3041 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-02-12 |
024/UN47.A1/LS-BAKP/2026 |
2026-02-23 |
0210S |
Rp. 27.000.000 |
11 Hari |
|
| 3042 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-03-02 |
031/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0314S |
Rp. 27.000.000 |
2 Hari |
|
| 3043 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-03-09 |
038/UN47.A1/LS-BAKP/2026 |
2026-03-11 |
0445S |
Rp. 27.000.000 |
2 Hari |
|
| 3044 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-04-02 |
046/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0653S |
Rp. 27.000.000 |
5 Hari |
|
| 3045 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-04-07 |
051/UN47.A1/LS-BAKP/2026 |
2026-04-09 |
0730S |
Rp. 27.000.000 |
2 Hari |
|
| 3046 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-04-27 |
064/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0929S |
Rp. 27.000.000 |
2 Hari |
|
| 3047 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-05-11 |
069/UN47.A1/LS-BAKP/2026 |
2026-05-26 |
1157S |
Rp. 27.000.000 |
15 Hari |
|
| 3048 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-06-08 |
083/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1298S |
Rp. 27.000.000 |
7 Hari |
|
| 3049 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-06-09 |
089/UN47.A1/LS-BAKP/2026 |
2026-06-29 |
1350S |
Rp. 27.000.000 |
20 Hari |
|
| 3050 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-06-17 |
093/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1490S |
Rp. 27.000.000 |
16 Hari |
|
| 3051 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-07-13 |
104/UN47.A1/LS-BAKP/2026 |
2026-07-22 |
1680S |
Rp. 27.000.000 |
9 Hari |
|
| 3052 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-07-23 |
124/UN47.A1/LS-BAKP/2026 |
2026-07-29 |
1752S |
Rp. 27.000.000 |
6 Hari |
|
| 3053 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-08-10 |
142/UN47.A1/LS-BAKP/2026 |
2026-08-12 |
1898S |
Rp. 27.000.000 |
2 Hari |
|
| 3054 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-09-01 |
151/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2202S |
Rp. 27.000.000 |
2 Hari |
|
| 3055 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-09-02 |
159/UN47.A1/LS-BAKP/2026 |
2026-09-10 |
2236S |
Rp. 27.000.000 |
8 Hari |
|
| 3056 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Sewa Dedicated server (Cloud) |
2026-09-16 |
173/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 27.000.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 3057 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525119 |
Pembuatan Video Profil dan Aplikasi AI media Informasi |
2026-03-02 |
031/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0314S |
Rp. 31.166.000 |
2 Hari |
|
| 3058 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
Pembuatan Video Profil dan Aplikasi AI media Informasi |
2026-03-02 |
034/UN47.A1/LS-BAKP/2026 |
2026-03-04 |
0308S |
Rp. 47.000.000 |
2 Hari |
|
| 3059 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525119 |
Pembuatan Video Profil dan Aplikasi AI media Informasi |
2026-04-02 |
046/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0653S |
Rp. 15.583.000 |
5 Hari |
|
| 3060 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Pembuatan Video Profil dan Aplikasi AI media Informasi |
2026-04-07 |
052/UN47.A1/LS-BAKP.2026 |
2026-04-09 |
0729S |
Rp. 38.500.000 |
2 Hari |
|
| 3061 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
April 2026 |
525119 |
Pembuatan Video Profil dan Aplikasi AI media Informasi |
2026-04-27 |
064/UN47.A1/GUP.4-BAKP/2026 |
2026-04-29 |
0929S |
Rp. 15.583.000 |
2 Hari |
|
| 3062 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525119 |
Pembuatan Video Profil dan Aplikasi AI media Informasi |
2026-05-12 |
076/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1078S |
Rp. 15.583.000 |
6 Hari |
|
| 3063 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Pembuatan Video Profil dan Aplikasi AI media Informasi |
2026-07-21 |
120/UN47.A1/GUP.8-BAKP/2026 |
2026-07-28 |
1711S |
Rp. 15.583.000 |
7 Hari |
|
| 3064 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525119 |
Pembuatan Video Profil dan Aplikasi AI media Informasi |
2026-08-10 |
137/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1903S |
Rp. 15.583.000 |
2 Hari |
|
| 3065 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525119 |
Pembuatan Video Profil dan Aplikasi AI media Informasi |
2026-09-01 |
151/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2202S |
Rp. 15.583.000 |
2 Hari |
|
| 3066 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Pembuatan Video Profil dan Aplikasi AI media Informasi |
2026-09-16 |
173/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 15.583.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 3067 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525119 |
Pembuatan Video Profil dan Aplikasi AI media Informasi |
2026-09-22 |
179/UN47.A1/LS-BAKP/2026 |
|
|
Rp. 41.500.000 |
14 Hari |
Belum ada SP2D terhitung dari 22 September 2026 hingga 06 Oktober 2026 (14 Hari) |
| 3068 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525115 |
Tiket PP |
2026-02-11 |
019/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0181S |
Rp. 13.829.480 |
2 Hari |
|
| 3069 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525115 |
Tiket PP |
2026-03-02 |
030/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0313S |
Rp. 1.845.000 |
2 Hari |
|
| 3070 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525115 |
Tiket PP |
2026-04-02 |
045/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0652S |
Rp. 14.756.960 |
5 Hari |
|
| 3071 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525115 |
Tiket PP |
2026-05-12 |
075/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1077S |
Rp. 13.166.740 |
6 Hari |
|
| 3072 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525115 |
Tiket PP |
2026-06-08 |
082/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1297P |
Rp. 22.356.200 |
7 Hari |
|
| 3073 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525115 |
Tiket PP |
2026-06-17 |
092/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1489S |
Rp. 6.172.880 |
16 Hari |
|
| 3074 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525115 |
Tiket PP |
2026-08-10 |
136/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1902S |
Rp. 6.073.820 |
2 Hari |
|
| 3075 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525115 |
Tiket PP |
2026-09-01 |
150/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2203S |
Rp. 4.433.080 |
2 Hari |
|
| 3076 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525115 |
Tiket PP |
|
|
|
|
Rp. 10.874.440 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 3077 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525115 |
Hotel |
2026-02-11 |
019/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0181S |
Rp. 14.934.500 |
2 Hari |
|
| 3078 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525115 |
Hotel |
2026-03-02 |
030/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0313S |
Rp. 7.035.000 |
2 Hari |
|
| 3079 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525115 |
Hotel |
2026-04-02 |
045/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0652S |
Rp. 9.854.840 |
5 Hari |
|
| 3080 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525115 |
Hotel |
2026-05-12 |
075/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1077S |
Rp. 5.068.608 |
6 Hari |
|
| 3081 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525115 |
Hotel |
2026-06-08 |
082/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1297P |
Rp. 8.590.100 |
7 Hari |
|
| 3082 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525115 |
Hotel |
2026-06-17 |
092/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1489S |
Rp. 1.981.815 |
16 Hari |
|
| 3083 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525115 |
Hotel |
2026-08-10 |
136/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1902S |
Rp. 1.454.500 |
2 Hari |
|
| 3084 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525115 |
Hotel |
2026-09-01 |
150/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2203S |
Rp. 2.580.000 |
2 Hari |
|
| 3085 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525115 |
Hotel |
2026-09-15 |
162/UN47.A1/TUP NIHIL.7_BAKP/2026 |
2026-09-16 |
2356S |
Rp. 2.200.000 |
1 Hari |
|
| 3086 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525115 |
Hotel |
2026-09-16 |
171/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 900.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 3087 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525115 |
Hotel |
|
|
|
|
Rp. 6.916.504 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 3088 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525115 |
Uang Harian |
2026-02-11 |
019/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0181S |
Rp. 38.850.000 |
2 Hari |
|
| 3089 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525115 |
Uang Harian |
2026-03-02 |
030/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0313S |
Rp. 15.540.000 |
2 Hari |
|
| 3090 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525115 |
Uang Harian |
2026-04-02 |
045/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0652S |
Rp. 6.890.000 |
5 Hari |
|
| 3091 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525115 |
Uang Harian |
2026-05-12 |
075/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1077S |
Rp. 3.600.000 |
6 Hari |
|
| 3092 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525115 |
Uang Harian |
2026-06-08 |
082/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1297P |
Rp. 6.970.000 |
7 Hari |
|
| 3093 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525115 |
Uang Harian |
2026-06-17 |
092/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1489S |
Rp. 1.920.000 |
16 Hari |
|
| 3094 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525115 |
Uang Harian |
2026-08-10 |
136/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1902S |
Rp. 1.590.000 |
2 Hari |
|
| 3095 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525115 |
Uang Harian |
2026-09-01 |
150/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2203S |
Rp. 2.150.000 |
2 Hari |
|
| 3096 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525115 |
Uang Harian |
2026-09-15 |
162/UN47.A1/TUP NIHIL.7_BAKP/2026 |
2026-09-16 |
2356S |
Rp. 1.130.000 |
1 Hari |
|
| 3097 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525115 |
Uang Harian |
2026-09-16 |
171/UN47.A1/GUP.11-BAKP/2026 |
|
|
Rp. 1.850.000 |
20 Hari |
Belum ada SP2D terhitung dari 16 September 2026 hingga 06 Oktober 2026 (20 Hari) |
| 3098 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Oktober 2026 |
525115 |
Uang Harian |
|
|
|
|
Rp. 3.220.000 |
5 Hari |
Belum ada SPP dan SP2D terhitung dari 1 Oktober 2026 hingga 06 Oktober 2026 (5 Hari) |
| 3099 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Januari 2026 |
525115 |
Transport Lokal |
2026-02-11 |
019/UN47.A1/GUP.1-BAKP/2026 |
2026-02-13 |
0181S |
Rp. 12.800.000 |
2 Hari |
|
| 3100 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Februari 2026 |
525115 |
Transport Lokal |
2026-03-02 |
030/UN47.A1/GUP.2-BAKP/2026 |
2026-03-04 |
0313S |
Rp. 5.650.000 |
2 Hari |
|
| 3101 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Maret 2026 |
525115 |
Transport Lokal |
2026-04-02 |
045/UN47.A1/GUP.3-BAKP/2026 |
2026-04-07 |
0652S |
Rp. 1.889.500 |
5 Hari |
|
| 3102 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525115 |
Transport Lokal |
2026-05-12 |
075/UN47.A1/GUP.5-BAKP/2026 |
2026-05-18 |
1077S |
Rp. 1.500.000 |
6 Hari |
|
| 3103 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Mei 2026 |
525115 |
Transport Lokal |
2026-06-08 |
082/UN47.A1/GUP.6-BAKP/2026 |
2026-06-15 |
1297P |
Rp. 2.243.000 |
7 Hari |
|
| 3104 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juni 2026 |
525115 |
Transport Lokal |
2026-06-17 |
092/UN47.A1/GUP.7-BAKP/2026 |
2026-07-03 |
1489S |
Rp. 500.000 |
16 Hari |
|
| 3105 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Juli 2026 |
525115 |
Transport Lokal |
2026-08-10 |
136/UN47.A1/GUP.9-BAKP/2026 |
2026-08-12 |
1902S |
Rp. 820.000 |
2 Hari |
|
| 3106 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
Agustus 2026 |
525115 |
Transport Lokal |
2026-09-01 |
150/UN47.A1/GUP.10-BAKP/2026 |
2026-09-03 |
2203S |
Rp. 360.000 |
2 Hari |
|
| 3107 |
Biro Akademik, Kemahasiswaan dan Perencanaan |
September 2026 |
525115 |
Transport Lokal |
2026-09-15 |
162/UN47.A1/TUP NIHIL.7_BAKP/2026 |
2026-09-16 |
2356S |
Rp. 700.000 |
1 Hari |
|
| 3108 |
UPA Bimbingan dan Konseling |
Maret 2026 |
537112 |
Pengadaan Laptop |
2026-04-06 |
05/UN47.E3/KU.01.00/SPP/GUP-II/2026 |
2026-04-16 |
0823AF |
Rp. 18.000.000 |
10 Hari |
|
| 3109 |
UPA Bimbingan dan Konseling |
Januari 2026 |
537112 |
Pengadaan Kamera |
2026-02-20 |
02/UN47.E3/KU.01.00/SPP/GUP-I/2026 |
2026-02-27 |
0265AF |
Rp. 16.675.000 |
7 Hari |
|
| 3110 |
UPA Bimbingan dan Konseling |
Maret 2026 |
537112 |
Pengadaan Kursi satu Seater |
2026-04-06 |
05/UN47.E3/KU.01.00/SPP/GUP-II/2026 |
2026-04-16 |
0823AF |
Rp. 4.162.500 |
10 Hari |
|
| 3111 |
UPA Bimbingan dan Konseling |
April 2026 |
537112 |
Pengadaan Kursi satu Seater |
2026-04-27 |
09/UN47.E3/KU.01.00/SPP/GUP-III/2026 |
2026-04-30 |
0953AF |
Rp. 5.837.500 |
3 Hari |
|
| 3112 |
UPA Bimbingan dan Konseling |
April 2026 |
537112 |
Pengadaan LCD Proyektor |
2026-04-27 |
09/UN47.E3/KU.01.00/SPP/GUP-III/2026 |
2026-04-30 |
0953AF |
Rp. 15.325.000 |
3 Hari |
|
| 3113 |
UPA Bimbingan dan Konseling |
April 2026 |
525114 |
Pemeliharaan Peralatan Kantor |
2026-04-27 |
12/UN47.E3/KU.01.00/SPP/GUP-III/2026 |
2026-04-30 |
0956AF |
Rp. 1.000.000 |
3 Hari |
|
| 3114 |
UPA Bimbingan dan Konseling |
Juni 2026 |
525114 |
Pemeliharaan Peralatan Kantor |
2026-07-23 |
21/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1815AF |
Rp. 2.966.500 |
11 Hari |
|
| 3115 |
UPA Bimbingan dan Konseling |
Juni 2026 |
525114 |
Pemeliharaan Jaringan Listrik UPA BK |
2026-07-23 |
21/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1815AF |
Rp. 606.000 |
11 Hari |
|
| 3116 |
UPA Bimbingan dan Konseling |
Oktober 2026 |
525114 |
Pemeliharaan Jaringan Listrik UPA BK |
2026-10-05 |
39/UN47.E3/KU.01.00/SPP/GUP-NIHIL/2026 |
|
|
Rp. 890.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 3117 |
UPA Bimbingan dan Konseling |
September 2026 |
525119 |
Paket Meeting Kegiatan Workshop Dosen PA |
2026-09-24 |
35/UN47.E3/KU.01.00/SPP/GUP-VII/2026 |
|
|
Rp. 22.800.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 3118 |
UPA Bimbingan dan Konseling |
September 2026 |
525119 |
Paket Meeting Pelatihan Growth Mindset Mahasiswa |
2026-09-24 |
31/UN47.E3/KU.01.00/SPP/TUP-NIHIL/2026 |
|
|
Rp. 14.250.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 3119 |
UPA Bimbingan dan Konseling |
Mei 2026 |
525119 |
Paket Meeting Pelatihan Public Speaking |
2026-05-20 |
17/UN47.E3/KU.01.00/SPP/GUP-IV/2026 |
2026-05-21 |
1119AF |
Rp. 14.250.000 |
1 Hari |
|
| 3120 |
UPA Bimbingan dan Konseling |
Juni 2026 |
525119 |
Biaya Langganan Zoom Meeting Pro Pelaksanaan Kegiatan Webinar Series 2025 |
2026-07-23 |
24/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1818AF |
Rp. 150.000 |
11 Hari |
|
| 3121 |
UPA Bimbingan dan Konseling |
Oktober 2026 |
525119 |
Biaya Langganan Zoom Meeting Pro Pelaksanaan Kegiatan Webinar Series 2025 |
2026-10-05 |
42/UN47.E3/KU.01.00/SPP/GUP-NIHIL/2026 |
|
|
Rp. 450.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 3122 |
UPA Bimbingan dan Konseling |
April 2026 |
525119 |
Kegiatan Goes to Fakulty dilingkungan UNG |
2026-04-27 |
14/UN47.E3/KU.01.00/SPP/GUP-III/2026 |
2026-04-30 |
0958AF |
Rp. 5.000.000 |
3 Hari |
|
| 3123 |
UPA Bimbingan dan Konseling |
Mei 2026 |
525119 |
Kegiatan Goes to Fakulty dilingkungan UNG |
2026-05-20 |
17/UN47.E3/KU.01.00/SPP/GUP-IV/2026 |
2026-05-21 |
1119AF |
Rp. 10.000.000 |
1 Hari |
|
| 3124 |
UPA Bimbingan dan Konseling |
Mei 2026 |
525119 |
Honorarium Narasumber Public Speaking |
2026-05-20 |
17/UN47.E3/KU.01.00/SPP/GUP-IV/2026 |
2026-05-21 |
1119AF |
Rp. 5.400.000 |
1 Hari |
|
| 3125 |
UPA Bimbingan dan Konseling |
Juni 2026 |
525119 |
Honorarium Narasumber Pelatihan Mahasiswa Untuk Persiapan Kerja |
2026-07-23 |
24/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1818AF |
Rp. 3.600.000 |
11 Hari |
|
| 3126 |
UPA Bimbingan dan Konseling |
September 2026 |
525119 |
Honorarium Narasumber Pelatihan Growth Mindset Mahasiswa |
2026-09-24 |
31/UN47.E3/KU.01.00/SPP/TUP-NIHIL/2026 |
|
|
Rp. 3.600.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 3127 |
UPA Bimbingan dan Konseling |
Maret 2026 |
525119 |
Honorarium Narasumber Webinar Series 2026 |
2026-04-06 |
08/UN47.E3/KU.01.00/SPP/GUP-II/2026 |
2026-04-16 |
0826AF |
Rp. 900.000 |
10 Hari |
|
| 3128 |
UPA Bimbingan dan Konseling |
April 2026 |
525119 |
Honorarium Narasumber Webinar Series 2026 |
2026-04-27 |
14/UN47.E3/KU.01.00/SPP/GUP-III/2026 |
2026-04-30 |
0958AF |
Rp. 900.000 |
3 Hari |
|
| 3129 |
UPA Bimbingan dan Konseling |
Juli 2026 |
525119 |
Honorarium Narasumber Webinar Series 2026 |
2026-07-23 |
24/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1818AF |
Rp. 900.000 |
11 Hari |
|
| 3130 |
Fakultas Ilmu Sosial |
Juli 2026 |
537112 |
Belanja
Komputer/Laptop/Printer |
2026-05-18 |
31/UN47.B2/PNBP-BLU/SPP-LS/2026 |
2026-07-02 |
1436B |
Rp. 28.000.000 |
45 Hari |
|
| 3131 |
UPA Bimbingan dan Konseling |
September 2026 |
525119 |
Honorarium Narasumber Webinar Series 2026 |
2026-09-24 |
31/UN47.E3/KU.01.00/SPP/TUP-NIHIL/2026 |
|
|
Rp. 900.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 3132 |
Fakultas Ilmu Sosial |
September 2026 |
537112 |
Belanja
Komputer/Laptop/Printer |
2026-09-30 |
76/UN47.B2/PNBP-BLU/SPP-LS/2026 |
|
|
Rp. 22.470.000 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 3133 |
UPA Bimbingan dan Konseling |
Oktober 2026 |
525119 |
Honorarium Narasumber Webinar Series 2026 |
2026-10-05 |
42/UN47.E3/KU.01.00/SPP/GUP-NIHIL/2026 |
|
|
Rp. 1.800.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 3134 |
Fakultas Ilmu Sosial |
Juli 2026 |
537112 |
Belanja AC |
2026-05-18 |
32/UN47.B2/PNBP-BLU/SPP-LS/2026 |
2026-07-02 |
1437B |
Rp. 29.500.000 |
45 Hari |
|
| 3135 |
UPA Bimbingan dan Konseling |
Juni 2026 |
525119 |
Kegiatan Pendampingan Mahasiswa untuk Persiapan Kerja |
2026-07-23 |
24/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1818AF |
Rp. 12.127.320 |
11 Hari |
|
| 3136 |
Fakultas Ilmu Sosial |
September 2026 |
537112 |
Belanja Alat Micro Teaching |
2026-09-24 |
31/UN47.E3/KU.01.00/SPP/TUP-NIHIL/2026 |
|
|
Rp. 9.150.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 3137 |
Fakultas Ilmu Sosial |
Maret 2026 |
525114 |
Pemeliharaan Jaringan Air,
Instalasi Listrik, dan
Internet |
2026-04-06 |
06/UN47.E3/KU.01.00/SPP/GUP-II/2026 |
2026-04-16 |
0824AF |
Rp. 7.653.500 |
10 Hari |
|
| 3138 |
Fakultas Ilmu Sosial |
Januari 2026 |
525114 |
Pemeliharaan Jaringan Air,
Instalasi Listrik, dan
Internet |
2026-02-24 |
05/UN47.B2/PNBP-BLU/SPP-GUP I/2026 |
2026-03-02 |
0285B |
Rp. 1.855.000 |
6 Hari |
|
| 3139 |
Fakultas Ilmu Sosial |
April 2026 |
525114 |
Pemeliharaan Jaringan Air,
Instalasi Listrik, dan
Internet |
2026-04-27 |
10/UN47.E3/KU.01.00/SPP/GUP-III/2026 |
2026-04-30 |
0955AF |
Rp. 237.500 |
3 Hari |
|
| 3140 |
Fakultas Ilmu Sosial |
Juni 2026 |
525114 |
Pemeliharaan Jaringan Air,
Instalasi Listrik, dan
Internet |
2026-03-04 |
08/UN47.B2/PNBP-BLU/SPP-GUP II/2026 |
2026-03-10 |
0378B |
Rp. 504.000 |
6 Hari |
|
| 3141 |
Fakultas Ilmu Sosial |
Juni 2026 |
525114 |
Pemeliharaan Jaringan Air,
Instalasi Listrik, dan
Internet |
2026-04-14 |
20/UN47.B2/PNBP-BLU/SPP-GUP IV/2026 |
2026-04-22 |
0848B |
Rp. 1.905.000 |
8 Hari |
|
| 3142 |
Fakultas Ilmu Sosial |
Juli 2026 |
525114 |
Pemeliharaan Jaringan Air,
Instalasi Listrik, dan
Internet |
2026-07-23 |
18/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1812AF |
Rp. 945.180 |
11 Hari |
|
| 3143 |
Fakultas Ilmu Sosial |
April 2026 |
525114 |
Pemeliharaan Jaringan Air,
Instalasi Listrik, dan
Internet |
2026-04-14 |
20/UN47.B2/PNBP-BLU/SPP-GUP IV/2026 |
2026-04-22 |
0848B |
Rp. 750.000 |
8 Hari |
|
| 3144 |
Fakultas Ilmu Sosial |
September 2026 |
525114 |
Pemeliharaan Jaringan Air,
Instalasi Listrik, dan
Internet |
2026-09-24 |
32/UN47.E3/KU.01.00/SPP/GUP-VII/2026 |
|
|
Rp. 260.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 3145 |
Fakultas Ilmu Sosial |
Juni 2026 |
525114 |
Pemeliharaan Jaringan Air,
Instalasi Listrik, dan
Internet |
2026-06-30 |
36/UN47.B2/PNBP-BLU/SPP-GUP VI/2026 |
2026-07-09 |
1571B |
Rp. 5.700.000 |
9 Hari |
|
| 3146 |
Fakultas Ilmu Sosial |
Oktober 2026 |
525114 |
Pemeliharaan Jaringan Air,
Instalasi Listrik, dan
Internet |
2026-10-05 |
36/UN47.E3/KU.01.00/SPP/GUP-NIHIL/2026 |
|
|
Rp. 3.206.930 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 3147 |
Fakultas Ilmu Sosial |
Juli 2026 |
525114 |
Pemeliharaan Jaringan Air,
Instalasi Listrik, dan
Internet |
2026-07-28 |
46/UN47.B2/PNBP-BLU/SPP-GUP VII/2026 |
2026-08-10 |
1869B |
Rp. 423.000 |
13 Hari |
|
| 3148 |
UPA Bimbingan dan Konseling |
September 2026 |
525115 |
Tiket PP |
2026-09-24 |
29/UN47.E3/KU.01.00/SPP/TUP-NIHIL/2026 |
2026-09-28 |
2531AF |
Rp. 17.778.460 |
4 Hari |
|
| 3149 |
UPA Bimbingan dan Konseling |
September 2026 |
525115 |
Tiket PP |
2026-09-24 |
33/UN47.E3/KU.01.00/SPP/GUP-VII/2026 |
|
|
Rp. 700.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 3150 |
Fakultas Ilmu Sosial |
September 2026 |
525114 |
Pemeliharaan Jaringan Air,
Instalasi Listrik, dan
Internet |
2026-09-30 |
77/UN47.B2/PNBP-BLU/SPP-LS/2026 |
|
|
Rp. 17.800.000 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 3151 |
UPA Bimbingan dan Konseling |
Oktober 2026 |
525115 |
Tiket PP |
2026-10-05 |
37/UN47.E3/KU.01.00/SPP/GUP-NIHIL/2026 |
|
|
Rp. 2.385.420 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 3152 |
Fakultas Ilmu Sosial |
Oktober 2026 |
525114 |
Pemeliharaan Jaringan Air,
Instalasi Listrik, dan
Internet |
2026-10-05 |
80/UN47.B2/PNBP-BLU/SPP-GU NIHIL/2026 |
|
|
Rp. 1.063.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 3153 |
Fakultas Ilmu Sosial |
Januari 2026 |
525114 |
Pemeliharaan
printer/scanner |
2026-02-24 |
05/UN47.B2/PNBP-BLU/SPP-GUP I/2026 |
2026-03-02 |
0285B |
Rp. 1.000.000 |
6 Hari |
|
| 3154 |
UPA Bimbingan dan Konseling |
September 2026 |
525115 |
Uang Harian |
2026-09-24 |
33/UN47.E3/KU.01.00/SPP/GUP-VII/2026 |
|
|
Rp. 1.000.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 3155 |
Fakultas Ilmu Sosial |
Oktober 2026 |
525114 |
Pemeliharaan
printer/scanner |
2026-03-04 |
08/UN47.B2/PNBP-BLU/SPP-GUP II/2026 |
2026-03-10 |
0378B |
Rp. 800.000 |
6 Hari |
|
| 3156 |
UPA Bimbingan dan Konseling |
Oktober 2026 |
525115 |
Uang Harian |
2026-10-05 |
37/UN47.E3/KU.01.00/SPP/GUP-NIHIL/2026 |
|
|
Rp. 1.450.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 3157 |
Fakultas Ilmu Sosial |
April 2026 |
525114 |
Pemeliharaan
printer/scanner |
2026-04-14 |
20/UN47.B2/PNBP-BLU/SPP-GUP IV/2026 |
2026-04-22 |
0848B |
Rp. 170.000 |
8 Hari |
|
| 3158 |
UPA Bimbingan dan Konseling |
September 2026 |
525115 |
Penginapan |
2026-09-24 |
29/UN47.E3/KU.01.00/SPP/TUP-NIHIL/2026 |
2026-09-28 |
2531AF |
Rp. 6.580.000 |
4 Hari |
|
| 3159 |
UPA Bimbingan dan Konseling |
September 2026 |
525115 |
Penginapan |
2026-09-24 |
33/UN47.E3/KU.01.00/SPP/GUP-VII/2026 |
|
|
Rp. 1.440.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 3160 |
Fakultas Ilmu Sosial |
Juni 2026 |
525114 |
Pemeliharaan
printer/scanner |
2026-06-30 |
36/UN47.B2/PNBP-BLU/SPP-GUP VI/2026 |
2026-07-09 |
1571B |
Rp. 525.000 |
9 Hari |
|
| 3161 |
UPA Bimbingan dan Konseling |
Oktober 2026 |
525115 |
Penginapan |
2026-10-05 |
37/UN47.E3/KU.01.00/SPP/GUP-NIHIL/2026 |
|
|
Rp. 2.920.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 3162 |
Fakultas Ilmu Sosial |
Juli 2026 |
525114 |
Pemeliharaan
printer/scanner |
2026-07-28 |
46/UN47.B2/PNBP-BLU/SPP-GUP VII/2026 |
2026-08-10 |
1869B |
Rp. 350.000 |
13 Hari |
|
| 3163 |
UPA Bimbingan dan Konseling |
Agustus 2026 |
525115 |
Transport |
2026-05-20 |
15/UN47.E3/KU.01.00/SPP/GUP-IV/2026 |
2026-05-21 |
1121AF |
Rp. 2.500.000 |
1 Hari |
|
| 3164 |
Fakultas Ilmu Sosial |
Agustus 2026 |
525114 |
Pemeliharaan
printer/scanner |
2026-09-23 |
65/UN47.B2/PNBP-BLU/SPP-GUP 8/2026 |
|
|
Rp. 575.000 |
13 Hari |
Belum ada SP2D terhitung dari 23 September 2026 hingga 06 Oktober 2026 (13 Hari) |
| 3165 |
UPA Bimbingan dan Konseling |
Juni 2026 |
525115 |
Transport |
2026-07-23 |
19/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1813AF |
Rp. 300.000 |
11 Hari |
|
| 3166 |
UPA Bimbingan dan Konseling |
September 2026 |
525115 |
Transport |
2026-09-24 |
29/UN47.E3/KU.01.00/SPP/TUP-NIHIL/2026 |
2026-09-28 |
2531AF |
Rp. 2.190.000 |
4 Hari |
|
| 3167 |
Fakultas Ilmu Sosial |
Juni 2026 |
525114 |
Pemeliharaan laptop/komputer/dll |
2026-06-30 |
36/UN47.B2/PNBP-BLU/SPP-GUP VI/2026 |
2026-07-09 |
1571B |
Rp. 525.000 |
9 Hari |
|
| 3168 |
UPA Bimbingan dan Konseling |
Oktober 2026 |
525115 |
Transport |
2026-10-05 |
37/UN47.E3/KU.01.00/SPP/GUP-NIHIL/2026 |
|
|
Rp. 730.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 3169 |
Fakultas Ilmu Sosial |
Oktober 2026 |
525114 |
Pemeliharaan laptop/komputer/dll |
2026-10-05 |
80/UN47.B2/PNBP-BLU/SPP-GU NIHIL/2026 |
|
|
Rp. 3.475.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 3170 |
UPA Bimbingan dan Konseling |
Agustus 2026 |
525119 |
Bantuan Biaya Pendaftaran Seminar/Diklat |
2026-08-04 |
26/UN47.E3/KU.01.00/SPP/GUP-VI/2026 |
2026-08-13 |
1962AF |
Rp. 2.850.000 |
9 Hari |
|
| 3171 |
Fakultas Ilmu Sosial |
Maret 2026 |
525114 |
Pemeliharaan AC |
2026-04-02 |
16/UN47.B2/PNBP-BLU/SPP-GUP III/2026 |
2026-04-09 |
0706B |
Rp. 9.200.000 |
7 Hari |
|
| 3172 |
UPA Bimbingan dan Konseling |
September 2026 |
525119 |
Bantuan Biaya Pendaftaran Seminar/Diklat |
2026-09-24 |
34/UN47.E3/KU.01.00/SPP/GUP-VII/2026 |
|
|
Rp. 6.800.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 3173 |
Fakultas Ilmu Sosial |
Oktober 2026 |
525114 |
Pemeliharaan AC |
2026-04-14 |
20/UN47.B2/PNBP-BLU/SPP-GUP IV/2026 |
2026-04-22 |
0848B |
Rp. 1.975.000 |
8 Hari |
|
| 3174 |
Fakultas Ilmu Sosial |
Oktober 2026 |
525114 |
Pemeliharaan AC |
2026-05-07 |
24/UN47.B2/PNBP-BLU/SPP-GUP V/2026 |
2026-06-02 |
1173B |
Rp. 2.825.000 |
26 Hari |
|
| 3175 |
UPA Bimbingan dan Konseling |
Oktober 2026 |
525119 |
Bantuan Biaya Pendaftaran Seminar/Diklat |
2026-10-05 |
38/UN47.E3/KU.01.00/SPP/GUP-NIHIL/2026 |
|
|
Rp. 5.350.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 3176 |
Fakultas Ilmu Sosial |
Juni 2026 |
525114 |
Pemeliharaan AC |
2026-06-30 |
36/UN47.B2/PNBP-BLU/SPP-GUP VI/2026 |
2026-07-09 |
1571B |
Rp. 3.555.000 |
9 Hari |
|
| 3177 |
UPA Bimbingan dan Konseling |
Maret 2026 |
525112 |
Konsumsi Rapat Evaluasi Kinerja Triwulan |
2026-04-06 |
06/UN47.E3/KU.01.00/SPP/GUP-II/2026 |
2026-04-16 |
0824AF |
Rp. 414.000 |
10 Hari |
|
| 3178 |
Fakultas Ilmu Sosial |
Juli 2026 |
525114 |
Pemeliharaan AC |
2026-07-28 |
46/UN47.B2/PNBP-BLU/SPP-GUP VII/2026 |
2026-08-10 |
1869B |
Rp. 1.925.000 |
13 Hari |
|
| 3179 |
UPA Bimbingan dan Konseling |
Agustus 2026 |
525112 |
Konsumsi Rapat Evaluasi Kinerja Triwulan |
2026-08-04 |
25/UN47.E3/KU.01.00/SPP/GUP-VI/2026 |
2026-08-13 |
1963AF |
Rp. 681.250 |
9 Hari |
|
| 3180 |
Fakultas Ilmu Sosial |
September 2026 |
525114 |
Pemeliharaan AC |
2026-09-30 |
78/UN47.B2/PNBP-BLU/SPP-LS/2026 |
|
|
Rp. 10.500.000 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 3181 |
UPA Bimbingan dan Konseling |
Oktober 2026 |
525112 |
Konsumsi Rapat Evaluasi Kinerja Triwulan |
2026-10-05 |
36/UN47.E3/KU.01.00/SPP/GUP-NIHIL/2026 |
|
|
Rp. 1.940.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 3182 |
Fakultas Ilmu Sosial |
Oktober 2026 |
525114 |
Pemeliharaan AC |
2026-10-05 |
80/UN47.B2/PNBP-BLU/SPP-GU NIHIL/2026 |
|
|
Rp. 10.020.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 3183 |
UPA Bimbingan dan Konseling |
Januari 2026 |
525112 |
Biaya Konsumsi Tamu Pimpinan |
2026-02-20 |
03/UN47.E3/Ku.01.00/SPP/GUP-I/2026 |
2026-02-27 |
0267AF |
Rp. 1.200.000 |
7 Hari |
|
| 3184 |
Fakultas Ilmu Sosial |
Agustus 2026 |
525114 |
Pemeliharaan gedung bertingkat |
2026-08-14 |
50/UN47.B2/PNBP-BLU/SPP-LS/2026 |
2026-09-01 |
2145B |
Rp. 9.988.333 |
18 Hari |
|
| 3185 |
UPA Bimbingan dan Konseling |
Agustus 2026 |
525112 |
Biaya Konsumsi Tamu Pimpinan |
2026-08-04 |
25/UN47.E3/KU.01.00/SPP/GUP-VI/2026 |
2026-08-13 |
1963AF |
Rp. 968.750 |
9 Hari |
|
| 3186 |
UPA Bimbingan dan Konseling |
Oktober 2026 |
525112 |
Biaya Konsumsi Tamu Pimpinan |
2026-10-05 |
36/UN47.E3/KU.01.00/SPP/GUP-NIHIL/2026 |
|
|
Rp. 1.489.565 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 3187 |
Fakultas Ilmu Sosial |
Agustus 2026 |
525114 |
Pemeliharaan Halaman Gedung Kantor |
2026-08-14 |
51/UN47.B2/PNBP-BLU/SPP-LS/2026 |
2026-09-01 |
2146B |
Rp. 4.990.200 |
18 Hari |
|
| 3188 |
UPA Bimbingan dan Konseling |
Januari 2026 |
525119 |
Paket Meeting Kegiatan Rapat Kerja UPA BK |
2026-02-20 |
04/UN47.E3/KU.01.00/SPP/GUP-I/2026 |
2026-02-27 |
0266AF |
Rp. 15.125.000 |
7 Hari |
|
| 3189 |
Fakultas Ilmu Sosial |
Maret 2026 |
525119 |
Bantuan biaya sosialisasi
penerimaan mahasiswa
baru |
2026-03-04 |
10/UN47.B2/PNBP-BLU/SPP-GUP II/2026 |
2026-03-10 |
0380B |
Rp. 3.500.000 |
6 Hari |
|
| 3190 |
UPA Bimbingan dan Konseling |
April 2026 |
525119 |
Biaya Cetak Leaflet/Flyer/Banner untuk Sosialisasi |
2026-04-27 |
11/UN47.E3/KU.01.00/SPP/GUP-III/2026 |
2026-04-30 |
0954AF |
Rp. 3.000.000 |
3 Hari |
|
| 3191 |
Fakultas Ilmu Sosial |
April 2026 |
525119 |
Bantuan biaya sosialisasi
penerimaan mahasiswa
baru |
2026-04-02 |
18/UN47.B2/PNBP-BLU/SPP-GUP III/2026 |
2026-04-09 |
0708B |
Rp. 5.000.000 |
7 Hari |
|
| 3192 |
Fakultas Ilmu Sosial |
April 2026 |
525119 |
Bantuan biaya sosialisasi
penerimaan mahasiswa
baru |
2026-04-14 |
21/UN47.B2/PNBP-BLU/SPP-GUP IV/2026 |
2026-04-22 |
0847B |
Rp. 5.500.000 |
8 Hari |
|
| 3193 |
Fakultas Ilmu Sosial |
April 2026 |
525119 |
Bantuan biaya sosialisasi
penerimaan mahasiswa
baru |
2026-05-07 |
29/UN47.B2/PNBP-BLU/SPP-GUP V/2026 |
2026-06-02 |
1178B |
Rp. 11.000.000 |
26 Hari |
|
| 3194 |
UPA Bimbingan dan Konseling |
Juli 2026 |
525119 |
Pelaksanaan Sosialisasi Manajemen Resiko |
2026-07-23 |
20/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1814AF |
Rp. 925.000 |
11 Hari |
|
| 3195 |
Fakultas Ilmu Sosial |
Juli 2026 |
525119 |
Bantuan biaya pelaksanaan
PKKMB |
2026-09-08 |
59/UN47.B2/PNBP-BLU/SPP- TUP NIHIL/2026 |
|
|
Rp. 25.000.000 |
28 Hari |
Belum ada SP2D terhitung dari 08 September 2026 hingga 06 Oktober 2026 (28 Hari) |
| 3196 |
UPA Bimbingan dan Konseling |
Juli 2026 |
525119 |
Pelaksanaan Kegiatan Penjajakan Kerjasama Produktif dengan institusi Non Industri dan Non Perguruan Tinggi |
2026-07-23 |
23/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1817AF |
Rp. 5.000.000 |
11 Hari |
|
| 3197 |
UPA Bimbingan dan Konseling |
September 2026 |
525119 |
Pelaksanaan Kegiatan Penjajakan Kerjasama Produktif dengan institusi Non Industri dan Non Perguruan Tinggi |
2026-09-24 |
30/UN47.E3/KU.01.00/SPP/TUP-NIHIL/2026 |
2026-09-28 |
2530AF |
Rp. 2.500.000 |
4 Hari |
|
| 3198 |
UPA Bimbingan dan Konseling |
Oktober 2026 |
525119 |
Pelaksanaan Kegiatan Penjajakan Kerjasama Produktif dengan institusi Non Industri dan Non Perguruan Tinggi |
2026-10-05 |
40/UN47.E3/KU.01.00/SPP/GUP-NIHIL/2026 |
|
|
Rp. 2.500.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 3199 |
Fakultas Ilmu Sosial |
Oktober 2026 |
525112 |
Biaya konsumsi berat kuliah umum/Pakar/Tamu |
2026-06-30 |
37/UN47.B2/PNBP-BLU/SPP-GUP VI/2026 |
2026-07-09 |
1572B |
Rp. 1.200.000 |
9 Hari |
|
| 3200 |
Fakultas Ilmu Sosial |
April 2026 |
525119 |
Biaya honorarium pemateri
kuliah umum/pakar |
2026-04-14 |
21/UN47.B2/PNBP-BLU/SPP-GUP IV/2026 |
2026-04-22 |
0847B |
Rp. 1.500.000 |
8 Hari |
|
| 3201 |
Fakultas Ilmu Sosial |
April 2026 |
525119 |
Biaya honorarium pemateri
kuliah umum/pakar |
2026-04-27 |
13/UN47.E3/KU.01.00/SPP/GUP-III/2026 |
2026-04-30 |
0957AF |
Rp. 1.220.000 |
3 Hari |
|
| 3202 |
Fakultas Ilmu Sosial |
Juni 2026 |
525119 |
Biaya honorarium pemateri
kuliah umum/pakar |
2026-06-30 |
39/UN47.B2/PNBP-BLU/SPP-GUP VI/2026 |
2026-07-09 |
1574B |
Rp. 1.800.000 |
9 Hari |
|
| 3203 |
Fakultas Ilmu Sosial |
Juni 2026 |
525119 |
Biaya honorarium pemateri
kuliah umum/pakar |
2026-07-23 |
22/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1816AF |
Rp. 610.000 |
11 Hari |
|
| 3204 |
Fakultas Ilmu Sosial |
Juli 2026 |
525119 |
Bantuan Penyusunan RPS Berbasis OB |
2026-09-08 |
59/UN47.B2/PNBP-BLU/SPP- TUP NIHIL/2026 |
|
|
Rp. 10.000.000 |
28 Hari |
Belum ada SP2D terhitung dari 08 September 2026 hingga 06 Oktober 2026 (28 Hari) |
| 3205 |
Fakultas Ilmu Sosial |
Juli 2026 |
525119 |
Biaya honorarium pemateri
kuliah umum/pakar |
2026-07-23 |
22/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1816AF |
Rp. 610.000 |
11 Hari |
|
| 3206 |
Fakultas Ilmu Sosial |
Agustus 2026 |
525119 |
Bantuan Penyusunan RPS Berbasis OB |
2026-09-23 |
67/UN47.B2/PNBP-BLU/SPP-GUP 8/2026 |
|
|
Rp. 2.500.000 |
13 Hari |
Belum ada SP2D terhitung dari 23 September 2026 hingga 06 Oktober 2026 (13 Hari) |
| 3207 |
UPA Bimbingan dan Konseling |
Maret 2026 |
525111 |
Honorarium Verifikator Unit Kerja UPA BK |
2026-04-06 |
07/UN47.E3/KU.01.00/SPP/GUP-II/2026 |
2026-04-16 |
0825AF |
Rp. 240.000 |
10 Hari |
|
| 3208 |
Fakultas Ilmu Sosial |
September 2026 |
525119 |
Finalisasi Kurikulum OBE |
2026-09-08 |
59/UN47.B2/PNBP-BLU/SPP- TUP NIHIL/2026 |
|
|
Rp. 20.000.000 |
28 Hari |
Belum ada SP2D terhitung dari 08 September 2026 hingga 06 Oktober 2026 (28 Hari) |
| 3209 |
UPA Bimbingan dan Konseling |
April 2026 |
525111 |
Honorarium Verifikator Unit Kerja UPA BK |
2026-04-27 |
13/UN47.E3/KU.01.00/SPP/GUP-III/2026 |
2026-04-30 |
0957AF |
Rp. 480.000 |
3 Hari |
|
| 3210 |
UPA Bimbingan dan Konseling |
Mei 2026 |
525111 |
Honorarium Verifikator Unit Kerja UPA BK |
2026-05-20 |
16/UN47.E3/KU.01.00/SPP/GUP-IV/2026 |
2026-05-21 |
1120AF |
Rp. 240.000 |
1 Hari |
|
| 3211 |
Fakultas Ilmu Sosial |
Juni 2026 |
525119 |
Biaya Pengumpulan Data Tracer Studi |
2026-06-30 |
39/UN47.B2/PNBP-BLU/SPP-GUP VI/2026 |
2026-07-09 |
1574B |
Rp. 2.000.000 |
9 Hari |
|
| 3212 |
UPA Bimbingan dan Konseling |
Juni 2026 |
525111 |
Honorarium Verifikator Unit Kerja UPA BK |
2026-07-23 |
22/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1816AF |
Rp. 240.000 |
11 Hari |
|
| 3213 |
UPA Bimbingan dan Konseling |
Juli 2026 |
525111 |
Honorarium Verifikator Unit Kerja UPA BK |
2026-07-23 |
22/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1816AF |
Rp. 240.000 |
11 Hari |
|
| 3214 |
UPA Bimbingan dan Konseling |
April 2026 |
525111 |
Honorarium PPK Unit Kerja UPA BK Desember 2025 |
2026-05-07 |
27/UN47.B2/PNBP-BLU/SPP-GUP V/2026 |
2026-06-02 |
1176B |
Rp. 1.680.000 |
26 Hari |
|
| 3215 |
UPA Bimbingan dan Konseling |
Maret 2026 |
525111 |
Honorarium PPK Unit Kerja UPA BK Desember 2025 |
2026-04-06 |
07/UN47.E3/KU.01.00/SPP/GUP-II/2026 |
2026-04-16 |
0825AF |
Rp. 730.000 |
10 Hari |
|
| 3216 |
Fakultas Ilmu Sosial |
April 2026 |
525112 |
Biaya konsumsi berat sinkronisasi data PD-DIKTI (15 org x 7 hari) |
2026-05-07 |
27/UN47.B2/PNBP-BLU/SPP-GUP V/2026 |
2026-06-02 |
1176B |
Rp. 4.725.000 |
26 Hari |
|
| 3217 |
UPA Bimbingan dan Konseling |
Maret 2026 |
525111 |
Honorarium Verifikator Unit Kerja UPA BK 2025 |
2026-04-06 |
07/UN47.E3/KU.01.00/SPP/GUP-II/2026 |
2026-04-16 |
0825AF |
Rp. 290.000 |
10 Hari |
|
| 3218 |
UPA Bimbingan dan Konseling |
Oktober 2026 |
525176 |
Honorarium PPK Unit Kerja UPA BK |
2026-10-05 |
41/UN47.E3/KU.01.00/SPP/GUP-NIHIL/2026 |
|
|
Rp. 1.830.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 3219 |
Fakultas Ilmu Sosial |
Maret 2026 |
525119 |
Bantuan biaya Mahasiswa Mengikuti Lomba Kreativitas dan Inovasi Tingkat Nasional/Internasional |
2026-03-04 |
10/UN47.B2/PNBP-BLU/SPP-GUP II/2026 |
2026-03-10 |
0380B |
Rp. 1.445.280 |
6 Hari |
|
| 3220 |
Fakultas Ilmu Sosial |
Maret 2026 |
525119 |
Bantuan biaya Mahasiswa Mengikuti Lomba Kreativitas dan Inovasi Tingkat Nasional/Internasional |
2026-04-02 |
18/UN47.B2/PNBP-BLU/SPP-GUP III/2026 |
2026-04-09 |
0708B |
Rp. 1.000.000 |
7 Hari |
|
| 3221 |
UPA Bimbingan dan Konseling |
Oktober 2026 |
525176 |
Honorarium Verifikator Unit Kerja UPA BK |
2026-10-05 |
41/UN47.E3/KU.01.00/SPP/GUP-NIHIL/2026 |
|
|
Rp. 720.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 3222 |
Fakultas Ilmu Sosial |
Oktober 2026 |
525119 |
Bantuan biaya Mahasiswa Mengikuti Lomba Kreativitas dan Inovasi Tingkat Nasional/Internasional |
2026-04-14 |
21/UN47.B2/PNBP-BLU/SPP-GUP IV/2026 |
2026-04-22 |
0847B |
Rp. 9.500.000 |
8 Hari |
|
| 3223 |
Fakultas Ilmu Sosial |
Oktober 2026 |
525119 |
Bantuan biaya Mahasiswa Mengikuti Lomba Kreativitas dan Inovasi Tingkat Nasional/Internasional |
2026-05-07 |
29/UN47.B2/PNBP-BLU/SPP-GUP V/2026 |
2026-06-02 |
1178B |
Rp. 500.000 |
26 Hari |
|
| 3224 |
Fakultas Ilmu Sosial |
Juni 2026 |
525119 |
Bantuan biaya Mahasiswa Mengikuti Lomba Kreativitas dan Inovasi Tingkat Nasional/Internasional |
2026-06-30 |
39/UN47.B2/PNBP-BLU/SPP-GUP VI/2026 |
2026-07-09 |
1574B |
Rp. 2.000.000 |
9 Hari |
|
| 3225 |
UPA Bimbingan dan Konseling |
Agustus 2026 |
525119 |
Paket Meeting Pelatihan Manajemen Stress Pegawai dan Dosen |
2026-08-04 |
27/UN47.E3/KU.01.00/SPP/GUP-VI/2026 |
2026-08-13 |
1964AF |
Rp. 28.500.000 |
9 Hari |
|
| 3226 |
Fakultas Ilmu Sosial |
Juli 2026 |
525119 |
Bantuan biaya Mahasiswa Mengikuti Lomba Kreativitas dan Inovasi Tingkat Nasional/Internasional |
2026-07-28 |
49/UN47.B2/PNBP-BLU/SPP-GUP VII/2026 |
2026-08-10 |
1872B |
Rp. 1.800.000 |
13 Hari |
|
| 3227 |
Fakultas Ilmu Sosial |
Agustus 2026 |
525119 |
Bantuan biaya Mahasiswa Mengikuti Lomba Kreativitas dan Inovasi Tingkat Nasional/Internasional |
2026-08-14 |
53/UN47.B2/PNBP-BLU/SPP-LS/2026 |
2026-09-01 |
2148B |
Rp. 6.000.000 |
18 Hari |
|
| 3228 |
Fakultas Ilmu Sosial |
Agustus 2026 |
525119 |
Bantuan biaya Mahasiswa Mengikuti Lomba Kreativitas dan Inovasi Tingkat Nasional/Internasional |
2026-09-23 |
67/UN47.B2/PNBP-BLU/SPP-GUP 8/2026 |
|
|
Rp. 2.679.000 |
13 Hari |
Belum ada SP2D terhitung dari 23 September 2026 hingga 06 Oktober 2026 (13 Hari) |
| 3229 |
UPA Bimbingan dan Konseling |
Juli 2026 |
525119 |
Pelaksanaan Kegiatan Pencanangan Zona Integritas |
2026-07-23 |
23/UN47.E3/KU.01.00/SPP/GUP-V/2026 |
2026-08-03 |
1817AF |
Rp. 3.050.000 |
11 Hari |
|
| 3230 |
Fakultas Ilmu Sosial |
Maret 2026 |
525119 |
Penguatan Kelembagaan Organisasi Mahasiswa |
2026-04-02 |
18/UN47.B2/PNBP-BLU/SPP-GUP III/2026 |
2026-04-09 |
0708B |
Rp. 4.000.000 |
7 Hari |
|
| 3231 |
Fakultas Ilmu Sosial |
April 2026 |
525119 |
Penguatan Kelembagaan Organisasi Mahasiswa |
2026-05-07 |
29/UN47.B2/PNBP-BLU/SPP-GUP V/2026 |
2026-06-02 |
1178B |
Rp. 3.500.000 |
26 Hari |
|
| 3232 |
Fakultas Ilmu Sosial |
Juli 2026 |
525119 |
Penguatan Kelembagaan Organisasi Mahasiswa |
2026-09-08 |
59/UN47.B2/PNBP-BLU/SPP- TUP NIHIL/2026 |
|
|
Rp. 2.500.000 |
28 Hari |
Belum ada SP2D terhitung dari 08 September 2026 hingga 06 Oktober 2026 (28 Hari) |
| 3233 |
Fakultas Ilmu Sosial |
September 2026 |
525119 |
Kegiatan Wirausaha Mahasiswa |
2026-09-08 |
59/UN47.B2/PNBP-BLU/SPP- TUP NIHIL/2026 |
|
|
Rp. 10.000.000 |
28 Hari |
Belum ada SP2D terhitung dari 08 September 2026 hingga 06 Oktober 2026 (28 Hari) |
| 3234 |
Fakultas Ilmu Sosial |
Agustus 2026 |
525119 |
Pelatihan Penyusunan Proposal Kewirausahaan Mahasiswa |
2026-09-23 |
67/UN47.B2/PNBP-BLU/SPP-GUP 8/2026 |
|
|
Rp. 3.000.000 |
13 Hari |
Belum ada SP2D terhitung dari 23 September 2026 hingga 06 Oktober 2026 (13 Hari) |
| 3235 |
Fakultas Ilmu Sosial |
Juli 2026 |
525119 |
Bantuan Lomba Karya Tulis
Ilmiah dan Lomba Seni Mahasiswa |
2026-07-28 |
49/UN47.B2/PNBP-BLU/SPP-GUP VII/2026 |
2026-08-10 |
1872B |
Rp. 1.500.000 |
13 Hari |
|
| 3236 |
Fakultas Ilmu Sosial |
Agustus 2026 |
525119 |
Bantuan Lomba Karya Tulis
Ilmiah dan Lomba Seni Mahasiswa |
2026-09-23 |
67/UN47.B2/PNBP-BLU/SPP-GUP 8/2026 |
|
|
Rp. 2.000.000 |
13 Hari |
Belum ada SP2D terhitung dari 23 September 2026 hingga 06 Oktober 2026 (13 Hari) |
| 3237 |
Fakultas Ilmu Sosial |
Maret 2026 |
525119 |
Bantuan Dosen Menjadi Praktisi |
2026-04-02 |
18/UN47.B2/PNBP-BLU/SPP-GUP III/2026 |
2026-04-09 |
0708B |
Rp. 1.000.000 |
7 Hari |
|
| 3238 |
Fakultas Ilmu Sosial |
April 2026 |
525115 |
Tiket PP Perjalanan dalam Rangka Kerjasama Jurusan/Asosiasi/Forum Ilmiah |
2026-05-07 |
28/UN47.B2/PNBP-BLU/SPP-GUP V/2026 |
2026-06-02 |
1177B |
Rp. 7.655.380 |
26 Hari |
|
| 3239 |
Fakultas Ilmu Sosial |
Mei 2026 |
525115 |
Tiket PP Perjalanan dalam Rangka Kerjasama Jurusan/Asosiasi/Forum Ilmiah |
2026-05-07 |
28/UN47.B2/PNBP-BLU/SPP-GUP V/2026 |
2026-06-02 |
1177B |
Rp. 900.000 |
26 Hari |
|
| 3240 |
Fakultas Ilmu Sosial |
Juni 2026 |
525115 |
Tiket PP Perjalanan dalam Rangka Kerjasama Jurusan/Asosiasi/Forum Ilmiah |
2026-06-30 |
38/UN47.B2/PNBP-BLU/SPP-GUP VI/2026 |
2026-07-09 |
1573B |
Rp. 12.928.500 |
9 Hari |
|
| 3241 |
Fakultas Ilmu Sosial |
Juli 2026 |
525115 |
Tiket PP Perjalanan dalam Rangka Kerjasama Jurusan/Asosiasi/Forum Ilmiah |
2026-07-28 |
48/UN47.B2/PNBP-BLU/SPP-GUP VII/2026 |
2026-08-10 |
1871B |
Rp. 22.935.000 |
13 Hari |
|
| 3242 |
Fakultas Ilmu Sosial |
Agustus 2026 |
525115 |
Tiket PP Perjalanan dalam Rangka Kerjasama Jurusan/Asosiasi/Forum Ilmiah |
2026-08-14 |
52/UN47.B2/PNBP-BLU/SPP-LS/2026 |
2026-09-01 |
2147B |
Rp. 1.400.000 |
18 Hari |
|
| 3243 |
Fakultas Ilmu Sosial |
September 2026 |
525115 |
Tiket PP Perjalanan dalam Rangka Kerjasama Jurusan/Asosiasi/Forum Ilmiah |
2026-09-25 |
71/UN47.B2/PNBP-BLU/SPP-LS/2026 |
|
|
Rp. 8.741.730 |
11 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 06 Oktober 2026 (11 Hari) |
| 3244 |
Fakultas Ilmu Sosial |
September 2026 |
525115 |
Tiket PP Perjalanan dalam Rangka Kerjasama Jurusan/Asosiasi/Forum Ilmiah |
2026-09-30 |
75/UN47.B2/PNBP-BLU/SPP-LS/2026 |
|
|
Rp. 620.000 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 3245 |
Fakultas Ilmu Sosial |
April 2026 |
525115 |
Biaya Penginapan Perjalanan dalam Rangka Kerjasama Jurusan/Asosiasi/Forum Ilmiah |
2026-05-07 |
28/UN47.B2/PNBP-BLU/SPP-GUP V/2026 |
2026-06-02 |
1177B |
Rp. 1.500.000 |
26 Hari |
|
| 3246 |
Fakultas Ilmu Sosial |
Juli 2026 |
525115 |
Biaya Penginapan Perjalanan dalam Rangka Kerjasama Jurusan/Asosiasi/Forum Ilmiah |
2026-07-28 |
48/UN47.B2/PNBP-BLU/SPP-GUP VII/2026 |
2026-08-10 |
1871B |
Rp. 3.000.900 |
13 Hari |
|
| 3247 |
Fakultas Ilmu Sosial |
Agustus 2026 |
525115 |
Biaya Penginapan Perjalanan dalam Rangka Kerjasama Jurusan/Asosiasi/Forum Ilmiah |
2026-08-14 |
52/UN47.B2/PNBP-BLU/SPP-LS/2026 |
2026-09-01 |
2147B |
Rp. 4.200.000 |
18 Hari |
|
| 3248 |
Fakultas Ilmu Sosial |
September 2026 |
525115 |
Biaya Penginapan Perjalanan dalam Rangka Kerjasama Jurusan/Asosiasi/Forum Ilmiah |
2026-09-25 |
71/UN47.B2/PNBP-BLU/SPP-LS/2026 |
|
|
Rp. 1.112.500 |
11 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 06 Oktober 2026 (11 Hari) |
| 3249 |
Fakultas Ilmu Sosial |
April 2026 |
525115 |
Uang Harian Perjalanan dalam Rangka Kerjasama Jurusan/Asosiasi/Forum Ilmiah |
2026-05-07 |
28/UN47.B2/PNBP-BLU/SPP-GUP V/2026 |
2026-06-02 |
1177B |
Rp. 3.200.000 |
26 Hari |
|
| 3250 |
Fakultas Ilmu Sosial |
Juli 2026 |
525115 |
Uang Harian Perjalanan dalam Rangka Kerjasama Jurusan/Asosiasi/Forum Ilmiah |
2026-07-28 |
48/UN47.B2/PNBP-BLU/SPP-GUP VII/2026 |
2026-08-10 |
1871B |
Rp. 2.960.000 |
13 Hari |
|
| 3251 |
Fakultas Ilmu Sosial |
Agustus 2026 |
525115 |
Uang Harian Perjalanan dalam Rangka Kerjasama Jurusan/Asosiasi/Forum Ilmiah |
2026-08-14 |
52/UN47.B2/PNBP-BLU/SPP-LS/2026 |
2026-09-01 |
2147B |
Rp. 2.000.000 |
18 Hari |
|
| 3252 |
Fakultas Ilmu Sosial |
September 2026 |
525115 |
Uang Harian Perjalanan dalam Rangka Kerjasama Jurusan/Asosiasi/Forum Ilmiah |
2026-09-25 |
71/UN47.B2/PNBP-BLU/SPP-LS/2026 |
|
|
Rp. 1.130.000 |
11 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 06 Oktober 2026 (11 Hari) |
| 3253 |
Fakultas Ilmu Sosial |
September 2026 |
525115 |
Uang Harian Perjalanan dalam Rangka Kerjasama Jurusan/Asosiasi/Forum Ilmiah |
2026-09-30 |
75/UN47.B2/PNBP-BLU/SPP-LS/2026 |
|
|
Rp. 1.480.000 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 3254 |
Fakultas Ilmu Sosial |
Maret 2026 |
525119 |
Bantuan Biaya Kerja Sama Dalam Negeri/Asosiasi/Forum Ilmiah |
2026-03-04 |
10/UN47.B2/PNBP-BLU/SPP-GUP II/2026 |
2026-03-10 |
0380B |
Rp. 1.000.000 |
6 Hari |
|
| 3255 |
Fakultas Ilmu Sosial |
Juni 2026 |
525119 |
Bantuan Biaya Kerja Sama Dalam Negeri/Asosiasi/Forum Ilmiah |
2026-06-30 |
39/UN47.B2/PNBP-BLU/SPP-GUP VI/2026 |
2026-07-09 |
1574B |
Rp. 1.000.000 |
9 Hari |
|
| 3256 |
Fakultas Ilmu Sosial |
September 2026 |
525119 |
Bantuan Biaya Kerja Sama Dalam Negeri/Asosiasi/Forum Ilmiah |
2026-10-05 |
81/UN47.B2/PNBP-BLU/SPP-GU NIHIL/2026 |
|
|
Rp. 2.500.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 3257 |
Fakultas Ilmu Sosial |
Oktober 2026 |
525119 |
Bantuan Biaya Kerja Sama Dalam Negeri/Asosiasi/Forum Ilmiah |
2026-10-05 |
81/UN47.B2/PNBP-BLU/SPP-GU NIHIL/2026 |
|
|
Rp. 2.000.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 3258 |
Fakultas Ilmu Sosial |
September 2026 |
525119 |
Honorarium pelaksanaan semester antara |
2026-09-24 |
68/UN47.B2/PNBP-BLU/SPP-Sem.Antara/2026 |
|
|
Rp. 12.720.000 |
12 Hari |
Belum ada SP2D terhitung dari 24 September 2026 hingga 06 Oktober 2026 (12 Hari) |
| 3259 |
Fakultas Ilmu Sosial |
Maret 2026 |
525119 |
Biaya Persiapan Akreditasi |
2026-03-04 |
10/UN47.B2/PNBP-BLU/SPP-GUP II/2026 |
2026-03-10 |
0380B |
Rp. 1.200.000 |
6 Hari |
|
| 3260 |
Fakultas Ilmu Sosial |
Maret 2026 |
525119 |
Biaya Persiapan Akreditasi |
2026-04-02 |
18/UN47.B2/PNBP-BLU/SPP-GUP III/2026 |
2026-04-09 |
0708B |
Rp. 10.000.000 |
7 Hari |
|
| 3261 |
Fakultas Ilmu Sosial |
September 2026 |
525119 |
Biaya Persiapan Akreditasi |
|
|
|
|
Rp. 23.800.000 |
35 Hari |
Belum ada SPP dan SP2D terhitung dari 1 September 2026 hingga 06 Oktober 2026 (35 Hari) |
| 3262 |
Fakultas Ilmu Sosial |
April 2026 |
525119 |
Bantuan pendampingan penyusunan Borang Akreditasi |
2026-04-14 |
21/UN47.B2/PNBP-BLU/SPP-GUP IV/2026 |
2026-04-22 |
0847B |
Rp. 21.000.000 |
8 Hari |
|
| 3263 |
Fakultas Ilmu Sosial |
Januari 2026 |
525112 |
Biaya ATM/ATK Perkantoran |
2026-02-26 |
04/UN47.B2/PNBP-BLU/SPP - GUP I/2026 |
2026-03-02 |
0286B |
Rp. 24.826.500 |
4 Hari |
|
| 3264 |
Fakultas Ilmu Sosial |
Juni 2026 |
525112 |
Biaya ATM/ATK Perkantoran |
2026-06-30 |
35/UN47.B2/PNBP-BLU/SPP-GUVI/2026 |
2026-07-09 |
1570B |
Rp. 1.280.200 |
9 Hari |
|
| 3265 |
Fakultas Ilmu Sosial |
Juli 2026 |
525112 |
Biaya ATM/ATK Perkantoran |
2026-09-08 |
57/UN47.B2/PNBP-BLU/SPP- TUP NIHIL/2026 |
|
|
Rp. 1.500.000 |
28 Hari |
Belum ada SP2D terhitung dari 08 September 2026 hingga 06 Oktober 2026 (28 Hari) |
| 3266 |
Fakultas Ilmu Sosial |
Agustus 2026 |
525112 |
Biaya ATM/ATK Perkantoran |
2026-09-23 |
63/UN47.B2/PNBP-BLU/SPP-GUP 8/2026 |
|
|
Rp. 1.500.000 |
13 Hari |
Belum ada SP2D terhitung dari 23 September 2026 hingga 06 Oktober 2026 (13 Hari) |
| 3267 |
Fakultas Ilmu Sosial |
Oktober 2026 |
525112 |
Biaya ATM/ATK Perkantoran |
2026-10-05 |
79/UN47.B2/PNBP-BLU/SPP-GU NIHIL/2026 |
|
|
Rp. 14.993.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 3268 |
Fakultas Ilmu Sosial |
Januari 2026 |
525112 |
Biaya Operasional Perkantoran |
2026-02-26 |
04/UN47.B2/PNBP-BLU/SPP - GUP I/2026 |
2026-03-02 |
0286B |
Rp. 8.520.000 |
4 Hari |
|
| 3269 |
Fakultas Ilmu Sosial |
Maret 2026 |
525112 |
Biaya Operasional Perkantoran |
2026-03-04 |
06/UN47.B2/PNBP-BLU/SPP-GUP II/2026 |
2026-03-10 |
0376B |
Rp. 4.950.720 |
6 Hari |
|
| 3270 |
Fakultas Ilmu Sosial |
Maret 2026 |
525112 |
Biaya Operasional Perkantoran |
2026-04-02 |
14/UN47.B2/PNBP-BLU/SPP-GUP III/2026 |
2026-04-09 |
0704B |
Rp. 2.140.000 |
7 Hari |
|
| 3271 |
Fakultas Ilmu Sosial |
Maret 2026 |
525112 |
Biaya Operasional Perkantoran |
2026-04-14 |
19/UN47.B2/PNBP-BLU/SPP-GUP IV/2026 |
2026-04-22 |
0849B |
Rp. 2.000.000 |
8 Hari |
|
| 3272 |
Fakultas Ilmu Sosial |
April 2026 |
525112 |
Biaya Operasional Perkantoran |
2026-04-14 |
19/UN47.B2/PNBP-BLU/SPP-GUP IV/2026 |
2026-04-22 |
0849B |
Rp. 580.000 |
8 Hari |
|
| 3273 |
Fakultas Ilmu Sosial |
April 2026 |
525112 |
Biaya Operasional Perkantoran |
2026-05-26 |
23/UN47.B2/PNBP-BLU/SPP-GUP V/2026 |
2026-06-02 |
1172B |
Rp. 2.059.000 |
7 Hari |
|
| 3274 |
Fakultas Ilmu Sosial |
Mei 2026 |
525112 |
Biaya Operasional Perkantoran |
2026-05-26 |
23/UN47.B2/PNBP-BLU/SPP-GUP V/2026 |
2026-06-02 |
1172B |
Rp. 1.715.000 |
7 Hari |
|
| 3275 |
Fakultas Ilmu Sosial |
Juni 2026 |
525112 |
Biaya Operasional Perkantoran |
2026-06-30 |
35/UN47.B2/PNBP-BLU/SPP-GUVI/2026 |
2026-07-09 |
1570B |
Rp. 2.734.300 |
9 Hari |
|
| 3276 |
Fakultas Ilmu Sosial |
Juli 2026 |
525112 |
Biaya Operasional Perkantoran |
2026-07-28 |
44/UN47.B2/PNBP-BLU/SPP-GUP VII/2026 |
2026-08-10 |
1867B |
Rp. 2.939.500 |
13 Hari |
|
| 3277 |
Fakultas Ilmu Sosial |
Agustus 2026 |
525112 |
Biaya Operasional Perkantoran |
2026-09-23 |
63/UN47.B2/PNBP-BLU/SPP-GUP 8/2026 |
|
|
Rp. 11.987.450 |
13 Hari |
Belum ada SP2D terhitung dari 23 September 2026 hingga 06 Oktober 2026 (13 Hari) |
| 3278 |
Fakultas Ilmu Sosial |
Oktober 2026 |
525112 |
Biaya Operasional Perkantoran |
2026-10-05 |
79/UN47.B2/PNBP-BLU/SPP-GU NIHIL/2026 |
|
|
Rp. 10.325.450 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 3279 |
Fakultas Ilmu Sosial |
Januari 2026 |
525112 |
Konsumsi Pelayanan Tamu Pimpinan |
2026-02-26 |
04/UN47.B2/PNBP-BLU/SPP - GUP I/2026 |
2026-03-02 |
0286B |
Rp. 187.500 |
4 Hari |
|
| 3280 |
Fakultas Ilmu Sosial |
Maret 2026 |
525112 |
Konsumsi Pelayanan Tamu Pimpinan |
2026-03-04 |
06/UN47.B2/PNBP-BLU/SPP-GUP II/2026 |
2026-03-10 |
0376B |
Rp. 1.600.000 |
6 Hari |
|
| 3281 |
Fakultas Ilmu Sosial |
Maret 2026 |
525112 |
Konsumsi Pelayanan Tamu Pimpinan |
2026-04-14 |
19/UN47.B2/PNBP-BLU/SPP-GUP IV/2026 |
2026-04-22 |
0849B |
Rp. 725.000 |
8 Hari |
|
| 3282 |
Fakultas Ilmu Sosial |
April 2026 |
525112 |
Konsumsi Pelayanan Tamu Pimpinan |
2026-04-14 |
19/UN47.B2/PNBP-BLU/SPP-GUP IV/2026 |
2026-04-22 |
0849B |
Rp. 1.425.000 |
8 Hari |
|
| 3283 |
Fakultas Ilmu Sosial |
April 2026 |
525112 |
Konsumsi Pelayanan Tamu Pimpinan |
2026-05-26 |
23/UN47.B2/PNBP-BLU/SPP-GUP V/2026 |
2026-06-02 |
1172B |
Rp. 1.360.000 |
7 Hari |
|
| 3284 |
Fakultas Ilmu Sosial |
Juni 2026 |
525112 |
Konsumsi Pelayanan Tamu Pimpinan |
2026-06-30 |
35/UN47.B2/PNBP-BLU/SPP-GUVI/2026 |
2026-07-09 |
1570B |
Rp. 7.502.000 |
9 Hari |
|
| 3285 |
Fakultas Ilmu Sosial |
Juli 2026 |
525112 |
Konsumsi Pelayanan Tamu Pimpinan |
2026-07-28 |
44/UN47.B2/PNBP-BLU/SPP-GUP VII/2026 |
2026-08-10 |
1867B |
Rp. 790.500 |
13 Hari |
|
| 3286 |
Fakultas Ilmu Sosial |
Agustus 2026 |
525112 |
Konsumsi Pelayanan Tamu Pimpinan |
2026-09-23 |
63/UN47.B2/PNBP-BLU/SPP-GUP 8/2026 |
|
|
Rp. 6.179.050 |
13 Hari |
Belum ada SP2D terhitung dari 23 September 2026 hingga 06 Oktober 2026 (13 Hari) |
| 3287 |
Fakultas Ilmu Sosial |
Oktober 2026 |
525112 |
Konsumsi Pelayanan Tamu Pimpinan |
2026-10-05 |
79/UN47.B2/PNBP-BLU/SPP-GU NIHIL/2026 |
|
|
Rp. 5.623.550 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| 3288 |
Fakultas Ilmu Sosial |
Januari 2026 |
525112 |
Konsumsi Ringan dan Berat Kegiatan Rapat Fakultas |
2026-02-26 |
04/UN47.B2/PNBP-BLU/SPP - GUP I/2026 |
2026-03-02 |
0286B |
Rp. 13.611.000 |
4 Hari |
|
| 3289 |
Fakultas Ilmu Sosial |
Maret 2026 |
525112 |
Konsumsi Ringan dan Berat Kegiatan Rapat Fakultas |
2026-04-02 |
14/UN47.B2/PNBP-BLU/SPP-GUP III/2026 |
2026-04-09 |
0704B |
Rp. 5.300.000 |
7 Hari |
|
| 3290 |
Fakultas Ilmu Sosial |
April 2026 |
525112 |
Konsumsi Ringan dan Berat Kegiatan Rapat Fakultas |
2026-04-14 |
19/UN47.B2/PNBP-BLU/SPP-GUP IV/2026 |
2026-04-22 |
0849B |
Rp. 1.150.000 |
8 Hari |
|
| 3291 |
Fakultas Ilmu Sosial |
April 2026 |
525112 |
Konsumsi Ringan dan Berat Kegiatan Rapat Fakultas |
2026-05-26 |
23/UN47.B2/PNBP-BLU/SPP-GUP V/2026 |
2026-06-02 |
1172B |
Rp. 5.253.600 |
7 Hari |
|
| 3292 |
Fakultas Ilmu Sosial |
Juni 2026 |
525112 |
Konsumsi Ringan dan Berat Kegiatan Rapat Fakultas |
2026-06-30 |
35/UN47.B2/PNBP-BLU/SPP-GUVI/2026 |
2026-07-09 |
1570B |
Rp. 7.250.000 |
9 Hari |
|
| 3293 |
Fakultas Ilmu Sosial |
Juli 2026 |
525112 |
Konsumsi Ringan dan Berat Kegiatan Rapat Fakultas |
2026-07-28 |
44/UN47.B2/PNBP-BLU/SPP-GUP VII/2026 |
2026-08-10 |
1867B |
Rp. 2.136.100 |
13 Hari |
|
| 3294 |
Fakultas Ilmu Sosial |
Agustus 2026 |
525112 |
Konsumsi Ringan dan Berat Kegiatan Rapat Fakultas |
2026-09-23 |
63/UN47.B2/PNBP-BLU/SPP-GUP 8/2026 |
|
|
Rp. 1.639.500 |
13 Hari |
Belum ada SP2D terhitung dari 23 September 2026 hingga 06 Oktober 2026 (13 Hari) |
| 3295 |
Fakultas Ilmu Sosial |
Maret 2026 |
525119 |
Kegiatan Rapat Kerja Fakultas |
2026-03-04 |
07/UN47.B2/PNBP-BLU/SPP-GUP II/2026 |
2026-03-10 |
0377B |
Rp. 30.000.000 |
6 Hari |
|
| 3296 |
Fakultas Ilmu Sosial |
Agustus 2026 |
525115 |
Tiket PP Perjalanan Dinas |
2026-09-23 |
64/UN47.B2/PNBP-BLU/SPP-GUP 8/2026 |
|
|
Rp. 8.760.000 |
13 Hari |
Belum ada SP2D terhitung dari 23 September 2026 hingga 06 Oktober 2026 (13 Hari) |
| 3297 |
Fakultas Ilmu Sosial |
Agustus 2026 |
525115 |
Uang Harian Perjalanan Dinas |
2026-09-23 |
64/UN47.B2/PNBP-BLU/SPP-GUP 8/2026 |
|
|
Rp. 1.130.000 |
13 Hari |
Belum ada SP2D terhitung dari 23 September 2026 hingga 06 Oktober 2026 (13 Hari) |
| 3298 |
Fakultas Ilmu Sosial |
Agustus 2026 |
525115 |
Biaya Penginapan Perjalanan Dinas |
2026-09-23 |
64/UN47.B2/PNBP-BLU/SPP-GUP 8/2026 |
|
|
Rp. 2.200.000 |
13 Hari |
Belum ada SP2D terhitung dari 23 September 2026 hingga 06 Oktober 2026 (13 Hari) |
| 3299 |
Fakultas Ilmu Sosial |
Maret 2026 |
525111 |
Insentif Kelola BLU Dosen |
2026-03-09 |
11/UN47.B2/PNBP-BLU/SPP-LS In. Kelola/2026 |
2026-03-11 |
0473B |
Rp. 65.400.000 |
2 Hari |
|
| 3300 |
Fakultas Ilmu Sosial |
Juni 2026 |
525111 |
Insentif Kelola BLU Dosen |
2026-05-04 |
30/UN47.B2/PNBP-BLU/SPP-LS Ins.Kelola/2026 |
2026-06-05 |
1251B |
Rp. 65.400.000 |
32 Hari |
|
| 3301 |
Fakultas Ilmu Sosial |
Juli 2026 |
525111 |
Insentif Kelola BLU Dosen |
2026-06-09 |
34/UN47.B2/PNBP-BLU/SPP-LS Ins.Kelola/2026 |
2026-07-03 |
1470B |
Rp. 32.700.000 |
24 Hari |
|
| 3302 |
Fakultas Ilmu Sosial |
Juli 2026 |
525111 |
Insentif Kelola BLU Dosen |
2026-07-22 |
43/UN47.B2/PNBP-BLU/SPP-LS Ins.Kelola/2026 |
2026-08-06 |
1859B |
Rp. 32.700.000 |
15 Hari |
|
| 3303 |
Fakultas Ilmu Sosial |
September 2026 |
525111 |
Insentif Kelola BLU Dosen |
2026-09-18 |
62/UN47.B2/PNBP-BLU/SPP-LS Ins.Kelola/2026 |
|
|
Rp. 65.400.000 |
18 Hari |
Belum ada SP2D terhitung dari 18 September 2026 hingga 06 Oktober 2026 (18 Hari) |
| 3304 |
Fakultas Ilmu Sosial |
Januari 2026 |
525111 |
Remunerasi Tugas Tambahan Dosen |
2026-01-15 |
03/UN47.B2/PNBP-BLU/SPP LS Remun TT/2026 |
2026-01-21 |
0075B |
Rp. 105.000.000 |
6 Hari |
|
| 3305 |
Fakultas Ilmu Sosial |
Maret 2026 |
525111 |
Remunerasi Tugas Tambahan Dosen |
2026-03-06 |
12/UN47.B2/PNBP-BLU/SPP-LS Remun TT/2026 |
2026-03-13 |
0526B |
Rp. 45.000.000 |
7 Hari |
|
| 3306 |
Fakultas Ilmu Sosial |
September 2026 |
525111 |
Remunerasi Tugas Tambahan Dosen |
2026-09-18 |
60/UN47.B2/PNBP-BLU/SPP-LS Ins. Kinerja/2026 |
|
|
Rp. 45.000.000 |
18 Hari |
Belum ada SP2D terhitung dari 18 September 2026 hingga 06 Oktober 2026 (18 Hari) |
| 3307 |
Fakultas Ilmu Sosial |
Januari 2026 |
525111 |
Remunerasi Fungsional Dosen |
2026-01-15 |
02/UN47.B2/SPP-LS Remun Fungsional/2026 |
2026-01-15 |
0030B |
Rp. 739.260.000 |
0 Hari |
|
| 3308 |
Fakultas Ilmu Sosial |
Maret 2026 |
525111 |
Remunerasi Fungsional Dosen |
2026-03-06 |
13/UN47.B2/PNBP-BLU/SPP-LS Remun Ins.Kinerja/2026 |
2026-03-16 |
0552B |
Rp. 345.660.000 |
10 Hari |
|
| 3309 |
Fakultas Ilmu Sosial |
Juli 2026 |
525111 |
Remunerasi Fungsional Dosen |
2026-07-07 |
41/UN47.B2/PNBP-BLU/SPP-LS Remun Ins.Kinerja/2026 |
2026-07-20 |
1650B |
Rp. 786.540.000 |
13 Hari |
|
| 3310 |
Fakultas Ilmu Sosial |
Juli 2026 |
525111 |
Remunerasi Fungsional Dosen |
2026-07-07 |
40/UN47.B2/PNBP-BLU/SPP-LS Remun TT/2026 |
2026-07-30 |
1794B |
Rp. 105.000.000 |
23 Hari |
|
| 3311 |
Fakultas Ilmu Sosial |
September 2026 |
525111 |
Remunerasi Fungsional Dosen |
2026-09-18 |
61/UN47.B2/PNBP-BLU/SPP-LS TT/2026 |
|
|
Rp. 373.728.000 |
18 Hari |
Belum ada SP2D terhitung dari 18 September 2026 hingga 06 Oktober 2026 (18 Hari) |
| 3312 |
Fakultas Ilmu Sosial |
September 2026 |
525114 |
Pemeliharaan Sistem Informasi Program Studi (SIMPRODI) |
2026-09-25 |
72/UN47.B2/PNBP-BLU/SPP-LS/2026 |
|
|
Rp. 5.663.265 |
11 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 06 Oktober 2026 (11 Hari) |
| 3313 |
Fakultas Ilmu Sosial |
Maret 2026 |
525111 |
Honorarium Verifikator UK |
2026-04-02 |
17/UN47.B2/PNBP-BLU/SPP-GUP III/2026 |
2026-04-09 |
0707B |
Rp. 1.410.000 |
7 Hari |
|
| 3314 |
Fakultas Ilmu Sosial |
April 2026 |
525111 |
Honorarium Verifikator UK |
2026-05-26 |
25/UN47.B2/PNBP-BLU/SPP-GUP V/2026 |
2026-06-02 |
1174B |
Rp. 470.000 |
7 Hari |
|
| 3315 |
Fakultas Ilmu Sosial |
Juli 2026 |
525111 |
Honorarium Verifikator UK |
2026-07-28 |
47/UN47.B2/PNBP-BLU/SPP-GUP VII/2026 |
2026-08-10 |
1870B |
Rp. 940.000 |
13 Hari |
|
| 3316 |
Fakultas Ilmu Sosial |
April 2026 |
525111 |
Honorarium PPK UK |
2026-04-02 |
17/UN47.B2/PNBP-BLU/SPP-GUP III/2026 |
2026-04-09 |
0707B |
Rp. 3.450.000 |
7 Hari |
|
| 3317 |
Fakultas Ilmu Sosial |
April 2026 |
525111 |
Honorarium PPK UK |
2026-05-26 |
25/UN47.B2/PNBP-BLU/SPP-GUP V/2026 |
2026-06-02 |
1174B |
Rp. 1.150.000 |
7 Hari |
|
| 3318 |
Fakultas Ilmu Sosial |
Juli 2026 |
525111 |
Honorarium PPK UK |
2026-07-28 |
47/UN47.B2/PNBP-BLU/SPP-GUP VII/2026 |
2026-08-10 |
1870B |
Rp. 2.300.000 |
13 Hari |
|
| 3319 |
Fakultas Ilmu Sosial |
Agustus 2026 |
525176 |
Honorarium Verifikator UK |
2026-08-14 |
54/UN47.B2/PNBP-BLU/SPP-LS/2026 |
2026-09-01 |
2149B |
Rp. 470.000 |
18 Hari |
|
| 3320 |
Fakultas Ilmu Sosial |
September 2026 |
525176 |
Honorarium Verifikator UK |
2026-09-25 |
70/UN47.B2/PNBP-BLU/SPP-LS/2026 |
|
|
Rp. 940.000 |
11 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 06 Oktober 2026 (11 Hari) |
| 3321 |
Fakultas Ilmu Sosial |
Agustus 2026 |
525176 |
Honorarium PPK UK |
2026-08-14 |
54/UN47.B2/PNBP-BLU/SPP-LS/2026 |
2026-09-01 |
2149B |
Rp. 1.150.000 |
18 Hari |
|
| 3322 |
Fakultas Ilmu Sosial |
September 2026 |
525176 |
Honorarium PPK UK |
2026-09-25 |
70/UN47.B2/PNBP-BLU/SPP-LS/2026 |
|
|
Rp. 2.300.000 |
11 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 06 Oktober 2026 (11 Hari) |
| 3323 |
Fakultas Ilmu Sosial |
Maret 2026 |
525119 |
Bantuan biaya mengikuti
diklat/workshop/bimtek/uji
sertifikasi kompetensi/studi
lanjut/iuran asosiasi tenaga
pendidik dan kependidikan, dan kegiatan pembinaan
kepegawaian lainnya |
2026-03-04 |
09/UN47.B2/PNBP-BLU/SPP-GUP II/2026 |
2026-03-10 |
0379B |
Rp. 5.000.000 |
6 Hari |
|
| 3324 |
Fakultas Ilmu Sosial |
April 2026 |
525119 |
Bantuan biaya mengikuti
diklat/workshop/bimtek/uji
sertifikasi kompetensi/studi
lanjut/iuran asosiasi tenaga
pendidik dan kependidikan, dan kegiatan pembinaan
kepegawaian lainnya |
2026-05-07 |
26/UN47.B2/PNBP-BLU/SPP-GUP V/2026 |
2026-06-02 |
1175B |
Rp. 500.000 |
26 Hari |
|
| 3325 |
Fakultas Ilmu Sosial |
September 2026 |
525119 |
Bantuan biaya mengikuti
diklat/workshop/bimtek/uji
sertifikasi kompetensi/studi
lanjut/iuran asosiasi tenaga
pendidik dan kependidikan, dan kegiatan pembinaan
kepegawaian lainnya |
2026-09-30 |
74/UN47.B2/PNBP-BLU/SPP-LS/2026 |
|
|
Rp. 27.000.000 |
6 Hari |
Belum ada SP2D terhitung dari 30 September 2026 hingga 06 Oktober 2026 (6 Hari) |
| 3326 |
Fakultas Ilmu Sosial |
Agustus 2026 |
525119 |
Workshop Penyusunan Strategi Peningkatan Peringkat QS University Ranking |
2026-09-23 |
66/UN47.B2/PNBP-BLU/SPP-GUP 8/2026 |
|
|
Rp. 3.000.000 |
13 Hari |
Belum ada SP2D terhitung dari 23 September 2026 hingga 06 Oktober 2026 (13 Hari) |
| 3327 |
Fakultas Ilmu Sosial |
Agustus 2026 |
525119 |
Sosialisasi Anti Kekerasan, Anti Narkoba dan Anti Korupssi |
2026-09-23 |
66/UN47.B2/PNBP-BLU/SPP-GUP 8/2026 |
|
|
Rp. 1.600.000 |
13 Hari |
Belum ada SP2D terhitung dari 23 September 2026 hingga 06 Oktober 2026 (13 Hari) |
| 3328 |
Fakultas Ilmu Sosial |
Agustus 2026 |
525119 |
Bantuan Biaya Sosialisasi dan Pencanangan Zona Integritas |
2026-09-23 |
66/UN47.B2/PNBP-BLU/SPP-GUP 8/2026 |
|
|
Rp. 1.250.000 |
13 Hari |
Belum ada SP2D terhitung dari 23 September 2026 hingga 06 Oktober 2026 (13 Hari) |
| 3329 |
Fakultas Ilmu Sosial |
Juni 2026 |
525119 |
Penelitian Kolaboratif |
2026-06-03 |
33/UN47.B2/PNBP-BLU/SPP-LS penelitian/2026 |
2026-06-29 |
1366B |
Rp. 126.700.000 |
26 Hari |
|
| 3330 |
Fakultas Ilmu Sosial |
September 2026 |
525119 |
Penelitian Kolaboratif |
2026-09-08 |
56/UN47.B2/PNBP-BLU/SPP-LS/2026 |
2026-09-15 |
2316B |
Rp. 54.300.000 |
7 Hari |
|
| 3331 |
Fakultas Ilmu Sosial |
Juli 2026 |
525119 |
Bantuan Penulisan Artikel
Nasional Terakreditasi Sinta
1 dan 2 |
2026-07-28 |
45/UN47.B2/PNBP-BLU/SPP-GUP VII/2026 |
2026-08-10 |
1868B |
Rp. 3.000.000 |
13 Hari |
|
| 3332 |
Fakultas Ilmu Sosial |
September 2026 |
525119 |
Bantuan Penulisan Buku
Teks/Buku Ajar |
2026-09-25 |
73/UN47.B2/PNBP-BLU/SPP-LS/2026 |
|
|
Rp. 7.500.000 |
11 Hari |
Belum ada SP2D terhitung dari 25 September 2026 hingga 06 Oktober 2026 (11 Hari) |
| 3333 |
Fakultas Ilmu Sosial |
Juni 2026 |
525119 |
Bantuan Workshop Peningkatan Kualitas dan Kuantitas Publikasi Karya Ilmiah Terindeks Nasional/Internasional |
2026-05-05 |
22/UN47.B2/PNBP-BLU/SPP-LS/2026 |
2026-06-09 |
1283B |
Rp. 25.000.000 |
35 Hari |
|
| 3334 |
Fakultas Ilmu Sosial |
Maret 2026 |
525119 |
Bantuan Penulisan Artikel Internasional Bereputasi |
2026-04-02 |
15/UN47.B2/PNBP-BLU/SPP-GUP III/2026 |
2026-04-09 |
0705B |
Rp. 7.500.000 |
7 Hari |
|
| 3335 |
Fakultas Ilmu Sosial |
Juli 2026 |
525119 |
Bantuan Pengelolaan Jurnal Jurusan/Prodi |
2026-07-28 |
45/UN47.B2/PNBP-BLU/SPP-GUP VII/2026 |
2026-08-10 |
1868B |
Rp. 3.000.000 |
13 Hari |
|
| 3336 |
Fakultas Ilmu Sosial |
Juli 2026 |
525119 |
Bantuan Biaya Pelaksanaan
Pengabdian Kolaborasi |
2026-09-08 |
58/UN47.B2/PNBP-BLU/SPP- TUP NIHIL/2026 |
|
|
Rp. 5.000.000 |
28 Hari |
Belum ada SP2D terhitung dari 08 September 2026 hingga 06 Oktober 2026 (28 Hari) |
| 3337 |
Fakultas Ilmu Sosial |
Agustus 2026 |
525119 |
Bantuan Biaya Pelaksanaan
Pengabdian Kolaborasi |
2026-08-20 |
55/UN47.B2/PNBP-BLU/SPP-LS/2026 |
2026-08-31 |
2120B |
Rp. 51.450.000 |
11 Hari |
|
| 3338 |
Fakultas Ilmu Sosial |
September 2026 |
525119 |
Bantuan Biaya Pelaksanaan
Pengabdian Kolaborasi |
2026-10-05 |
69/UN47.B2/PNBP-BLU/SPP-LS/2026 |
|
|
Rp. 19.050.000 |
1 Hari |
Belum ada SP2D terhitung dari 05 Oktober 2026 hingga 06 Oktober 2026 (1 Hari) |
| Total |
Rp. 98.251.803.502 |
|
|